Loading...
1993-10741-Order No. 93-100 Recorded 4/1/1993BEFORE THE BOARD OF COUNTY COMMISSIONERS OF An Order Directing the County Treasurer to Disburse Funds From the Park Acquisition and Development Fund to Bend Metro Park and Recreation District. 93-10'7.11 ORDER W. 93-100 DESC t`g r - J c 0120-1326 WHEREAS, Deschutes County has collected from Developers, and holds in trust, funds in lieu of park land dedication pursuant to Title 17, Chapter 17.44 of the Deschutes County Code, and the use of said funds is restricted to the acquisition and development of land for park or recreation purposes; and WHEREAS, Bend Metro Park and Recreation District is a political subdivision of the State of Oregon, organized for the purpose of providing public park and recreation facilities; and WHEREAS, the Board of the Bend Metro Park and Recreation District has requested that Deschutes County disburse funds in the amount of $69,804.00, for renovation and remodeling Hollinshead Barn into a cultural arts community center within Hollinshead Park; and WHEREAS, said funds will be used for materials acquisition and related services provided by non -staff contractors; and WHEREAS, said project will be an appropriate use of funds from the Park Acquisition and Development Fund; now, therefore, THE BOARD OF COUNTY COMMISSIONERS OF DESCHUTES COUNTY, OREGON, ORDERS as follows: Section 1. That the Deschutes County Treasurer be directed to release funds in the amount of $69,804.00 from the Park Acquisition and Development Fund to Bend Metro Park and Recreation District. Section 2. That Bend Metro Park and Recreation District shall use said funds as described in Exhibit "A," attached hereto and by this reference incorporated herein. Section 3. That Bend Metro Park and Recreation District shall annually account to Deschutes County on the use of Park Acquisition and Development Funds during the preceding fiscal year. 1 - ORDER NO. 93-100 (3/31/93) KEYPu KBD 0120-1327 Section 4. That Bend Metro Park and Recreation District shall account to Deschutes County for the use of said funds upon completion of the project and that any unused funds be returned to the Treasurer and redeposited to the Park Acquisition and Development Fund. DATED this 31 day of �1,GG� , 1993. E ording Secretary 2 - ORDER NO. 93-100 (3/31/93) BOARD OF COUNTY COMMISSIONERS OF D HUTES COUNTY, OREGON , I Vnair a� ry ap��.ada.acaawaaa�, �.vaauaaiq►'71VaaG1 B. H. SLAUGHTER, Commissioner BEND METRO PARK -REC" March 17,1993 Mr. Michael A. Maier County Administrator 1130 NW Harriman Bend, Oregon 97701 0120-1328 BEND METRO PARK AND RECREATION DISTRICT 200 N.W. Pacific Park Lane Bend. Oregon 97701 503/389-7275 FAX 503/388-5429 Post•It"" brand tax transmittal memo 7671 fiot pagaa ► To rt. "";M 151MP5ok Dept. P ona # .3 Fax tP a%B o 52- IIx N Subject: 8% Park Dedication / Hollinshead Barn The enclosed information is in response to your June 24, 1992 letter to me indicating the County required a plan for the expenditure of funds !on the Hollinshead Barn project. i As you recall from my June 15 letter to the County Commissioner Bend Metro Park & Recreation District requested funding from the Park Pedication Trust (8%v funds). The county funds are to be combined with $90,00Q0 already received from the City of Bend. Essentially all labor will be provided by park district staff. Eight pecent funds will be used to supply materials. We will revise this figure when construction drawings are completed. The District would like to request a total of $69,804 of County 8% funds. These funds will be accounted for and any excess monies will be returned to the County. We expect to complete architectural and engineering Nork by May 1. We will apply for building permits and expect to begin work by June 1. Construction will take 14 months. Please contact John Simpson at 89-7275 if you have any further questions. Sincerely, Y Ernie Drapela General Manager enc: Construction Cost Estimate E Xit 49 17IT A A BEND METRO PARK` RKI Hollinshead Barn Renovation • Bend Metro Park & Recreation Difftict 0120-1329 I Preliminary Construction Cost Estimate Cast Projections are based on bids, and Means Building Construction Cast Data 1993, & Assemblies Cost Data 1993. Project: Hollinshead Barn Renovation Location: 1235 NE Jones Road Building Arca: 3,667.46 Sq. Feet. Date: 17 March 1993 DIVISION 2: Sitework Clearing & Grubbing Utility Excavation Utility Connections Selective Guttin& Raising/Excavation Paving Base Asphalt Paving Storm Drainage Landscape Irrigation loured Concrete Curbs Sidewalks Subtotal: NOTE: Exterior terraces, retaining walls, paving, etc. to be determined following Site Design, DIVISION 3: Concrete 6" Concrete Slab Spread Footings: Foundation Wall Strip Footing Accessories Subtotal: DIVISION 4: Masonry DIVISION 5: Metals Metal Connectors: Subtotal: " s.f. x 0.06 s.f, A * IS. x 1.16 11 * ea. x 1,000.00 ea = 3,192.00 s.f. x .90 81 = allowance c.y. x 5,700.00 e.y. * S.Y. x 8.74 s.y = * S.Y. x 6.20 s.y ea. x 1,000.00 ea = s.f. x 1.11 s.f! a s.f. x 0.56 s.f l.f. x 1.79 IT +* * s.f. x 3.31 s.f, = 1597.00 s.f. x 4.01 I s.f a 6.00 ea, x 149.50 ea = 62.75 11 x 18.76 IS R 62.75 11 x 15.94 ea = 1.00 ea. x 500.00 ca� _ 1.00 ea. x 500.00 I ea; a i U*Ps chirlr ettrhitartm* P r . lnl7 Nnrtliwoo'Wall Qt~t • TI"A AQ 077tH 4A1 ZRIAIA 1R * 2,872.80 5,700.00 * $8,572.80 6,403.97 897.00 1,177.19 1,000.00 500.00 $9,978.16 500.00 $500.00 �r BEND METRO PARF`REC HoIlinshead Barn Renovation • Bend Metro Park $ Recreation District MUM 6: Wood & Plastics Exterior Closure Assembly Syystem; 2 x 6 Studs at 16" o.c.,, CDX 1/2" plywood sheathing, building paper, asphalt felt sheathing paper 15 lb, Fiberglass insulation R-19, Exterior wood stain on other than shingles, 2 coats and sealers. 1 x 12 Rough Sawn Cedar w/battens Housewrap Roof Trusses @ shed addition Roof Sheathing, 1/2" CDX, main bldg. Roof Sheathing, 1/2" CDX, shed Steel Columns, 4" wide flange Steel Beams, W18 x 50, 2 x 12 Floor Joists ®16" o.c., w/ sub.flr. Sleepers on concrete slab Floor boards, labor, finish Interior Closum Assembly System: 2 x 4 studs 016" QC, 5/8" F.R.1 Side, R1 Side, taped, textured 010'-0" ht. Underlayment, plywood, 3/8" Subfloor, 2 x 6, select pine Plastic laminate countertops Ups & Lower Cabinets Built-in bulletin boards Stairs w/landings, rails 5/8" gypsum bard walls, taped & finished Interior window trim Interior Door Trim Subtotal: 0120-1330 2,326.00 s.f. x 3.86 s.f. = 8,978.36 i 2.,326.00 91 x 3.02 s-fJ = 7,024.52 2,326.00 s.f. x .16 s.f. = 372.16 486.00 s.f, x 1.65 s.f; 801.90 2,900.00 81 x .64 Oil 1,856.00 496.00 s.f, x .64 s.f: = 317.44 60.00 Lf. x 14,40 IS, = 864.00 96.00 1.f, x 29.00 is = 2,784.00 728.00 s.f. x 2.34 9111 = 1,703.52 1,596.00 s.f. x 2.24 s.f = 3,573.00 allowance ea. x 6200.00 ea: = 6,200.00 832.00 s.f. x 2.68 54 = 2,229.76 DMSION 7: Thermal & Moisture Protection 6 mil Vapor Barrier Housewrap Rigid Insulation along slab footing Batt Insulation (Ceiling) R-30 Batt Insulation (Floor*) R-38. Cedar Shingle Roof w/building paper & felt sheathing Flashing Subtotal 3,192.00 s.f. x 2,425.92 s.f. = 2,425.92 3,008.00 l.f. x 1.45 11i = 4,361.60 26.00 11 x 22.00 1.f; - 572.00 24.00 l.f, x 100.00 U., = 2,400.00 3.00 ea. x 176.50 ea = 529.50 2.00 ea. x 1,250.00 ea; = 2,500.00 428.00 s.f. x .69 s.f = 295.32 23.00 ea. x 43.40 ea i M 998.20 10.00 ea. x 45.85 ea = 458.50 $51,247.70 20.71 sq. x 853S = 176.65 2,326.00 s.f, x .16 s.f' = 1 372.16 344.25 s.f. x 2.13 733.25 3,396.00 s.f. x .66 s.f 2,241.36 474.50 s.f. x .86 s.fi = 408.07 3,396.00 s.f. x 2.53 s.f = 8,591.88 500.00 s.f. x 3.33 Oil = 1,665.00 Nam 1R1h;AF A.rt,;rrrnnw P r • 1017 Alar wpvt wall Ctrert a Rmti OR 07701 inA IRI-ilm $14,188.37 - = _fad dRI iv1E i F�0 FARK��SEC - - Hollinshead Barn Renovation - Bead Mots Park & R=Mtion District 0120-1331 DIVISION 8: Doors & Windows Window Package (wood, true div. lite) bid price 9,901.00 all operable, screens, hardware Window Installation 22.00 ea. x 130.00 ea.= 2,860.00 Doors allowance ea. x 2,000.00 ca.R 21000.00 Door Installation 12.00 m x 46.80 ca= 561.60 Hardware allowance ea. x 2,690.00 ca= 2,690.00 Thresholds 5.00 ea. x 31.00 ca= 155.00 Weatherstripping 5.00 ca. x 105.00 ea = 525.00 Subtotal $18,692.60 DMSION 9: Finishes Vinyl sheet goods 350.00 s.f. x 4.14 s.f = 1,449.00 Latex Adhesive 1.00 ga, x 11.85 g = 11.85 Wood Floor Refinish 3,192.00 s.f. x 2.00 s.f = 6,384.00 Painting (Interior wall) 3,000.00 s.f. x .51 81 = 1,530.00 Staining, finish doors & frames 16.00 ca. x 25.00= 400.00 Base 250.00 Lf. x 1.60 l.f, = 400.00 Subtotal $10,174.85 DIVISION 10: Specialties j Mirrors 32.00 s.f, x 7.80 s.f i = 249.60 TP Dispenser 3.00 ea. x 27.00 = 81.00 Towel Dispenser 2.00 ea. x 105.00 ea, 210.00 Grab Bars 4.00 ea. x 46.00 ca■ 184.00 Misc. Toilet Accessories 1.00 ea. x 250.00 ea = 250.00 Fire Extinguisher Cabinet 2.00 ea. x 182.00 364.00 Signage 5.00 ca. x 41.00 205.00 Signage (Misc.) 3.00 ca. x 70.00 eat = 210.00 Subtotal: $1,753.60 DIVISION 11: Equipment Applialac�os (Residential Grade) Allowance 1,700.00 Subtotal: ! $1,700.00 DIVISION 12: Furnishings Chairs, Tables, etc. DIVISION 13: Special Construction Toilet Partitions 2.50 ea. x 612.00 ea} = 1530.00 Subtotal: I i $1,530.00 EX �'T . A _ irarn c1„ tete A r . 1ni7 wnrt wpai wxn ctw.t . R ma OR 41701 5m im-ianR _!- BEND METRO,PARK'' REC Hollinshead Bart Renovation • Bend Metro Park & RecroOon District j 012 -1332 DIVISION 14: Conveyin Systems Personal Lift Subtotal: DIVISION 15: Mechanical Systems: Sprinkler System Plumbing HVAC System Subtotal: DIVISION 16: Electrical Systema S�OW�gl'It/S1gI10.1 Subtotal All Divisions SUBTOTAL: Materials & Labor Miscellaneous at 10% TOTAL: Materials & Labor 1. Unquantified Items for level of estimate at this time. (212,325,69 x .12) 212,325.69 + 25,479.08 = $237,804.76 2, PermitOees (237,804.76 x.01) 3. ArchiteewxatIngineering Fees TOTAL CONSTRUCTION COSTS: Cost /Sq. Ft. = 166,341.33 / 3,667- 72.63 sq, ft. Budgeted cash cost : Allowance ea, x EXH I �T 2.30 s.f. x 3.50 ea. x 4.47 ea. x 5.45 ea, x 17,000.00 sal = 17,000.00 $17,000.00 3,667.46 3,667.46 3,667.46 3,667.46 Hare Shicr Architecture. P.C. • 1012 Northwest Well Street • Bcad, OR 97701 503 ca ea = eeI = 8,435.16 12,836.11 16,414.00 $37,685.27 20,000.00 20,000.00 $193,023-31 19,302.34 5212, 23 5.69 $25,479.08 $2378.05 $26,158.52 t266.341_,.,^34 $159,804.00