Loading...
1991-35768-Resolution No. 91-093 Recorded 11/7/1991REVIEWED q,,35768 LE�Ai,/COUNSEL BEFORE THE BOARD OF COUNTY COMMISSIONERS OF DESCHUTES, COUNTY, OREGON 91 NOV -7 PH 2: 39 MAR Y SUE PENHOLLC ' COUNTY CLERK A Resolution Initiating Proceedings to Improve Certain Dedicated Roads Known as 73rd Street and Gift Road in Whispering Pines Estates (Second, Third * and Fourth Additions) Deschutes County, * Oregon; Describing the Roads to be Improved; Designating Where the Improvements Shall be Made; Defining the Nature of the Improvements; and Referring this Resolution to the County * Engineer for Investigation of the Proposed Improvements. RESOLUTION NO. 91 -093 0108 0074 WHEREAS, the owners of property abutting the proposed improvement of 73rd Street and Gift Road in Whispering Pines Estates (Second, Third and Fourth Additions) in Deschutes County, Oregon, have requested the Board of County Commissioners to improve these roads; and WHEREAS, it appears that such roads should be improved; and WHEREAS, it appears that it is in the public interest that the Public Works Department of Deschutes County, Oregon, perform required engineering and surveying for this improvement; now, therefore, BE IT RESOLVED BY THE BOARD OF COUNTY COMMISSIONERS OF DESCHUTES COUNTY, OREGON, as follows: Section 1. That proceedings be initiated to improve 73rd Street and Gift Road to Deschutes County Rural Local Road Standards for the benefit of the area described in Exhibit "A ", attached hereto and by this reference incorporated herein. Section 2. That the dedicated roads to be improved within the district described in Section 1 of this Resolution are shown on Exhibit "B ", attached hereto and by this reference incorporated herein. Section 3. Improvements to be made to the roadway within the district include all or part of, but are not limited to, the following: 1. Mobilization - normal mobilization costs incurred in preparation of the work. 171C rOFILIr1ED 1 - RESOLUTION NO. 91 -093 CHED 991 0108 0075 2. Traffic Control - signs and flaggers will be provided to warn, safeguard, protect, guide and inform the public and the workers. 3. Subgrade - earthwork will be required to construct subgrade. There will be some construction required to provide proper drainage. 4. Base - placing, shaping, compacting and fine grading of base. An eight (8) inch depth of compacted cinder base will be utilized. The finished width shall be thirty -two feet measured between the edge of shoulders. 5. Paving - the paving will be an 0 -9 Asphaltic Penetration Macadam (Oil Mat). The pavement will be twenty -four (24) feet in width. 6. Engineering and Administration - County expenses in preparation of plans and specifications, inspection, surveying, accounting and payment collection and other incidental costs required for Bancroft Bonding. Section 4. The road(s) to be improved as a result of this Resolution shall be improved to County Rural Local Road Standards. Section 5. This Resolution shall hereby be referred to the County Engineer for investigation of the proposed improvements in accordance with ORS 371.625. The County Engineer may engage the services of any qualified engineer for all or part of the investigation required under ORS 371.625. 6P'2 DATED this day of TTEST: ecording Secretary 2 - RESOLUTION NO. 91 -093 , 1991. BOARD OF •UNTY COMMISSIONERS OF DESCHU ES COUNTY, OREGON OMMIS'.ION R GE C11; RMAN NANCY DICIC MAUDLIN SIONER w 0108 0076 EXHIBIT "A" 73RD STREET L.I.D. Lot 7, Block 28 and Lots 1 through 7, Block 27, Whispering Pines Estates Third Addition; Lots 1 through 8, Block 2, and Lots 1 through 8, Block 1, Whispering Pines Estates Fourth Addition; Lots 17 through 21, Block 26, Whispering Pines Estates Second Addition. 0108 0077 EXHIBIT "B" Gift Road from the C.O.I. Canal bridge westerly to 73rd Street, and 73rd Street from Gift Road southerly to the southerly boundary of Whispering Pines Estates Fourth Addition.