Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
1992-08628-Resolution No. 92-017 Recorded 3/18/1992
92 -08628 REVIEWED LEG COUNSEL BEFORE THE BOARD OF COUNTY COMMISSIONERS OF DESCHUTES ail al 9 A Resolution Amending Resolution No. 91 -012, * Adopting the 1991 Fee Schedule for County Services, and Prescribing an Effective Date. * RESOLUTION NO. 92 -017 { /6PIf4 :l© WHEREAS, the Oregon State Building Codes Agency has revised fees for certain electrical installations, which fees Deschutes County charges for such installations within the County; now, therefore, BE IT RESOLVED BY THE BOARD OF COUNTY COMMISSIONERS OF DESCHUTES COUNTY, OREGON, as follows: Section 1. That the fees in the Building Safety Division, Electrical section, of the Community Development Department be amended as follows: "Electrical: Number of Inspections Per Permit Allowed: Residential - Single or Multi- Family Per Dwelling Unit. Service included: 1000 sq. ft. or less 85.00 4 Each Additional 500 sq. ft. or portion thereof 15.00 Each manufactured home or modular dwelling service or feeder [35.00]40.00 2 Services /Feeders Installation, Alterations or Relocation [100]200 amps or less [35.00)50.00 2 [101)201 amps to 400 amps 60.00 2 401 amps to 600 amps [80.00)100.00 2 601 amps [and above]to 1000 amps 130.00 2 [600 volts and above]Over 1000 amps or volts 300.00 2 Reconnect only [35.00]40.00 2 Temporary Services or Feeders Installation, Alterations or Relocation 200 amps or less 201 amps to 400 amps Over 400 amps to 600 amps Over 600 amps or 1000 volts, see "Services and Feeders (10 branch circuits included)" above Branch Circuits New, alteration or Extension Per Panel a) Fee for branch circuits with purchase of service or feeder fee Each branch circuit 1 - RESOLUTION NO. 92 -017 (3/18/92) [35.00]40.00 2 [40.00]55.00 2 80.00 2 2.00 b) The fee for branch circuits without purchase of service or feeder fee [One circuit [Two to ten circuits First branch circuit Each additional [ten]branch circuit[s or part thereof] Miscellaneous (service or feeder not included) Each pump or irrigation circle Each sign or outline lighting Signal circuit(s) or a limited energy panel, alteration or extension Each additional inspection over the allowable in any of the above, per inspection Other inspections not listed above (Portal to portal.) (Minimum one hour.) Minor Installation Labels (Pack of 10 labels @ $5.00 each) Inspections Outside of Normal Business Hours (Minimum Charge - Two Hours) Reinspection Fee Inspections for Which No Fee is Specifically Indicated (Minimum Charge - 1/2 Charge) Additional Plan Review Required by Changes, Additions or Revisions to Approved Plans 0109 0669 35.00 50.00 35.00 [15.00)2.00 2] 2] 2 2 [36.00]40.00 2 [36.00]40.00 2 [36.00)40.00 2 35.00 30.00 per hour 50.00 40.00 hour 15.00 ea. 40.00 hour 40.00 hour Refunds: A refund may be made when no work and no inspections have been performed. If any portion of the permit process, i.e. planning, plan check, etc., have been completed, the fees dedicated to that portion will not be refunded. Refunds must be applied for within 180 days of issue date. Refunds are subject to the $35 refund processing fee. Section 2. That the provisions of Section 1 of this resolution shall become effective on April 1, 1992. DATED this 18th day of March, 1992. AT(714 ST 74Aof Recording Secretary BOARD OF OUNTY COMMISSIONERS OF DES I TES COUNTY, OREGON /�T_ THROOS ommiss' .ner ANC PO CK MAIIDL Chairman 2 - RESOLUTION NO. 92 -017 (3/18/92) oner