HomeMy WebLinkAbout2022-04-27 COID Comments1
Kyle Collins
From:LandUse <landuse@coid.org>
Sent:Wednesday, April 27, 2022 1:53 PM
To:Kyle Collins
Subject:FW: Notice of Application for Land Use File 247-22-000123-PA, 247-22-000124-ZC
Attachments:22-123-PA, 22-124-ZC NOA Mailing.pdf
[EXTERNAL EMAIL]
April 27, 2022
Sent Via Email Only
Re: 247-22-000123-PA. 247-22-000124-Z
21455 Hwy 20 in Bend, Oregon
Tax Maps: 1712350001501
Please be advised that Central Oregon Irrigation District (COID) has reviewed the application received via email on April
7, 2022 for the above referenced project. The applicant requests an Amendment to the Comprehensive Plan designation
and Zone of the subject property from Rural Residential Exception Area (RREA) and Multiple Use Agricultural (MUA10)
Zone to Bend Urban Growth Boundary (UGB) Area and Urbanizable Area (UA), respectively. The subject proposal is in
conjunction with House Bill (HB) 4079, which designates a City of Bend Affordable Housing Pilot Program. The subject
property is located at 21455 HWY 20, BEND, OR 97701; 1712350001500.
The A-Lateral has an easement of 50-feet with a road easement of 20-feet on the west side. The piped A-23 is located on
the north end of the properties and will need to be accommodated. In addition, there is an abandoned ditch with an easement
of 20-feet that traverses the subject property.
Listed below are COIDs initial comments to the provided preliminary site plan. All development affecting irrigation
facilities shall be in accordance with COID’s Development Handbook and/or as otherwise approved by the District.
Central Oregon Irrigation District (COID) and Hayden Homes are coordinating on the location and construction
timeline of the proposed piping of the A-lateral. While there are several technical and public safety matters to be
addressed, COID has agreed, in principle, to the proposed piping of the canal. It is our understanding the goal is to
perform this work winter of 2023.
Any irrigation conveyance, District or private, which passes through the subject property shall not be
encroached upon or crossed without written permission from this office.
No structures of any kind, including fence, are permitted within COID property/easement/right of way.
Irrigation infrastructure and rights-of-way are required to be identified on all maps and plans.
Please note that COID facilities are located within the vicinity of the project. If the project expands to include
additional tax lots or areas, please contact COID.
Comply with Requirements of COID Developer Handbook including restriction on drilling / blasting and excavation
within and adjacent to the existing canal embankment. There is no blasting within 100-feet of the canal
COID has discussed the following water rights information for Tax Map 17123500 01500 with Hayden Homes:
7.50 acres of appurtenant COID pond maintenance right. Property owner has the option to retain the pond on the
property with the understanding no water will be delivered to it during the non-irrigation season.
2.25 acres of appurtenant COID pond maintenance right (small southern pond). This pond has not been actively
filled and maintained since 2017. This water is subject to cancellation November 1, 2022 due to nonuse. Property
owner must contact COID by 4/29/22 to file an instream lease application to protect the water. If an instream lease
2
is not filed by the due date, the only option to retain the 2.25 acre pond is to fill and maintain the pond during the
2022 irrigation season. Failure to lease the water instream or to fill the pond will result in the cancellation of the
water right and may subject the property owner to cancellation fees. Contact COID for information.
0.25 acres of appurtenant COID irrigation right. This irrigation right should be removed from the property prior to
development.
Our comments are based on the information provided, which we understand to be preliminary in nature at this time. Our
comments are subject to change and additional requirements may be made. Please provide updated documents to COID for
review as they become available. Policies, standards and requirements set forth in the COID Developer Handbook must
be complied with. Irrigation infrastructure and right-of-way are required to be identified on all maps and plans.
Central Oregon Irrigation District
From: Brooke Clark <Brooke.Clark@deschutes.org>
Sent: Thursday, April 7, 2022 3:04 PM
To: 'kelseys@bendparksandrec.org' <kelseys@bendparksandrec.org>; LandUse <landuse@coid.org>; CraigHorrell
<chorrell@coid.org>; Cody Smith <Cody.Smith@deschutes.org>; Peter Russell <Peter.Russell@deschutes.org>;
'ODOTR4PLANMGR@odot.state.or.us' <ODOTR4PLANMGR@odot.state.or.us>; 'Andrew.J.Walch@odfw.oregon.gov'
<Andrew.J.Walch@odfw.oregon.gov>; 'sam.j.vanlaningham@oregon.gov' <sam.j.vanlaningham@oregon.gov>; Randy
Scheid <Randy.Scheid@deschutes.org>; Todd Cleveland <Todd.Cleveland@deschutes.org>
Cc: Kyle Collins <Kyle.Collins@deschutes.org>
Subject: Notice of Application for Land Use File 247‐22‐000123‐PA, 247‐22‐000124‐ZC
Hello,
Please see the attached Notice of Application for Land Use File 247‐22‐000123‐PA, 247‐22‐000124‐ZC.
Brooke Clark | Administrative Assistant
Deschutes County Community Development
117 NW Lafayette Ave | Bend, Oregon 97703
Tel: (541) 617-4707
Enhancing the lives of citizens by delivering quality services in a cost-effective manner.