1991-20529-Minutes for Meeting June 19,1991 Recorded 7/12/199191-2`529
0107 0254
MINUTES
KMB ENTERPRISES SITE 541 (Cyrus)
DESCHUTES COUNTY BOARD OF COMMISSIONERS
June 19, 1991
Chairman Maudlin called the meeting to order at 6 p.m. Board
members in attendance were Dick Maudlin, Tom Throop and Nancy Pope
Schlangen. Also present were: Bruce White, Assistant County
Counsel; Karen Green, Community Development Director; George Read,
Planning Director; and Dave Leslie, Associate Planner.
Before the Board was a public hearing to consider whether or not to
inventory and zone KMB Enterprises (County Site No. 541) for
surface mining.
Dave Leslie gave the staff report summarizing that this matter was
remanded to the Board by LCDC for consideration of an open space
management plan in connection with proposed surface mining. There
had been some changes in circumstance since that plan was first
prepared, and the Board considered and adopted findings last summer
(i.e. beginning construction of residences on the Rim at Aspen Lake
Subdivision). Because of these changes, staff was recommending
that the public hearing be opened to consider "any and all issues"
for public testimony. Since the June 7, 1991, staff report, they
had received a letter from the Oregon Department of Fish and
Wildlife written in response to a letter from Max Merrill, attorney
for the owner, plus two letters from opponents who wished that the
property not be zoned for surface mining (which he gave to the
Board). The order from LCDC regarding the open space management
plan did not require that the inventory adoption, made previously
by the Board, be reconsidered. Staff was not recommending that
this site be taken off the inventory for aggregate resources. The
issue of rezoning the property from flood plain to surface mining
was the only issue to be considered. The issues of location,
quantity and quality of the material did not need to be discussed
since the question of whether to leave this site on the inventory
was not being determined. He said the Board should consider the
conflicts and consequences of rezoning this property to surface
mining or retaining the current zone designation. He pointed out
that Goal 5 did require the protection of aggregate resources
unless certain conflicts and consequences arose which would leave
the property better zoned as flood plain.
Chairman Maudlin opened the public hearing for testimony. He asked
the members of the Board to declare any contacts they might have
had regarding this issue. Commissioners Throop and Schlangen said
they had had no contacts. Chairman Maudlin said he had talked with
Keith Cyrus but not about this subject. No one challenged any
member of the Board's ability to hear this matter.
Chairman Maudlin asked that proponents testify first.
PAGE 1 MINUTES: 6/19/91
010'7 0255
Max Merrill, attorney representing the applicants, KMB Enterprises,
testified that this matter was before the Board because it was
remanded to the County from LCDC for the purpose of taking another
look at the management proposal.
Max Merrill (verbatim): The issue certainly is one of whether it
would be better to leave the project the way it is now or to allow
the limited excavation and removal of materials that we are
requesting with the consequent addition of the ponds that we have
worked with the Fish and Wildlife Department, which we believe and
I think the letters from the Fish and Wildlife Department, although
they have not taken a stand one way or another as to what you folks
should do, the implication there is, the indication is that overall
for wildlife habitat, the construction of these ponds as requested
would have beneficial effect on the habitat, wildlife habitat in
that area as opposed to leaving it just as a field as it is now.
Commissioner Throop (verbatim): Mr. Chair, I don't read that into
the letter. Could you point out to me why you draw that
conclusion.
Max Merrill (verbatim): The comments in the documents which are
in your packet in the report out of the newspaper where the
conversation with Mr. Behrens indicates that directly. Our feeling
has been all along from our discussions with them that they feel
that the habitat would be enhanced over a vacant field, and I
believe that is in the newspaper article.
Commissioner Throop (verbatim): All it says in the letter that we
received June 10 was the plan as developed relative to the open
space acreage should provide wildlife benefits. And then it goes
on to have another paragraph talking about the ponds, and they say
very specifically, they have no position on that at all, no value
judgement on that at all. So I think you're reading more into it
than .... and you're probably not in a position to represent their
position are you Max?
Max Merrill (verbatim): No, not at all, but I do believe that with
respect to the material that we have submitted that the newspaper
article and the comments from Mr. Behrens I believe would indicate
support for what I'm..
Commissioner Throop (verbatim): Have you seen the letter?
Max Merrill (verbatim): Yes.
Commissioner Throop (verbatim): This is their position.
Max Merrill (verbatim): I understand that.
PAGE 2 MINUTES: 6/19/91
0107 0256
Mr. Merrill continued that the two issues which the staff report
raised concerning the proposed denial of the rezoning were noise
impact and the effect of the ponds on the water resources. The
concern about the noise impacts was based upon a staff report on
some preliminary tests which expressed concern as to whether the
material could be extracted and crushed without raising the decibel
level above the DEQ noise standard. He said their position was
that these noise levels could be met. In the packet of materials
he submitted, there was a letter from Russell N. Altermat who was
a professional engineer from Beaverton and specialized in noise
control matters. His opinion was that appropriate noise levels
within the DEQ requirements could be handled with available
modifications or noise buffers to the equipment, including both the
removal equipment and the crusher. They were willing to agree to
make the necessary modifications to any equipment or do any
screening required to make the noise levels meet the DEQ
requirements. There was no way to determine exactly what kind of
sound would be produced until the equipment was on site. He
pointed out another site where the material could be stockpiled and
crushed. He said the topography was more wooded and there was a
hillside. The decibel readings on this site would be within
acceptable DEQ levels without modifying the equipment. They would
have brought this alternative up sooner, but they had not realized
that the noise issue was going to be a factor until recently.
Using this site for stockpiling and crushing would reduce the time
they would work at the material removal site by approximately one-
half (approximately one year instead of two). This would allow
them to do all of the removal and restoration work at one time
rather than having the crusher at this site and crushing as it was
removed. The second item of concern in the staff report was the
impact of the ponds on Squaw Creek. Staff had a concern that
because of water tables, the water flowing in and out of the ponds
would bring up the temperature of Squaw Creek. There were two ways
of dealing with this possible problem. First, they could put a
clay layer of sealant around the pond so that the water would not
circulate with the water of Squaw Creek.
Max Merrill (verbatim): Just today or yesterday, my clients talked
to Ted Fies at Fish and Wildlife. He's not able to be here tonight
because they have their own hearing going on at the same time, but
he mentioned to us that in looking at these ponds and their depth,
that his feeling was that it might not be in the best interests of
either the ponds themselves or Squaw Creek to do that sealant, and
the reason he says that is that with the depth of these ponds, he
feels that the water actually may be cooler at the bottom after it
sits there for awhile than the water in the creek itself, and that
it may be advantageous to have it go through there, and it will
also percolate through the underground before it gets back to the
stream which will have a filtering effect as well. We're not
representing at all tonight that that's their position. All we
wanted to do was say that this is something that came up in
conversations. Our position simply is that we will certainly defer
PAGE 3 MINUTES: 6/19/91
0107 0257
to whatever Fish and Wildlife says would be the best for the water
supply system out there. If they feel after looking at it that it
should be sealed, we'll seal it. If they feel it would be better
to let it percolate, we'll let it percolate. That's entirely up
to them, and it doesn't matter to us. But I think that either way
that problem is not a real issue. The other issue on the water
that was raised was whether the water right which my clients have
out there could be there for pond storage. We have a letter from
Bob Main in your file that indicates that that should not be a
problem, and we don't anticipate that it would be a problem nor
does he, so I don't think that that is a real issue either.
Mr. Merrill said that another area which the applicants wanted to
address was the effect of this project on building permits for
houses on the rim. He understood there was a kind of "fast track"
building permit process within the effected mining impact zone,
with a more detailed process if the houses were actually going to
require some shielding from a permanent site problem. They felt
that since this was a short-term situation, there shouldn't be any
need to modify any houses in the impact area, because they could
handle the noise control on their side.
Commissioner Throop asked if the County had the ability to ignore
the surface mining impact area ordinance.
Bruce White said perhaps the County could. If there were specific
conditions made in the ESEE process, they could conceivably
override, in individuals cases, the County ordinance.
Karen Green said she felt they would still have to do a SMIA
review, but that it might be more abbreviated based on conditions
imposed on the surface mining site.
Max Merrill said that all of the lots were similarly situated, so
maybe there could be a blanket process for everyone.
Bruce White asked if they were proposing to do a noise study for
each lot as part of this process?
Max Merrill said he didn't think it would be a problem for them to
do some meter readings from each lot site.
Chairman Maudlin asked how many of the lots would be within one-
quarter mile of the mining zone. Mr. Merrill responded probably
three-fourths.
Matt Cyrus, 68157 Cloverdale Road, Sister, testified that they used
a piece of equipment to simulate the noise a crusher would
generate, and 50 ft from the machine at full throttle, they
recorded 85 decibels. They used it as a portable source of sound
to try at different locations. In the location between the Rim at
Aspen Lake and Panoramic View Estates, at the nearest homesite at
PAGE 4 MINUTES: 6/19/91
010'7 0258
Panoramic View Estates, the reading was approximately 50 decibels,
whereas at the Rim at Aspen Lakes, Lot 4, and there was no
appreciable reading on the scale. The bottom end of the scale was
40 decibels. This option would eliminated most all of the concerns
about the noise. They also took a reading at the proposed crusher
site. At the closest homesite, Lot 10, the reading was 63
decibels, which would indicated some abatement would need to be
done. The acoustical engineer indicated that would not be a
problem. They also tried it at the home at the bridge at Squaw
Creek, which was the closest current resident, and the reading
there was 40 decibels except when an occasional bird chirped which
would raise it to 50. The ambient levels, during light raining
weather which created higher readings, ranged between 40 and 45.
Keith Cyrus, one of the partners with KMB, testified that there was
a number of ways to approaching processing the material from this
site. One would be to remove the material to the optional
processing site which they owned, another would be to process it
through a screen which would reduce the quantity of material which
would have to go through the crusher. The screening process was
much quieter than using the crusher. There were also some options
in the crushing equipment used, i.e. generator, direct drive
diesels, size of the crusher. A lot of the new cat engines were
very quiet. He felt there was a number of things that they could
do before they would need to baffle and screen to alleviate the
noise. He showed an illustration of the proposed ponds which had
been developed in conjunction with Fish and Wildlife.
Keith Cyrus (verbatim): The ponds that you see illustrated here,
the right hand illustration is looking from the west to the east
toward the lots, that is the very approximate configuration that
has been determined in conjunction with Fish and Wildlife. Those
sites were selected because there's nothing growing on those but
very sparse grass, mostly sage brush, those are gravel bars,
there's really no top soil there, and if there were top soil there,
we wouldn't be considering this. If you'd notice the work we've
done with digging our test wholes, we've attempted to located those
areas where there were top soil and as much as is practical, there
may be some pockets of top soil within the affected area, but we're
trying to hold our outer perimeters out of the area that would
produce grass and natural forages. Again, it's unfortunate that
Fish and Wildlife had a hearing, a conflict to tonight, otherwise
Ted Fies or Norm Behrens could have been here to directly answer
some of the questions that have been a concern. In my conversation
with Ted this afternoon, I kidded him a little bit about their
letter being on the fence again. He's very frustrated about the
position that they have to take and the position they've been put
in by the County at different times. His comments..
Commissioner Throop (verbatim): Could you expand on that
statement. That's an allegation of some kind I'd like to hear more
about.
PAGE 5 MINUTES: 6/19/91
010'7 0259
Keith Cyrus (verbatim): Well I really don't have anything further.
I think that's something..
Commissioner Throop (verbatim): The position that the County put
them in? What position did the County put them in?
Keith Cyrus (verbatim): I think you'd have to take that up with
Fish and Wildlife, and I'm sure they'd be more than willing to sit
down and discuss that. The..
Commissioner Throop (verbatim): Well you're willing to speak their
position when it's to your benefit, I don't understand why you
don't complete your statement on this..
Keith Cyrus (verbatim): The site that we're looking at there,
Ted's comments were that that is nothing but barren rock bar, and
anything we do to it has to be an improvement. Now that's second
hand to you from, through me. Any variances that the homeowners
would need, we would cooperate utmost to try to accomplish those
for those to alleviate any delays. Kind of secondary benefit of
something like this that is often overlooked, with the development
of the lots up on the rim, we put in a 64,000 gallon reservoir with
a 40 horse fire pump. When electricity is available, most of the
time we do have pretty good fire flow. That is available to the
different fire departments and the federal and state agencies, if
they should have a need. They did contact us after that fire out
north of Hinkle Butte this spring which we assisted on with our
equipment. If there was a pond where they could draw water for
their choppers and their baskets, the same as they used quite
extensively on the Awbrey Hall fire. Unfortunately, there was
nothing really available within the range that would accommodate
that. In this location here, that would be an asset to quite an
area there, a pond with enough depth and open enough they could get
into to take care of that. Well that's a consideration, I know the
County's concerned with safety and wild fires and this would be
kind of an extra bonus. That's about all I've got.
Chairman Maudlin asked what the depth of the water was from the
ground surface down to the water. Keith Cyrus said approximately
4 feet. Chairman Maudlin asked then if the whole plain had a high
water table. Keith Cyrus said it appeared to be that way.
Chairman Maudlin asked how deep the ponds would be. Keith Cyrus
said they were proposing to make them approximately 15 feet deep.
Chairman Maudlin said they wouldn't have to fill the ponds then
because they'd fill like a well. Keith Cyrus said their proposal
was to circulate some of their water right through them to help
maintain some circulation for oxygen and fresh water. Chairman
Maudlin asked if the water would be running from pond to pond and
then back into the creek. Keith Cyrus said the overflow would
spill back in. If the ponds were lined, it would probably return
over the surface and overflow back in, but if they were not lined,
PAGE 6 MINUTES: 6/19/91
0107 0260
it would dissipate back through the gravel which would filter the
water. Chairman Maudlin said apparently Mat testified at DLCD that
the depth was more than 100 feet below the site. Matt Cyrus said
that he was considering the water that was flowing through the
gravel formation to be surface water rather than the aquifer where
they drilled a well up on the rim. The water level at that point
was approximately 100 feet below the creek.
Commissioner Schlangen asked if all of the ponds would be connected
by a ditch. Reith Cyrus said they were proposing to feed all of
the ponds through the ditch.
Jim Carnahan, 709 NW Wall Street, Suite 102 Bend, 97701, said he
was a civil engineer with David Evans and Associates and was hired
by RMB. His conclusion was that the way the ponds were constructed
would probably not make any difference to the impacts on Squaw
Creek. If the ponds were lined with clay to isolate them, but they
were not kept fuller than the surrounding ground water, there would
be an uplift problem which would loosen the lining. Therefore, he
felt it was better not to line the ponds. If the ponds were
unlined, the ground water would go through them. It was his
experience that shallow ground water fed the stream and not vice
versa. He calculated it would take a minimum of 23 days to move
through the gravel material between the ponds and Squaw Creek.
Sand and gravel was a natural filter, and if there was a
temperature increase while it was in the pond, it would be
dissipated by the slow movement back through the ground.
Chairman Maudlin asked if the ponds were 15 feet deep and the water
table was 4-6 feet deep, how deep the aquifer was. Mr. Carnahan
guessed from the results of the test pits, that there was an
impermeable layer below the ground water, and then a deeper
aquifer. Chairman Maudlin asked if there was any water in Squaw
Creek on August 15 and was told it was spring fed.
Chairman Maudlin asked for testimony in opposition.
Bob Brockway, 68440 George Cyrus Road, Sister, testified that he
was a resident of Cloverdale and was speaking as member of the
Rural Preservation Committee which was in opposition to the
granting of surface mining rights on Squaw Creek. He submitted a
statement from the committee regarding a surface mining permit on
Squaw Creek file #541 urging the Commissioners to accept the
Planning Staff recommendation to deny the application. They felt
that the wild life did not balance all ESEE consequences. Reasons
for denial were: concern about noise standards (echo effect from
canyon walls), groundwater saturation, possible rise in temperature
of surface water and ponds could affect biological balance of water
and plant life down stream. Since 1941 at least 10 floods had
occurred in Squaw Creek or approximately once every five years.
A flood would fill the pond with sediment and carry away the
existing fish. He provided material from the Corp of Engineers
PAGE 7 MINUTES: 6/19/91
0107 0261.
relating to the floods on Squaw Creek. In 1964 the estimated
discharge was 1,980 cfs. The gauge heights at the measuring
station was 6.6 feet. Again in 1980, there was a 2,000 cfs
discharge with a gauge height of 6.1 feet. As a tributary of the
Deschutes River, Squaw Creek had scenic and wildlife status, and
they felt strongly that to allow surface mining on the Squaw Creek
flood plain conflicted with the rest of the uses allowed on the
waterway. A much larger supply of gravel than what the pond
excavation would supply was available on the applicant's property
south of the Aspen Lakes development and was approved for use last
year.
Chairman Maudlin asked if Mr. Brockway knew where the U.S. Guard
Station gauge at RM 26.6 was? Mr. Brockway said south of Sisters
but he didn't know the exact location.
R. C. Owens, testified that he presently lived at Black Butte but
had recently purchased lot 6 on the rim. He said he was purchasing
a lot which was previously purchased from the Cyruses, the
developers. In order for the Cyruses to get approval for the
development of these 19 lots, there was a requirement that there
be adjacent open space. He was not necessarily opposed to the
ponds, and the gravel had to be removed to create the pit for the
ponds. However, he felt the two year period being proposed to
remove the gravel was outrageously long and would create and eye
sore and ear sore for all of the adjacent property owners. He felt
RMB had an obligation to satisfy the homeowners in the development
which they developed. He felt they should be given a minimal
amount of time to take out the gravel to complete the pond building
process (i.e. two weeks to a month). He was concerned about how
the ponds would look when they were finished, and thought a
concrete plan should be developed and brought to the homeowners
association for their approval. Before getting to this stage, he
felt they should have given the homeowners association the
following information: how deep the ponds would be, how many fish
would be planted, how many plants, how it would be maintained, who
would pay for the maintenance, and under what conditions would the
area be turned over to the homeowners association. He felt RMB
should be bonded to ensure there would be adequate funds to
complete the project. He opposed the proposal until these things
could be done.
Walter Paul said he would be impacted more than anyone else in the
area since the dirt road that the truck would use was about 100
feet from his house. When they hauled water out there last summer,
the dust and the noise was severe. They had been hauling gravel
over the last year, and when they used there breaks to come down
the hill to the bridge, there was a tremendous noise. He said he
had walked across Squaw Creek one day this week and didn't get his
feet wet.
PAGE 8 MINUTES: 6/19/91
0107 0262
Chairman Maudlin asked Mr. Paul if his house was the last one
before crossing the bridge. Mr. Paul said yes, on the east side.
Dick Mooney, 70090 Camp Polk Road, Sisters, submitted some written
testimony.
Jim Cummings, 17732 Edmunson Road, Sisters, testified that he
agreed with the Planning staff recommendation to deny the zoning.
He felt there were a lot of unanswered questions. They had had
nine months since the last hearing to get everything worked out.
He was concerned that the gravel would be stored on open space.
He felt having a surface mine in a flood plain was an important
issue for all the residents of Deschutes County. He questioned the
wildlife benefit of the ponds, and wanted the area to remain a
natural space.
Chairman Maudlin asked if there was any rebuttal testimony.
Reith Cyrus testified again. He said the gauging station was where
Squaw Creek flattened out up by Runkles. Permits and bonding for
surface mining were handled through the state. The state required
a reclamation bond, and they monitored the yardage removed. The
majority of the trucks currently going down the grade were loaded
and would probably be using their jake breaks. There would be a
some difference during surface mining, because the trucks would not
be loaded when going down the hill. They took a reading with a
sound meter at that homesite and the meadowlark made more noise
than the simulated noise source. The road would need improvement
and would be graveled to reduce the
affected property owners. He wanted
to come to an understanding. Some
indicated that some items had been u
that all of the homeowners, up to t:
the proposed site was a separate p
space and was not part of the rim.
wildlife management was at KMB's sug
it was a unique opportunity for thei
area. The alternative would be to 14
20. He said they really didn't have
by the County. They had worked wi
Wildlife and came to an understands:
Planner, but the Planning Director
and Wildlife Department was not wi.
everyone could get together and hams
dust. He had concern for the
to get together with Mr. Owens
)f the comments Mr. Owens made
isrepresented to him. He felt
tis point, had been aware that
_ece of property, it was open
The recommendation to do the
jestion to the County. He felt
i to do something nice in this
it the land revert back to EFU-
a plan that had been accepted
:h the Department of Fish and
ig and agreement with a County
could not accept it. The Fish
_ling to go any further until
ter out the details.
Chairman Maudlin said some letter were received in opposition to
the rezoning and two letters in favor of the application. Mr.
Mooney's letter said that he would agree to the ponds if the
material was processed elsewhere in a timely manner.
Keith Cyrus said the original staff report which went to Salem was
full of misrepresentations and errors, and they had not been able
PAGE 9 MINUTES: 6/19/91
0167 ®x'63
to obtain some reports. If some things had not been
misrepresented, perhaps the process would have moved quicker, and
they would have already taken the material out before there were
would have been so many problems.
Commissioner Throop said the Board of Commissioners denied this
project, and the only reason the Board was hearing it again was
because LCDC remanded it to the County. His characterization of
people dragging their feet and preventing him from moving forward
expeditiously with his project was absolutely false.
Chairman Maudlin said that the findings were based upon the
information that was received and the motion the Board made. If
there was additional information other than the findings, he wasn't
aware of it. He said the three Commissioners in office at the time
read and signed the findings. He pointed out that the LCDC
remanded the site back to the County for a very narrow reason, but
the Board decided to reopen the hearing for all issues.
Commissioner Throop mentioned that he was a member of LCDC but had
disqualified himself from participating in the state level decision
due to his conflict as a Deschutes County Commissioner.
Chairman Maudlin closed the public hearing.
Commissioner Throop said he was ready to make a decision. He said
this site was in the Squaw Creek flood plain and each of the ponds
were below the ground water level. There was already inadequate
aquatic habitat on this site, primarily during the summer. He felt
this project was too large of a risk and too great a potential to
further degrade Squaw Creek. The creation of more surface water
and the manner in which the system would work, had the potential
of elevating water temperatures even further. These kinds of
alterations were inappropriate for a key waterway like Squaw Creek.
The potential damage to the water resources could not be mitigated.
He said there was no evidence that the noise standards could be
met.
THROOP: I would be prepared to offer a motion which would
recommend that the site be included on the inventory but
that the proposal to zone the site for surface mining not
be approved, and that the underlying zoning be retained.
SCHLANGEN: Second.
Bruce White asked if the Board had received a report on noise.
Chairman Maudlin said yes.
Chairman Maudlin said he wondered whether Squaw Creek could be
damaged any more than it already had been. He didn't think the
ponds would further damage Squaw Creek. Perhaps the noise had not
been addressed as fully as possible, but he didn't think that could
PAGE 10 MINUTES: 6/19/91
010'7 0264
be accomplished without the equipment on the site. The proposal
not to crush in the valley site was a new proposal, and he didn't
feel they had enough answers to make a decision at this time.
Commissioner Schlangen said she was going to abstain because she
didn't feel she had enough information to vote.
Bruce White said staff would like a chance to look at some of the
new information, especially the noise report. Chairman Maudlin
agreed.
Commissioner Throop withdrew his motion, and Commissioner Schlangen
withdrew her second.
Chairman Maudlin announced that a decision would be made at the
Board's meeting on Monday July 1, 1991 at 10 a.m. in the Board's
Conference Room in the Deschutes County Administration Building.
DESCHUT S COUNTY BOARD OF COMMISSIONERS
To T hr oot Commis%ioner
-�
ancy P S jilaPen, ommis Toner
in;
BOCC:alb
PAGE 11 MINUTES: 6/19/91