Loading...
1991-02079-Resolution No. 91-004 Recorded 1/24/199191-02079 106 • 00.48 BEFORE THE BOARD OF COUNTY COMMISSIONERS OF DESCHUTES COUNTY, OREGON' A Resolution Initiating Proceedings * to Improve a Certain Dedicated Road * Known as Antler Lane from Burgess Road * to Cagle Road in the Cagle Subdivision * No. 5 in Deschutes County, Oregon; * Describing the Road to be Improved; * Designating Where the Improvements * Shall be Made; Defining the Nature of * the Improvements; and Referring this * Resolution to the County Engineer for * Investigation of the Proposed * Improvements. * RESOLUTION NO. 91 -004 WHEREAS, the owners of property abutting the proposed improvement of Antler Lane from Burgess Road to Cagle Road in the Cagle Subdivision No. 5 in Deschutes County, Oregon, have requested the Board of County Commissioners to improve this road; and WHEREAS, it appears that such road should be improved; and WHEREAS, it appears that it is in the public interest that the Public Works Department of Deschutes County, Oregon, perform required engineering and surveying for this improvement; now, therefore, BE IT RESOLVED BY THE BOARD OF COUNTY COMMISSIONERS OF DESCHUTES COUNTY, OREGON, as follows: Section 1. That proceedings be initiated to improve Antler Lane to Deschutes County Rural Local Road Standards for the benefit of the area described in Exhibit "A ", attached hereto and by this reference incorporated herein. Section 2. That the dedicated road to be improved within the district described in Section 1 of this Resolution is Antler Lane from Burgess Road to Cagle Road in the Cagle Subdivision No. 5 in Deschutes County, Oregon. Section 3. Improvements to be made to the roadway within the district include all or part of, but are not limited to, the following: 1. Mobilization - normal mobilization costs incurred in preparation of the work. 1 - RESOLUTION NO. 91 -004 106 - 0049 2. Traffic Control - signs and flaggers will be provided to warn, safeguard, protect, guide and inform the public and the workers. 3. Subgrade - a minimal amount of earthwork will be required to construct subgrade. There will be some construction required to provide proper drainage. 4. Base - placing, shaping, compacting and fine grading of base. An eight (8) inch depth of compacted cinder base will be utilized. The finished width shall be thirty -two feet measured between the edge of shoulders. 5. Paving - the paving will be an 0 -9 Asphaltic Penetration Macadam (Oil Mat). The pavement will be twenty -four (24) feet in width. 6. Engineering and Administration - County expenses in preparation of plans and specifications, inspection, surveying, accounting and payment collection and other incidental costs required for Bancroft Bonding. Section 4. The road to be improved as a result of this Resolution shall be improved to County Rural Local Road Standards. Section 5. This Resolution shall hereby be referred to the County Engineer for investigation of the proposed improvements in accordance with ORS 371.625. The County Engineer may engage the services of any qualified engineer for all or part of the investigation required under ORS 371.625. DATED this 0,23a- day o cording Secretary 2 - RESOLUTION NO. 91 -004 , 1991. BOARD OF COUNTY COMMISSIONERS OF DESCI UTES COUNTY, OREGON TO THROOP; �MMISS/'ONE (NA , 400 �NCY E S GEN, COMMISSIONER DI MAUDLIN, H' RMAN . 106 " 0050 EXHIBIT "A" ANTLER LANE L.I.D. All platted lots within Blocks 1,2,3, and 4 of Cagle Subdivision No. 5 abutting Antler Lane.