1992-40356-Minutes for Meeting November 23,1992 Recorded 11/25/199292-40356 011 1-1364
PUBLIC HEARING MINUTES
92 NO," 9-5 P ; MESCHUTES COUNTY BOARD OF COMMISSIONERS
November 23, 1992
�-Otju cifCLERK
Chairman Maudlin called the meeting to order at 10:00 a.m. Board,
members in attendance were: Dick Maudlin and Nancy Pope Schlangen.
Also present were: Bruce White, Assistant County Counsel;
Catherine Morrow, Planner; and George Read, Planning Director.
PUBLIC HEARING ON AMENDMENTS TO THE DESCHUTES COUNTY COMPREHENSIVE
PLAN MAP
Before the Board was a public hearing on Ordinances 92-060 and
92-061 amending the Deschutes County Comprehensive Plan Map. The
amendments to the map were part of the County's Periodic Review and
were required to update the plan map to reflect the current
Comprehensive Plan and to be consistent with zoning changes since
adoption of the map.
Catherine Morrow said Ordinance 92-060 would adopt a map that made
sure that all of the rural residential areas (MUA-10 and RR -10)
which were not shown on the original Comprehensive Plan Map, but
were in fact zoned rural residential in 1979, were included on the
new Comprehensive Plan Map. Ordinance 92-061 would amend the 1979
Comprehensive Plan Map to make the Comprehensive Plan designations
consistent with the zoning boundaries. Some of the designations
which were shown on the 1979 Comprehensive Plan Map had been
removed from the new map because they were not "base" zones but
"overlay" zones, i.e. landscape management overlay zone. The new
Comprehensive Plan Map would indicate only the "base" zones, i.e.
agriculture, rural residential, forest. The zoning maps would
still show the "overlay" zones. She said the new map would also
make the boundaries consistent with the zoning boundaries. The
flood plain zone, which was a "base" zone, had been removed from
the Comprehensive Plan Map, however where the flood plain zone was
adjacent to another zone, the other zone designation was extended
to the river rather than following the flood plain boundary. That
was true in all cases except in the LaPine area where the flood
plain zone would be maintained as agriculture, because the flood
plain in this area was riparian meadows, and the intention of the
Comprehensive Plan was that the agricultural zone in the LaPine
area would encompass all of the riparian meadows. It was done this
way because the County did not require a comprehensive plan
amendment if someone's land was located in the flood plain
boundary.
Chairman Maudlin opened the public hearing and asked for testimony.
There being no one who wished to testify, the public hearing was
closed. CHED
PAGE 1 MINUTES: 11/23/92
01.19-15001
Bruce White said these ordinances would be ready for signature on
Wednesday, November 25, 1992, along with the final Period Review
Package.
DATED this 6�� day of2IM221�--, 1992, by the Board of
Commissioners of Deschutes County, Oregon.
AT
ecording Secretary
PAGE 2 MINUTES: 11/23/92