1991-02079-Resolution No. 91-004 Recorded 1/24/199191-02079
106 • 00.48
BEFORE THE BOARD OF COUNTY COMMISSIONERS OF DESCHUTES COUNTY, OREGON'
A Resolution Initiating Proceedings *
to Improve a Certain Dedicated Road *
Known as Antler Lane from Burgess Road *
to Cagle Road in the Cagle Subdivision *
No. 5 in Deschutes County, Oregon; *
Describing the Road to be Improved; *
Designating Where the Improvements *
Shall be Made; Defining the Nature of *
the Improvements; and Referring this *
Resolution to the County Engineer for *
Investigation of the Proposed *
Improvements. *
RESOLUTION NO. 91 -004
WHEREAS, the owners of property abutting the proposed improvement
of Antler Lane from Burgess Road to Cagle Road in the Cagle Subdivision
No. 5 in Deschutes County, Oregon, have requested the Board of County
Commissioners to improve this road; and
WHEREAS, it appears that such road should be improved; and
WHEREAS, it appears that it is in the public interest that the
Public Works Department of Deschutes County, Oregon, perform required
engineering and surveying for this improvement; now, therefore,
BE IT RESOLVED BY THE BOARD OF COUNTY COMMISSIONERS OF DESCHUTES
COUNTY, OREGON, as follows:
Section 1. That proceedings be initiated to improve Antler Lane
to Deschutes County Rural Local Road Standards for the benefit of the
area described in Exhibit "A ", attached hereto and by this reference
incorporated herein.
Section 2. That the dedicated road to be improved within the
district described in Section 1 of this Resolution is Antler Lane from
Burgess Road to Cagle Road in the Cagle Subdivision No. 5 in Deschutes
County, Oregon.
Section 3. Improvements to be made to the roadway within the
district include all or part of, but are not limited to, the following:
1. Mobilization - normal mobilization costs incurred in
preparation of the work.
1 - RESOLUTION NO. 91 -004
106 - 0049
2. Traffic Control - signs and flaggers will be provided to
warn, safeguard, protect, guide and inform the public and the
workers.
3. Subgrade - a minimal amount of earthwork will be required to
construct subgrade. There will be some construction required
to provide proper drainage.
4. Base - placing, shaping, compacting and fine grading of base.
An eight (8) inch depth of compacted cinder base will be
utilized. The finished width shall be thirty -two feet
measured between the edge of shoulders.
5. Paving - the paving will be an 0 -9 Asphaltic Penetration
Macadam (Oil Mat). The pavement will be twenty -four (24)
feet in width.
6. Engineering and Administration - County expenses in
preparation of plans and specifications, inspection,
surveying, accounting and payment collection and other
incidental costs required for Bancroft Bonding.
Section 4. The road to be improved as a result of this Resolution
shall be improved to County Rural Local Road Standards.
Section 5. This Resolution shall hereby be referred to the County
Engineer for investigation of the proposed improvements in accordance
with ORS 371.625. The County Engineer may engage the services of any
qualified engineer for all or part of the investigation required under
ORS 371.625.
DATED this 0,23a- day o
cording Secretary
2 - RESOLUTION NO. 91 -004
, 1991.
BOARD OF COUNTY COMMISSIONERS
OF DESCI UTES COUNTY, OREGON
TO THROOP; �MMISS/'ONE
(NA , 400
�NCY E S GEN, COMMISSIONER
DI MAUDLIN, H' RMAN
. 106 " 0050
EXHIBIT "A"
ANTLER LANE L.I.D.
All platted lots within Blocks 1,2,3, and 4 of
Cagle Subdivision No. 5 abutting Antler Lane.