1991-35768-Resolution No. 91-093 Recorded 11/7/1991REVIEWED
q,,35768 LE�Ai,/COUNSEL
BEFORE THE BOARD OF COUNTY COMMISSIONERS OF DESCHUTES, COUNTY, OREGON
91 NOV -7 PH 2: 39
MAR Y SUE PENHOLLC '
COUNTY CLERK
A Resolution Initiating Proceedings
to Improve Certain Dedicated Roads
Known as 73rd Street and Gift Road in
Whispering Pines Estates (Second, Third *
and Fourth Additions) Deschutes County, *
Oregon; Describing the Roads to be
Improved; Designating Where the
Improvements Shall be Made; Defining
the Nature of the Improvements; and
Referring this Resolution to the County *
Engineer for Investigation of the
Proposed Improvements.
RESOLUTION NO. 91 -093
0108 0074
WHEREAS, the owners of property abutting the proposed improvement
of 73rd Street and Gift Road in Whispering Pines Estates (Second, Third
and Fourth Additions) in Deschutes County, Oregon, have requested the
Board of County Commissioners to improve these roads; and
WHEREAS, it appears that such roads should be improved; and
WHEREAS, it appears that it is in the public interest that the
Public Works Department of Deschutes County, Oregon, perform required
engineering and surveying for this improvement; now, therefore,
BE IT RESOLVED BY THE BOARD OF COUNTY COMMISSIONERS OF DESCHUTES
COUNTY, OREGON, as follows:
Section 1. That proceedings be initiated to improve 73rd Street
and Gift Road to Deschutes County Rural Local Road Standards for the
benefit of the area described in Exhibit "A ", attached hereto and by
this reference incorporated herein.
Section 2. That the dedicated roads to be improved within the
district described in Section 1 of this Resolution are shown on Exhibit
"B ", attached hereto and by this reference incorporated herein.
Section 3. Improvements to be made to the roadway within the
district include all or part of, but are not limited to, the following:
1. Mobilization - normal mobilization costs incurred in
preparation of the work.
171C rOFILIr1ED
1 - RESOLUTION NO. 91 -093
CHED
991
0108 0075
2. Traffic Control - signs and flaggers will be provided to
warn, safeguard, protect, guide and inform the public and the
workers.
3. Subgrade - earthwork will be required to construct subgrade.
There will be some construction required to provide proper
drainage.
4. Base - placing, shaping, compacting and fine grading of base.
An eight (8) inch depth of compacted cinder base will be
utilized. The finished width shall be thirty -two feet
measured between the edge of shoulders.
5. Paving - the paving will be an 0 -9 Asphaltic Penetration
Macadam (Oil Mat). The pavement will be twenty -four (24)
feet in width.
6. Engineering and Administration - County expenses in
preparation of plans and specifications, inspection,
surveying, accounting and payment collection and other
incidental costs required for Bancroft Bonding.
Section 4. The road(s) to be improved as a result of this
Resolution shall be improved to County Rural Local Road Standards.
Section 5. This Resolution shall hereby be referred to the County
Engineer for investigation of the proposed improvements in accordance
with ORS 371.625. The County Engineer may engage the services of any
qualified engineer for all or part of the investigation required under
ORS 371.625. 6P'2 DATED this day of
TTEST:
ecording Secretary
2 - RESOLUTION NO. 91 -093
, 1991.
BOARD OF •UNTY COMMISSIONERS
OF DESCHU ES COUNTY, OREGON
OMMIS'.ION R
GE
C11; RMAN
NANCY
DICIC MAUDLIN
SIONER
w 0108 0076
EXHIBIT "A"
73RD STREET L.I.D.
Lot 7, Block 28 and Lots 1 through 7, Block 27, Whispering
Pines Estates Third Addition; Lots 1 through 8, Block 2, and
Lots 1 through 8, Block 1, Whispering Pines Estates Fourth
Addition; Lots 17 through 21, Block 26, Whispering Pines
Estates Second Addition.
0108 0077
EXHIBIT "B"
Gift Road from the C.O.I. Canal bridge westerly to 73rd
Street, and 73rd Street from Gift Road southerly to the
southerly boundary of Whispering Pines Estates Fourth
Addition.