1990-33313-Resolution No. 90-099 Recorded 10/26/1990105 0832
UO-33313
BEFORE THE BOARD OF COUNTY COMMISSIONERS OF DESCHUTES COUNTY, OREGON
A Resolution Initiating Proceedings
to Improve a Certain Dedicated Road
Known as N.W. Westwood Lane in the
Westwood Acres Section Two Subdivision *
Deschutes County, Oregon; Describing
the Road to be Improved; Designating
Where the Improvements Shall be Made;
Defining the Nature of the Improvements; *
and Referring this Resolution to the
County Engineer for Investigation of
the Proposed Improvements.
RESOLUTION NO. 90 -099
90 OCT 26 AN 9 :51
MICROFILMED'
NOV 27199n
WHEREAS, the owners of property abutting the proposed improvement
of N.W. Westwood Lane in the Westwood Acres Section Two Subdivision in
Deschutes County, Oregon, have requested the Board of County
Commissioners to improve this road; and
WHEREAS, it appears that such road should be improved; and
WHEREAS, it appears that it is in the public interest that the
Public Works Department of Deschutes County, Oregon, perform required
engineering and surveying for this improvement; now, therefore,
BE IT RESOLVED BY THE BOARD OF COUNTY COMMISSIONERS OF DESCHUTES
COUNTY, OREGON, as follows:
Section 1. That proceedings be initiated to improve all of
N.W. Westwood Lane to Deschutes County Rural Local Road Standards for
the benefit of the area described in Exhibit "A ", attached hereto and
by this reference incorporated herein.
Section 2. That the dedicated road to be improved within the
district described in Section 1 of this Resolution is N.W. Westwood
Lane from N.W. Way southerly to the end of the cul -de -sac.
Section 3. Improvements to be made to the roadway within the
district include all or part of, but are not limited to, the following:
1. Mobilization - normal mobilization costs incurred in
preparation of the work.
1 - RESOLUTION 90 -099
g {'tl
Nov ,_ ON
105 0833
2. Traffic Control - signs and flaggers will be provided to
warn, safeguard, protect, guide and inform the public and the
workers.
3. Subgrade - a minimal amount of earthwork will be required to
construct subgrade. There will be some construction required
to provide proper drainage.
4. Base - placing, shaping, compacting and fine grading of base.
An eight (8) inch depth of compacted cinder base will be
utilized. The finished width shall be thirty -two feet
measured between the edge of shoulders.
5. Paving - the paving will be an 0 -9 Asphaltic Penetration
Macadam (Oil Mat). The pavement will be twenty -four (24)
feet in width.
6. Engineering and Administration - County expenses in
preparation of plans and specifications, inspection,
surveying, accounting and payment collection and other
incidental costs required for Bancroft Bonding.
Section 4. The road to be improved as a result of this Resolution
shall be improved to County Rural Local Road Standards.
Section 5. This Resolution shall hereby be referred to the County
Engineer for investigation of the proposed improvements in accordance
with ORS 371.625. The County Engineer may engage the services of any
qualified engineer for all or part of the investigation required under
ORS 371 .625. '
DATED this 406 day of , 1990.
BOARD OF COUNTY COMMISSIONERS
OF DESCHUTES COUNTY, OREGON
TOW PRANTE, Commissioner
TOM ITHROOP,j Chair
EST:
Recording r
g Sec eta y
2 - RESOLUTION 90 -099
K MAUDLIN, Commissioner
lob. 'e 0834
EXHIBIT "A"
N.W. WESTWOOD LANE L.I.D.
(Boundary)
Lots 1, 2, 3, 7, 8, and 9 in Block 2, Westwood
Acres Section Two Subdivision as filed in the
Office of the County Clerk, Deschutes County,
Oregon.