Loading...
HomeMy WebLinkAbout1998-45758-Ordinance No. 98-044 Recorded 9/10/1998REVIEWED AS TO FOAM � REVIEWED 41---- - 98-45758 CODE REVIEW POMM, LEGAL CJUNS21. BEFORE THE BOARD OF COUNTY COMMISSIONERS OF DESCHUTES COUNTY, O EG � 19 Z An Ordinance Repealing and Replacing the Deschutes County Comprehensive Plan Transportation Chapter, and Repealing and Replacing the Transportation Section * M of the Deschutes County Comprehensive Plan Resource * _. Element, and Declaring an Emergency. * —t C:) ORDINANCE NO. 98-044, THE BOARD OF COUNTY COMMISSIONERS OF DESCHUTES COUNTY, RIN, ORDAINS as follows: WHEREAS, the Board of County Commissioners has determined that to comply with OAR 660- 12, the preparation of a Transportation System Plan for Deschutes County was required; and WHEREAS, a hearing was held, after notice given in accordance with law, before the Deschutes County Planning Commission; and WHEREAS, the Deschutes County Planning Commission recommended approval of the Transportation System Plan; and WHEREAS, a hearing was held, after notice given in accordance with law, before the Deschutes County Board of Commissioners; now, therefore, THE BOARD OF COUNTY COMMISSIONERS OF DESCHUTES COUNTY, OREGON, ORDAINS as follows: Section 1. REPEAL AND REPLACE. The Transportation Chapter, pages 79 through 92 of the Deschutes County Comprehensive Plan, are hereby repealed and replaced by portions of the Deschutes County Transportation System Plan, including all transportation goals and policies, as set forth in Exhibit "A," attached hereto and included herein by this reference. Section 2. REPEAL AND REPLACE. The Transportation Section, pages 182 through 195 of the Deschutes County Comprehensive Plan Resource Element, are hereby repealed and replaced by the Deschutes County Transportation System Plan, as set forth in Exhibit "B," (pages 1 through 228 and Appendices A through N) attached hereto and included herein by this reference. MICROFII i PAGE 1 OF 2 - ORDINANCE NO. 98-044 (8/26/98) OCT I 199 169 0953 Section 3. EMERGENCY. This ordinance being necessary for the immediate preservation of the public peace, health and safety, an emergency is declared to exist, and this ordinance takes effect on its passage. DATED this 26th day of August, 1998. ATTEST: Recording Secreta BOARD OF COUNTY COMMISSIONERS OAESCHUTE$Z'QUNTY, OREGON Chair RO RT . NIPPER, Co sioner z LINDA L. SWEARI N, Commissioner PAGE 2 OF 2 - ORDINANCE NO. 98-044 (8/26/98) EXHIBIT "A" TRANSPORTATION 169 - 0954 The Deschutes County Comprehensive Plan Transportation Chapter addresses both short and long-term transportation needs. This Chapter looks at the next 20 years in Deschutes County, and identifies through goals and policies, how best to efficiently move people and goods throughout the County. Planning for the transportation needs within the Bend, Redmond and Sisters urban growth boundaries is covered by those cities' respective comprehensive plan transportation elements. The purpose of this chapter is to develop a transportation system that meets the needs of Deschutes County residents, while also considering regional and state needs at the same time. This plan addresses a balanced transportation system that includes automobile, bicycle, rail, transit, air, pedestrian and pipelines. It reflects existing land use plans, policies and regulations that affect the transportation system. Much of the background documentation, facility inventory and forecast data referenced in this chapter are located in the Transportation System Plan (TSP), which is located in the Resource Element of the Comprehensive Plan. The TSP also contains a list of prioritized short and long- term projects. EXISTING ROAD SYSTEM Deschutes County is responsible for maintaining approximately 943 total miles within the County system. Out of the total miles maintained by the County, approximately 750 miles are paved and 193 are unpaved. An additional 1,200 miles of unpaved roads are dedicated to the public but not in the County system. Most of the rural roads are located in the western part of the County along the major state highway corridors. In the other, mostly unpopulated areas, roads totaling approximately 410 miles are under the jurisdiction of the U.S. Forest Service, U.S. Bureau of Land Management, the Oregon State Forestry Division, or the Oregon State Parks Division. Of the 750 paved miles of public roads located in the County, many are controlled by the local jurisdictions within the three incorporated cities (Bend, Redmond and Sisters). However, the County maintains approximately 120 miles of urban roadways within UGB's. Of the 120 urban road miles the County maintains, approximately 27 miles are within city limits. An additional 200 miles of roadways (state highway system) are controlled by ODOT. Types Of Roads in Deschutes County There are many types of roads in Deschutes County. The following are some definitions and examples of the types of roads commonly found in the County. Road - means the entire right of way of any public or private way that provides ingress to or egress from property by means of vehicles or other means or that provides travel between places by means of vehicles. "Road" includes, but is not limited to: • "Ways" described as streets, highways, throughways or alleys; • Road related structures that are in the right of way such as tunnels, culverts or similar structures; and • Structures, such as bridges, which provide for continuity of the right-of-way PAGE 1 of 42 — EXHIBIT "A" to ORDINANCE NO. 98-044 (8/26/98) 169 0955 Public Road - A road over which the public has a right of use that is a matter of public record. Maintenance of public roads, including plowing and repair, is the responsibility of the adjoining property owners. There are far more miles of public roads in rural Deschutes County than there are miles of County roads or state highways. County Road - A public road under the jurisdiction of a county that has been designated as a county road under ORS 368.016. County roads are maintained (paved, repaired, plowed, bladed) by the County. A public road becomes established as a County Road by order of the County Commissioners. Huntington and Burgess Roads are examples of County Roads. Local Access Road - A public road that is not a county road, state highway or federal road. Private Road - Private roads that have not been dedicated to the public. These roads do not come under County, City or State jurisdiction. Examples of private roads include those in Sunriver, Eagle Crest and Black Butte Ranch. Roads created by easements between two parties can also be considered private roads. Easement - An access or road easement occurs when one person allows another person to drive (cross) their property. The property owner granting the easement still owns the land under the easement, but the other party has a legal right to use the easement. The public, except for invited visitors, does not have a right to use the easement. State Highway - A State Highway is a public road, maintained by the Oregon Department of Transportation. In addition, the US Forest Service and the Bureau of Land Management have roads on their lands in Deschutes County that they maintain and have jurisdiction over. Many improved, gravel surfaced or paved roads were constructed as a condition of approval of a subdivision of land. Other public roads have been improved through the formation of a Special Road District. People living within an area, such as a subdivision, may form a special road district to improve and maintain the roads within a specially designated geographical area. The residents forming the district agree to pay property taxes to support the special district. Road District Commissioners are appointed by the Deschutes County Board of Commissioners to operate the special road district. The special road district improves and maintains the roads within the district to the level agreed to by the residents of the district. County residents may also petition the Deschutes County Board of Commissioners to form a Local Improvement District (LID) to get their road improved, usually involving the paving of a gravel or dirt road. Public roads improved under the LID process may be accepted by the Deschutes County Commissioners as a County -maintained road. Under the LID, property owners agree to pay for road improvements. Road System Configuration Functional classification describes how the public road system should operate. Roads are grouped by their similar characteristics in providing mobility and/or land access. Within the County, there are six rural road classifications and nine urban classifications. An explanation of the various road classifications used in Deschutes County is found in Table 1. There are three PAGE 2 of 42 — EXHIBIT "A" to ORDINANCE NO. 98-044 (8/26/98) 169 -0956 designated urban areas within the County where the urban standards generally apply, with the rest of the County using the rural standards. Table 2.231 in the Transportation chapter of the Resource Element, provides a mileage and maintenance responsibility breakdown of the various County road classifications. The following represents a general overview of state highways, street functional classifications and a listing of County roads falling under each category. Complete data lists for County highways, arterials, collectors, and local roads can be found in Appendix F of the Transportation chapter of the Resource Element. Table 1 Road Functional Classifications Rural Principal Arterial: Trip length and travel density characteristics representative of substantial statewide or interstate travel; and Penetrates urban boundaries, or comes within 10 miles of the center of an urban area of 25,000 population or greater, and are within 20 minutes travel time (off-peak) of the center of the area via a minor arterial road. Movement of interstate goods and services. Arterial: • Links cities, larger towns, and other major traffic generators, providing interregional and intercounty service; and • Spaced at distances so that all developed areas are within reasonable distance of an arterial highway; and • Provides service to corridors with trip length and travel density greater than that predominately served by rural collector or local systems. • Serves the more important intracounty travel corridors. • Movement of goods and services. • Includes Federal Forest Highways. Collector: Spaced at intervals to collect traffic from local roads and provide all developed areas a reasonable distance from a collector road; and Provides service to the remaining smaller communities; and Links locally important traffic generators with rural destinations. Local: • Primarily provides access to adjacent land/properties; and • Accommodates travel over short distances as compared to arterials and collectors. PAGE 3 of 42 — EXHIBIT "A" to ORDINANCE NO. 98-044 (8/26/98) 169 - 0957 Urban Principal Arterial: • Serves the major activity centers in a metropolitan area, and also serves the highest traffic corridors and satisfies the longest trip desires; and • Carries the major portion of trips entering and leaving the urban area, as well as the majority of the through traffic desiring to bypass the city. Arterial: Provides service to trips of moderate length at a somewhat lower level of travel mobility than principal arterials; and Distributes travel to geographic areas smaller than those served by principal arterials, while not penetrating specific neighborhoods; and Spacing varies from 1/2 to 1 mile in downtown areas, to 2 to 3 miles in areas outside downtown. Collector: • Provides both land access and traffic circulation within residential neighborhoods, commercial, and industrial areas; and • Distributes trips from arterials through these areas to their final destination, and conversely, collects traffic from local streets and channels it onto arterials. Local: • Provides access to adjacent land and access to higher classified roads; and • Provides lowest level of travel mobility including no bus routes; and • Normally carries less than 1,700 vehicles per day. Highways / Principal Arterials Highways have the responsibility of facilitating traffic movement through and between urban areas, regions and between states. The 1991 Oregon State Highway Plan identifies four levels of functional importance (LOI) assigned to highways, and these can either be U.S., Oregon State, or local highways; Interstate, Statewide, Regional, and District. All state highways in Deschutes County are classified as "principal arterial' roads. The principal arterial system consists of a connected network of continuous routes having the following characteristics: 1. Serve corridor movements having trip length and travel density characteristics indicative of substantial statewide or interstate travel. 2. Serve all, or virtually all, urban areas of 50,000 population and over and a large majority of those with population of 25,000 and over. 3. Provide an integrated network without stub connections except where unusual geographic or traffic flow conditions dictate otherwise. PAGE 4 of 42 — EXHIBIT "A" to ORDINANCE NO. 98-044 (8/26/98) 169 - 0958 With the exception of interstates, Deschutes County has representative examples of every highway road classification. The U.S. highways in the County consist of: US Highway 97 — The Dalles-California Highway US Highway 20 — Various segments are commonly known as the Santiam Highway, the Sisters -Bend Highway, or the Millican-Burns Highway. The Oregon State highways consist of: OR Highway 126 — The McKenzie Highway OR Highway 31 — The Fremont Highway OR Highway 242 — The Old McKenzie Highway OR Highway 27 - The Crooked River Highway OR Highway 372 — The Cascade Lakes Highway (and Century Drive in Bend) OR Highway 370 — The O'Neil Highway Powell Butte Highway — A former state highway that is now a rural arterial within Deschutes County. In Crook County, this highway is still a state facility. Urban and Rural Minor Arterials / Rural Collectors Lower down in the functional classification hierarchy are the minor arterial (including federal forest highways) and collector streets and roads that enable people to move between the neighborhoods where they live, to the places they work, shop, and go to school. Streets are generally classified in the following order according to the amount of traffic they are designed to handle, and their allowable design speeds. The County has jurisdiction over several segments of urban minor arterial road segments located within or adjacent to UGB areas. These roads generally play a larger role in their relationship to the adjacent city's transportation network, than the County network. The rural minor arterial road system should, in conjunction with the principal arterial system, form a rural network having the following characteristics: 1. Link cities and larger towns (and other traffic generators, such as major resort areas, that are capable of attracting travel over similarly long distances) and form an integrated network providing interstate and intercounty travel. 2. Be spaced at such intervals, consistent with population density, so that all developed areas of the State are within a reasonable distance of an arterial highway. 3. Provide (because of the previous two characteristics) service to corridors with trip lengths and travel density greater than those predominantly served by rural collector or local systems. Minor arterials constitute routes whose design should be expected to provide for relatively high overall travel speeds, with minimum interference to through movement. The complete listing of all County arterial and collector roads, as well as local roads, can be found in the TSP, located in the Resource Element of the Comprehensive Plan PAGE 5 of 42 — EXHIBIT "A" to ORDINANCE NO. 98-044 (8/26/98) 169 0959 Traffic Control Devices Traffic Signals - There are no traffic signals in the rural areas of the County. Flashing Warning Lights - Red and/or yellow flashing warning lights generally are located at intersections where a full stop light control is not yet warranted and four-way stop signs would not meet the need to balance safety concerns and through traffic movement. Locations are identified in the TSP. Traffic Volumes The Deschutes County Road Department conducts average daily traffic (ADT) and peak hour traffic volume counts on a rotating basis for most arterials and collector roads in the County. Each road is counted on average, once every two to four years. The traffic count information was assembled in spreadsheets. For road segments not counted in 1996, a trend analysis was used to establish a 1996 estimated traffic volume. The ADT information for County roads and state highways within Deschutes County can be found in the TSP. Level of Service In order to effectively communicate about traffic flow and traffic capacity conditions, the engineering and planning professions have adopted a concept of level of service to describe traffic conditions and associated traffic flow rates. Six levels of service designations ranging from A to F are typically recognized by the transportation professions. For rural, two-lane roads in the County, the peak hour traffic volumes were assumed to be ten percent (10%) of the average daily traffic amount, then further adjusted to reflect a desirable flow rate. For a ten -percent (10%) peak hour flow ("K" factor), the corresponding ADT and LOS are identified in Table 2. Table 2 Maximum Average Daily Traffic Allowed for Various Levels of Service K Factor Level of Service A B I C D E Average Daily Traffic (ADT) (ideal conditions, i.e., level terrain, etc.) 10% 1,700 1 3,400 1 5,700 1 9,600 1 16,300 Accident Statistics In 1996, the grant -funded Deschutes County Safe Communities program was initiated in an effort to reduce transportation -related injuries of all types. The program links accident data with medical information to identify the most significant problems and then develop solutions. Focus areas include safety equipment for bicyclists and safe cycling education programs for school children. Program Staff used the state accident database, from the Accident Data Unit at ODOT, to evaluate accident data for the period 1991 - 1996. Crash data and a summary of accident issues can be found in the TSP. Pavement Type / Condition Out of the 943 roadway miles that the County maintains, 625 miles (66%) are paved while the other 318 miles (34%) are either dirt or aggregate. PAGE 6 of 42 — EXHIBIT "A" to ORDINANCE NO. 98-044 (8/26/98) 169 - 0960 Bridge Condition The County Road Department maintains a list (see the TSP) of the 120 various bridges throughout Deschutes County and their weight limits. Many of the bridges are relatively new, constructed of reinforced concrete, and are able to withstand many years of use before repairs or replacement is necessary. However, some others are old flatbed railroad cars that were converted to bridges. BIKE FACILITIES The Deschutes County Bicycle Advisory Committee was formed in 1988 (pedestrian component added in 1996). In March 1992, the County adopted a Bicycle Master Plan as a resource element of the Deschutes County Year 2000 Comprehensive Plan. The Bicycle Master Plan provides recommendations for policies, classifications of bike facilities, location of bike facilities, bicycle parking and other transportation issues related to bike facilities. Bicycle facilities include bikeways, both paved and unpaved, and parking. Currently, bikeway design falls under the general design criteria section of the County's Title 17 (Subdivision Ordinance). It states that: Bikeways shall be designed in accordance with the current standards and guidelines of the State of Oregon Bicycle Master Plan, American Association of State Highway and transportation Officials (AASHTO) Guide for the Development of New Bicycle Facilities, and the Deschutes County Bicycle Master Plan. 2. All collectors and arterials shown on the County Transportation Plan map shall be constructed to include bikeways as defined by the Deschutes County Bicycle Master Plan. 3. If interim road standards are used, interim bikeways and/or walkways shall be provided. These interim facilities shall be adequate to serve bicyclists and pedestrians until the time of the road upgrade. Paved Bikeways Bicycles are legally classified as vehicles, which may be ridden on most public roadways in Oregon. There are four basic types of paved bicycle facilities in Deschutes County: Shared Roadway - On a shared roadway facility, cyclists share the normal vehicle lanes with motorists. Shoulder Bikeway - Smooth, paved, rural roadway shoulders provide a good area where cyclists can ride with faster moving motor vehicle traffic with few conflicts. The majority of bicycle travel on the state highway system is accommodated on shoulder bikeways. Bike Lane - Where bicycle travel is substantial and where adequate width is available, a portion of the roadway may be designated for preferential use by cyclists. Bike lanes are more common in urban rather than rural areas. Bike/ Multi -use Path - A bike path is a bikeway that is physically separated from motorized traffic by open space or a barrier. They generally serve corridors not served by other bikeways or pedestrian facilities and where there are few crossing roadways. PAGE 7 of 42 — EXHIBIT "A" to ORDINANCE NO. 98-044 (8/26/98) 169 0961 Unpaved Bikeways With the advent of mountain bikes, previously unused trails and poor roads are opened up to potential use as inexpensive bike routes that require little more than right-of-way and signage. Deschutes County has many primitive roads and trails, most of which are on National Forest or Bureau of Land Management land, some of which are located close to urban areas. Mountain Bike Trail/Route - This category is designed to accommodate bicycle travel on unpaved roads and trails. Mountain bike trails are primarily recreational, although in some cases they may provide an interim or commuter transportation facility. Alternative Routes Alternative routes are usually the most cost effective or immediate way to provide for bicycle movement through a difficult section. Several high traffic sections with bike facilities in the County have alternative routes identified in Table 2.2311 of the Transportation chapter of the Resource Element. Other Facilities Resort Communities In Deschutes County, there are four resort communities that have developed independent bicycle networks. These networks, being privately owned, funded and maintained, are available to owners and guests of the individual communities and are not open to the general public. However, these bike facilities shall meet County construction standards and shall not impede movement within the countywide system. PEDESTRIAN SIDEWALKS / WALKWAYS Sidewalks are currently required along some street frontages for new developments only in the Unincorporated Communities of La Pine, Terrebonne and Tumalo. The County standard for sidewalk width is five feet. Although most of the County's improved sidewalks occur in La Pine, there are also short sections along the south sides of B Avenue and Smith Rock Way in Terrebonne. PUBLIC TRANSPORTATION Intercity • Greyhound • CAC Transportation • The People Mover • Porter Stage Lines • Valley Retriever Bus Lines Fixed Route Transit There is currently no traditional fixed -route local transit service in Deschutes County. However, the Mt. Bachelor Ski Resort Super Shuttle does operate during the winter months on a fixed - PAGE 8 of 42 - EXHIBIT "A" to ORDINANCE NO. 98-044 (8/26/98) 169 - 0962 route and schedule. • Mt. Bachelor Super Shuttle and Employee Shuttle Local Demand Responsive Transportation Deschutes County has a network of special transportation providers who serve the elderly and disabled population. In most cases, the general public does not have access to these special transportation services. There are several providers of special transportation services in the County, ranging from public to private, both profit and non-profit. • City of Bend Dial -A -Ride • Central Oregon Council on Aging (COCOA) Dial -A -Ride (La Pine, Redmond and Sisters) • Opportunity Foundation of Central Oregon • Residential Assistance Program (RAP) • Disabled American Veterans • Volunteer Services • Central Oregon Resources for Independent Living (CORIL) • Access Express TRANSPORTATION DEMAND MANAGEMENT (TDM) Currently, the County, ODOT and the City of Bend jointly fund Commute Options for Central Oregon. This organization began in 1990 as a volunteer citizen's group working towards solutions to traffic congestion and pollution. They are responsible for maintaining the Central Oregon Rideshare list, promoting Commute Options Week each Spring, and acting as transportation consultants to businesses, cities, counties and other agencies interested in alternative commuting methods such as carpooling and teleworking. Rideshare (Park and Ride) Facilities This plan makes reference to rideshare lots, which are more appropriate for the carpooling emphasis in Deschutes County, rather than park & ride lots which usually involve a fixed route transit stop (such as the Mt. Bachelor Super Shuttle). Central Oregon Rideshare Central Oregon Rideshare is a carpool matching service available to Deschutes, Crook and Jefferson County residents free of charge. The matching service is essentially a database of interested individuals, which is maintained by Commute Options for Central Oregon. RAILROAD Passenger Rail Other than the occasional (annual) excursion train from Portland to Bend, no regular passenger rail service is currently available in Deschutes County. PAGE 9 of 42 — EXHIBIT "A" to ORDINANCE NO. 98-044 (8/26/98) 169 - 0963 Freight Rail The recent merger between the Burlington Northern and Santa Fe railroads provides freight operations on a trunk line running through Deschutes County. This line connects with the Union Pacific main line at Biggs in the north and with the Southern Pacific mainline at Chemult to the south. MOTOR FREIGHT/TRUCKING U.S. Highways 97, 20 and OR 126 all carry intercity and interstate freight trucking. Approximately 14 trucking companies currently operate in Deschutes County. No state highways within Deschutes County are currently designated as State Trucking Routes. AIR TRANSPORTATION With the passage of SB 1113 in 1995, ODOT is proposing that the County establish an "airport zone" for each of the public use airports in the County to assure the continuation of airport and airport -related uses there. State Rule OAR 660-13, was adopted in December 1996 by the Land Conservation and Development Commission. In July 1997, the state passed HB 2605 which modified Oregon Statutes regarding airport planning and will have an as yet undetermined effect on OAR 660-13. Public -Use Airports Publicly -Owned (Municipal) • Redmond Municipal Airport • Bend Municipal Airport Privately -Owned • Sunriver • Sisters Airport Privately -Owned, Private -Use Airports and Heliports: Recognized by ODOT as having three or more based aircraft in 1994: • Cline Falls Airpark (6 mi. W of Redmond at Cline Falls) • Juniper Airpark (10 mi. SE of Bend) • Pilot Butte Airport (S. of Pilot Butte in City of Bend) Less than three based aircraft in 1994: • Don Stevenson Ranch Airport • Fall River Fish Hatchery Airport • Gopher Gulch Airport • Pine Ridge Ranch Airport • The Citadel Airport • St. Charles Heliport (4 mi. S of Bend) (31 mi. SSW of Bend at Fall River) (3 mi. NW of Bend) (5 mi. NE of Sisters) (9 mi. NE of Sisters) (2 mi. E of Bend at the Medical Center) PAGE 10 of 42 — EXHIBIT "A" to ORDINANCE NO. 98-044 (8/26/98) 169 -0964 • Whippet Field Airport (6 mi. NE of Sisters) • La Pine Heliport (S edge of La Pine) • Freight Wagon Field Airport (5 mi. S. of Redmond) • Sage Ranch Airport (9 mi. SE of Sisters) • Cinder Butte Heliport (3.4 mi. N of Redmond) Airfreight Service Airfreight is available at the Redmond Airport through United Express and Horizon Air. Express package services are provided by Federal Express (FedEx), Airborne, United Parcel Service (UPS), and the U.S. Postal Service Express Mail. WATER -BORNE TRANSPORTATION No commercial river transport services or port districts are located in Deschutes County. PIPELINE TRANSPORTATION The Pacific Gas Transmission Company operates two natural gas transmission lines from Canada to California that generally follow the Highway 97 corridor through Deschutes County. TRANSPORTATION SYSTEM PLAN In late 1994, the County initiated work on a long-range transportation system plan (TSP), which was a requirement of OAR 660-12, the Transportation Planning Rule (TPR). The State of Oregon approved the Rule in 1991. The purpose of the Transportation System Plan is to guide the development of a safe, convenient and efficient transportation system that promotes economic prosperity and livability for all County residents. As required by the TPR, Deschutes County developed the standards and policies in the Transportation System Plan (TSP) that comply with the requirements to provide a multi -modal approach to solving transportation issues. The Rule identifies the specific actions required of jurisdictions based on their population. For most urban areas, the Rule requires an alternatives analysis to compare various new project options versus an alternative that proposes to build only existing funded and committed projects. Many of the alternatives have goals such as an increase in mode split share and reduced vehicle miles traveled (VMT). These goals are measurable in many urban areas or areas with a Metropolitan Planning Organization (MPO), but not in rural Deschutes County. The logical alternative choices in the County were to: Pursue an alternative that programs only the identified projects in the current County Major Roads Capital Improvement Plan (MRCIP) and gradually shifts funding from new capital projects to more preservation and maintenance. Over time, capital improvements to address traffic and safety problem areas will proceed on a prioritized basis. The long-term effect is that preservation and maintenance of the existing system becomes a higher priority than relieving congestion and solving safety issues. This is often referred to as the "no build" alternative. Adopt a "build" alternative, which tries to keep pace with anticipated growth by focusing funding on building capacity -enhancing and safety oriented projects, while also attempting to maintain the existing road network. PAGE 11 of 42 - EXHIBIT "A" to ORDINANCE NO. 98-044 (8/26/98) 169 1. 0965 • Adopt a combination alternative, as recommended in the Deschutes County Transportation System Plan (TSP, located in the transportation chapter of the Resource Element), which includes a mixture of new projects to enhance roadway capacity, improve safety while also maximizing preservation and maintenance. The alternative also shifts emphasis to non -auto modes as much, as is practical to meet the intent of the Transportation Planning Rule (TPR). This Plan balances the need to reduce the reliance on single occupant vehicles given the County's needs, geography and demographics, with the need to solve safety and operational problems. At the same time, the system needs a significant effort in maintenance over the next twenty years to preserve the investment already made by the community. Additionally, the Plan encourages ridesharing, telecommuting and eventually fixed -route transit. The TSP makes recommendations regarding short-term and long-term transportation projects on state and County facilities that will be needed over the next 20 years. The project list was based on: • Evaluating the capacity of the County road system and the state highway network within Deschutes County. • The results of state accident database analysis. • Input from the County Road Department. • Efforts to enhance alternative modes of transportation through compliance with the Transportation Planning Rule. • The input received from the citizen review committee (County Planning Commission) and the public outreach process in general. The identified projects were prioritized based on the following criteria: Most Important: Solving safety problems Important: Maximizing the use of pedestrian and bicycle facilities Location of schools and fire stations Project cost, cost per average daily trip Anticipated traffic volumes (2016) COORDINATION AND IMPLEMENTATION OF THE TRANSPORTATION SYSTEM PLAN Based on the requirements of the Transportation Planning Rule (TPR), Deschutes County has established an ongoing procedure to periodically analyze, prepare and plan for the transportation needs of Deschutes County residents and visitors. The following goals and policies are intended to implement the Deschutes County Transportation System Plan, and thereby meet the requirements of the TPR. Goals 1. Achieve an efficient, safe, convenient and economically viable transportation and communication system. This system includes roads, rail lines, public transit, air, pipeline, pedestrian and bicycle facilities. The Deschutes County transportation system shall be designed to serve the existing and projected needs of the unincorporated communities and rural areas within the County. The system shall PAGE 12 of 42 — EXHIBIT "A" to ORDINANCE NO. 98-044 (8/26/98) 169 - 0966 provide connections between different modes of transportation to reduce reliance on the single -occupancy vehicle. 2. Have an ongoing transportation planning process and maintain a transportation plan that meets the needs of the County and its residents. The transportation plan and facilities of Deschutes County shall be coordinated with the plans and facilities of incorporated cities within Deschutes County, adjacent counties and the State of Oregon. Policies 1. Deschutes County shall: a. Identify local, regional and state transportation needs; b. Develop a transportation plan that shall address those needs; c. Review and update the plan every three to five years; d. Continue to coordinate transportation planning with local, regional and state plans by reviewing any changes to Deschutes County local transportation plans, regional transportation plans, the Oregon Transportation Plan and ODOT's State Transportation Improvement Plan (STIP); and e. Continue public and interagency involvement in the transportation planning process. 2. Deschutes County shall notify ODOT concerning: a. All land use proposals or actions that would create access onto a state highway or add >100 ADT to any County road intersection with a state highway; b. Any proposed land use or development within 500 feet of a state highway or public use airport within the County; and c. Required ODOT road approach permits. 3. Deschutes County shall protect approved or proposed transportation project sites through: a. Access control measures; b. Review of future large development and transportation projects that significantly affect the County's transportation system; and c. The imposition of conditions of approval on developments and transportation projects that have a significant effect on the County's transportation system. 4. Deschutes County shall coordinate local plans and land use decisions with state transportation plans, including the Oregon Transportation Plan, modal plans and PAGE 13 of 42 - EXHIBIT "A" to ORDINANCE NO. 98-044 (8/26/98) 169 - 0967 corridor plans. These plans provide ODOT policies and performance standards for statewide highways within Deschutes County. The statewide plans also provide the framework for access management on state facilities to protect the capacity and function of the highways. 5. The lead agency for transportation project review in Deschutes County shall be: a. Deschutes County for projects outside UGB's; b. The affected city for projects within the UGB's; and c. The State of Oregon, Deschutes County and affected cities on projects involving state-owned facilities. 6. Transportation Projects a. The County shall have a list of transportation projects, adopted by the Board of County Commissioners in accordance with the policies set forth below. b. The initial Transportation Project List shall be set forth in Table 5.11.T1 of the Transportation System Plan adopted as part of the Resource Element of the Comprehensive Plan. The Board shall update the Transportation Project List periodically by resolution adopted by the Board, without need of a formal amendment to the TSP. c. New transportation projects shall be included on the County's Transportation Project List. A transportation project proposed for addition to the list shall be subject to an individual land use review only if applicable administrative rules or land use regulations require such review. d. Transportation or development projects that require a plan text amendment or a conditional use permit may be required to fulfill conditions or implement mitigation measures before approval is granted. Mitigation and conditions may include, but are not limited to: • Improvement of surrounding roads; • Limits on level of development; • Revision of development placement; • Addition or redesign of access; • Addition of traffic management devices such as traffic signals, medians, turn lanes or signage; and/or • Improvements that reduce transportation impacts. Deschutes County acknowledges that land use designations have a significant impact on the overall transportation system and any alterations shall be completed with consideration to traffic impacts on the County road system. e. The findings of compliance with applicable statewide planning goals, acknowledged comprehensive plan policies and land use regulations, shall be coordinated with the preparation of any Environmental Impact Statement (EIS) PAGE 14 of 42 — EXHIBIT "A" to ORDINANCE NO. 98-044 (8/26/98) 169 0968 required for a proposed transportation facility that is identified on the Deschutes County Transportation System Plan. ARTERIAL & COLLECTOR ROADS County Road Network The findings in the TSP conclude that the County road network currently in place, except for several specific road segments, should be adequate to serve the County needs over the next twenty years. Given the rural nature of Deschutes County and the fact that the majority of new development will take place on existing lots with existing access, few additional roads are anticipated. New road corridors to isolated subdivisions and new roads linking urban and rural areas are the main exceptions. Any new roads that will be created most likely will be the result of new developments and would therefore be part of land use development review or would be for secondary access or emergency ingress/egress to isolated subdivisions. Unforeseen large developments such as destination resorts normally have a private road system but their impacts to the County road network would be assessed at the time of land use approval. The majority of road -related projects will consist of safety-related or other upgrades, maintenance and repair. Upgrades, maintenance and repair should be actively pursued to maintain the integrity of the system and not jeopardize the current conditions. Pedestrian, bicycle and transit modes of transportation require wider, smoother roadways. These improvements also benefit automobile and truck traffic by making the roads safer and more efficient. The main purpose of the County -owned road network is to move people and goods as efficiently as possible between and to the incorporated cities in the County, not as a means of increasing urban scale developments in the unincorporated communities of the County. The County recognizes the importance of having a natural and seamless transition of jurisdiction for County roads within urban growth boundaries to their respective city jurisdictions as the cities continue to grow. Goal 3. Establish a transportation system, supportive of a geographically distributed and diversified industrial base, while also providing a safe, efficient network for residential mobility and tourism. Policies 12. Deschutes County shall: a. Consider the road network to be the most important and valuable component of the transportation system; and b. Consider the preservation and maintenance and repair of the County road network to be vital to the continued and future utility of the County's transportation system. 13. Deschutes County shall not add any miles of new road to the system unless the following issues are satisfied: a. The need for the road can be clearly demonstrated; PAGE 15 of 42 — EXHIBIT "A" to ORDINANCE NO. 98-044 (8/26/98) 169 w®969 b. The County can financially absorb the additional maintenance requirements; c. The condition of the road proposed for acceptance into the County system must meet County road standards; d. An accrued benefit can be shown to the County's economic growth; and e. An overall increase in efficiency in the County road network can be demonstrated. 14. Deschutes County shall make transportation decisions with consideration of land use impacts, including but not limited to, adjacent land use patterns, both existing and planned, and their designated uses and densities. 15. Deschutes County shall consider roadway function, classification and capacity as criteria for plan map amendments and zone changes to assure that proposed land uses do not exceed the planned capacity of the transportation system. 16. Roads in Deschutes County shall be located, designed and constructed to meet their planned function and provide space for motor vehicle travel and bike and pedestrian facilities where required. 17. Deschutes County shall manage the development process to obtain adequate street right-of-way and improvements commensurate with the level and impact of development. New development shall provide traffic impact analysis to assess these impacts and to help determine transportation system needs. The guidelines for traffic impact analysis shall be located within the Deschutes County Road Standards and Specifications document upon its adoption. 18. Transportation system improvements in Deschutes County shall comply with the Americans with Disabilities Act. 19. Transportation safety in Deschutes County shall improve for all modes through approved design practice and sound engineering principles. 20. Deschutes County shall acquire the necessary right-of-way through the development process to correct street intersections, substandard road geometry or other problems in order to improve the safety of a road alignment, consistent with constitutional limitations. 21. Deschutes County shall support efforts to educate the public regarding hazards related to travel on the transportation system. 22. Deschutes County shall support public and private efforts to acquire right-of-way for new secondary access roads to isolated subdivisions. State Highways Each of the Access Oregon Highways (AOH) in Deschutes County has a specific role in the statewide transportation network, as well as the County system. The 1991 Oregon Highway Plan specifies the design, access management and level of service requirements that need to PAGE 16 of 42 — EXHIBIT "A" to ORDINANCE NO. 98-044 (8/26/98) 169 0970 be applied to these highways. Deschutes County supports ODOT policy to develop highways through a "four -phased" approach. The four phases of development take place incrementally as the traffic volumes increase and the level of service decreases. Beginning with a standard two- lane rural highway, the improvement phases are as follows: 1. Addition of passing or climbing lanes 2. Widening to a four -lane section 3. Adding grade -separated interchanges and raised medians 4. Develop full grade -separated interchanges and frontage roads Through a coordinated analysis effort between ODOT and County staff, the probable locations of future passing and climbing lanes on the state highways in Deschutes County were identified. Also identified were the four -lane extension to Highway 97 from La Pine south to Highway 31, along with the probable locations of future grade -separated interchanges. The projected conceptual highway lane additions and interchanges are shown on Figures 5.2.F1 and 5.2.F2 in the Transportation chapter of the Resource Element. Actual locations and design would be the result of detailed engineering work occurring during project development. No signals are appropriate on state highways outside of UGB's, Terrebonne or La Pine. Instead, as intersections develop safety or operational problems, they shall be grade -separated, restricted or closed (where there is alternative access). The following descriptions identify the roles the state highways are expected to play in Deschutes County over the next twenty years. US Highway 97 Congestion on Highway 97 has been mostly a problem within the communities of Bend and Redmond, due to the increasing volumes of truck traffic combined with local traffic generated by the rapid growth experienced in recent years. The Highway 97 Strategy (Appendix D of the Transportation chapter of the Resource Element) contains the goals and policies that govern the future development of the Highway 97 corridor. Outside of urban areas, the highway is characterized by two, three, and four -lane sections. The ultimate plan is for a continuous four - lane section to be built throughout the corridor, except for the sections through unincorporated communities such as Terrebonne. In those communities, traffic calming and pedestrian safety are more important than through traffic movement. In most cases, the time delay to drivers passing through the small rural communities is insignificant compared to the overall travel time along the corridor. Highway 97 is considered a Category 2 access management facility outside of urban areas, except for the specific sections through the communities of Terrebonne, Wickiup Junction and La Pine which are Category 4 (definitions can be found on page 17). The Category 4 section in Terrebonne extends from Lower Bridge Way south to 11th Street. The section in Wickiup Junction extends from Drafter Road south to Burgess Road. The La Pine section extends south from 1st Street to 6th Street. The Terrebonne section has already been redesigned to be pedestrian -friendly by the eventual inclusion of sidewalks, landscaped strips, bulbed intersection corners and a center median. The La Pine section will be studied in 1998 as part of an approved state Transportation and Growth Management (TGM) grant. The La Pine section will be challenging due to the existing four -lane section through the community. Issues regarding Highway 97 in Deschutes County include: • The increasing traffic volumes north of Terrebonne, especially at Lower Bridge Way; PAGE 17 of 42 — EXHIBIT "A" to ORDINANCE NO. 98-044 (8/26/98) 169 - 0971 • Traffic calming through Terrebonne, Wickiup Junction and La Pine; • Local road and direct driveway access onto the highway; • North and south connections to the Redmond "bypass"; • The needed grade -separated interchange at South Century Drive (Sunriver); • The realignment of the highway on existing ODOT right-of-way east of Wickiup Junction and the grade separation over the railroad; • The excessive speeds through the rural communities; and • The possible grade separation between Yew Avenue and Deschutes Junction. • The opportunity to enhance the parallel local road network to redistribute local trips that would otherwise need to use the highway (such as paving FS Rd. #41 between Sunriver and Bend). US Highway 20 The ODOT Highway 20 corridor planning process is currently underway, and not expected to be completed before this TSP is adopted. However, policy direction and identified projects resulting from the corridor work can be added to the County's adopted TSP when completed. The Tumalo section was studied (with Terrebonne) in 1997 as part of an approved state Transportation and Growth Management (TGM) grant. The community focused on the need to reduce accidents and ease the burden of crossing three lanes of high-speed traffic on Highway 20. The high volume of truck trips in the Tumalo area is seen as a contributor to the overall problem, and is not anticipated to diminish during the next twenty years. Highway 20 is considered a Category 3 access management facility west of the Sister's UGB, Category 4 within Sisters (similar to Terrebonne), Category 2 between Sisters and the Bend UGB, and Category 4 east of the Bend UGB. The critical areas of the corridor are: • The increasing traffic volumes west of Sisters that may necessitate additional passing lanes; • The intersection of Cook Avenue in Tumalo which will require an eventual grade separation; • Safety problems at the intersection of the Old Redmond -Bend Highway, which will also require an eventual grade separation; • Local road and direct driveway access onto the highway between Sisters and Bend; and • Improvements to the Powell Butte Highway intersection if land uses intensify at the Bend Airport and/or accelerated growth occurs in Crook County. Oregon Highway 126 (OR 126) With the completion of the Cline Falls interchange in 1997, there are few transportation issues remaining or anticipated on this facility. No new interchanges or medians are proposed. The primary issues are related to the highway as it passes through the City of Redmond. Areas outside of the Redmond UGB that could develop problems include: • The intersection of Helmholtz Way if rapid development in and around Redmond continues; • Access to a possible new state park expansion at Cline Falls; • Local road and direct driveway access onto the highway between Sisters and Redmond; and • The substandard section east of Redmond. • The connection of 74th Street to the Cline Falls interchange. PAGE 18 of 42 — EXHIBIT "A" to ORDINANCE NO. 98-044 (8/26/98) 169 0972 Other Oregon Highways (OR 27, OR 31, OR 370 & OR 372) The remaining highways in the County are not considered AOH facilities, and as such, do not warrant the same priority for projects nor are they anticipated to carry significant traffic volumes. Each of these highways, except for OR 27, is currently considered a Category 4 facility. None has identified high accident rates or safety problems. With the exception of OR 370 (O'Neil Highway), none has much direct private access or potential for intensified land use. There are no plans to pave OR 27 which is considered a Category 6 facility. Deschutes County recognizes that Crook County is incrementally paving a new road extending south from their industrial area towards Deschutes County. Ultimately this new road may connect to Highway 20 west of OR 27 near Millican. When and if this new road connects to Highway 20, ODOT may choose to designate this new route as OR 27. Access Management Roads accommodate two types of travel: local travel and through traffic. Arterial streets are intended for through movement of traffic while local roads are designed to give direct access to the abutting properties. Collector roads provide a link between the local and arterial roads, balancing accessibility and function. Historically, the state and local governments corrected many congestion problems by constructing new bypasses, grade separations or major street improvements. However, such solutions are expensive and are fast becoming infeasible under current funding levels. Arterial roads without access management can over time become overused for short distance trips and local access to property. Land use changes along these overburdened arterials results in increased trip generation and traffic conflicts, as businesses normally desire to locate on high traffic arterials. The lack of adequate access management and insufficient coordination of land use development, property division and access review can contribute to the deterioration of both the arterial and collector road network. Traffic signals, new road approaches and driveways can decrease speed and capacity, and increase both congestion and hazards. Access management includes the control of vehicular access to major roadways. Partial access control, which is often found on major arterials and highways, is provided by limiting or prohibiting driveway access, left turn movements and cross traffic at intersections. These limitations increase the capacity of an arterial to carry through traffic at the desired speeds without requiring the addition of more travel lanes. Coordination, planning and proper policies can help avoid these problems and costly solutions. Goal 4. Establish an access management system adequate to protect the quality and function of the arterial and collector street system. Policies 23. Deschutes County shall designate access and land uses appropriate to the function of a given road. 24. Deschutes County shall require new development to minimize direct access points onto arterials and collectors by encouraging the utilization of common driveways. PAGE 19 of 42 — EXHIBIT "A" to ORDINANCE NO. 98-044 (8/26/98) 169 " 09?3 25. Wherever practical, access to state highways shall be provided via frontage roads, alternative local roads or other means, rather than direct access to the highway. 26. A non-traversible median on state highways shall be installed by ODOT when operational or safety issues warrant installation. Directional breaks in the median shall be provided as needed to allow safe traffic operation. 27. Access requests onto Deschutes County arterials and collectors for new partitions, subdivisions and commercial and industrial development shall be processed with the following access management classification system in mind: a. Public road access spaced at no less than every 500 feet on arterials and 300 feet on collectors. b. If either safety or environmental factors, or the unavailability of adequate distance between access points requires placing access points at lesser intervals, then access will be denied or the best alternative placement will be chosen. On road segments that are already severely impacted by numerous access points or on road segments which abut exception areas, adherence to the above standards may be either unreasonable or counterproductive to infill of exception areas. In such cases, these standards may be relaxed by the County Road Department Director to accommodate the aforementioned special conditions. Functional Classification Functional classification describes how the public road system should operate. Roads are grouped by their similar characteristics in providing mobility and/or land access. Within the County, there are six rural road classifications and nine urban classifications. Further coordination is needed between the County and cities in Deschutes County regarding the functional classification of County roads within city limits and urban growth boundaries. Currently, the County maintains approximately 123 miles of roadway within city limits and urban growth boundaries. The County lacks funds to upgrade these roads to city urban standards. Strengthening and revising Urban Growth Management agreements with cities may be an effective way to pursue tight coordination on this important issue and reduce the long-term financial burden to the County. As an example, the County and the City of Bend have agreed that as of July 1, 1998, all roads within the Bend UGB will become the responsibility of the City of Bend. This shift reduces the County's urban road mileage by approximately 70%. The following changes to functional classification are identified on the Deschutes County Transportation Plan Map, designated as Exhibit "A" to Ordinance No. 98-044, and also identified on the more detailed maps located in the Transportation System Plan which is part of the Resource Element of the Comprehensive Plan. Bend TSP The draft Bend Transportation System Plan is proposing only one change in functional classification to a County road within the UGB. However, with the recent management agreement, this road will become the jurisdiction of the City of Bend. The functional classification of all other roads that cross the Bend UGB between the City and the County have been coordinated. PAGE 20 of 42 - EXHIBIT "A" to ORDINANCE NO. 98-044 (8/26/98) 169 - 0974 • Yeoman Road from 18th street east to the outer (ultimate) urban growth boundary is currently classified as either a future or current arterial depending on segment. It is proposed to change to a corresponding future and current collector. Redmond TSP The draft Redmond Transportation System Plan proposes several classification changes to County roads within and around the UGB. The Redmond TSP also splits the existing arterial classification into two new categories, "major arterial" replaces "principal arterial" and "minor arterial" replaces "arterial". The collector category is also changed by creating a "Major" and "Minor" classification. The difference is that bike lanes are not required on "Minor" collectors. The designation of County roads outside of UGB's shall remain consistent with the County functional classes of Rural Arterial and Rural Collector. The County shall require at least a four - foot shoulder bikeway along those sections of road within the County that are extensions of designated Minor Arterials and Major Collectors on the Redmond Plan. Rural Arterial to Rural Collector. • Hemholtz Way (43rd) between Maple Avenue and Obsidian Avenue. • Northwest Way north of Maple Avenue. • Maple Avenue between'Hemholtz Way (43rd) and Northwest Way (27th). Rural Collector to Rural Arterial. • 27th Street between Maple Avenue and Hemlock Avenue. Other Changes: • 9th Street classification as future arterial north of Maple Avenue / Negus Way is eliminated County Roads Several roads within the rural areas of the County road network are in need of reclassification. The reclassification of these roads is warranted based on either their current and projected average daily traffic (ADT), or planned functional role in the transportation network. In most cases, a projected level of service "D" or worse triggered the change from collector to arterial. One exception to this is the reclassification of Forest Service Road #45. This road is expected to have high peak seasonal use between Sunriver and Mt. Bachelor, and should therefore be reconstructed to a rural arterial standard. Several roads currently classified as arterial are recommended to revert to collector status because they don't have a projected level of service of "D" or worse, and serve as a parallel route to a state highway. The original Transportation Element of the County Comprehensive Plan made several recommendations as to reclassifications at that time. As time has passed, some of these roads have not experienced the anticipated traffic while others are .playing larger roles than originally planned due to accelerated development pressure. The County emphasis is for County roads to remain rural, have lower traffic speeds, and reduced cost to upgrade, repair and maintain. PAGE 21 of 42 — EXHIBIT "A" to ORDINANCE NO. 98-044 (8/26/98) 169 «0975 New local roads for secondary access to rural isolated subdivisions have been identified as part of the Regional Problem Solving Project. In some cases, there is an existing dirt road across private or government land, but no dedicated right-of-way. Figures 5.2.F3a and 5.2.F3b of the Transportation chapter of the Resource Element identify proposed new roads as "corridors", subject to future engineering and design, rather than specific alignments. The Sunriver Business Park is also in need of a future secondary access or intersection treatment such as a roundabout. With increasing development of commercial uses in the Park along with the increasing traffic volumes on South Century Drive, the single entrance/exit onto South Century Drive will become inadequate. Any solution may be problematic due to the established development pattern, the electric substation location, the forest -zoned land, and the Harper town site to the south. Figure 5.2.F3c in the Transportation chapter of the Resource Element identifies possible solutions to the problem by establishing a new access to Huntington Road. In the interim, an upgrade project to South Century Drive is identified in the Project List in the Transportation chapter of the Resource Element. The project would add a continuous two-way center turn lane from the entrance at Sunriver to the intersection at Spring River Road. Roads classified as "future" in Figures 5.2.F4a-5.2.F4e of the Transportation chapter of the Resource Element are currently in need of either dedicated right-of-way, paving to County standard or both. The County makes the following changes in functional classification based on the current and projected traffic volumes, as well as the need for coordination between jurisdictions: Upgrade Functional Class Rural Collector to Rural Arterial • Baker Road from US 97 to Brookswood Blvd. • Burgess Road from US 97 to Day Road. • South Century Drive from US 97 to Spring River Road. • Cline Falls Highway from OR126 to Second St. (Tumalo). • Spring River Road from South Century Drive to FS Road #45. • Forest Service Road #45 from Spring River Road to Century Drive. Rural Local to Rural Collector • Stevens Road from Bend UGB to Ward Road • Nelson Road from Waugh Rd. to Powell Butte Highway • Billadeau Road from Ward Rd. to Arnold Market Rd. • Reed Road from US 97 to Darlene Way (edge of La Pine Community) • Hunnell Rd. from Tumalo Rd. to Bend UGB. • Rogers Rd. from Old Redmond -Bend Hwy. to Hunnell Rd. Rural Local to Future Rural Collector • Lazy River Drive to Tamarack Dr. • Tamarack Drive from Lazy River Dr. to 4th Street • 4th Street to Whittier Drive • Whittier Drive to La Pine State Recreation Road • Solar Drive to Milky Way • Upland Road from Milky Way to Savage Drive PAGE 22 of 42 — EXHIBIT "A" to ORDINANCE NO. 98-044 (8/26/98) 169 0 97 6 • Savage Drive from Upland Road to Winchester Drive • Winchester Drive From Savage Drive to Browning Drive • Browning Drive from Winchester Drive to Stagestop Drive • Stagestop Drive from Browning Drive to Bonanza Lane • Bonanza Lane from Stagestop Drive to South Century Drive • Sunrise Blvd. from Day Rd. to Burgess Rd. Downgrade Functional Class Rural Arterial to Rural Collector • Holmes Road from OR126 to Lower Bridge Way • OB Riley Road from Bend UGB to Johnson Market Road • Lower Bridge Way from Holmes Road to 43rd Street • Deschutes Market Road from US 97 to Bend UGB Rural Collector to Rural Local • Horse Butte Road from Knott Road to end. • Arnold Market Road from Rickard Rd. to Billadeau Rd. Deschutes County functional classification goals and policies are as follows: Goal 5. Designate access and land uses appropriate to the function of a given road. Policies 28. Deschutes County shall: a. Coordinate the County Transportation System Plan with the transportation system plans of the cities of Bend, Redmond and Sisters. The County shall emphasize continuity in the classification of roads and appropriate design standards for roads that link urban areas with rural areas outside the urban growth boundaries. Prior to the finalization of any UGB amendment, the County and affected city shall agree on the functional classification and design standards of County roads within the proposed UGB area. b. Request the transfer, or an agreement to transfer with specific timelines and milestones, jurisdiction of County roadways within the urban growth boundaries to their respective cities at the time of annexation. County policy also directs that any developer of property who proposes annexation and who has frontage on a road that does not meet city standards shall have the primary responsibility for upgrading the road to applicable city specifications. Roads shall be upgraded prior to or at the time of annexation, or the developer shall sign an agreement with the city to upgrade the road, at the time of development. Transfer of road jurisdiction shall require the approval of both the County and affected city in accordance with the provisions in ORS 373.270. PAGE 23 of 42 — EXHIBIT "A" to ORDINANCE NO. 98-044 (8/26/98) 169 - 0977 Road and Street Standards Historically, County road and street standards and specifications have been located in various places throughout the County Zoning and Subdivision Ordinances, making it a difficult task to implement standards uniformly and update them as needed. The County pledges to create a separate standards and specifications document, which will enable the County to periodically update or change specifications or road project procedures without a Comprehensive Plan amendment. The likely location for the new document or chapter will be in Title 12 (Road Department) of the Deschutes County Code. The new document will reflect the County's desire to no longer have urban road standards, only rural road standards, including specific standards for the unincorporated communities of La Pine, Terrebonne and Tumalo. Goal 6. Develop and adopt a document or chapter of Road Standards and Specifications that shall control all aspects of construction related to roads, pedestrian walkways and bicycle facilities occurring outside designated urban growth boundaries in Deschutes County. 7. Develop and adopt criteria for the requirement of various levels of traffic analysis for each new rural development. The traffic analysis requirements shall be located in the Road Standards document. Policies 29. After County adoption of the Deschutes County Road Standards and Specifications document, all new Deschutes County rural roads and reconstructed rural roads shall be built to those identified standards. In the interim, rural road dimensions outside of the unincorporated communities of Terrebonne and Tumalo shall' match the requirements set forth in Table 5.2.T1, which replaces current Table "A" located in Title 17 of the Deschutes County Code. The City of Sisters Road Development Standards shall apply within the Sisters Urban Area. The Road requirements for the unincorporated communities of Tumalo and Terrebonne are governed by the previously- adopted tables included in Appendix G of the Transportation chapter of the Resource Element. 30. Road, pedestrian and bicycle projects occurring in unincorporated areas within urban growth boundaries shall be governed by the respective city's road and street standards. Those requirements shall be coordinated between the city, the County and the applicant during the land use process according to procedures to be identified in the Deschutes County Road Standards and Specifications document. Road Management System Road management is an orderly scheduling of pavement preservation, maintenance, repairs and improvements to meet serviceability goals and provide safe, comfortable and economical transportation while striving to achieve the best possible value from available funds. Routine maintenance activities are carried out on a daily basis. Road sections requiring more extensive work are prioritized and then selected for improvements based on an evaluation of pavement condition. PAGE 24 of 42 — EXHIBIT "A" to ORDINANCE NO. 98-044 (8/26/98) 169 - 0978 Local road standards need to evolve over time as a given road experiences more traffic. A dirt or aggregate surfaced road may be adequate for access to individual properties. However, as additional properties begin to use that road for access, it may no longer be adequate. At a certain point, the owners of property using the road for access will need to join together and participate in the improvement of the road through the formation of a special road district or local improvement district. Goal 8. Maintain the County road network pavement in good to excellent condition. Policies 31. Deschutes County shall continue to maintain and preserve the County road network through its pavement management system which guides a program of paving, repairing, reconstruction, drainage clearance and vegetation control. 32. After safety-related issues, the highest volume road segments shall be the next priority for County road maintenance and repair. 33. If and when gravel or dirt criteria shall be: density classification, gap filling, evacuation potential. Level of Service roads are paved by the County, the main controlling of surrounding development, traffic volumes, road potential school bus routing efficiency and emergency Levels of service (LOS) describe the service quality on two lane roads or highways as determined by average travel speed, percent of time delay due to the inability to pass, roadway capacity utilization, or intersection delay. LOS ratings generally apply to collector and arterial streets only. LOS is defined by a range of designations from "A" to "F". LOS "A" is completely unimpeded traffic flow while "F" is highly congested. Table 5.232 in the Transportation chapter of the Resource Element identifies the relationship between two-way average daily traffic (ADT) volumes, level of service and the percentage of daily traffic that occurs during the peak travel hours of the day (K factor) on two-lane highways. While several road segments are expected to reach LOS "E" over the next 20 years, most County roads will be at LOS "D" or better as long as population growth does not exceed the projections. ODOT highway policies dictate that anything over LOS "C" outside of urban areas is unacceptable. For rural highway segments in Deschutes County, ODOT projects several to exceed LOS "D" over the next 20 years. Table 5.232 Maximum Average Daily Traffic Allowed for Various Levels of Service K Factor Level of Service A B I C I D E Average Daily Traffic Volume (ideal conditions, i.e., level terrain, etc.) 10% 2,400 1 4,800 1 7,900 1 13,50-0---T 22,900 PAGE 25 of 42 — EXHIBIT "A" to ORDINANCE NO. 98-044 (8/26/98) 169 0979 Goal 9. Maintain a level of service of "D" or better during the peak hour throughout the County arterial and collector road system over the next 20 years. Policy 34. Deschutes County shall continue to monitor road volumes on the County arterial and collector network. The County Road Department shall continue to be the department responsible for monitoring volumes and shall strive to count each arterial and collector at least once every four years. The Road Department shall periodically examine the traffic volumes to identify level of service deterioration. Capacity County Roads Traffic volumes on County roads were estimated using a combination of trending analyses and the Potential Development Impact Analysis work done by ODOT for Deschutes County. It was assumed that any road segment with fewer than 9,600 projected ADT in 2016 would operate at an LOS of "D" or better, and that LOS "D" is acceptable for County arterial and collector roads. Of all the County roads, only Baker Road (LOS "E") leading into Deschutes River Woods is projected to operate at worse than LOS "D" in 2016. Additional roads approaching LOS "E" are located in the South County and include: • Burgess Road west of Huntington Road in La Pine. • South Century Drive near Sunriver. These two road segments shall be monitored by the County Road Department and counted at least every two years instead of the usual 4 -year cycle. ODOT State Highways ODOT provides yearly traffic counts on all the state highways running through Deschutes County. ODOT used historical growth rates based on the last twenty years of traffic volume data. The yearly growth ranged from 0.0 to 11.4 percent. It was also assumed that the number of access points remained constant. Whereas the County road analysis related LOS directly to ADT levels, several highway segments may have high ADT levels but a correspondingly low LOS because of the presence of multilane and passing lane sections. Therefore, the most important analysis tool for highway sections becomes the LOS value rather than ADT. For multilane sections in the County, the forecasted traffic volumes are well within the capacity limits through the year 2016. However, several sections of the state highways will be reaching capacity thresholds for two-lane sections. The sections projected to approach capacity and operate at level of service (LOS) "D" or worse are: • Highway 126 through downtown Sisters and on either side of the City of Redmond. • Most of Highway 20/126 between the Jefferson County line, through Sisters and Bend to Powell Butte Highway. • Highway 97 from the Jefferson County line through Terrebonne and Cottonwood Drive south to La Pine. PAGE 26 of 42 - EXHIBIT "A" to ORDINANCE NO. 98-044 (8/26/98) 169 - 0980 • Highway 372 from Bend to Dillon Falls Road on the way to Mt Bachelor. Goal 10. Maintain the current arterial and collector system in the County and prevent degradation of the capacity of the system. Policies 35. Deschutes County shall monitor County arterials and collectors to help in the determination of when road improvement projects are necessary. 36. Deschutes County shall continue to work with the ODOT and the Cities of Bend, Redmond and Sisters to coordinate solutions to highway and non -highway road issues that cross over jurisdictional boundaries. 37. The County shall establish requirements and adopt standards for secondary access roads to isolated rural subdivisions. Bridges Deschutes County owns and manages approximately 120 bridges throughout the County. The County Road Department performs routine maintenance and repairs as necessary. Several of the bridges are signed for weight limitations in the five to fifteen -ton range because they are structurally deficient. Five bridges on higher volume roads are signed with 25 -ton weight limits. Since the recent replacement of the Fall River Bridge in 1995, no significant bridge problems have been identified for correction or reconstruction. Goal 11. Maintain a safe and efficient network of bridges on County roadways Policy 38. Deschutes County shall monitor the condition of County bridges on a regular basis, and perform routine maintenance and repair when necessary. The County shall also explore additional funding sources when major reconstruction or replacement of bridges is necessary. Truck Routes Currently Deschutes County has no designated truck routes or hazardous materials routes on County roads. However, several roads are signed to not allow trucks over a certain weight due to bridge limitations. Oregon is one of the few states that currently allow oversized tractor -trailer vehicles referred to as Longer Combination Vehicles (LCV's) on certain highways. Two types of Luvs, triple trailers and heavier double trailers (105,000 -Ib weight limit) are allowed to operate in Oregon without a special permit. Truck traffic is generally confined to industrial, commercial and surface mining areas. State highways serve the majority of truck traffic and are most suitable for truck use. The County shall continue to designate state highways as the desired through truck routes in the County. The draft 1998 Oregon Highway Plan proposes to designate U.S. 97 as a State Trucking Route. This designation could mean that additional funds would be PAGE 27 of 42 — EXHIBIT "A" to ORDINANCE NO. 98-044 (8/26/98) 169 - 0981 available for improvements to U.S. 97. Outside of the state highway system, trucks should be limited to travel only on arterial roads. Goal 12. Develop a plan of designated truck routes. Policy 39. Deschutes County shall require that long-haul, through trucks be limited to operating on Principal Arterial and Rural Minor Arterial roads as designated in the County transportation network, except in emergency situations and when no reasonable alternative arterial road is available for access to commercial or industrial uses. Hazardous Material Routes The transport of non -radioactive hazardous materials (NRHM) is guided by Part 397 of the Federal Motor Carrier Safety Regulations. The Federal Department of Transportation defines hazardous materials (HAZMAT) and regulates their packaging and shipping. ODOT designates the NRHM routes in Oregon. Currently, there are no designated NRHM routes in Central Oregon, which means HAZMAT can be transported through Deschutes County without any restrictions. In order to establish a new NHRM route, the County would need to work with ODOT to make findings on various federal criteria such as population density and proximity to hospitals and schools. The creation of NRHM routes requires a deeper understanding of the movement of these shipments than is currently available, therefore no routes shall be designated in this Plan. However, the County shall work with ODOT to determine if any Deschutes County highways should be candidates for designation as NRHM routes. Goal 13 Develop a plan of designated hazardous materials (NRHM) routes Policy 40. Deschutes County shall work with ODOT to determine the feasibility of designating NHRM route(s) through Deschutes County. Facility / Safety Improvements In 1996, the grant -funded Deschutes County Safe Communities program was initiated in an effort to reduce transportation -related injuries of all types. Program staff used the state accident database, from the Accident Data Unit at ODOT, to evaluate accident data for the period 1991 - April 1995. During this time period there were a total of 2,518 crashes reported on County roads and highways outside of urban areas. Of the total number of accidents, 70 were fatal, 1,073 involved injury (170 serious), and 1,375 were property damage only accidents. Safe Communities staff has also identified the difference in accident rates between the County in general and the rural areas. Countywide, fatal accidents accounted for 1.2 percent of the total number of accidents, while fatal accidents just in the rural area accounted for 2.8 percent of the total. Injury accidents PAGE 28 of 42 — EXHIBIT "A" to ORDINANCE NO. 98-044 (8/26/98) 189 0982 made up 4.4 percent of the County total, while in just the rural areas; they accounted for 6.8 percent of the total. The Safe Communities Group identified the process of reengineering high incident areas, where the greatest number of accidents occur, as the most important issue that should be addressed within the first year of the program. However, it could also be argued that the number of accidents alone is not the only indicator of need for corrective measures. A location with very high traffic volumes and a high accident rate may be safer than a location with low volumes but a high accident per average daily trip (ADT) rate. The "high priority" projects in the Project List section of the Transportation chapter of the Resource Element include improvement projects recommended to improve safety. Goal 14 Maintain a safe and efficient network of roadways. Policy 41. Deschutes County shall maintain a prioritized inventory of safety -deficient facilities on the County road network and give highest priority to correcting safety issues. PUBLIC TRANSPORTATION Special Transit Services Fixed -Route Transit There is currently no traditional fixed -route local transit service in Deschutes County. However, the Mt. Bachelor Ski Resort Super Shuttle does operate during the winter months on a fixed - route and schedule. The County shall continue to work with service providers such as Mt. Bachelor to secure additional funding as well as increase promotion of their services. Future Fixed -Route Transportation Options In 1997, ODOT funded a study to address the issue of a fixed -route, commuter shuttle transit system between Bend and Redmond. The Study includes a commuter survey, information regarding potential ridership and costs. The results indicated that the most feasible operation would be a 3 -van system with reasonably direct routing and few stops. The travel time between Bend and Redmond would average 30 minutes. The capital costs would be approximately $150,000, with annual operating costs of $200,000. Average daily ridership could average 100 if fares were $3.00 or less. Further study would be required prior to implementation. If the County were to establish a rural transit "district' to include a Bend -Redmond shuttle, another potential transit route could be from La Pine to Bend. Although no formal study has been done on this, similar results as the Bend -Redmond Study would be expected. A major difference in a La Pine -Bend shuttle would be the limited number of stops in La Pine and Wickiup Junction, and a probable diversion to serve Deschutes River Woods. To achieve its potential, a commuter shuttle service needs good connections to sidewalks, bikeways, fixed -route transit and rideshare lots. Currently, there is no fixed -route transit in Bend or Redmond. The sidewalk and bicycle networks are generally fragmented and there are few rideshare lots. Because of these limitations, a shuttle service should attempt point to point PAGE 29 of 42 — EXHIBIT "A" to ORDINANCE NO. 98-044 (8/26/98) 169 -0963 travel as much as possible, which means working with larger employers to encourage the service. Figure 5.3.F1 in the Transportation chapter of the Resource Element identifies the potential routes and stops for a County rural transit system. The need for a public transit center has been identified and shall be supported by Deschutes County. The center would include adequate parking and restroom facilities, and provide the opportunity to transfer between multiple intercity and local service providers. The most likely transit center location is in Bend, but additional locations in Redmond and possibly La Pine/Wickiup Junction may also be established. The County shall cooperate with ODOT and local jurisdictions in establishing future transit facilities as needed. Local Demand -Responsive Transportation Deschutes County has a network of special transportation providers who serve the elderly and disabled population. In most cases, the general public does not have access to these special transportation services. There are several providers of special transportation services in the County, ranging from public to private, both profit and non-profit. The following are the existing service providers in the County: • City of Bend Dial -A -Ride • Central Oregon Council On Aging (COCOA) Dial -A -Ride • Opportunity Foundation of Central Oregon • Residential Assistance Program (RAP) • Disabled American Veterans • Volunteer Services • Central Oregon Resources for Independent Living • Access Express With limited funding options, no significant expansions in these demand responsive programs are planned. Short-term capital needs have been identified for several dial -a -ride service providers and are included in the Project List. Intercity Bus and Passenger Rail The following intercity bus services are planned to continue as the primary (and only) public transit options in the County. • Greyhound • CAC Transportation • The People Mover • Porter Stage Lines • Valley Retriever The focus is to maximize the efficiency of these services as land use changes occur. The County realizes it has no control over the market driven forces that allow private transit providers to thrive or just survive. Increased emphasis shall be placed on the transit/rideshare connections possible in the South County as the population increases. The County will continue to work with the cities of Bend and Redmond as they investigate the possibility of fixed -route local transit systems. Without a local transit system to distribute trips, a commuter system linking the rural and urban areas of the County is less likely to succeed. PAGE 30 of 42 — EXHIBIT "A" to ORDINANCE NO. 98-044 (8/26/98) 169 h 0984 The Oregon Transportation Commission in November 1992 adopted the Oregon Rail Passenger Policy and Plan. It provides a comprehensive long-range plan for railroad passenger service in Oregon in coordination with the Oregon Transportation Plan. Unfortunately, passenger rail service for Central Oregon was ruled out as not being cost-effective. However, as conditions change and the population of Deschutes County continues to increase, the County will monitor the feasibility for future passenger rail service and work with ODOT and the community on future transit/rail options. Goal 15. Enhance the opportunity for intermodal connections throughout the County transportation system. 16. Increase the existing level of special services provided. 17. Establish rural transit service for Deschutes County residents. 18. Decrease barriers to the use of existing services. Policies 42. Deschutes County shall work with ODOT, the cities of Bend, Redmond and Sisters, and transit service providers to study countywide rideshare facility needs, and investigate public transit possibilities including potential transit stops for a regional or commuter -based transit system. Those possibilities shall include bus and rail, and if economically feasible, the County shall seek such services as are found to be safe, efficient, and convenient in serving the transportation needs of the residents of Deschutes County. 43. Deschutes County shall continue to work with special service providers, ODOT, and the cities of Bend, Redmond and Sisters to secure additional funding as well as increase promotion of those special transit services that may be underutilized. 44. Deschutes County shall monitor the needs of the transportation disadvantaged and attempt to fill those needs. BIKEWAYS AND PEDESTRIANS In March 1992, the County adopted a Bicycle Master Plan as a resource element of the Deschutes County Year 2000 Comprehensive Plan. The Bicycle Master Plan provides recommendations for policies, classifications of bike facilities, location of bike facilities, bicycle parking and other transportation issues related to bike facilities. Many of the goals and objectives of that Plan have been implemented and/or are still valid. With the adoption of the latest version of the Oregon Bicycle and Pedestrian Plan by the Oregon Transportation Commission on June 14, 1995, portions of the 1992 County Bicycle Master Plan are no longer relevant. The new state Plan contains several changes from earlier versions, which will have an effect on the Deschutes County Bicycle Master Plan. The most significant change is the new emphasis on pedestrian facilities, which were not addressed in the previous Plan. PAGE 31 of 42 - EXHIBIT "A" to ORDINANCE NO. 98-044 (8/26/98) 189 - 0985 Based on need and road characteristics, all roads open for public use should be considered for the potential to improve bicycling and walking. Facilities should safely accommodate the majority of users. Roads designed to accommodate cyclists with moderate skills will meet the needs of most riders; special consideration should be given close to school areas, where facilities designed specifically for children should be provided. Roads designed to accommodate young, elderly and disabled pedestrians serve all users well. Rural Bikeways On most rural roadways, shoulder bikeways are appropriate, accommodating cyclists with few conflicts with motor vehicles. In general, the minimum shoulder widths recommended by Oregon Bicycle and Pedestrian Plan for rural highways are adequate for bicycle travel. These standards take into account traffic volumes and other considerations. Shared roadways are adequate on low-volume rural roads, where motor vehicle drivers can safely pass bicyclists due to the low likelihood of encountering on -coming traffic. Shoulder bikeways can be added to roads with high bicycle use, such as in semi -rural residential areas or close to urban areas. It may be appropriate to stripe and mark shoulders as bike lanes near schools or other areas of high use. Even adding minimal -width shoulders can improve conditions for bicyclists on roads with moderate traffic volumes. On roads with high use, it may be necessary to add full -width shoulders in areas of poor visibility due to topography. Rural Walkways In sparsely populated areas, the shoulders of rural roads usually accommodate pedestrians. There are, however, roadways outside urban areas where the developing urban character creates a need for sidewalks, such as on highly developed commercial strips or in residential clusters along county roads or state highways. How and where pedestrians cross arterial roads is potentially more important that pedestrian travel along roads. Road volumes will dictate at what locations special pedestrian treatments may be warranted. It is anticipated that much of the focus will be on the state highways as they travel through rural communities. These locations have the highest concentrations of pedestrians and activity centers. Pedestrian treatments will be analyzed in concert with traffic calming strategies on the highways. Where sidewalks are not provided, paved shoulders should be wide enough to accommodate both pedestrians and bicyclists, Paved multi -use paths provided on one or both sides of a roadway in a rural community may be appropriate for providing access to schools. These paths will also serve the needs of young bicycle riders. Through the site plan review process, the County will continue to monitor pedestrian facility design, and require appropriate facility designs to comply with provisions of the Americans with Disabilities Act (ADA). The TSP identifies policies, bike and pedestrian facility classifications, design standards and construction and maintenance guidelines. Many of the design standards apply to urban rather than rural areas. However, they are in this plan because they may apply to specific projects, new neighborhoods, or urban unincorporated communities. This TSP contains a list of suggested improvements on the Deschutes County Road System to accommodate bike and pedestrian facilities. Completion of these projects will considerably enhance the network of bike and pedestrian facilities throughout the County. PAGE 32 of 42 — EXHIBIT "A" to ORDINANCE NO. 98-044 (8/26/98) 169 -0986 The TSP recommends standards and design guidelines for bicycle and pedestrian facilities set by the 1995 Oregon Bicycle and Pedestrian Plan. All traffic devices used in conjunction with bikeways are required to meet the standards set forth in the national Manual on Uniform Traffic Control Devices (MUTCD). Goals 19. Adopt a Countywide system plan for bike and pedestrian facilities which provide access to various destinations within unincorporated communities and between urban areas and unincorporated communities. 20. Provide and maintain a safe, convenient and pleasing countywide bicycle and pedestrian system that is integrated with other transportation systems. 21. Establish bicycle safety, education and enforcement programs for all ages, improve riding skills, achieve observances of traffic laws, increased awareness of cyclist's and pedestrian rights, and monitor and analyze bicycle accident data to determine safety problem areas. Policies 45. Deschutes County shall coordinate local plans for pedestrian and bicycle facilities with the 1995 Oregon Bicycle and Pedestrian Plan. The statewide plan provides a framework for a local bicycle and pedestrian system and design standards. 46. Deschutes County shall require bike facilities at locations that provide access within and between residential subdivisions, schools, shopping centers, industrial parks, and other activity centers when financially feasible. 47. Deschutes County shall: a. Balance the plan with a variety of facilities to meet the needs of different cyclists; b. Plan for bicycle access between the County's urban and rural areas; c. Develop a bikeway system, to be updated yearly and including a map for the public that describes the opportunities for bicycling in Deschutes County; d. Establish priorities for facility construction and maintenance based on need and resource availability; e. Evaluate the plan regularly to monitor how well the facilities meet the goals of the Plan; f. Upgrade rural road shoulder widths to County standards during road modernization or maintenance projects involving overlays as funding allows; g. Require bicycle and pedestrian facilities to satisfy the recreational and utilitarian needs of the citizens of Deschutes County; PAGE 33 of 42 — EXHIBIT "A" to ORDINANCE NO. 98-044 (8/26/98) 169 w 0987 h. Make potential use, safety and the cost of bikeway construction, the primary considerations when designing specific bikeways; L Emphasize the designation of on -road bikeways, where conditions warrant due to safety reasons and the cost of construction and maintenance of separate bike paths; j. Expend resources for the maintenance of existing bikeways and to keep pace with the development of new bikeways; k. Designate that the Deschutes County Bicycle and Pedestrian Advisory Committee facilitate the coordination of all bicycle and pedestrian planning in the County to assure compatibility; I. Designate that the Deschutes County Bicycle and Pedestrian Advisory Committee assure that the Plan remains up-to-date and that implementation proceeds according to the Plan; m. Work with affected jurisdictions to acquire, develop and maintain a series of trails along the Deschutes River, Tumalo Creek, and the major irrigation canals so that these features can be retained as a community asset; and n. Adopt standards for trail system right-of-ways and trail improvements that are based on the type of planned trail use and reflect the standards of the 1995 Oregon Bicycle and Pedestrian Plan. On -Road Route Selection The integrity and usefulness of the bicycle system mandates that future development is designed with bicycling in mind. Goal 22. Coordinate on -road County bikeways with known existing and proposed state and city bikeways. Policies 48. New public and private land developments in Deschutes County shall accommodate and tie into the bicycle system, and shall provide their residents and employees with appropriate bicycle facilities. 49. County arterials and collectors may use shoulder bikeways or shared roadways. These bikeways shall be upgraded to bike lanes when highway reconstruction occurs and the traffic volumes warrant lanes. 50. Deschutes County shall facilitate safe and direct bicycle and pedestrian crossings of arterial roads. 51. On -road bikeways shall be constructed in accordance with the specifications set forth in the 1995 Oregon Bicycle and Pedestrian Plan. PAGE 34 of 42 - EXHIBIT "A" to ORDINANCE NO. 98-044 (8/26/98) Off -Road Route Selection On -road bike facilities are generally preferred due to their lower cost and easier maintenance. However, paved and unpaved off-road bike paths could cater more to the recreational and fitness riders, and also offer an automobile -free route for inexperienced and younger cyclists. Well-placed paths could also serve commuting traffic. A paved multi -use path should be of sufficient width to accommodate multiple user groups such as jogging strollers and rollerbladers. The opportunity exists in Deschutes County to create off-road, separate multiple -use paths in some circumstances: •\ Along maintenance "ditchrider" roads adjacent to main irrigation canals. • Major utility easements. • Short connector routes between adjoining subdivisions, and between subdivisions and adjoining schools and parks. • Abandoned roadways. • Additional bicycle paths within destination resorts and new recreational communities now in the planning stage. • Heavily impacted forest trails. Goal 23. Identify a system of off-road paved multiple use paths to be included in the County transportation system. Policies 52. Developers in Deschutes County are encouraged to design paths that connect to the countywide bikeway system and that provide a direct route for commuters. In some cases, it may be appropriate to relax a requirement, such as for a sidewalk on one side of a residential street, in favor of a comparable bike path in the development. However, the use of a bike path shall not change the on -road bikeway requirement for arterials and collectors. 53. Deschutes County shall facilitate mountain bike routes and the creation of paved off-road multiple -use paths. The County shall identify routes and incorporate them into its transportation system where appropriate. Particular attention shall be given to obtaining and keeping rights-of-way for uninterrupted routes linking areas within the County. Natural corridors such as rivers, irrigation canals, ridges and abandoned roadway and rail lines shall receive special attention. Proposed developments may be required to provide such identified rights-of-way as part of their transportation scheme in order to maintain the integrity and continuity of the countywide system. 54. The County shall work with local agencies and jurisdictions to acquire, develop and maintain those sections of trail that are located outside of UGB's, but are part of a trail plan or map that has been adopted by the local jurisdiction and the County. 55. Off-road paved multiple use paths shall be constructed in accordance with the specifications set forth in the 1995 Oregon Bicycle and Pedestrian Plan. PAGE 35 of 42 — EXHIBIT "A" to ORDINANCE NO. 98-044 (8/26/98) 169 - 0999 Facility Requirements The TPR has various requirements relating to bicycle facilities such as bike parking amounts and areas, and employee considerations such as shower and changing facilities. Most of these requirements have already been implemented through Deschutes County ordinances, but are reinforced here with goals and policies. Goal 24. Maintain the existing development requirements for bicycle facilities in Deschutes County. Policy 56. Deschutes County shall maintain and update as necessary the existing ordinance requirements for bicycle facilities found in Title 18.116.031, or such other location that it may be moved to within the Deschutes County Development Code. AIRPORTS The continued operation and vitality of airports registered, licensed or otherwise recognized by the Department of Transportation is a matter of State and County concern. There are currently 18 registered airports in Deschutes County. Four of these are public use airports; two of which, Bend Municipal and Redmond Municipal -Roberts Field are publicly owned while Sisters Eagle Air and Sunriver airports are privately owned. These airports have improved (paved) runways, and offer a range of services, from the availability of commercial passenger flights arriving and departing daily at Redmond Municipal Airport, to the Sisters (Eagle Air) Airport which offers no services or runway navigational aids. The Redmond Airport, which is located within the City limits of Redmond, is owned and controlled by the City of Redmond. It has a master plan, which was adopted by the City in 1988. The Plan is currently being updated, and when completed, will guide the future use of the airport. The Master Plan will include an inventory of existing facilities, land use, aviation forecasts, a demand/capacity analysis, airport plans and a development program. The County recognizes the 1980 Bend Airport Master Plan as the guiding document for airport development. The Bend Plan is scheduled for an update in the near future. Once updated, the County will need to adopt the new Plan for it to become the new guiding document for airport development. No changes or expansions to the Sisters and Sunriver airports are envisioned at this time. Currently, LCDC has administrative regulations (OAR 660-13) which were adopted in 1996. These regulations apply to airports that, in 1994, were the base for three or more aircraft. However, with the passage of HB 2605, the regulations were revised by the 1997 Oregon Legislature, which will require DLCD to update the rules to incorporate the changes made by the Legislature. For purposes of this TSP, the County will not alter current land use regulations in response to the current regulations (OAR 660-13) which have been revised by the Oregon Legislature. While the content of the new regulations is not yet known, the County policy shall be to develop ordinances to comply with the new regulations once they are adopted by DLCD. PAGE 36 of 42 — EXHIBIT "A" to ORDINANCE NO. 98-044 (8/26/98) 169 - 0990 Goal 25. Protect the function and economic viability of the existing public -use airports, while ensuring public safety and compatibility between the airport uses and surrounding land uses for public use airports and for private airports with three or more based aircraft. Policies 57. Deschutes County shall protect public -use airports through the development of airport land use regulations. Efforts shall be made to regulate the land uses in designated areas surrounding the Redmond, Bend, Sunriver and Sisters (Eagle Air) airports based upon adopted airport master plans or evidence of each airports specific level of risk and usage. The purpose of these regulations shall be to prevent the installation of airspace obstructions, additional airport hazards, and ensure the safety of the public and guide compatible land use. For the safety of those on the ground, only limited uses shall be allowed in specific noise impacted and crash hazard areas that have been identified for each specific airport. Protecting the privately owned, private -use airports, with three or more based aircraft, will be accomplished by development of specific land use regulations for these types of airports. The function and economic vitality of privately owned, private -use airports with two or fewer based aircraft will also be accomplished through land use planning. Each airport's specific level of risk and usage shall be used to guide the continued safe aeronautical access to and from these airports considering the type of aircraft approved to use the airfield. 58. Deschutes County shall: a. Continue to recognize the Redmond (Roberts Field) Airport as the major commercial/passenger aviation facility in Deschutes County and an airport of regional significance. Its operation, free from conflicting land uses, is in the best interests of the citizens of Deschutes County. Incompatible land uses shall be prohibited on the County lands adjacent to the airport; b. Cooperate with the cities of Bend, Redmond and Sisters in establishing uniform zoning standards, which will prevent the development of hazardous structures and incompatible land uses around airports; c. Through adoption of appropriate zoning restrictions, take steps to ensure that any proposed uses shall not impact airborne aircraft because of height of structures, smoke, glare, lights which shine upward, radio interference from transmissions or any water impoundment's or sanitary landfills which would create potential hazards from waterfowl to airborne aircraft; d. Through adoption of appropriate zoning restrictions, allow land uses around public -use airports that will not be adversely affected by noise and safety problems and will be compatible with the airports and their operations; e. Work with, and encourage airport sponsors to work with the Federal Aviation Administration (FAA) to enforce FAA -registered flight patterns and FAA flight PAGE 37 of 42 — EXHIBIT "A" to ORDINANCE NO. 98-044 (8/26/98) 169 - 0991 behavior regulations to protect the interests of County residents living near airports. f. Adopt zoning restrictions to ensure that developments in the airport approach areas will not be visually distracting, create electrical interference or cause other safety problems for aircraft or persons on the ground. In addition, efforts shall be made to minimize population densities and prohibit places of public assembly in the approach areas; g. Continue efforts to prevent additional residential encroachment within critical noise contours or safety areas without informed consent; h. Specifically designate any proposed airport facility relocations or expansions within County jurisdiction on an airport master plan or airport layout plan map, as amended, and establish the appropriate airport zoning designation to assure a compatible association of airport growth with surrounding urban or rural development; i. Maintain geographic information system (GIS) mapping of the Airport Overlay Zones and provide timely updates; j. For those airports in Deschutes County without adopted master plans, the County shall, as a minimum, base any land use decisions involving airports on LCDC airport regulations, upon adoption of those regulations by LCDC, which implement HB 2605; k. Participate in and encourage the County -adoption of airport master plans for all public use airports and at least an airport layout plan for the remaining ODOT-recognized airfields in Deschutes County; I. Encourage appropriate federal, state and local funding for airport improvements at public -owned airports; and m. Discourage future development of private landing fields when they are in proximity to one another, near other public airports and potential airspace conflicts have been determined to exist by the Federal Aviation administration (FAA) or ODOT Aeronautics. RAILROADS Goals 26. Maintain the existing levels of freight rail activity throughout the County while also encouraging expanded usage by commercial and industrial companies. 27. Increase the safety of existing at -grade crossings and work towards the eventual replacement of all at -grade crossings with gate -protected or grade -separated crossings. PAGE 38 of 42 — EXHIBIT "A" to ORDINANCE NO. 98-044 (8/26/98) 169 - 0992 Policies 59. Deschutes County shall: a. Work cooperatively with affected local jurisdictions and railroad operators to reduce land use conflicts and increase safety at all at -grade crossings; b. Encourage efforts to improve the condition of rail lines throughout the County in order to retain the effectiveness and competitiveness of freight rail; c. Not endorse the abandonment of any rail lines unless they are to be converted to trail use through the federal "Rails to Trails" program. Once converted, the trails will be incorporated into the County Bikeway/Trail System; d. Not endorse any activities that would diminish existing rail service; and e. Work cooperatively with affected local jurisdictions, businesses and railroad operators to protect all rail spurs that currently serve businesses or have the potential to serve freight rail uses from abandonment or incompatible zoning. WATERWAYS A water -borne transportation plan is not applicable in Deschutes County. PIPELINES Many miles of pipeline in Deschutes County currently carry power transmission lines, cable television, telephone, natural gas, water and sewage. The County encourages the continued use of pipelines to carry goods across County boundaries and for distribution within the County. TRANSPORTATION SYSTEM MANAGEMENT (TSM) AND TRANSPORTATION DEMAND MANAGEMENT (TDM) Although not urban, Deschutes County still has the potential to use several TSM and TDM strategies in order to help preserve the function of major County roads and state highways. Transportation System Management (TSM) TSM improvements focus on optimizing the carrying capacity of roads by alleviating congestion and reducing accidents. Examples of TSM strategies include: • Minimizing the number of access points • Channelization of turning movements • Creation of continuous turning and merging lanes • Raised medians • Signalization An important aspect of TSM is that public agencies work closely with affected businesses to fully evaluate impacts from changes to access. In addition, TSM must account equally for the PAGE 39 of 42 — EXHIBIT "A" to ORDINANCE NO. 98-044 (8/26/98) 169 -0993 needs of all modes of travel, particularly that bike, pedestrian and transit movements and safety are not compromised in exchange for improving roadway capacity. Goal 28. In order to optimize the carrying capacity of the County road system, provide cost effective transportation improvements and implement strategies that shall improve the efficiency and function of existing roads. Policies 60. Deschutes County shall adopt land use regulations to limit the location and number of driveways and access points on all collector and arterial roads 61. Deschutes County shall ensure that land use actions support the access management policies of the Oregon Department of Transportation (ODOT) along state highways 62. Deschutes County shall implement transportation system management measures to increase safety and reduce traffic congestion on arterial and collector streets, and protect the function of all travel modes. 63. Deschutes County shall promote safety and uninterrupted traffic flow along arterials via the following planning considerations: a. Clustering of all types of development and provisions for an internal traffic circulation pattern with limited arterial access shall be encouraged; b. A minimum setback of 50 feet from arterial rights-of-way shall be required; c. Recommendations on speed limits shall be forwarded to the State Speed Control Board. Transportation Demand Management (TDM) Unlike TSM strategies, which focus on physical changes, TDM targets driver behavior, mode choice and employers to lower the traffic demands on the roads, especially during the peak travel times of the day. Examples of TDM strategies include: • Alternative or flexible work schedules • Ridesharing/carpooling • Transit use • Bicycling/walking • Parking management • Working at home/telecommuting (teleworking) TDM strategies often involve and education and promotion effort to encourage changes in single occupant driving behavior. Therefore, TDM strategies require a concerted community and/or employer effort and commitment to realize the greatest results. A "tool box" of TDM strategies suitable for Central Oregon is included in Appendix M of the Transportation chapter of the Resource Element. Also significant is that, of all the different strategies used to relieve PAGE 40 of 42 — EXHIBIT "A" to ORDINANCE NO. 98-044 (8/26/98) 169 - 0994 congestion, TDM efforts in Bend, Redmond, Sisters, Prineville, and Madras can all affect the County and each city because of the employee commute patterns throughout the tri -county area. Goal 29. Reduce peak hour traffic volumes on County roads and diminish the exclusive use of single -occupant vehicles. Policies 64. Deschutes County shall: a. Encourage businesses to participate in transportation demand management efforts through the development of incentives and/or disincentives. These programs shall be designed to reduce peak hour traffic volumes by encouraging ridesharing, cycling, walking, telecommuting, alternative/flexible work schedules and transit use when it becomes available; b. Work with business groups, large employers and school districts to develop and implement transportation demand management programs; c. Continue to support the work of non-profit agencies working towards the same TDM goals as Deschutes County; d. Encourage programs such as van or carpooling (rideshare) to increase vehicle occupancy and reduce unnecessary single -occupant vehicle travel; e. Continue to pursue the development of park and ride facilities and consider the siting of a rideshare facility, based on identified needs, when realigning County roadways, considering the sale of surplus property, or reviewing land use applications for developments that could benefit from such a facility; f. Pursue the development and utilization of telecommunication technologies that facilitate the movement of information and data; g. Support efforts to educate the public regarding the actual costs related to travel on the transportation system and encourage transportation demand management alternatives; and h. Establish and make available a transportation demand management program to County employees, to serve as a role model for the community. DESCHUTES COUNTY TRANSPORTATION PROJECT LIST The list of expected transportation projects needed over the next twenty years is provided in the Transportation chapter of the Resource Element. The projects chosen were a result of: • Analysis of County roadway accident data provided by the state. • Using capacity analysis on County roads based on the forecasted growth. • Knowledge and experience of the County Road Department. PAGE 41 of 42 — EXHIBIT "A" to ORDINANCE NO. 98-044 (8/26/98) 169 - 0995 • Public input • Efforts to enhance non -auto modes of transportation to conform to requirements of the State Transportation Planning Rule (OAR 660-12). The project list is broken down into two categories: • A list of previously -committed projects, which in most cases, the County has an obligation to fund and/or construct; and A prioritized detailed project list of the remaining needs in Table 5.1131 of the Transportation chapter of the Resource Element. The method used to prioritize the projects involved a criteria -ranking system. The complete ranking matrix is located in Appendix J of the Transportation chapter of the Resource Element. Categories were created then divided up by level of importance as follows: Most Important: Solving safety problems Other Important Criteria Included: Maximizing the use of pedestrian and bicycle facilities Location of schools, parks and fire stations Project cost, cost per average daily trip (ADT) Pavement condition index Anticipated traffic volumes (2016) Safety related issues were automatically placed at the top of the list, then were ranked by cost and future traffic volumes within their category. Projects that add or enhance bicycle and pedestrian facilities and/or have access to schools, parks or fire stations, received extra credit. The rankings for each category were added together to result in a numerical score or "rank total". The lower the "rank total" number was, the higher the project was rated. The rankings for bike and pedestrian projects within the communities of Terrebonne and Tumalo were defined by a community planning process that took place in 1996-'97, and were to be used as general guidelines. Goal 30. Have an annual review of the Transportation Project List for the purposes of prioritizing, adding or deleting projects. Policies 65. The Deschutes County Board of Commissioners shall review the Transportation Project List annually to add, delete, and/or reprioritize projects, and may do so by adoption of a resolution. 66. The County Board of Commissioners has the authority to add projects to the list at any time if whole or partial private sector (developer) funding becomes available through the land use process, and the potential financial benefit to the County can be demonstrated to the satisfaction of the Board. PAGE 42 of 42 — EXHIBIT "A" to ORDINANCE NO. 98-044 (8/26/98) 169 -0996 EXHIBIT "B" Deschutes County Transportation System Plan Adopted by Ordinance 98-044 on August 26, 1998 by the Deschutes County Board of Commissioners Deschutes County, Oregon 169 0997 Deschutes County Transportation System Plan Prepared By: Deschutes County Community Development Department Long -Range Planning Division For: 06 Deschutes County, Oregon 117 NW Lafayette Bend, OR 97701 (541) 388-6575 This project was partially -funded through a grant from the Oregon Department Of Transportation (ODOT) Cover photo: Early attempt at ridesharing circa 1918, the Meeks and Staffer children at Hampton, Oregon. Unless otherwise noted, all photos in this document are courtesy of the Deschutes County 00 Historical Society Page 2 of 232 — EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) • Deschutes County Transportation System Plan Staff: Deschutes County Steve Jorgensen, Project Manager 117 NW Lafayette Bend, OR 97701 Phone: (541) 383-6718 Fax: (541) 385-1764 Catherine Morrow, Principal Planner Phone: (541) 385-1708 Tom Blust, Road Department Director Phone: (541) 388-6581 Oregon Department of Transportation Peter Russell, Senior Planner 63034 O.B. Riley Road Bend, OR 97701 Phone: (541) 388-6046 Fax: (541) 385-0476 is Mark DeVoney, Region 4 Planning Manager Phone: (541) 388-6342 Committees: 169 - 0998 E-mail: stevej(a deschutes.org County Transportation Advisory Committee Deschutes County Planning Commission Rick Root, City of Bend Tony Tirico, City of Bend Bob Quitmeier, City of Redmond Neil Thompson, City of Sisters Dick Johnson, Deschutes County Road Department Gary Judd, Deschutes County Road Department Deborah Hogan, Deschutes County Safe Communities Paul Blikstad, Deschutes County Planning Department Barbara Rich, Deschutes County Planning Department Brian Harrington, Deschutes County Planning Department Deschutes County Board of Commissioners Paul Bianchina (Chair) Jerry Miller Bruce Brothers Ted Schassberger Everett C. Turner Beverly Nilsson Joel Dasenko Eric Dolson (former Commissioner) Nancy Pope Schlangen (Chair) Robert L. Nipper Linda Swearingen Barry Slaughter (former Commissioner) Page 3 of 232 — EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 w 0999 . Deschutes County Transportation System Plan EXECUTIVE SUMMARY The Deschutes County Transportation System Plan addresses transportation needs throughout the County over the next twenty years (1996-2016). The County transportation system provides connections between Deschutes County and adjacent counties, as well as between the urban and rural areas within the County. The transportation network involves many different modes, including auto, bike, pedestrian, rail and transit. The Plan provides an overview of the existing transportation system in the County and addresses both short and long-term transportation needs. In the short-term, the study identifies and provides recommended solutions to immediate safety and congestion problems. For the future, the study looks at the next 20 years in Deschutes County, and identifies through goals and policies, how best to move people and goods efficiently throughout the County. Long-term projects are identified and prioritized. The Plan contains many pages of background information and facts, including data on the County's 943 road miles of maintenance jurisdiction, 80 percent of which are paved. The County currently maintains approximately 123 miles of urban roads within city limits and urban growth boundaries (UGBs). Approximately 200 miles of principal arterials in the County are . designated State Highways. Twenty-one percent (21 %) of County roads carry more than 1,500 vehicles per day. There are twelve bridges with restrictive load limits, on the County road system. Between 1991 and 1995, there were 2,528 reported crashes on County roads outside of urban areas. Of the total number of accidents, 70 were fatal, 1,073 involved injury (170 serious), and 1,375 involved only property damage. Less than one percent (1%) of all crashes in the County were fatal. However, a driver and their passengers are three times as likely to be killed in a crash occurring on a rural road. The Plan identifies six intersections on the County road system for safety-related improvements. The Plan examines the status of other modes of transportation in the County including bicycle, air, public transit and rail. Generally, the approximately 750 paved miles of County -maintained roads provide the most efficient and safest routes for bicycle commuters and recreational riders to travel between home, work and school. The existing public transit system consists of intercity providers such as Greyhound, demand responsive "dial -a -ride" services and the Mt. Bachelor Super Shuttle. There are designated rideshare areas in Wickiup Junction, south Redmond, north Bend and Sisters. The nearest passenger rail station is located in Klamath County at Chemult. The Burlington Northern & Santa Fe Railroad provides freight rail service. The general aviation, public -use airports in the County are located at Redmond, Bend, Sunriver and Sisters (Eagle Air). State population projections estimate the County population in 2016 at 172,427 with 79,530 persons or 46 percent living in the incorporated cities of Bend, Redmond and Sisters. Population and employment projections were used to estimate future traffic on the road network and highlight future deficiencies. The analysis showed that the road network necessary to serve the future population is essentially in place. Because of the rural nature of Page 4 of 232 — EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) • 169 - 1000 much of the County, any anticipated development will occur on a rural scale and should have only minor impacts on the transportation system. However, increasing traffic volumes are projected on the state-owned highway system, especially in the South County area where most of the future countywide growth is anticipated. The rate of development is anticipated to continue and should use up available rural lots over the next twenty years, resulting in rural "buildout". In response to Deschutes County's efforts to involve the public in the planning process, this Plan addresses issues raised: • At two TSP public open houses; • Through a public survey, • At multiple meetings with the Deschutes County Planning Commission, • At meetings held in La Pine, Terrebonne and Tumalo regarding rural community planning, • Through written correspondence, • At multiple meetings held with the County Bicycle and Pedestrian Advisiory Committee, and • At meetings with the La Pine Transportation Advisory Group. The issues raised include: • High speeds through rural communities • Safety issues at many County intersections • Highway access from County roads • Lack of road shoulder width for bicycle use • Secondary road access to isolated subdivisions • Ice build-up on roads and highways • Condition of roads, deferred maintenance The Plan supports the goals and policies outlined in the Highway 97 Corridor Strategy, which was adopted by the Oregon Transportation Commission, as well as the rural community plans for La Pine, Terrebonne and Tumalo, which were adopted by the Deschutes County Board of Commissioners. The Plan also provides policies and project recommendations to meet the requirements of the Transportation Planning Rule (Statewide Goal 12, OAR 660-12). Deschutes County is required by Goal 12 to adopt standards and policies in the Transportation System Plan that encourage multimodal travel and reduce reliance on the single -occupant automobile. The Rule also requires that Deschutes County set standards and policies to promote and enhance pedestrian, bicycle, and transit travel. A complete list of the proposed transportation goals and policies that address all modes of transportation is provided in the Plan. Depending on the combination of projects chosen for short-term implementation and long-term programming, the following are the costs for the County Transportation System Plan projects over the next 20 years. Page 5 of 232 — EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 - 1001 Project Summary revious y Committed Projects Total $ 940,000 o - erm, High Priority Projects Total $11,051,080 11- erm, Priority Projects Total $43,957,740 n ge Projects Total $647,900 11- erm, Non -Prioritized Projec s Total $57,139,174 Total 20 -Year Combined Project Costs: $112,147,994 The ability of the County to fund needed projects is in doubt. With the limited future funding opportunities available, the project outlook is questionable. Under current funding levels there • are no resources available for capital projects outside of the County's previously committed projects. In addition, if road preservation takes precedence over new projects, the projected funding available for road operations, maintenance and preservation (OM&P) alone over the next three years is already $8.1 million below the Road Department's estimated minimum desired level of OM&P. • Projected Shortfalls: 1998-1999 $2.4 million 1998-2000 $2.8 million 1998-2001 $2.9 million $8.1 million The minimum desired level of OM&P is based on the Road Department's 1992-93 Operations Plan, which defined levels of service. The dollar figures from this study have been adjusted to reflect 1998 costs. Also, the mileage figures used to calculate the total OM&P costs have been adjusted to reflect the transfer of Bend UGB roads to the City of Bend as of July 1, 1998. If all the projects (excluding the non -prioritized projects) are combined into a twenty-year plan amount, the resulting $55,656,720 would amount to an expenditure of approximately $2.8 million per year. Page 6 of 232 — EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 - 1002 Deschutes County Transportation System Plan TABLE OF CONTENTS EXECUTIVE SUMMARY Pg. CHAPTER 1 INTRODUCTION 16 1.1 Setting 16 1.2 Transportation System Plan Requirements 16 Goal 12 17 Transportation Planning Rule (TPR) 17 Components of a Transportation System Plan 17 Multi -Modal Planning 18 The TSP as a Land Use Decision 18 Transportation Planning Rule Requirements for Deschutes County 19 1.3 Developing a Transportation System Plan 21 Review of Existing Plans, Policies and Standards, and Inventory of Existing Transportation Systems 21 Inventory of Natural and Cultural Environmental Constraints 21 Population and Employment Forecasts 21 Determine Transportation Needs • Other Roadway Needs • Public Transportation Needs • Bikeway Needs • Pedestrian Needs 22 Transportation System Plan 23 Financing Plan CHAPTER 2 INVENTORY AND BACKGROUND 24 2.1 Existing Transportation Goals and Objectives 24 Deschutes County Comprehensive Plan 24 Deschutes County Major Roads Capital Improvement Plan (MRCIP) 25 Deschutes County Pavement Management Plan 25 Deschutes County Bicycle Master Plan 25 City of Bend Transportation System Plan 26 City of Bend, Bend Municipal Airport Master Plan 26 City of Redmond Transportation System Plan 26 Redmond Municipal Airport Master Plan 26 City of Sisters Transportation System Plan Page 7 of 232 — EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 -1003 . 26 28 Oregon State Transportation Plan Oregon State Highway Plan 30 Access Management Policy 31 Access Oregon Highways (AOH) System 31 Truck Load Restrictions 32 Highway 97 Corridor Strategy 32 Statewide Transportation Improvement Plan (STIP) 1998-2002 34 Oregon Aviation System Plan 34 Oregon Bicycle and Pedestrian Plan 35 Governor's Transportation Initiative 37 Oregon Travel Behavior Study 38 2.2 Existing Transportation System and Current Needs 38 Existing Road System • Types of Roads in Deschutes County 39 Road System Configuration • Highways✓Principal Arterials • Rural Minor Arterials/Collectors 56 Traffic Control Devices 56 Traffic Volumes 57 Level of Service 66 Fire Districts 66 Accident Statistics 68 Accident Issues • 68 Pavement Type / Condition 68 Roadway Width / Street Standards 74 Bridge Condition 76 Bike Facilities • Paved Bikeways • Unpaved Bikeways • Alternate Bike Routes • Bikeway Maps • Typical Design Standards • Other Facilities 81 Pedestrian Sidewalks / Walkways 82 Public Transportation • Intercity Public Transportation • Fixed Route Transit • Local Demand Responsive Transportation 88 Transportation Demand Management (TDM) 89 Rideshare (Park & Ride) Facilities • Central Oregon Rideshare 89 Railroad • Passenger Rail • Freight Rail 92 Motor Freight / Trucking Page 8 of 232 — EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) • 169 - 1004 92 Air Transportation • Public -Use Airports • Private -Use Airports • Airfreight Service 96 Water -Borne Transportation 96 Pipeline Transportation 103 2.3 Existing Land Use, Population And Employment 103 Analysis of Existing Land Uses and Vacant Land • Current Land Use Patterns • Unincorporated Communities (UC) • Activity Centers 106 MUA-10 and RR -10 Exception Areas • Potential Impact • Development Constraints • Other Development Areas 110 Population 110 Employment 116 Oregon travel Behavior Survey CHAPTER 3 TRANSPORTATION FORECAST 117 3.1 General Background 122 3.2 Population and Employment Forecast 122 Population Forecast 125 Employment Forecast 127 3.3 Traffic Forecast 128 Deschutes County Roads Forecast 128 ODOT State Highway Forecast CHAPTER 4 TRANSPORTATION NEEDS ANALYSIS 135 4.1 Transportation Facility Deficiencies 135 4.2 Public Involvement and Interagency Coordination 139 Traffic Congestion Issues 139 Safety Issues 140 Regional Long -Range Needs 140 Bend "Eastside Bypass" 141 Transit Needs • Intercity Transit • Bend -Redmond Commuter Shuttle 142 Regional Problem Solving Project Page 9 of 232 — EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) • 169 CHAPTER 5 TRANSPORTATION SYSTEM PLAN 145 5.1 Coordination and Implementation of the Transportation System Plan 148 5.2 Arterial / Collector Road Plan 148 County Road Network 150 State Highways 152 Access Management Plan 156 Functional Classifications 170 Road and Street Standards 172 Road Management System 172 Level of Service 173 Capacity 174 Bridges 175 Truck Routes 175 Hazardous Material Routes 176 Facility / Safety Improvements 177 5.3 Public Transportation Plan 177 Special Transit Services 178 Intercity Bus and Passenger Rail 181 5.4 181 181 182 196 203 208 208 209 Bikeway / Pedestrian Plan Rural Bikeways Rural Walkways Design Standards Practices to be Avoided Intersections On -Road Route Selection Off -Road Route Selection Facility Requirements 211 5.5 Airport Plan 214 5.6 Rail Plan 215 5.7 Water Plan 215 5.8 Pipeline Plan 215 5.9 Transportation System Management (TSM) and Transportation Demand Management (TDM) Plan 217 5.10 Deschutes County Transportation Project List 218 5.11 Short -Term Improvement Projects 218 Previously Committed Projects 219 Priority Project List Page 10 of 232 — EXHIBIT °B". to ORDINANCE No. 98-044 (8/26/98) b 1005 • • 169 CHAPTER 6 TRANSPORTATION FINANCE PLAN 227 6.1 Current Funding Sources 227 6.2 Improvement Costs 228 6.3 Possible Funding Sources APPENDIX A Oregon State Transportation Plan Requirements B Oregon State Highway Plan Requirements C Access Oregon Highways (AOH) System D Highway 97 Corridor Strategy E Oregon Travel Behavior Survey F State Highway and County Road Listing G Terrebonne and Tumalo Street Standards H Bend -Redmond Commuter Shuttle Service Feasibility Study 1996 and 2016 Traffic Volumes and Level of Service estimates for I Deschutes County and State Highways J Transportation System Plan Project Selection Matrix K Deschutes County Potential Funding Source Calculations L Glossary of Terms and Abbreviations M Toolbox of TDM Strategies for Central Oregon N Agency and Public Comment Letters Page 11 of 232 — EXHIBIT "B° to ORDINANCE No. 98-044 (8/26/98) � 1006 1 69 - 1007 Deschutes County Transportation System Plan LIST OF TABLES Pg. CHAPTER 2 Projected Deschutes County Population (Urban Areas) 25 Table 2.171 Draft Deschutes County MRCIP Projects 28 Table 2.1.T2 State Highway Level of Service (LOS) Standards 33 Table 2.1.T3 1998-2002 Draft STIP Projects in Deschutes County 40 Table 2.271 Deschutes County Road Mileage and Maintenance 126 Table 3.236 Responsibility by Functional Classification 41 Table 2.272 Road Functional Classifications 59 Table 2.273 Generalized County Rural _Road and Highway ADT / LOS 60 Table 2.274 Top County 1996 Rural Road Volumes and LOS Ranking 64 Table 2.275 Top ODOT 1996 Highway Volumes and LOS Ranking 72 Table 2.276 Top County Road Accident Locations 1991-1996 73 Table 2.277 Top Highway Accident Locations 1991-1996 74 Table 2.278 Deschutes County Unpaved Arterials / Collectors 75 Table 2.279 Current Deschutes County Road Standards 76 Table 2.2710 Bridge Locations and Weight Limits 79 Table 2.2711 Alternative Routes 80 Table 2.2712 Current County Bikeway Design Standards 94 Table 2.2713 Redmond Municipal Airport Annual Enplanements 1987-1997 95 Table 2.2.T14 Deschutes County Public Use Airport Inventory 105 Table 2.371 Unincorporated Community Summary 107 Table 2.372 MUA-10 and RR -10 Exception Area Data 107 Table 2.373 UC / MUA-10 / RR -10 Cumulative Potential Impact 110 Table 2.374 Deschutes County Population 111 Table 2.375 Deschutes County Significant Rural Employers 115 Table 2.376 1990 Deschutes County Journey to Work Trip Mode 116 Table 2.337 1990 Deschutes County Travel Time to Work CHAPTER 3 122 Table 3.231 Projected Deschutes County Population (Urban Areas) 123 Table 3.2.T2 Projected Deschutes County Population (Cities) 123 Table 3.2.T3 Historic Deschutes County Population (Cities) 124 Table 3.2.T4 Deschutes County Population Distribution (Cities) 124 Table 3.235 Historic Deschutes County Housing Unit Data 126 Table 3.236 Projected Unincorporated Area Housing Units 126 Table 3.237 Deschutes County Non -Agricultural Employment Forecast 127 Table 3.238 Deschutes County Employment Distribution Forecast (Cities) Page 12 of 232 — EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 - 1008 129 Table 3.331 Top County 2016 Rural Road Volume Estimates and LOS Ranking 133 Table 3.332 Top ODOT 2016 Highway Volume Estimates and LOS Ranking CHAPTER 4 137 Table 4.231 Deschutes County TSP Public Outreach Chronology 138 Table 4.232 Transportation Survey Results CHAPTER 5 171 Table 5.271 Interim Rural Road Development Standards 173 Table 5.232 Maximum ADT Allowed for Various Levels of Service 220 Table 5.11.T1 Transportation Project List • • Page 13 of 232 — EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 165 1009 • Deschutes County Transportation System Plan LIST OF FIGURES Pg. CHAPTER 1 20 Figure 1.1.F1 Deschutes County CHAPTER 2 29 Figure 2.1.F1 State Highway Level of Importance (LOI) Policy 46 Figure 2.2.F1 County Road System 47 Figure 2.2.F2 Principal Arterial System 51 Figure 2.2.F3 Redmond Area Roads 52 Figure 2.2.F4 Bend Area Roads 53 Figure 2.2.F5 Sisters Area Roads 54 Figure 2.2.F6 Tumalo Area Roads 55 Figure 2.2.F7 South County Roads 58 61 Figure 2.2.F8 Figure 2.2.F9 Traffic Control Devices 1996 North County ADT 62 Figure 2.2.F10 1996 Bend Area ADT 63 Figure 2.2.F11 1996 South County ADT 65 Figure 2.2.F12 1996 State Highway LOS 67 Figure 2.2.F13 County Rural Fire Protection Districts 69 Figure 2.2.F14 High Accident Locations 71 Figure 2.2.F15 Unpaved County Arterials / Collectors 84 Figure 2.2.F16 North County Bikeways 85 Figure 2.2.F17 Bend Area Bikeways 86 Figure 2.2.F18 South County Bikeways 87 Figure 2.2.F19 Rural Sidewalks 90 Figure 2.2.F20 Park & Ride (rideshare) Sites 91 Figure 2.2.F21 County Rail Lines 97 Figure 2.2.F22 County Public -Use Airports 98 Figure 2.2.F23 County Private -Use Airports 99 Figure 2.2.F24a Redmond Airport 100 Figure 2.2524b Bend Airport 101 Figure 2.2124c Sunriver Airport 102 Figure 2.2.F24d Sisters Airport 104 Figure 2.3.F1 Unincorporated Communities 108 Figure 2.3.F2 MUA-10 and RR -10 Exception Areas 112 Figure 2.3.F3 Exclusive Farm Use (EFU) and Forest Zones 113 Figure 2.3.F4 Open Space and Floodplain Zones 114 Figure 2.3.F5 Rural Industrial and Surface Mining Zones Page 14 of 232 — EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) • CHAPTER 3 ODOT Projected Lane Additions 118 Figure 3.1.171 North County Area Potential Development 119 Figure 3.1.F2 Sisters Area Potential Development 120 Figure 3.1.F3 Bend Area Potential Development 121 Figure 3.1.F4 South County Area Potential Development 130 Figure 3.3.F1 2016 North County Estimated ADT 131 Figure 3.3.F2 2016 Bend Area Estimated ADT 132 Figure 3.3.F3 2016 South County Estimated ADT 134 Figure 3.3.F4 2016 State Highway Estimated LOS CHAPTER 4 143 Figure 4.2.F1 Isolated Rural Subdivisions CHAPTER 5 154 Figure 5.2.171 ODOT Projected Lane Additions 155 Figure 5.2.F2 ODOT Projected Interchange Locations 160 Figure 5.2.173a New Road Corridors 161 Figure 5.2.F3b New Road Corridors 162 Figure 5.2.F3c New Road Corridors 163 Figure 5.2.F3d New Road Corridors 164 Figure 5.2.173e Sunriver Business Park 165 Figure 5.2.F4a Redmond Area Road Plan 166 Figure 5.2.F4b Bend Area Road Plan 167 Figure 5.2.F4c South County Road Plan 168 Figure 5.2.F4d Sisters Area Road Plan 169 Figure 5.2.F4e Tumalo Area Road Plan 180 Figure 5.3.F1 Possible County Transit System 226 Figure 5.11.171 High Priority Road Projects • Page 15 of 232 — EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 - 1010 169 - 1011 w 169 - 1012 40 1. INTRODUCTION 1.1 SETTING Deschutes County (Figure 1.1.F1) is adjacent to and on theeast side of the Cascade Mountain range, approximately 160 miles southeast of Portland and midway between the Washington and California borders. In 1995, the County had a certified total population of 94,100. Deschutes County includes the incorporated cities of Bend (pop. 30,630), Redmond (pop. 10,585), Sisters (pop. 775), and an unincorporated area totaling 52,110. The 3,055 square miles covered by the County provide for a diverse economy combining tourism, recreation, manufacturing, industry and services. As the most populous city in Central Oregon, Bend forms the hub of activities for Central Oregon, as well as many parts of Eastern Oregon, and therefore contains many more businesses than other cities of similar population size. Deschutes County is served by a network of state highways providing access, north to the Columbia Gorge, south to California, east to Idaho and west to the cities of Eugene, Albany, Salem and Portland in the Willamette Valley. The Deschutes County Transportation System Plan (TSP) addresses both short and long-term transportation needs. In the short-term, the study identifies and provides recommended solutions to immediate safety and congestion problems. For the future, the study looks at the next 20 years in Deschutes County, and identifies through goals and policies, how best to efficiently move people and goods throughout the County. Long-term projects are identified and prioritized. Planning for the transportation needs within the Bend, Redmond and Sisters urban growth boundaries is covered by those cities' respective transportation system plans. The purpose of the TSP is to develop a transportation system that meets the needs of the residents of Deschutes County, as well as regional and state needs. This plan addresses a balanced transportation system that includes automobile, bicycle, rail, transit, air, pedestrian and pipelines. It reflects existing land use plans, policies and regulations that affect the transportation system and includes options to finance future projects. 1.2 TRANSPORTATION SYSTEM PLAN REQUIREMENTS The Deschutes County Transportation System Plan is required to address the statewide requirements outlined in Goal 12 and its implementing administrative rule, the Transportation Planning Rule (OAR Chapter 660, Division 12). Goal 12 affects all levels of government by requiring that transportation plans be coordinated among state and local agencies. In addition to the State (Oregon Department of Transportation, ODOT, the Land Conservation and Development Commission, LCDC) the local agencies influenced by the Deschutes County TSP include the cities of Bend, Redmond and Sisters. GOAL 12 Goal 12 is one of nineteen separate statewide planning goals adopted by the State of Oregon in the 1970's. These goalswere designed to be implemented through inclusion in regional and local comprehensive plans. Under Goal 12, local governments, regions and metropolitan areas MPOs) must adopt transportation plans which: Page 16 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 - 1013 "...provide and encourage a safe, convenient and economic transportation system." Specifically, each transportation plan: "...shall (1) consider all modes of transportation including mass transit, air, water, pipeline, rail, highway, bicycle and pedestrian; (2) be based upon an inventory of local, regional and state transportation needs; (3) consider the differences in social consequences that would result from utilizing differing combinations of transportation modes; (4) avoid principal reliance upon any one mode of transportation; (5) minimize adverse social, economic and environmental impacts and costs; (6) conserve energy; (7) meet the needs of the transportation disadvantaged by improving transportation services; (8) facilitate the flow of goods and services so as to strengthen the local and regional economy; and (9) conform with local and regional comprehensive land use plans." The Deschutes County Comprehensive Plan was prepared in 1979 and codified in April 1993. The Plan included a chapter on transportation, which addressed countywide issues. TRANSPORTATION PLANNING RULE (TPR) In April, 1991, the Land Conservation and Development Commission (LCDC) adopted a new administrative rule, the Transportation Planning Rule (OAR 660, Division 12), governing transportation planning and project development at local, regional and statewide levels. Under the Transportation Planning Rule, Deschutes County must identify a system of transportation facilities and services adequate to meet regional transportation needs (outside of the Bend, Redmond and Sisters Urban Growth Boundaries). Transportation system plans (TSPs) to be prepared and adopted must be consistent with the state and IocaITSPs (Bend, Redmond and Sisters). Two important aspects of this rule are that it ties land use to transportation and that it mandates that transportation planning reduce reliance on any one mode of transportation. COMPONENTS OF A TRANSPORTATION SYSTEM PLAN A transportation system plan (TSP) is defined as: "...a plan for one or more transportation facilities that are planned, developed, operated and maintained in a coordinated manner to supply continuity of movements between modes, and within and between geographic and jurisdictional areas." The transportation system plan represents the "first phase" of transportation planning. The TSP establishes land use controls, through the establishment of goals and policies, and a network of facilities and services to meet overall transportation needs. The "second phase" is transportation project development, during which the local government determines the exact location, alignment, and preliminary design of improvements identified in the TSP (OAR 660-12-010(1). MULTI -MODAL PLANNING The Transportation Planning Rule (TPR) emphasizes the adoption of multi-modalTSPs. This Page 17 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 - 1014 emphasis is an attempt by the state to reduce the singular reliance on automobiles occurring at is an increasing pace throughout Oregon. The Rule encourages transportation solutions that: "...support a pattern of travel and land use in urban areas which will avoid the air pollution, traffic and livability problems faced by other areas of the country." The Rule emphasizes multi -modal improvements in urban areas. However, goals and policies that support multi -modal solutions can be applied to the rural areas of the County. THE TSP AS A LAND USE DECISION According to OAR 660-12-025(1), adoption of the TSP is a land use decision: "...regarding the need for transportation facilities, services and major improvements and their function, mode and general location." The adoption of a TSP is subject to review by the Land Conservation and Development Commission (LCDC) and appeal to the State Land Use Board of Appeals (LUBA). TRANSPORTATION PLANNING RULE REQUIREMENTS FOR DESCHUTES COUNTY The Rule applies differently to cities, counties, metropolitan planning organizations (MPOs) and the Oregon Department of Transportation (ODOT). For purposes of compliance, Deschutes County falls into the second of four categories, that being an urban area of between 2,500 and . 25,000 population located outside of areas governed by metropolitan planning organizations (MPOs). Since Deschutes County also has characteristics of the next higher category of requirements, several additional tasks are required by LCDC. To comply with the Rule, Deschutes County shall: "establish a system of transportation facilities and services adequate to meet identified local transportation needs and shall be consistent with local TSPs and adopted elements of the state TSP." Transportation needs are defined as: "...estimates of the movement of people and goods consistent with acknowledged comprehensive plans and requirements of this rule. Needs are typically based on projections of future travel demand resulting from a continuation of current trends as modified by policy objectives, including those expressed in Goal 12 and this rule, especially those for avoiding principal reliance on any one mode of transportation [i.e., the automobile]" (OAR 660-12-005(16). Under OAR 660-12-055, cities and counties outside of MPOs (such as Deschutes County) are required to complete TSPs for their planning areas by May 1997. However, individual ODOT Region managers have the ability to grant contract extensions as funding allows. Deschutes County has been granted a contract extension until December 31, 1997. The County is required to include the following plan elements in its TSP to comply with the Transportation Planning Rule: • A Street System Plan for Motor Vehicles Page 18 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 - 1015 • A Bicycle Facility Plan • A Pedestrian Circulation Plan • A Public Transportation Plan • A Rail Transportation Plan • An Air, Water and Pipeline Plan • A Transportation System and Demand Management Plan • Cost Estimates • A Project Priority Listing • A Transportation Financing Plan 1.3 DEVELOPING A TRANSPORTATION SYSTEM PLAN Under the Transportation Planning Rule, Deschutes County must identify a system of transportation facilities and services adequate to meet the regional needs and then prepare a transportation system plan which is consistent with the Oregon Transportation Plan (state TSP) and other local TSPs (Bend, Redmond and Sisters). The Oregon Transportation Plan contains specific criteria and guidelines for local and regional jurisdictions, which form the basis for determining consistency with the state plan. Performing the analyses and preparing the plan elements described in the guidelines enable Deschutes County and other communities to develop an efficient transportation system, comply with the Transportation Planning Rule, and achieve consistency with other planning jurisdictions including the Oregon Department of Transportation (ODOT). Several key performance standards . can be used as indicators to determine the adequacy of a transportation system plan. The following elements are addressed by the Deschutes County Transportation System Plan in order to achieve an adequate plan for the region and satisfy the requirements of the Transportation Planning Rule: r1 • Public and Interagency Involvement • Plan Consistency • Consistency with State and Local Plans • Reduced Auto Reliance • Network of Streets Transportation Accessibility • Efficient Transportation Management • Safe and Convenient Walking and Bicycling • Minimize Adverse Economic, Social, Environmental, and Energy Consequences • Intermodal Linkage and Passenger Services Coordination • Minimizing Conflicts Between Modes • Fundable Plan • Enabling Ordinances • Facility/Corridor Protection Ordinances • Development Ordinances to Encourage Alternate Mode Usage Page 19 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) -0 0 0 fzQ 1 f) 1 r, Sz 11 LL E E 0 MU 'a 157 8 S r a 0 0 a 0 0 ate@:Q U. cn P. -0 tmCD Cl) 0 co —j m CL 0 m IMMAY 77 O z 0z z w LLI We mz m 0 x �~® \ ® � # _ � Cl) CO W US LLJ (kF— CO Cl) 169 - 1017 The plan is broken down into the following specific tasks to be completed in a predetermined order. REVIEW OF EXISTING PLANS, POLICIES AND STANDARDS Chapter 2 provides a review and evaluation of all current plans and policies affecting Deschutes County, an inventory of the existing Transportation System, and deficient transportation facilities in the County. As a part of the review process, initial meetings were held with the County Transportation Advisory Committee (CTAC), County Planning Commission, County staff and the public. These meetings produced a set of goals and objectives for the Transportation System Plan. The review involved the following six -step process: 1) Review and evaluation of the existing comprehensive land use and transportation plans. 2) Review of local and state plans. 3) Analysis of existing land uses and vacant lands. 4) Review of existing ordinances, as well as zoning, subdivision, and engineering standards. 5) Review of existing, significant transportation studies. 6) Review of existing capital improvement programs and/or public facilities plans. INVENTORY OF EXISTING TRANSPORTATION SYSTEMS A significant part of developing a transportation system plan is to inventory the existing physical facilities, services and conditions of the transportation system (streets, bikeways, etc.). This task seeks to determine the extent, nature and condition of the facilities and systems already in place to determine how the current system functions. INVENTORY OF NATURAL AND CULTURAL ENVIRONMENTAL CONSTRAINTS Although a detailed inventory is not required for this system level of planning, any environmental features associated with the existing and planned transportation facilities need to be identified. Examples of environmental features are wetlands, significant natural areas, historic buildings, cemeteries, parks, schools and scenic areas. POPULATION AND EMPLOYMENT FORECASTS Chapter 3 provides a transportation forecast in order to determine the future transportation needs in the County. The County inventoried existing land uses, as well as demographic and economic data outside of the Bend and Redmond Urban Growth Boundaries. Population, employment and traffic forecasts were made based on historic and existing data. In addition to trending historical growth patterns, existing and planned land uses were examined to predict future development growth and to forecast the traffic generated from that development. These forecasts help one to understand the existing transportation system and form the basis for projecting future travel needs. The Transportation Planning Rule requires that forecasts address a 2Qyear period beginning in the year that the TSP was originally planned for adoption in Deschutes County (1996), therefore, the projections were estimated out to the year 2016. DETERMINE TRANSPORTATION NEEDS Chapter 4 addresses the transportation needs of the County based on the outcome of the forecasts Page 21 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 - 1018 and inventory analysis and the concerns of a wide range of Deschutes County residents. Other Roadway Needs Several additional needs of the transportation system are not specified in the Transportation Planning Rule but they need to be included because they directly affect the transportation - financing plan, which is required by the Rule. The additional needs include: • Safety needs, including traffic accident data covering at least three years, knowledge of existing unsafe roadway sections or intersections, and a review of any existing traffic safety studies. • Bridge needs, an inventory of existing bridges and other structures in the transportation system and any needed repairs, widening or replacement. • Reconstruction needs, based on a prioritized list of existing, substandard roadway sections. • Operation/Maintenance needs, including the ongoing needs of patching, chip sealing, sweeping, etc., for the continued safe operation of public roadways. Public Transportation Needs This requirement addresses two separate needs, one being the mobility needs of the public and the other being the system design considerations (level of service). In general mobility needs fall into two categories: accessibility to jobs in urban areas and the mobility needs in rural areas. Primarily, Deschutes County has rural mobility needs since most of the areas outside the urban growth boundaries fall into the rural category. The TSP requires the determination of demand for public transportation and then the appropriate system design to satisfy that demand. As part of the TSP, the County completed an interurban transit feasibility analysis and an associated public survey to determine need. Bikeway Needs The bicycle element of the plan addresses the Countywide needs for bicycle transportation and draws upon the existing Deschutes County Master Bikeway Plan (March 1992) for recommendations for new and upgraded facilities. Additional recommendations are provided based upon community input and changes in land use and the street network. Pedestrian Needs The need for sidewalks is limited outside of urban growth boundaries and the business districts of the larger unincorporated communities. In most cases the pedestrianvolumes, and width of the paved or graded shoulders are such that pedestrians can effectively travel without sidewalks. TRANSPORTATION SYSTEM PLAN Chapter 5 outlines the transportation system plan with recommended goals and policies, as well Page 22 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) • r� 169 1019 as a list of proposed transportation projects. The project list is prioritized based on various criteria including safety, costs and need. FINANCING PLAN Chapter 6 addresses various financing options. Page 23 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 10'20 169 U 1021 • 2. INVENTORY AND BACKGROUND 2.1 EXISTING TRANSPORTATION GOALS AND OBJECTIVES In the state of Oregon, a clear hierarchy exists with regard to the role of statewide comprehensive planning and its relationship to regional and local planning. The state provides clear direction on the types of issues that need to be addressed in local plans and how- possible problem -solving solutions can be developed. Deschutes County has several previous plans and guidelines available that give direction for development of the local transportation system plan. The documents most appropriate to review for Deschutes County are the Deschutes County Comprehensive Plan, the Oregon Transportation Plan, and the Oregon Highway Plan. The Oregon Transportation Plan includes specific action items as a means of attaining the statewide transportation goals. The existing goals and objectives from these plans are outlined below. In addition, the comprehensive plans for Bend, Redmond and Sisters were also reviewed as part of this project. DESCHUTES COUNTY COMPREHENSIVE PLAN The current comprehensive plan for Deschutes County was the first comprehensive plan developed in the County. After a major planning effort involving many citizens and agency personnel, the plan was adopted in 1979, then later codified in 1993. From the goals and objectives set forth in the plan, it is apparent that many of the goals set forth in 1979 are still relevant in 1998. The following are the existing County transportation goals: To provide a balanced, safe, efficient and integrated transportation system which reflects environmental, economic and social considerations. 2. To serve the existing, proposed and future land uses with an efficient, safe, attractive roadway network. 3. To provide expansion of opportunities for rail and air transportation for passengers and freight. 4. To provide opportunity for the development of public transit systems. 5. To provide a system for safe and efficient transportation and recreation routes for pedestrians, bicyclists, and equestrians. 6. To decrease the adverse effects of the automobile domination of existing transportation systems. DESCHUTES COUNTY MAJOR ROADS CAPITAL IMPROVEMENT PLAN (MRCIP) The current draft Deschutes County Major Roads Capital Improvement Program (MRCIP) (Table • 2.131) was adopted by the County Board of Commissioners in 1996. Page 24 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 -1022 Table 2.1.T1 is 1997-98 Draft Deschutes County MRCIP Projects Program Road Location Project Project County Road Other Total Year Type Description Funds Funds Cost 1998 U.S. 97 Terrebonne Sidewalks Install sidewalks along portions of U.S. 97 $0 $60,000' $60,000 1998 Various La Pine Sidewalks Install sidewalks along portions of U.S. 97, Huntington, 1st, 3rd, and $17,600 $70,4002 $88,000 4th Streets 1998 Reed Market Bend Construction Extend Reed Market Road from U.S. 97 to Blakely Road $186,000 $264,000' $450,000 1998 Deschutes Deschutes Realignment Relocate existing intersection with $110,000 $3,000,000 $3,110,000 Market Rd. Junction U.S. 97, to the south 1998 Purchase Right-of-way acquisition $20,000 $20,000 Total $473,600 $3,814,400 $4,288,000 DESCHUTES COUNTY PAVEMENT MANAGEMENT SYSTEM Deschutes County is divided up into five road maintenance areas (North, West, Central, South and East). The pavement management system addresses ongoing maintenance of County roads generally related to sealing, widening, overlay and deferred pavement maintenance and preservation activities. Road conditions are routinely monitored by road crews and graded based on condition and need. DESCHUTES COUNTY BICYCLE MASTER PLAN The Deschutes County Bicycle Master Plan was adopted in March 1992 as a resource element of the Deschutes County Year 2000 Comprehensive Plan. The Plan provided goals and objectives, policy recommendations, classifications of bicycle facilities, location of bicycle facilities, bicycle parking and other transportation issues related to bike facilities. Many of the policies identified in the Plan have since been implemented through adopted County Ordinances. The emphasis of the Bicycle Master Plan is to develop an overall network of bikeways to connect the urban areas, recreation areas and destination resorts. CITY OF BEND, TRANSPORTATION SYSTEM PLAN Currently, the City of Bend is developing a transportation system plan that covers the area within the Bend Urban Growth Boundary (UGB). The Bend project is running concurrent with this 'ODOT Bicycle and Pedestrian Program Grant 'ODOT Bicycle and Pedestrian Program Grant 'System Development Charge (SDC) Funds • 'ODOT Page 25 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 - 1023 • transportation system plan for Deschutes County. Results and recommendations from this plan will be incorporated into the County TSP. CITY OF BEND, BEND MUNICIPAL AIRPORT MASTER PLAN In 1994, CenturyWest Engineering completed an update of the 1979 Bend Municipal Airport Master Plan. However, the 1994 updated Plan has not been adopted by Deschutes County and therefore is not recognized as a planning reference document. The County Comprehensive Plan recognizes the original 1979 Airport Plan as "...a guide for development, although it is not a part of this plan." (Comp Plan) CITY OF REDMOND TRANSPORTATION SYSTEM PLAN The City of Redmond has identified the following goals in its draft Transportation System Plan: Reduce through -traffic, congestion and improve circulation along Highway 97, especially along the 5th and 6th Street Couplet. 2. Enhance east -west circulation. 3. Identify roadway system needs to serve undeveloped areas so that steps can be taken to preserve rights-of-way and maintain adequate traffic circulation. 4. Increase the use of alternative travel modes through improved safety and service. REDMOND MUNICIPAL AIRPORT (ROBERTS FIELD) MASTER PLAN The existing master plan dates from 1988 and is currently being updated. The County recognizes the existing Plan as the guiding document for airport -related development and land use in the airport environs. CITY OF SISTERS, TRANSPORTATION SYSTEM PLAN A TSP for the City of Sisters, as required by the Planning Rule and the Oregon Department of Transportation, has not yet been initiated, but is anticipated to begin sometime in FY '98299. Without a Sisters TSP, the County has made generalized estimates regarding future growth and needs for the Sisters community. OREGON STATE TRANSPORTATION PLAN The Oregon Transportation Commission in 1992 adopted the current statewide transportation plan. The State Plan addresses all statewide transportation issues from air, rail and highway development, to alternative commute modes such as transit, bicycling and walking. The full text of the plan is included in Appendix A. Goals from the Oregon Transportation Plan are: Goal 1: Provide for a balanced, efficient, accessible and environmentally responsible transportation system that connects places, modes and carriers, while maintaining • safety and financial responsibility. Page 26 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 - 1024 Goal 2: To develop a multi -modal transportation system that provides access to the entire state, supports acknowledged comprehensive land use plans, is sensitive to regional differences and supports livability in urban and rural areas. Goal 3: To promote the expansion and diversity of Oregon's economy through the efficient and effective movement of goods, services and passengers in a safe, energy efficient and environmentally sound manner. Goal 4: To implement the Transportation Plan by creating a stable but flexible financing system, by using good management practices, by supporting transportation research and technology, and by working cooperatively with federal, regional and local governments, Indian tribal governments, the private sector and citizens. Preferred Alternative The Plan identifies a "Preferred Alternative" that meets all policy goals by: • Identifying a multi -modal system including air, rail, auto, truck, bus, bicycle, pedestrian, waterway transportation and pipelines to be implemented by the Year 2012. • Establishing minimum levels of service to be achieved by each mode of transportation. • Identifying other major improvements beyond minimum levels of service. • Identifying the transportation corridors and facilities that serve statewide and interstate functions. • Identifying transportation system and facility management processes that must be put into place, including local transportation demand management (TDM) and financing principles. • Identifying land use patterns that must be put into effect to achieve the goals of the transportation plan. • Identifying local, state and federal roles in implementing the plan and setting planning and performance criteria for modal implementation plans and local and regional transportation plans. • Estimating the financial requirements to implement the plan. The Preferred Alternative includes the following specific recommendations, which apply to incorporated areas of Deschutes County, to be in place by the Year 2012: • Walking and bicycle trips at double the present rate; • Full implementation of the LCDC Transportation Rule. The preliminary cost estimate for the preferred alternative to be implemented statewide is approximately $12 billion over the next 17 years. This amount includes all local, state and federal commitments. Fifty-seven percent (57%) of the funding is earmarked for roads, streets Page 27 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 1025 IS and highways, with the remainder pledged for new investments in railroads, ports, aviation, intercity bus and transit. • OREGON STATE HIGHWAY PLAN The Oregon State Highway Plan was adopted by the Oregon Transportation Commission in 1991, and represents the highway element of the Oregon State Transportation Plan. The Plan (in Appendix B) identifies state highway needs up to the year 2012 and sets policies on how to address those needs. The categories of needs are divided into the following: Level of Importance (LOI), Access Management, Access Oregon Highways (AOH), and Truckload Restrictions. Note that this Plan only affects highways, not arterials, collectors or local roads. Where a highway section is severely constrained by intensive land use or other physical or environmental limitations, and where service levels are substandard, ODOT's objective will be to maintain current service levels. On highway sections that are not constrained, but are substandard and not scheduled for improvement, ODOT's objective will be to maintain and, to the extent possible, improve the LOS. Table 2.1.T2 lists the state standards for level of service (LOS), while Figure 2.1.F1 identifies the state policy regarding state highway level of importance (LOI). Table 2.1.T2 1991 Oregon Highway Plan Level of Service (LOS) Standards Levels For Design Hour Operating Conditions Through a 20 -Year Horizon LOI Highway Through Unincorporated Communities (1) Rural Areas (2) Interstate none in county None in county none in county Statewide 20, 97, 126 C B Regional 31 C C District 27, 242, 370, 372 D C 1) Rural unincorporated communities (i.e., La Pine, Wickiup Jct., Tumalo, Terrebonne, etc.). 2) Rural areas are areas outside of urban growth boundaries (UGBs) but not including unincorporated communities. These LOS standards are used by ODOT when making operating decisions, such as access management decisions, and when coordinating with local comprehensive planning. It is ODOT's objective to maintain the LOS at or above the listed standards. Page 28 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 1026 0 Figure 2.1.F1 1991 Oregon Highway Plan Level of Importance (LOI) Policy Level of Importance Description Interstate Highways None in Deschutes County Statewide Highways Function The primary function of highways at this level is to provide connections and links to larger urban areas, ports and major recreation areas that are not directly served by interstate highways. Statewide highways provide links to the interstate system and alternate links to other states. A secondary function is to provide links and connections for intra -urban and intra -regional trips. Connections are primarily with roadways that serve areas of regional significance or scope. Statewide routes generally serve centers of 5,000 or more population, have route lengths of 50 miles or more, do not parallel other statewide routes within 25 miles, connect at each end with interstate routes, statewide routes or major recreational areas, and carry at least 500 vehicles per day. Management Objective The management objective is to provide for safe and efficient high-speed continuous -flow operation in rural areas and high to moderate -speed operations with limited interruptions of flow in urban and urbanizing areas. Regional Highways Function The primary function of highways at this level is to provide connections and links to areas within regions of the state, between small urbanized areas and larger population centers, and to higher level (interstate/statewide) facilities. A secondary function is to serve land uses in the vicinity of these highways. Management Objective The management objective is to provide for safe and efficient high-speed continuous -flow operation in rural areas, except where there are significant environmental constraints, and moderate to low -speed operation in urban and urbanizing areas with moderate interruptions to flow. District Highways Function The primary function of highways at this level is to serve local traffic and land access. Highways included in this level primarily serve local functions and are of relatively low significance from a statewide perspective. They are often routes that held a • higher function during the development of Oregon's highway system. With the passage of time and the construction of other through routes, the importance of Page 29 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 - 1027 these highways from a statewide perspective has diminished. They now serve a similar function to county roads and city streets. Management Objective The management objective is to provide for safe and efficient moderate to high- speed continuous -flow operation in rural areas reflecting the surrounding environment, and moderate to low speed operation in urban and urbanizing areas with a moderate to high level of interruptions to flow. ACCESS MANAGEMENT POLICY The Access Management policy focuses on statewide access control measures and targets those areas of emerging development rather than retrofitting already built-up areas. The Highway 97 corridor between Redmond and Bend is an example of an emerging development area. The 1991 Highway Plan identifies the following six access management categories into which specific highway segments will be placed. The segments are assigned a category in conjunction with the development of highway corridor plans. Category 1 - The highway segments provide for the efficient and safe high speed and high volume traffic movements, in interstate, interregional, intercity, and some intracity routes in the largest urbanized areas. The segments do not provide direct land access. Access control and other methods will be used on nearby cross streets in the area of interchanges to protect the operation of those interchanges. This category will apply to all interstate highways that function like freeways. Category 2 - 'These highway segments provide for efficient and safe high speed and high volume traffic movements on interstate, interregional, intercity and longer distance intracity routes. They should not provide direct land access. Highly controlled intersections and medians distinguish these segments. Traffic signals should be avoided. Where they must be installed, their effect on mainline traffic flow should be minimized. Grade separations should be considered for high volume cross streets or other cases where signals are not appropriate. Some category 2 facilities may be developed into category 1 facilities over time. This category includes many of the statewide facilities. Category 3 - These highway segments provide for efficient and safe medium to high speed and medium to high volume traffic movements on interregional, intercity and longer distance intracity routes. These segments are appropriate for areas that have some dependence on the highway to serve land access and where financial and social costs of attaining full access control would substantially exceed benefits. This category includes some of the statewide facilities. Category 4 - These highway segments provide for efficient and safe medium to high speed and medium to high volume traffic movements, on higher function interregional and intercity highway segments. They also may carry . significant volumes of longer distance intracity trips. They are appropriate for routes passing through areas that have moderate dependence on the Page 30 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 - 1028 highway to serve land access and where the financial and social costs of attaining full access control would substantially exceed benefits. This category includes a small part of the statewide facilities and most regional facilities. Category 5 - These highway segments provide for efficient and safe medium speed and medium to high volume traffic movements on intercity, intracity and intercommunity routes. There is a reasonable balance between direct access and mobility needs within this category. Category 6 - These highway segments provide for efficient and safe slower to medium speed and low to high volume traffic movements on intracity and intercommunity routes. This category will be assigned only where there is little value in providing for high-speed travel. Providing for reasonable and safe access to abutting property is a major purpose of this access category. The Highway 97 corridor plan is the only one completed in the County so far. The corridor plan for Highway 20 is in process. Local highway segments fall into the following categories: Category 2 U.S. 97: for its entire length outside of the urban growth boundariesof Bend, Redmond and Sisters, except for the specific areas listed below. U.S. 20: from the Sisters eastern UGB to the Bend western UGB. Category 3 U.S. 20: from the Jefferson County Line to the Sisters western UGB. 0 OR 126: may be category 3 or 4 Category 4 U.S. 20: from Bend eastern UGB to Lake County. U.S. 97: specific sections within Terrebonne and La Pine. OR 31, OR 370 and OR 372 Category 6 OR 27 ACCESS OREGON HIGHWAYS (AOH) SYSTEM The AOH system was developed to focus limited state resources on significant highway segments that provide access through and between major cities, regional centers and interstate cities. The primary goal is to maintain the efficient flow of traffic along these highways, protect right-of-way for future development, guide land uses by coordination with local comprehensive plans, and promote alternative modes and congestion management tools in areas that highway improvements are not cost-effective. In Deschutes County, Highways 20, 97 and 126 are all classified as Access Oregon Highways. The complete goals can be found in Appendix C. TRUCK LOAD RESTRICTIONS The State Transportation Commission has set a goal of 96 percent of all Oregon highways be modernized to the point of being approved for continuous heavy truck (< 80,000 lbs.) usage by the year 2010. It is up to the ODOT Region Engineer to program reconstruction or resurfacing • projects in the six-year state transportation improvement program (STIP) to meet the Commission's goals. The remaining four percent of highways do not have the potential to carry Page 31 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) • 169 1029 significant truck traffic; therefore they are to be left "as is". HIGHWAY 97 CORRIDOR STRATEGY In 1995, ODOT completed phase 1 (strategy development) of a corridor -planning project for the entire length of Highway 97 from Madras to the California border. The applicable section through Deschutes County identified strategies necessary for ODOT to implement the Oregon Transportation Plan and the Oregon Highway Plan. The Corridor Strategy assumes implementation of near-term projects within the corridor that have been previously approved for construction. The strategy development process for the US 97 corridor included several public meetings and workshops where corridor issues, concerns and opportunities were discussed. The overall goal for the US 97 corridor was based on input received from these meetings and relevant technical information on the transportation trends, projections and safety. While the strategy applies corridorwide, much of the emphasis is clearly on urban areas and therefore not directly applicable to the County TSP. The complete Corridor Plan can be found in Appendix D. The Corridor Strategy objective for the U.S. 97 Corridor are intended by ODOT to embody the overall goal for the Corridor and establish direction and provide guidance for corridor -wide transportation plans and enhancements over the next 20 years. The Deschutes County Board of Commissioners in October 1995 endorsed the Corridor Strategy. Once endorsed, the Strategy became the guiding document for detailed transportation system planning and comprehensive planning, which will establish corridor improvement priorities for state funding; thereby ensuring that future transportation facilities and services optimize the needs of Oregon's Corridor stakeholders. STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) 1998-2002 Each year, ODOT updates a five-year capital improvement program that contains a list of projects proposed for development and construction. Table 2.173 identifies the draft STIP projects located in Deschutes County. The projects are prioritized and follow the policy directions of the Oregon Transportation Commission (OTC), and reflect work done in: • The 1992 Oregon Transportation Plan; • Consultation and partnership with local government officials and the public; • Projects and needs identified by mode plans and management systems developed in compliance with the Intermodal Surface Transportation Efficiency Act (ISTEA); • Strategies developed during the first phase of Corridor Plans; Page 32 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 - 1030 Table 2.1.T3 1998-2002 Draft STIP Projects in Deschutes County Program Road Project Project Type Project Year Description Cost 1998 None Central Oregon Carpool/TDM Various Maintain, operate carpool program, $38,000 Program promote alternate modes through TDM 1998 US 97 South Bend Scale Relocation Relocation Relocate weigh scale $1,000,000 1998 US 97 Bend Parkway, Unit 3A Modernization Construct new roadway $12,911,000 1998 US 20 NW Jack Pine — Odem Medo Preservation Millout/inlay, upgrade ADA, $518,000 intersections and sidewalks 1999 None Central Oregon Carpool/TDM Various Maintain, operate carpool program, $38,000 Program promote alternate modes through TDM 1999 US 20 Jack Lake Rd — Sisters Preservation Millout/inlay, preservation overlay $2,419,000 Section i 1999 US 97 Bend Parkway, Unit 313 Modernization Construct new roadway $5,335,000 2000 None Central Oregon Carpool/TDM Various Maintain, operate carpool program, $42,000 Program promote alternate modes through TDM 00 US 97 Empire Ave - China Hat Rd Preservation Millout/inlay, preservation overlay $2,245,000 2000 US 20 Arnold Ice Cave— Horse Ridge Preservation Millout/inlay travel lanes, $1,128,000 preservation overlay 2001 None Central Oregon Carpool/TDM Various Maintain, operate carpool program, $42,000 Program promote alternate modes through TDM 2002* OR 126 11t' St. — Redmond East C.L. Modernization Widen and realign roadway $6,970,000 2002* US 97 Wickiup Jct. Overcrossing Operational Realign Hwy 97 east of Wickiup Jct. $5,000,000 and construct RR overcrossing 2002* US 97 Burgess Rd PFH 157-1(1) Modernization 3.4 mile reconstruction $2,340,000 2002* US 97 South Century Dr PFH 92-1(1) Modernization 10.8 mile reconstruction $3,000,000 Total" $25,716,000 • Note: * No funding has been identified for these projects. ** Excludes unfunded projects. Page 33 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 - 1031 • The Oregon Transportation Initiative (OTI) which directed ODOT to address, first and foremost, the maintenance, operation and preservation of the existing system; • The Governor's Coastal Salmon Restoration Initiative; and • ODOT's Community -Based Solutions Strategy (in coordination with the Governor's Community Solutions Team). The current STIP responds to Oregon's needs in a continuing challenge, which is made more difficult in the face of dwindling revenues. Due to the Balanced Budget Amendment, federal revenues are projected to decrease approximately 3 percent per year. This means a projected reduction in federal revenues of 9 percent for 1998, 12 percent for 1999, and so on. The draft STIP reflects the revenue reduction by adding few new projects. New federal guidelines also require that the final STIP be fiscally constrained. Therefore, ODOT can no longer include construction projects where funding is uncertain. However, the draft is not fiscally constrained yet, but will likely show a funding level approximately 20 percent less in its final version. OREGON AVIATION SYSTEM PLAN The Aviation System Plan is due to be adopted incrementally by the Oregon Transportation Commission. This plan will identify a base airport system, system funding needs and gaps, and recommend various strategies to pay for the system. It will also recommend policies to guide the state in protecting, maintaining and developing the airport system. It will provide an inventory and forecasts for airports statewide. Some key issues that affect the Plan include: • Local governments own most public use airports • The federal government owns most of the navigational system. • The FAA determines funding levels and prioritization of expenditures for nationally recognized NPIAS airports. • U.S. Congress proposes to severely limit or eliminate general aviation airport funding altogether. OREGON BICYCLE AND PEDESTRIAN PLAN In June 1995, the Oregon Transportation Commission adopted the Oregon Bicycle and Pedestrian Plan. The plan represents a modal element of the Oregon Transportation Plan and serves to guide cities, counties and others in establishing facilities on local transportation systems. The plan focuses on existing street systems in urban areas, where short trips are more realistic and where most congestion problems occur. The plan found that existing statewide conditions are generally good for bicyclists on rural highways, not very good or poor for bicyclists and pedestrians on many urban highways. Also, local systems with good walking and cycling conditions were highlighted as examples to emulate. The plan acknowledges that ODOT will provide appropriate pedestrian. and bicycle facilities to meet the following goal and actions: Goal: To provide safe, accessible and convenient bicycling and walking facilities and to support and encourage increased levels of bicycling and walking. Action 1: Provide bikeway and walkway systems that are integrated with other transportation systems. Action 2 Create a safe, convenient and attractive bicycling and walking environment. Page 34 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 n 1032 0 Action 3: Develop education programs that improve bicycle and pedestrian safety. Each action is refined with specific strategies. After determining needs and priorities, the plan provides for the establishment of bike and walking facilities in the following ways: • Rural highways will have shoulders widened in the course of modernization projects, as well as on many preservation overlays, where warranted. Cost to Implement the Plan: The overall cost to retrofit the existing urban highway system with appropriate facilities is estimated at $150 to $200 million. This would require expending $7.5 to $10 million per year to accomplish the goal in 20 years; this doubles the current ODOT expenditures on pedestrian and bicycle facilities. GOVERNOR'S TRANSPORTATION INITIATIVE To better identify the statewide transportation needs, including the differences between regions, Governor Kitzhaber established regional fact-finding citizen committees to meet with government agencies and the public throughout Oregon. For ease of implementation, the regions followed existing ODOT statewide boundaries. ODOT Region 4 encompasses Central Oregon from Klamath Falls north to Hood River. The Central Oregon Committee identified existing needs in Deschutes County, funding shortfalls, identified possible future funding sources, and developed the following summary recommendations that were reported to the Governor in June 1996. In general, the Committee established that the underlying premise for all its recommendations was that the cost responsibility for improvements fell to those who benefit most. However, the Committee also recognized that not only the direct users benefit from transportation system improvements. The Committee felt that the following recommendations would have the most impact on the region's transportation needs: Increasing partnerships between government entities, and establishing public and private partnerships for highway maintenance and transit systems. By working together to stretch limited resources, city, county and state governments can cut costs and accomplish tasks more efficiently. Costs can be reduced by locating similar services, such as maintenance offices, together, or by working together across jurisdictional boundaries to address priority concerns. Need to have more flexibility in regulations/policies and better intergovernmental cooperation and coordination. • Support community efforts to achieve a land -use pattern that reduces the infrastructure costs and improves livability: mixed-use zoning, higher density and avoidance of commercial strips. • Move trucks off main streets through the development of truck routes or bypasses around downtown districts. Make improvementsto the local road system so it can handle heavier trucks. Where necessary, limit truck travel through congested areas to non -peak hours only. Page 35 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 a 1033 • Increase the $50,000 limit on state -operated maintenance projects when public agencies can do the work more economically than private contractors. • Institute a studded tire and traction device fee at a level that matches the damage they cause. • Decentralize design standards to the regions to allow for exceptions that better meet the needs of the region and communities. • Support a constitutional amendment to allow increases in vehicle registration fees to be used for non -highway uses. The increase would be applied statewide, and that amount would be distributed to counties for alternative modes, or for other transportation -related uses if there were no alternative mode needs. The distribution should be pro -rata. • Modify the "Little Davis -Bacon Act" to reduce labor costs on maintenance and preservation projects. • Provide incentives for (and where appropriate require) development to incorporate design/management features that facilitate alternative modes, such as connectivity of sidewalks/bike paths, bike parking, etc. To provide an incentive to developers, encourage legislative change that would allow variable SDCs if development reduces its impact on the system. • Provide the 10 percent matching funds for non-commercial airports to take advantage of the federal funds available for runway repairs by raising all aviation fuel taxes and/or using lottery funds. • Establish local regional transportation committees to address region -wide issues. Delegate much of the decision-making authority on major projects. • Educate the public about the relationship between land -use and transportation, and the need for adequate transportation funding. The Committee met with GovernorKitzhaber in May 1996, to discuss the issues in Central Oregon and arrived at the following priorities: Preserving and maintaining the existing transportation system is the highest priority for the Central Oregon region. The favored "Tier 1" strategy was to focus on highways and local roads that function as "truck routes", and provide a network of truck routes to get trucks off "main streets". However, these roads must have an adequate base to handle to the weight of trucks using them. The Committee identified the approximate rural highway mileage involved in ODOT Region 4 and assigned the cost of $17 million per year for twenty years to cover costs. ODOT estimated that a 2-3 cent gas tax increase and weight -mile fee would address the Tier 1 needs over the twenty-year period. • Increase ODOT's partnerships with counties, primarily for maintenance activities. Reduce the bureaucracy that restricts state, county and local governments from using their forces • for simple contract operations. Page 36 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) • 169 - 1034 • Greater flexibility in decision-making by shifting decision-making responsibilities to the regional level. Eliminate restrictive administrative policies that limit a region's ability to respond to local needs. • Maintain good access to the Willamette Valley and Portland, and expanding Highway 97 to four lanes. • Simplify the project development process. The amount of "process" should fit the size of the project. • There exists a significant backlog of modernization projects that still need to be done in Central Oregon to maintain the transport of goods and people. Land -use planning and alternative modes are not a "magic bullet" for a region that has vast distances and small population centers. The creation of a regional transportation advisory committee to establish priorities for modernization has merit, provided the scope of the committee is narrowly focused on transportation needs. • Between corridor planning, the State Transportation Improvement Plan, the recent GTI process and other public involvement efforts, ODOT goes to the public "well" too often and confuses the public. OREGON TRAVEL BEHAVIOR SURVEY In general, rural areas normally lack data regarding the travel behavior of residents. The U.S. Census database has a limited usefulness due to the configurations of the tracts used to group the information and the age of the 1990 data. 1n 1996, ODOT funded a consultant study to perform a travel behavior phone survey of rural residents in eight counties in Oregon. The survey respondents kept a travel diary for two days, documenting their trip frequency, characteristics and purpose. A total of 1,208 households were recruited to do the survey, with an actual 775 completing valid surveys. The full report is included in Appendix E. The following is a report summary: Surveys Completed Representative zip codes Overall response rate Average Trip Generation Percentage who telecommute Percentage with flexible /shift work schedules Percentage full or part time students Percentage who use private vehicle Percentage who walk Percentage who bike Percentage who use something else 775 households 97701, 02, 07, 56, 59, & 60 32% 8 trips per household per day 8% 32% 24% 88.3% 6.5% 0.8% 4.4% Page 37 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 -1035 2.2 EXISTING TRANSPORTATION SYSTEM AND CURRENT 0 NEEDS EXISTING ROAD SYSTEM Deschutes County is responsible for maintaining approximately 943 total miles within the County system. Out of the total miles maintained by the County, approximately 750 miles are paved and 193 are unpaved. An additional 1,200 miles of unpaved roads are dedicated to the public but not in the County system. Most of the rural roads are located in the western part of the County along the major state highway corridors. In the other, mostly unpopulated areas, roads totaling approximately410 miles are under the jurisdiction of the U.S. Forest Service, U.S. Bureau of Land Management, the Oregon State Forestry Division, or the Oregon State Parks Division. Of the 750 paved miles of public roads located in the County, many are controlled by the local jurisdictions within the three incorporated cities (Bend, Redmond and Sisters). However, the County maintains approximately 120 miles of urban roadways within UGB's. Of the 120 urban road miles the County maintains, approximately 27 miles are within city limits. An additional 200 miles of roadways (state highway system) are controlled by ODOT. As part of the TSP process, staff has made an extensive inventory of the existing county street network. The County Road Department as part of its pavement management system maintains base level, physical inventory information for County roads. The County Road Department on a rotating cycle also collects traffic volume count information. This rotating cycle produces updated peak -hour and daily traffic volume totals once every two to four years for most arterial and collector roads in the County. This existing database provided a starting.point for a detailed physical inventory of all county arterial and collector roads. The traffic count data for the state highways come from the 1996 traffic volume tables published by ODOT. The results of the inventory are used to define existing street and road capacities, define short-term improvement projects and form the basis for long-term transportation alternatives. TYPES OF ROADS IN DESCHUTES COUNTY There are many types of roads in Deschutes County. The following are some definitions and examples of the types of roads commonly found in the County. Road - means the entire right of way of any public or private way that provides ingress to or egress from property by means of vehicles or other means or that provides travel between places by means of vehicles. "Road" includes, but is not limited to: • Ways described as streets, highways, throughways or alleys; • Road related structures that are in the right of way such as tunnels, culverts or similar structures; and • Structures that provide for continuity of the right-of-way such as bridges. Public Road- means a road over which the public has a right of use that is a matter of public record. Maintenance of public roads, including plowing and repair, is the responsibility of the adjoining property owners. There are far more miles of public roads in rural Deschutes County Page 38 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 1036 than there are miles of County roads or state highways. County Road - means a public road under the jurisdiction of a county that has been designated as a county road under ORS 368.016. County roads are maintained (paved, repaired, plowed, bladed) by the County. A public road becomes established as a County Road by order of the County Commissioners. Huntington and Burgess Roads are examples of County Roads. Local Access Road- means a public road that is not a county road, state highway or federal road. Private Road- Private roads have not been dedicated to the public. These roads do not come under County, City or State jurisdiction. Examples of private roads include those inSunriver, Eagle Crest and Black Butte Ranch. Roads created by easements between two parties can also be considered private roads. Easement- An access or road easement occurs when one person allows another person to drive (cross) their property. The property owner granting the easement still owns the land under the easement, but the other party has a legal right to use the easement. The public, except for invited visitors, does not have a right to use the easement. State Highway - A State Highway is a public road, maintained by the Oregon Department of Transportation. • In addition, the US Forest Service and the Bureau of Land Management have roads on their lands in Deschutes County that they maintain and have jurisdiction over. Many improved, gravel surfaced or paved roads were constructed as a condition of approval of a subdivision of land. Other public roads have been improved through the formation of aSpecial Road District. People living within an area may form a special road district to improve and maintain the roads within a specially designated geographical area such as subdivision. The residents forming the district agree to pay property taxes to support the special district. Road District Commissioners are appointed by the Deschutes County Board of Commissioners to operate the special road district. The special road district improves and maintains the roads within the district to the level agreed to by the residents of the district. County residents may also petition the Deschutes County Board of Commissioners to form aLocal Improvement District (LID) to get their road improved, usually involving the paving of a gravel or dirt road. Public roads improved under the LID process may be accepted by the Deschutes County Commissioners as a County -maintained road. Underan LID, property owners agree to pay for road improvements. ROAD SYSTEM CONFIGURATION Functional classification describes how the public road system should operate. Roads are grouped by their similar characteristics in providing mobility and/or land access. Within the County, there are six rural road classifications and nine urban classifications. An.explanation of the various road • classifications used in Deschutes County is found in Table 2.2.T2. There are three designated urban areas within the County where the urban standards generally apply, with the rest of the Page 39 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) • • 169 - 1037 County using the rural standards. Table 2.231 provides a mileage and maintenance responsibility breakdown of the various County road classifications. The following represents a general overview of state highways, street functional classifications and a listing of County roads falling under each category. Figure 2.2.F1 identifies the current Deschutes County Road System. Complete data lists for all County highways, arterials and collectors can be found in Appendix F. The physical inventory of County roads included the following elements as required by the state Transportation Planning Rule (TPR): • Road Classification and Jurisdiction • Right-of-way Width • Number of Travel Lanes • Lane Width • Inclusion of Sidewalks • Bike Facility Type (if present) • Location of Traffic Control Devices/Signals • General Pavement Condition Table 2.2.T1 *Deschutes County Road Mileage and Maintenance Responsibility by Functional Classification Deschutes County Urban Urban Urban Rural Rural Rural Total Arterial Collector Local Arterial Collector Local Miles County -Maintained (747 35 24 64 181 223 416 943 miles paved, 196 miles unpaved) Public Roads (all 1,200 unpaved) Subtotal: 135 124 164 1181 1223 1416 1 2,143 "Note: Mileage prior to the transfer of County road jurisdiction within the Bend UGB to the citpf Bend on July 1, 1998. Page 40 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 - 1038 . Table 2.2.T2 Road Functional Classifications • Rural Principal Arterial: • Trip length and travel density characteristics representative of substantial statewide or interstate travel; and • Penetrates urban boundaries, or comes within 10 miles of the center of an urban area of 25,000 population or greater, and are within 20 minutes travel time (off-peak) of the center of the area via a minor arterial road. • Movement of interstate goods and services. Arterial: • Links cities, larger towns, and other major traffic generators, providing interregional and intercounty service; and • Spaced at distances so that all developed areas are within reasonable distance of an arterial highway; and • Provides service to corridors with trip length and travel density greater than that predominately served by rural collector or local systems. • Serves the more important intra -county travel corridors. • Movement of goods and services. • Includes Federal Forest Highways. Collector: • Spaced at intervals to collect traffic from local roads and provide all developed areas a reasonable distance from a collector road; and • Provides service to the remaining smaller communities; and • Links locally important traffic generators with rural destinations. Local: • Primarily provides access to adjacent land/properties; and • Accommodates travel over short distances as compared to arterials and collectors. Urban Principal Arterial: • Serves the major activity centers in a metropolitan area, and also serves the highest traffic corridors and satisfies the longest trip desires; and • Carries the major portion of trips entering and leaving the urban area, as well as the majority of the through traffic desiring to bypass the city. Page 41 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 165 a 1039 • Arterial: • Provides service to trips of moderate length at a somewhat lower level of travel mobility than principal arterials; and • Distributes travel to geographic areas smaller than those served by principal arterials, while not penetrating specific neighborhoods; and • Spacing varies from 1/2 to 1 mile in downtown areas, to 2 to 3 miles in areas outside downtown. L Collector: • Provides both land access and traffic circulation within residential neighborhoods, commercial, and industrial areas; and • Distributes trips from arterials through these areas to their final destination, and conversely, collects traffic from local streets and channels it onto arterials. Local: • Provides access to adjacent land and access to higher classified roads; and • Provides lowest level of travel mobility including no bus routes; and • Carries less than 1,500 vehicles per day. Highways / Principal Arterials Highways have the responsibility of facilitating traffic movement through and between urban areas, regions and between states. The 1991 Oregon State Highway Plan identifies four levels of functional importance (LOI) assigned to highways, and these can either be U.S., Oregon State, or local highways; Interstate, Statewide, Regional, and District. All roads in Deschutes County classified as principal arterial roads are state highways. The principal arterial system consists of a connected network of continuous routes having the following characteristics: 1. Serve corridor movements having trip length and travel density characteristics indicative of substantial statewide or interstate travel. 2. Serve all, or virtually all, urban areas of 50,000 population and over and a large majority of those with population of 25,000 and over. 3. Provide an integrated network without stub connections except where unusual geographic or traffic flow conditions dictate otherwise. With the exception of interstates, Deschutes County has representative examples of every highway road classification. The principal arterial system is displayed in Figure 2.2.F2. The U.S. highways in the County consist of: Page 42 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 a 1040 • US Highway 97 — Known as the Dalles-California Highway, Highway 97 is the principal statewide north -south route through central Oregon, extending from California to the Columbia River. It also serves as the main thoroughfare through the cities of Redmond and Bend, and the unincorporated community of La Pine. Congestion on Highway 97 has been an ongoing problem for the communities of Bend and Redmond in particular, due to the increasing volumes of freight and logging truck traffic combined with local residential traffic generated by the rapid growth experienced in recent years. US Highway 20 — Various segments are commonly known as the Santiam Highway, the Sisters -Bend Highway, or the Millican-Burns Highway. Highway 20 is one of the principal statewide east -west routes through Central Oregon, extending from the Oregon coast at Newport, via Albany to Sisters and Bend then on via Burns to the Idaho border at Ontario. Highway 20 forms the principal thoroughfare for trucks and autos from the Willamette Valley over the Cascades to central Oregon. All of the traffic generated, passes through downtown Sisters,then splits east of Sisters to either Redmond (on OR 126) or Bend. The Oregon State highways consist of: OR Highway 126 — Statewide OR 126 extends west to east through Central Oregon, originating on the Oregon coast in Florence. It passes through the Willamette Valley via Eugene, through the Cascades as the McKenzie Highway, then through Sisters and Redmond and on toPrineville, then connecting to US Highway 26 and on to eastern Oregon. Through Redmond, Highway 126 uses several local streets before exiting town. OR Highway 31— OR 31, a Regional highway, also referred to as the Fremont Highway. It originates from US 97 just south of La Pine and extends southeast to US 395 at Valley Falls connecting the south part of Deschutes County with the US 395 corridor in northeastern California. OR Highway 242 — Otherwise known as the Old McKenzie Highway, OR 242 connects with US 20 at the City of Sisters, and extends westward over McKenzie Pass to a connection with OR 126. Closed in winter, OR 242 is considered a District highway. OR Highway 27 - OR 27, a minor District highway also known as the Crooked River Highway,has a short (gravel) section located in Deschutes County. It connects to Highway 20 at a point betweenMillican and Brothers and extends north to Prineville. OR 27 is the only gravel -surfaced state highway in Oregon. Page 43 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 - 1041 0 OR Highway 372 — Another District highway, OR 372 is also known as the Cascade Lakes Highway and Century Drive. This highway connects the City of Bend with Mt. Bachelor to the west. Beyond Mt. Bachelor, the Cascade Lakes Highway becomes a Forest Service arterial serving the high country lakes south of Mt. Bachelor all the way to the Klamath County line. OR Highway 370 — Known as the O'Neil Highway, this District highway originates at a point on US 97 between Redmond and the community of Terrebonne, and extends eastward to the City of Prineville. Powell Butte Highway — Powell Butte Highway is a former state highway that is now a rural arterial within Deschutes County. It originates at Highway 20 east of Bend and connects the City of Bend northeastward past the Bend Municipal Airport to OR 126 nearPowell Butte in Crook County. The portion of the highway within Deschutes County was formerly a state highway but is now the responsibility of Deschutes County. In Crook County, this highway is still a state facility. Rural Minor Arterials / Collectors Lower down in the functional classification hierarchy are the minor arterial (including federal forest highways) and collector streets and roads that enable people to move between the neighborhoods where they live, to the places they work, shop, and go to school. Streets are generally classified in the following order according to the amount of traffic they are designed to handle, and their allowable design speeds. The rural minor arterial road system should, in conjunction with the principal arterial system, form a rural network having the following characteristics: 1. Link cities and larger towns (and other traffic generators, such as major resort areas, that are capable of attracting travel over similarly long distances) and form an integrated network providing interstate and intercounty travel. 2. Be spaced at such intervals, consistent with population density, so that all developed areas of the State are within a reasonable distance of an arterial highway. 3. Provide (because of the previous two characteristics) service to corridors with trip lengths and travel density greater than those predominantly served by rural collector or local systems. Minor arterials constitute routes whose design should be expected to provide for relatively high overall travel speeds, with minimum interference to through movement. The County rural minor arterials, generally located in the north and central part of the County consist of: Page 44 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 0 0 • Redmond Area (Figure 2.2.F3) NE 9th Street - NW 31 st Street - NW Almeter Way - S Canal Blvd. - NW Helmholtz Way - SW Helmholtz Way - Holmes Road - Lower Bridge Way - NW Maple Avenue - NW Maple Avenue - Northwest Way - Smith Rock Way - 169 -1042 Redmond UGB to Highway 97 (ROW needed) NW Sedgewick Avenue to NW Lower Bridge Way Northwest Way to NW Sedgewick Avenue SW 39th Street to Tumalo Road W Antler Avenue to NW Maple Avenue W Antler Avenue to SW Obsidian Avenue Highway 126 to NW Lower Bridge Way Highway 97 to Holmes Road Redmond UGB to Northwest Way 35th Street to NW Helmholtz Way (ROW needed) W Maple Avenue to NW Almeter Way Terrebonne Railroad Crossing to Crook County Line Bend Area (Figure 2.2.F4) Alfalfa Market Road - Brookswood Blvd. - Butler Market Road - Deschutes Market Rd. - Johnson Market Road - NE Neff Road - OB Riley Road - Old Redmond -Bend Hwy Powell Butte Highway - Shevlin Park Road - Willard Road - Federal Forest Highways Powell Butte Highway to Johnson Ranch Road Buck Canyon Drive to Baker Road Bend UGB to Powell Butte Highway Highway 97 to Butler Market Road Shevlin Park to Tyler Road Bend UGB to Powell Butte Highway Glen Vista Road to Tumalo (rural service center boundary) Tumalo Road to Highway 20 Highway 20 to Crook County Line Tumalo Creek Bridge to Shevlin Park Johnson Ranch Road to Crook County Line Cascades Lakes Highway - Skyliners Road - Edison Butte Rd. (FS Rd. #45) - Conklin Rd. (FS Rd. #41) - Three Trappers Road - Paulina Lake Road - South Century Drive - Pringle Falls Loop - Elk Lake Road - Cultus Lake Road - Twin Lakes Road - Keefer Road - China Hat Road - Mt. Bachelor to Klamath County line Bend UGB to Tumalo Falls FS Rd. #40 to Century Drive Spring River Rd. to Century Drive Spring River Road to Cascade Lakes Highway Paulina Creek to East Lake Deschutes River to Cascade Lakes Highway Burgess Road to South Century Drive Loop to and from Cascade Lakes Highway Cascade Lakes Highway to Cultus Lake South Century Drive to South Twin Lake South Century Drive to north end of Crane Prairie Res. End of pavement (near Knott) to Klamath County line Page 45 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 0 0 169 - 1043 LL 3 X w NE E O:E C**j E Cl) CL _j L >% - 0.06U > 0—'s:. C m U)0 m Z) Cl) 0 73 cu 0 za O 10 CD Q tm cr) c o CD oj m CL 0 tu o�Z� o z < LL. -j z ♦♦a^^. W Z 0 CQ < C) z W W 0 F w z OZ Wn uj Z Z Cl) 0 D coz 0: W LQ Cf) CO w 0 a. w wMtn bo CO cn N co 0 • 0 LU op, 0 m Q Z 0 z Q Q LL U J GQ J_ co W W .; n 169 1044 rtO J5. W N =U UZ LL .-. �3 z N E■ U W � N E0 U� �s< t 120 cv V- N o Q a D) �— Q CU � J LL > .+ C C 7 U I I LU op, 0 m Q Z 0 z Q Q LL U J GQ J_ co W W .; n LLl Z o rtO J5. =U UZ U W � N �s< t 120 a O LB 'S.n (L O Q Q Y Z 2 Z m a g3C. o zZW a� U) O y0 w w U) 04H v '�_/� 04 N U) 0 8I 81 !�i R R1 0 c • �J 169 1Ud5 Rural Collectors The collector street system provides land access and traffic circulation within residential neighborhoods, and commercial and industrial areas. It differs from the arterial system in that facilities on the collector system may penetrate residential neighborhoods, distributing trips from the arterials through the area to the ultimate destination. Conversely, thecollector street also collects traffic from local streets in residential neighborhoods and channels it into the arterial system. In the central business district, and other areas of like development and traffic density, the collector system may include the street grid, which forms a logical entity for traffic circulation. The rural collectors in the County are identified below by general geographic area: Redmond Area (Figure 2.2.F3) NE 1st Street - NE 5th Street - NW 10th Street - NW 19th Street - NW 35th Street - NW 43rd Street - NE 17th Street - NW 59th Street - SW 61 st Street - SW 63rd Street - SW 67th Street - NW 67th Street - Buckhorn Road - N Canal Blvd. - SW Catlow Way - NE Cayuse Avenue - NW Chinook Drive - Cline Falls Highway - NW Coyner Avenue - NE Eby Avenue - NW Eby Avenue - NW Helmholtz Way - SW Helmholtz Way - NW Ice Avenue - NE King Way - NW Kingwood Ave. - NE Knickerbocker Avenue - NW Maple Avenue - NE Negus Way - SW Obsidian Avenue - NW Odem Avenue - NW Pershall Way - NW Upas Avenue - SW Wickiup Avenue - NE Wilcox Avenue - NE Knickerbocker Avenue to NE Wilcox Avenue O'Neil Highway to NE Eby Avenue Redmond UGB to NW Pershall Way NW Odem Way to NW Lower Bridge Way NW Hemlock Avenue to NW Upas Avenue NW Lower Bridge Way to NW Chinook Drive NE Upas Avenue to O'Neil Highway NW Kingwood Avenue to NW Maple Avenue S. Canal Blvd. to Highway 97 SW Catlow Way to SW Obsidian Avenue Beginning of grid to SW Catlow Way Beginning of grid to NW Kingwood Avenue Highway 126 to NW Lower Bridge Way O'Neil Highway to Highway 97 SW 67th Street to SW 63rd Street NE 5th Street to NE 9th Street NW 43rd Street to Jefferson County line Highway 126 to Tumalo UC Pershall Way to NW Helmholtz Way beginning of grid to NE 5th Street beginning of grid to Highway 97 NW Maple Avenue to NW Coyner Avenue canal bridge to S. Canal Blvd. NW Wimp Way to NW 43rd Street Redmond UGB to NE 17th Street NW 59th Street to NW 67th Street NE 1st Street to NE 5th Street NW Helmholtz Way to NW 59th Street Redmond UGB to NE Upas Avenue SW 35th Street to SW 63rd Street NW 10th Street to Northwest Way Highway 97 to NW Coyner Avenue Northwest Way to NW 35th Street SW Helmholtz Way to SW 58th Street NE 1st Street to Crook County line Page 48 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) • • • Sisters Area (Figure 2.2.F5) Gist Road - Buffalo Road - Camp Polk Road - Cloverdale Road - Fryrear Road - Indian Ford Road - Three Creek Road - Wilt Road - Unnamed - Unnamed - Unnamed - Unnamed - 169 - 1046 Highway 20 to Varco Road Wilt Road to Mountain View Road Highway 126 to Sisters UGB Highway 20 to Highway 126 Highway 20 to Highway 126 Camp Polk Road to Green Ridge Road Sisters UGB to Forest Service Road #1600-210 Camp Polk Road to end Pavement Three Creeks Road to Highway 126 (South UGB) Highway 126 to Barclay Drive (East UGB) Three Creeks Road to Highway 20 (South and West UGB) Barclay Court/Camp Polk Loop to Highway 20/126 to Highway 242 Bend Area (Figure 2.2.F4) Arnold Market Road - Baker Road - SE Bear Creek Road - Bennett Road - Cinder Butte Road - Dickey Road - Dodds Road - Erickson Road - Gosney Road - Hamby Road - Hamehook Road - Johnson Ranch Road - McGrath Road - Minnetonka Lane - Plainview Road - Rickard Road - Stenkamp Road - Ward Road - Rickard Road (west) to 90 degree left turn Highway 97 to Shoshone Road (west) Bend UGB to Ten Barr Road Alfalfa Market Road to NE Bear Creek Road Baker Road to Minnetonka Lane Butler Market Road to Erickson Road Highway 20 to Alfalfa Market Road Highway 20 to Dickey Road Highway 20 to 90 degree right -turn Highway 20 to Butler Market Road Butler Market Road to Deschutes Market Road Alfalfa Market Road to Crook County line Morrill Road to Stenkamp Road Kiowa Road to Cherokee Road Highway 20 to Gist Road Knott Road to Highway 20 McGrath Road to Alfalfa Market Road Highway 20 to Arnold Market Road Tumalo Area (Figure 2.2.F6) Bailey Road - Couch Market Road - Deschutes Pleasant Ridge Rd - Johnson Market Road - Tumalo Road - Tumalo Reservoir Rd.- Gerking Market Road - Collins Road - Innes Market Road - Tumalo RSC to Tumalo Reservoir Road Highway 20 to Collins Road Highway 97 to Deschutes Market Road Tyler Road to Tumalo Reservoir Road Highway 97 to Tumalo RSC OB Riley Road to Collins Road Highway 20 to Innes Market Road Couch Market Road to Tumalo Reservoir Road Highway 20 to Cline Falls Highway Page 49 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 - 1047 • Sunriver and South County Area (Figure 2.2.F7) 5th Street - Amber Lane to La Pine State Recreation Road 6th Street - Highway 97 to Dorrance Meadow Road Amber Lane - Deep Woods Road to 5th Street Burgess Road - Highway 97 to Sunset Court Cottonwood Road - Highway 97 to Railroad crossing Day Road - Burgess Road to Amber Lane Dorrance Meadow Road - Burgess Road to 6th Street Finley Butte Road - Highway 97 to Darlene Way Huntington Road - South Century Drive to La Pine RSC La Pine State Recreation Rd -Highway 97 to Foster Road (FS #4205) Lazy River South Drive - Huntington Road to Otter Drive Masten Road - Highway 97 to end of pavement Paulina Lake Road - Highway 97 to Paulina Creek Bridge Prairie Drive - Highway 97 to Huntington Road Reed Road - Highway 97 to Darlene Way Riverview Drive - Otter Drive to Huntington Road South Century Drive - Highway 97 to Deschutes River Bridge Spring River Road - South Century Drive to Forest Service boundary Vandevert Road - Highway 97 to South Century Drive • Page 50 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) • �j 0 69 M M i o LL Q " N s oW N to a N t � o z � 0 0 s.. 0 Q,vU� m o �� O' -C CJ CaO ■� aQU O O.0 LL o E E N C C O C O L> O N N O0" O 1,zl r o _OxO c O w cra m O a MCDr r w F.MNO t m m c A U O CL io W t �a '2 �teM 24104w H MN .co L co r m Q o m _F r Pa wo0V ^� W o V'^ nU) W � Q • 0 169 1049 `Cr LL Cf) c w ' N ma ' cu E ca E -- a O OS 0— L. — Lu '. =3 o -2E o-2 E -t•2 V J 0) o Q o L- .� LLm 0 QQUU� '� L C ` C C c :3 :3 r� a J a � a < c �J m m � C U � ° y a m }K N L a Pros dwquas 6 N � Z oe.�zuoiioowa W Pa e11�9 3 Ali O, cma PNJBw ♦ /'� r � 1 �F w UJ0 _ UJ 0 J. b' 0 ry ti cn z� a) CA I, ^V W Q • 0 CID 169 1050 3 LO CIO a)W LL 1-1 i- F N Q L o z — ... .F m N U) to a�o0 N (D Qac E U) LL N d � C A a 0 m rn � m a � c m J C U 0 m U � m N 9� Rd• o py � s s N 0 'P8 al.PJanop 'Pa PIS r ^ O 1 ti Qd��a• Jg. (D aPa O Ptl MaaJp amyl 1�6 U) U 20�0� H v5 U) N N U ;cq O C) Cl) Z2 W X 0 Lij N • �l • ,O ,vA-� '3S;S 69 �' p Deschutes Market Rd. U O eg'o �, cr %A, -00 m AM461H SIIBI au!ID -PH 3a)peyy 6ul)lJag 169 1051 � 0 w � cu cT LL C E z N �0 1..1... 0 N m L m 4) W L O CL L t 75 5 L O U W tp LL O N O U o 3 3 nQ ~ U t0 (fl Nc O C� C LL LL LL r W E �r/ c ,O ,vA-� '3S;S 69 �' p Deschutes Market Rd. U O eg'o �, cr %A, -00 m AM461H SIIBI au!ID -PH 3a)peyy 6ul)lJag � 0 ► cT Em f0 0 m to c W tp O U 3 3 ~ PH SUIUoO A m In v a OF m 8 u 7 • 169 .9 1052 I` U. W N Cl) z 14 cNi cuO E U .F.r O O 0 C V N O N N LL Q �'O O Q.J N aU> �•. O U �'C C C U •c��c 0 aw(1)D a m°' O n c a tmw c m J _ / C U 0 o.o � U � y 8 g 446CL 004 O .Pb Ilea K O O N N o a Awa"w coueLoa 6 U)Oo LnU v N � co O N 0 169 - 1053 TRAFFIC CONTROL DEVICES Traffic Signals - No traffic signals occur in the rural areas of the County. Flashing Warning Lights- Red and/or yellow flashing warning lights generally are located at intersections where a full stop light control is not yet warranted and four-way stop signs would not meet the need to balance safety concerns and through traffic movement. Yellow flashing lights can also occur at school crossings and railroad crossings, etc. Often, typical speeds on the roads approaching an intersection may not give drivers enough time to react, therefore flashing red lights are placed over the intersection to alert drivers in advance of a four-way stop. In some cases, the yellow flashing light is facing traffic on the cross street with a higher functional classification and the red flashing light faces drivers on the lesser classified street causing them to stop before entering the intersection. Commonly, a red or yellow flashing light facing all intersecting streets would denote similar functional classifications. These warning lights occur in the County at the following intersections shown on Figure 2.2.F8: 1. Highway 97 (yellow) / Smith Rock Way (red) 2. Highway 97 (yellow) / O'Neil Highway (red) 3. Highway 97 (yellow) / Deschutes Market Road (red) 4. Old Redmond -Bend Highway (red) / Tumalo Road (red) 5. Highway 20 (yellow) / Hamby Road (red) 6. Powell Butte Highway (yellow) / Neff Road (red) 7. Highway 97 (yellow) / South Century Drive (Sunriver exit) (red) 8. Huntington Road (red) / Burgess Road (red) • 9. Highway 97 (yellow) / William Foss Road (flashes only during periods when school children may be present) 10. Butler Market Road (red) / Hamby (yellow) TRAFFIC VOLUMES The Deschutes County Road Department conducts average daily traffic (ADT) and peak hour traffic volume counts on a rotating basis for most arterials and collector roads in the County. Each road is counted on average, once every two to four years. The traffic count information was assembled in a spreadsheet. For road segments not counted in 1996, a trend analysis was used to establish a 1996 estimated traffic volume. Table 2.234 identifies the County roads with a significant volume (>3,000 ADT) in 1996. Most County roads carry a very low volume due to their mostly rural nature. Of the 404 County -maintained rural arterials and collectors, only 21% (88.5 miles) carry 1,500 or more average daily trips. The County rural road with the highest ADT volume in 1996 was Baker Road, just west of Highway 97, with 9,090 ADT. The complete listing of County road and state highway volumes for 1996, as well as 2016 estimates are contained in Appendix I. State highway traffic volumes within Deschutes County vary widely. The traffic count information comes from the Oregon Department of Transportation's document "1996 Traffic Volume Tables". The heaviest traveled highway in the County is Highway 97 with 1996 average daily volumes ranging from 8,800 at the northern county line to 40,800 within the City of Bend, and 5,200 at the south county line. The next most traveled highway is Highway 20 withADTs ranging from 4,100 west of Black Butte Ranch to 9,000 within Sisters, to 16,000 within Bend, then dropping off significantly east of Powell Butte Highway to 3,700 then decreasing easterly through Millican, Brothers and Hampton to approximately 1,500. Page 56 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) • 169 1054 LEVEL OF SERVICE In order to effectively communicate about traffic flow and traffic capacity conditions, the engineering and planning professions have adopted a concept of level of service to describe traffic conditions and associated traffic flow rates. Six levels of service designations ranging from A to F are typically recognized by the transportation professions. For rural, two-lane roads in the County, the peak hour traffic volumes were assumed to be ten percent (10%) of the average daily traffic amount, then further adjusted to reflect a desirable flow rate. The LOS calculations for the highway segments also used a 10% peak hour amount, but were not adjusted for desirability because of the likelihood that a greater number of through trips using the highways would spread the average daily traffic amounts more uniformly over the day. Level of service can vary based on many factors, including terrain, lane width, design speed, number of accesses, number of heavy trucks and RVs, etc. For Deschutes County, LOS was determined based on the relationship of general capacity to average daily traffic (ADT) for level terrain. For a ten- percent (10%) peak hour flow, the corresponding ADT and LOS are identified in Table 2.233. The capacity of a given transportation facility or road is a measure of its ability to accommodate a moving stream of people or vehicles. A level of service definition generally describes a motorist's perception in terms of such factors as speed and travel time, freedom to maneuver, traffic interruptions, comfort and convenience, and safety. This capacity forms the basis for most transportation planning and design decisions and actions. Table 2.234 and Figures 2.2.F9 -F11 identify the estimated LOS for County roads in 1996. Table 2.235 and Figure 2.2.1712 show the estimated 1996 LOS for highway segments in the County. Most planning applications deal with future conditions and involve estimates of traffic, transit or pedestrian flows. Therefore, reasonable order -of -magnitude estimates of capacity are usually adequate. Transportation capacity reflects the ability of a roadway to carry vehicles or people, under the prevailing conditions of operation. In general, capacity represents the maximum hourly rate (usually the peak hour) at which a number of people or vehicles pass a given point within a specific time period under prevailing conditions. The desirable flow rate is usually somewhat less since it introduces the qualitative aspect of a specified level of service (LOS). Level of service at unsignalized intersections is commonly evaluated by using the amount of time delay drivers perceive as they wait to enter or cross an intersection. All intersections in the unincorporated areas of Deschutes County are currently unsignalized. Two-way stop or yield controls are common on arterial streets and highways. As cross -street volumes increase, these intersections can reach capacity limits and produce significant delays to cross -street vehicles as well as accident potential. Four-way stop control is often an interim phase preceding signalization. Calculations of unsignalized intersection capacity are based on a simplifying assumption that minor street traffic does not affect the traffic flow on the major street. In reality, when congestion occurs, the major flows are probably affected to some degree by minor street traffic and left turns, all conflicting traffic movements affect minor street traffic. Page 57 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) • 0 169 X1055 co 5% LL co E cNi E O:E CDO — N 0 CD ca (D o< a)= CD &-a r- 0 L —j O S 0 cL< L) 4? m C C :3m LL .r co m O cuca 0 CL ca .2 0 E Q cc > 0 0 O Lp 0 co a r- > cn co CL U) 0 C4 `� U 0 Cl) (D • 16-9 - 1056 Table 2.2.T3 Generalized County Road and Highway ADT/LOS • Note: ADT based on 10% peak hour factor, then modified (for County roads) to reflect a desirable flow. Page 59 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) Highway County Level of Characteristics ADT ADT Service A A free-flow condition with individual users unaffected by the presence 2,400 1,700 of others in the traffic stream. B Stable flow with a high degree of freedom to select speed and 4,800 3,400 operating conditions but with some influence from other users. C Restricted flow which remains stable but with significant interactions 7,900 5,700 with others in the traffic stream. The general level of comfort and convenience declines noticeably at this level. D High-density flow in which speed and freedom to maneuver are 13,500 9,600 severely restricted and comfort and convenience have declined even though flow remains stable. E Unstable flow at or near capacity levels with poor levels of comfort 22,900 16,300 and convenience. F Forced flow in which the amount of traffic approaching a given point > 22,900 > 16,300 exceeds the amount that can be. served, and queues form which are characterized by stop and go waves, poor travel times, low comfort and convenience, and increased accident exposure. • Note: ADT based on 10% peak hour factor, then modified (for County roads) to reflect a desirable flow. Page 59 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 1057 Table 2.2.T4 is Top County 1996 Rural Road Volumes and Estimated LOS Rank Rd-Sg Dir Road Name From To ADT PM Peak LOS Class 1 2 3 4 3006-10 3161-50 4106-20 4106-30 BAKER RD SE 27TH ST BURGESS RD BURGESS RD HWY 97 FERGUSON RD PINE DR GLENWOOD DR LAKEVIEW DR RICKARD RD GLENWOOD DR LOST PONDEROSA RD 9,090 7,900 7,240 6,290 909 790 620 629 D D D D Collector Arterial Collector Collector 5 4106-40 BURGESS RD LOST PONDEROSA RD DEER FIELD DR 5,340 534 C Collector 6 4112-10 SOUTH CENTURY DR SEWAGE TREATMENT RD SPRING RIVER RD 5,266 474 C Collector 7 4101-30 HUNTINGTON RD BURGESS RD EVERGREEN LN 5,220 522 C Collector 8 3006-20 BAKER RD LAKEVIEW DR SHOSHONE RD E 4,870 487 C Collector 9 1171-10 COOK AVE TUMALO RD HWY 20 4,774 401 C Collector 10 4106-50 BURGESS RD DEER FIELD DR STEARNS RD 4,400 440 C Collector 11 3181-70 DESCHUTES MARKET RD YEOMAN RD BUTLER MARKET RD 4,285 383 C Arterial 12 3181-60 DESCHUTES MARKET RD J D ESTATES DR YEOMAN RD 4,270 427 C Arterial 13 3181-50 DESCHUTES MARKET RD HAMEHOOK RD J D ESTATES DR 4,260 426 C Arterial 14 3181-40 DESCHUTES MARKET RD UGB - BEND HAMEHOOK RD 4,241 275 C Arterial 15 3181-30 DESCHUTES MARKET RD PIONEER LOOP UGB - BEND 4,210 421 C Arterial 16 3181-20 DESCHUTES MARKET RD DALE RD PIONEER LOOP 4,180 418 C Arterial 17 3181-10 DESCHUTES MARKET RD HWY 97 DALE RD 4,142 376 C Arterial 18 1148-80 CLINE FALLS HWY UGB - TUMALO TUMALO RD 3,930 393 C Collector 19 4112-25 SOUTH CENTURY DR VANDEVERT RD HUNTINGTON RD 3,760 376 C Collector 20 4106-10 BURGESS RD HWY 97 PINE DR 3,640 364 C Collector 21 2177-10 LOWER BRIDGE WAY HWY 97 NW 27TH ST 3,601 326 C Arterial 22 4112-30 SOUTH CENTURY DR HUNTINGTON RD SNOW GOOSE RD 3,590 359 C Collector 23 4106-60 BURGESS RD STEARNS RD DORRANCE MEADOW RD 3,450 345 C Collector 24 1148-70 CLINE FALLS HWY EDGE HILL DR UGB - TUMALO 3,450 345 C Collector 3518-45 POWELL BUTTE HWY MCGRATH RD BUTLER MARKET RD 3,440 344 C Arterial 4111-10 DAY RD BURGESS RD NORTHWOOD DR 3,434 294 C Collector 27 3518-60 POWELL BUTTE HWY NEFF RD HWY 20 3,390 339 B Arterial 28 4112-05 SOUTH CENTURY DR HWY 97 SEWAGE TREATMENT RD 3,384 294 B Collector 29 3182-60 BUTLER MARKET RD UGB - BEND HAMBY RD 3,260 326 B Arterial 30 3518-40 POWELL BUTTE HWY MILE POINT MCGRATH RD 3,220 322 B Arterial 31 2130-40 S CANAL BLVD SW HELMHOLTZ WAY SW 61ST ST 3,210 330 B Arterial 32 4111-20 DAY RD NORTHWOOD DR DEEDON RD 3,180 318 B Collector 33 1148-60 CLINE FALLS HWY CONNARN RD EDGE HILL DR 3,160 316 B Collector 34 4101-40 HUNTINGTON RD BURGESS RD UGB - LAPINE 3,140 314 B Collector 35 3022-10 CINDER BUTTE RD BAKER RD LAKEVIEW RD 3,050 305 B Collector 36 3518-35 POWELL BUTTE HWY MILE POINT MILE POINT 3,020 302 B Arterial Code: ADT: LOS: > 16,300 F 9,600 - 16,300 E 5,700 - 9,600 D 3,400 - 5,700 C 1,700 - 3,400 B < 1,700 A Note: Numbers in BOLD are actual LOS estimates are based on 1996 counts, others are the Highway Capacity Deschutes County estimates. Manual, and a 10% peak hour traffic flow being Modified to arrive at a desirable flow. Page 60 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) r • 0 169 1058 W 0 E LL >, 0 z 3 0 N w N COcc CY)�U) o O � "-U U O � •C N N � N ■� LL caC O co J , L< 0 O � O () N C � L 7 3 T N 0 Z c a m e a c N 0 C X mm� m O (� C a U U i — (0 Ix a >' cv w r CC L U = � p — Z u') � � 0 O L 't t Highway 97 ~ 1 cu� CD i O CIO No�hwes U Is Pj£ti 3 0 vI o U W 0 • 0 169 1059 O cu >. o U cm LL Q E00 � z N C O t— F- m 3 N A' W Uo0" -0QQ.F ` QD L- cu 00 a) E t5 r Q - L Q N O J m c QrnLr-2:, O QQUQU�� X00 U N N -0-0"a O .� o o C LZ L C C C D ' c r- IT '` 0 7 0) 0 0 0 �L c6(LWwmmmU m c LL a m a J Q J m_ c a c � C U � CL o io U � m 5 y o o®aeumNs rc OZ lz yZ�ieoo, c� p D-aAWMH z DoH a 1aNaW sainwsao N Ir r H i o-tx y W s U R cn g 0 A W N 169 1060 � a � _ W LL v = z CNI Q ' U)�, o ° E C- cn U i ` 3 /1 F- ♦^ ao L �J o o ai 0 ooh corms M o 0& _j 0) 0 ooQUcoi> .� V ooa==z0 LL ui rid w D cA U C C O C r� a v / � � c 7 N m J � d C V 0 a 0 5 Ly Qa U co sem( �My am C C J �J Q U (a x o ^ CD v J n �� 'p21 OJBWJunjj co �a�2 (D soy m Q a O (n - Q pa Mopeeyi eousuoa V U V! M T N T ♦� s p x C13 J � V♦ N Q waO 169 - 1061 Table 2.2.T5 ODOT 1996 Highway Volumes and Estimated LOS Code: Generalized ADT: LOS: > 22,900 Highway 13,500 - 22,900 E 7,900 - 13,500 1996 1996 Est. 2,400 - 4,800 Rank Hwy # Name Route # Location Mile Point ADT PM Peak LOS 1 4 DALLES-CALIF. HWY. US 97 SOUTH CENTURY DR. 153.09 8,100 810 E 2 4 DALLES-CALIF. HWY. US 97 "A" AVENUE (TERREBONNE) 115.87 11,200 1,120 D 3 4 DALLES-CALIF. HWY. US 97 COTTONWOOD DR. 151.10 10,750 1,075 D 4 15 MCKENZIE HWY OR 126 HWY 20 92.32 10,100 1,010 D 5 15 MCKENZIE HWY OR 126 ELM ST. 92.51 9,800 980 D 6 15 MCKENZIE HWY OR 126 LOCUST ST. 92.95 8,950 895 D 7 16 SANTIAM HWY. US 20/126 MCKENZIE HWY 100.03 8,900 890 D 8 16 SANTIAM HWY. US 20/126 SANTIAM PASS RD. 99.53 8,375 838 D 9 16 SANTIAM HWY. US 20/126 TOLLGATE RD. 98.33 7,850 785 D 10 17 MCKENZIE-BEND US 20 CLINE FALLS HWY. 14.77 7,400 740 D 11 4 DALLES-CALIF. HWY. US 97 LAPINE STATE REC. RD. 160.60 7,400 740 D 12 16 SANTIAM HWY. US 20/126 INDIAN FORD RD. 94.91 7,325 733 D 13 4 DALLES-CALIF. HWY. US 97 PAULINA LAKE RD. 161.76 7,300 730 D 14 4 DALLES-CALIF. HWY. US 97 1 ST STREET (LAPINE) 167.49 7,300 730 D 15 16 SANTIAM HWY. US 20/126 BLACK BUTTE RANCH (09-014) 93.19 6,800 1,156 D 16 17 MCKENZIE-BEND US 20 INNES MARKET RD. 9.71 6,700 670 D 17 4 DALLES-CALIF. HWY. US 97 JEFFERSON COUNTY LINE 112.86 8,800 880 C 18 4 DALLES-CALIF. HWY. US 97 VANDERVERT RD. 155.51 7,500 750 C 19 4 DALLES-CALIF. HWY. US 97 BURGESS RD. 165.20 7,300 730 C 20 17 MCKENZIE-BEND US 20 COUCH MARKET RD. 12.28 7,050 705 C 21 7 MILLICAN-BURNS US 20 ERICKSON RD. 4.55 7,000 700 C 22 17 MCKENZIE-BEND US 20 TWEED RD. 10.07 6,875 688 C 23 4 DALLES-CALIF. HWY. US 97 OR 31 (FREMONT HWY.) 169.67 6,700 670 C 24 17 MCKENZIE-BEND US 20 FRYREAR RD. 7.87 6,600 660 C 25 17 MCKENZIE-BEND US 20 CLOVERDALE RD. 4.77 6,400 640 C 26 17 MCKENZIE-BEND US 20 HARRINGTON LOOP 3.21 6,300 630 C 17 MCKENZIE-BEND US 20 OR 126 0.11 6,200 620 C W9, 15 MCKENZIE HWY OR 126 HELMHOLTZ WAY 109.64 6,000 600 C 41 OCHOCO HWY OR 126 REDMOND CITY LIMITS 2.32 5,700 570 C 30 41 OCHOCO HWY OR 126 CROOK COUNTY LINE 3.58 4,700 470 C 31 16 SANTIAM HWY. US 20/126 CAMP SHERMAN RD. 90.91 4,500 450 C 32 16 SANTIAM HWY. US 20/126 JEFFERSON COUNTY LINE 80.77 4,100 410 C 33 7 MILLICAN-BURNS US 20 POWELL BUTTE HIGHWAY 4.83 3,700 370 C 34 372 CENTURY DR. OR 372 INN OF THE 7TH MTN. 7.14 3,600 360 C 35 372 CENTURY DR. OR 372 DILLON FALLS RD. 7.60 3,600 360 C 36 15 MCKENZIE HWY OR 126 HWY 20 93.08 3,500 350 C 37 370 O'NEIL HWY OR 370 NE 33RD ST. 2.57 1,600 160 C Code: Generalized ADT: LOS: > 22,900 F 13,500 - 22,900 E 7,900 - 13,500 D 4,800 - 7,900 C 2,400 - 4,800 B < 2,400 A Note: Locations in BOLD denote permanent recorder stations. Numbers in BOLD are actual 1995 counts, ITALICS are County estimates, and others are ODOT estimates. LOS estimates furnished by ODOT. • Page 64 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) M • a�c cu TD) i W cu U) TO VTI V lr� ZZ Nlo ib? - iocna N W � LL z � N N N LL M�l 1�. o1 cm CLL U) F- 0 rslU o o, V � U Cl) C5- c� 0 X as waO • 169 w 1063 FIRE DISTRICTS Within Deschutes County there are a total of seven rural fire protection districts (RFPD). Two of the districts, Redmond #1 and Bend #2, include the urban growth boundaries of Redmond and Bend. The other five districts provide mostly rural fire protection. In addition, the U.S Forest Service also provides fire protection to parts of Deschutes County, and theSunriver resort maintains its own fire department. All of the fire district areas are shown on Figure 2.2.F13. The following is a listing of the fire protection districts by area: • Redmond RFPD #1 - Redmond Area/North County • Bend RFPD #2 - Bend Area/East County • Crooked River RFPD - North County/Terrebonne/Redmond/part of Jefferson County • Black Butte RFPD - Black Butte Ranch Area • Sisters/Camp Sherman RFPD - Sisters and Camp Sherman Area • Cloverdale RFPD - Cloverdale Area between Sisters and Bend • La Pine RFPD - South County Area between Sunriver and La Pine District fire stations are located at/on: • Redmond RFPD #1 • Bend RFPD #2 - • Crooked River RFPD - • Black Butte RFPD - • Sisters/Camp Sherman RFPD - • Cloverdale RFPD - • La Pine RFPD - ACCIDENT STATISTICS Dogwood Street (Redmond) 740" Street (Redmond) C Avenue (Terrebonne) Hamby Road Crooked River Ranch (Jefferson County) Black Butte Ranch Elm Street (Sisters) Highway 126 Huntington Road South Century Drive Burgess and Day In 1996, the grant -funded Deschutes County Safe Communities program was initiated in an effort to reduce transportation -related injuries of all types. The program links accident data with medical information to identify the most significant problems and then develop solutions. Focus areas include safety equipment for bicyclists and safe cycling education programs for school children. Program Staff used the state accident database, from the Accident Data Unit at ODOT, to evaluate accident data for the period 1991 - 1996. During the '91-'95 time period there were a total of 2,518 crashes reported on County roads and highways outside of urban areas. Of the total number of accidents, 70 were fatal, 1,073 involved injury (170 serious),'and 1,375 were property damage only accidents. Safe Communities staff has also identified the difference in accident occurrences between the County in general and the rural areas. Countywide, fatal accidents accounted for 1.2 percent of the total number of accidents, while fatal accidents just in the rural area accounted for 2.8 percent of the total. Injury accidents made up 4.4 percent of the County total, while in just the rural areas; they accounted for 6.8 percent of the total. Page 66 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 0 0 0 wj CL cn uj Cl) U. z cNi 0 Z li EL 3 oz� N 0 ol cz, <� Es LaL Ww mw E za LU cr La, LML MW om lwl� w W> a- ;5 < D f,— f,— LXL a— m T T w rim) LL Z5.a >Lywoo cw, W, a 'r- 0 > 0 w c 0 w !K (1) E.E- -i w 0 n m D W LL M 0 0 LL CL 55 0 LL U) z o D ro CL cn uj Cl) z a Z cl IL LU cr w CL LL U) z o D p O z O w IL UJ2 LL ............................. X?o cl: 0 w w a M to Z 8 W 6 C� W U- Lq S2 C0< 0 LL w cl LLJ w IX !K w LL D CL LL CO o W LLI r U) D CL CL cn 169 -1065 ACCIDENT ISSUES The Safe Communities Group has identified the following six most important issues that should be addressed within the first year of the program: 1. Reengineering high incident areas where the greatest numbers of accidents have occurred. 2. Develop better data sources and improve the quality of information. 3. Address the high percentage of ice -related crashes, injuries, and fatalities on the Highway 97 corridor between Bend and La Pine. 4. Evaluate the costs and impacts of traffic accidents, and direct program activities where there is a chance for the greatest improvement. 5. Focus on injury and fatality information, with reduced emphasis on property damage and minor injury events. 6. Educate drivers as to changes in road usage; examples include the higher speed rural roads at the edges of the urban centers which are rapidly becoming more populated with more pedestrians and school children present. The top rural accident locations for County roads and for state highways are identified in Figure 2.2514 is and Tables 2.236 and 2.237. PAVEMENT TYPE / CONDITION Out of the 943 roadway miles that the County maintains, 625 miles (66%) are paved while the other 318 miles (34%) are either dirt or aggregate. There is only one unpaved principal arterial in the County and that is Highway 27 which runs north to Crook County (Prineville Reservoir). It connects to Highway 20 at a point located approximately 30 miles east of Bend, betweenMillican and Brothers. There are no unpaved rural arterials, but several miles of unpaved rural collectors. The unpaved sections of collectors currently handle low daily traffic volumes and are identified in Figure 2.2.F15. The unpaved arterials/collectors are shown in Table 2.238. ROADWAY WIDTH / STREET STANDARDS Road and Street Standards Table 2.239 identifies the current design and development standards for streets and roads in the unincorporated areas of Deschutes County both within and outside of the applicable Urban Growth Boundaries. The unincorporated communities ofTerrebonne and Tumalo have different standards that were adopted in 1997 and are included in Appendix G. Page 68 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 4W, 169 1066 W � cNic OO EC N . _ !;; E oV cu CD U � 'L O 4,���� O Q O O C LL -�+ Q O Q- Q U > ,�, a) 2�a���cnU U L `-0 O rn m a � c gmo m U c CL U COD c Q " m C 0O c d CL 9 • g�� c w {--r.d (A 7 O o- 8j 4:,`/ U G R.tw y m CL O U << m _I, U Q >_ Cl)N N COL. ♦� r�+ N_ o CN V'A m VJ o 169 -- 1068 . Table 2.2.T6 Top County Road Accident Locations 1991-1996 Ranke Intersection Intersection Accidents Traffic. ADT per. Recent ADT (1996) Control Accident Improvement 1 Old Redmond -Bend Highway and 3,295 19 Flashing 173 Flashing light Tumalo Road light added 2 Burgess Road and Huntington Road 6,020 19 Flashing 317 Flashing light light added 3 Neff Road and Hamby Road 3,985 12 Flashing 332 Under study light 4 Coyner Avenue and Northwest Way 1,535 12 Twsc 128 None 5 Smith Rock Way and 11th Street 1,430 7 Twsc 204 Added stop (Terrebonne) signs on 11"' 6 Burgess Road and Day Road 3,715 7 Twsc 531 None 7 South Century Drive and Spring 4,005 7 Twsc 572 Added left - River Road turn lane • Note: Bold intersections have had recent improvements or are currently programmed for improvement projects. twsc = two-way stop controlled Page 72 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 - 1069 • Table 2.2.T7 Top Highway Accident Locations 1991-1996 Rank Intersection Intersection Accidents Traffic ADT per - ADT Control Accident 1 Highway 97 and Deschutes 9,900 36 Flashing 275 Market Road light (Interchange under construction) 2 Highway 97 and South Century 5,890 17 Flashing 346 Drive light 3 Highway 97 and Wickiup 5,625 13 Flashing 433 Junction (Burgess Rd.) light (Realignment completed) 4 Highway 126 and Cline Falls 3,315 12 twsc 276 Highway (Interchange completed) 5 126 and Helmholtz 3,600 10 twsc 360 EHighway Way 6 Highway 20 and Old Redmond- 6,540 10 twsc 654 Bend Highway • Note: Bold intersections are currently programmed for improvement projects. twsc = two-way stop controlled Page 73 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 - 1070 Table 2.2.T8 Deschutes County Unpaved Arterials/Collectors Class Road Segment Length (mi.) ADT Arterial Highway 27 from Highway 20 to Crook County line 3.5 40 Collector Huntington Road from N. Riverview Dr. to S. Riverview Dr. 1.3 <50 Collector Foster Road from La Pine State Rec. Rd. To S. Century Dr. 3.8 <200 Collector Fryrear Road from NW Transfer Cntr. Rd. To Hwy. 126 4.4 180 Collector Northern portion of Wilt Road 4.5 80 Collector Masten Road from end of pavement to Klamath County line 0.75 <100 Collector Rickard Road from Blackfoot Trail to Highway 20 1.8 60 BRIDGE CONDITION The County Road Department maintains a list of the 120 various bridges throughout Deschutes County . and their weight limits. Many of the bridges are relatively new, constructed of reinforced concrete, and are able to withstand many years of use before repairs or replacement is necessary. However, some others are old flatbed railroad cars that were converted to bridges. The Oregon Department of Transportation (ODOT) assesses bridge condition for all bridges over twenty feet in length. The County checks all bridges less than twenty feet long. Replacement or major renovation projects areadded to the Major Roads Capital Improvement Program each year by the Road Department as funding becomes available. Table 2.2.T10 identifies the bridge locations, cost to upgrade and their respective weight limits. • Page 74 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) so 4 169 - 1U?1 Table 2.2.T9 Current County Road Standards Road Type Class Generalized Average Daily Traffic (AD 7) Right -of- Way Width Pavement Width No. of Lanes Bike Lanes Sidewalks On -Street Parking Urban Roads Arterial Principal <15,000-40,000 80'400' 60'--80' 3-5 6' 5'min. no Minor <5,000-18,000 80' 36-52' 2-3 6' 5min. no Collector 0,000-9,000 6V-80' 36-52' 2-3 6' 5min. maybe Industrial <500-4,500 60' 40' 2 no 5min. maybe Frontage 0,500 40=60' 28' 2 maybe 55'min. no Local <400-1,500 60' 36' 2 no 5min. yes Cul-de-sac <400 60' 36' 1.5 no 5min. yes Private <400-1,500 Na 624-28' 1.5-2 no no no Alley >400 20' 20' 1.5 no no no Rural Roads Arterial Principal <14-30,000 80'400' 36-70' 2-4 76' no no Minor <2-15,000 80' 28-36' 2 5' no no Collector <500-2,000 60' 28'-36' 2 no no maybe Frontage 40'--60' 28' 2 no no no olk Local 1 <200-1,200 60' 28' 1.5-2 no no yes Partition I <400 60' 20' 1.5 no no no 5Sidewalks are required only on the side of the road abutting the development. 624 -foot paved width allowed if separate ped./bike path (8'wide min.) is provided. 76 -foot lanes required on rural arterials and collectors (with curbs) with more than 50 bicycle average daily trips. Page 75 of 232 - EXHIBIT "B" to ORDINANCE No..98-044 (8/26/98) • C7 169 -1072 Table 2.2.T10 County Bridges BRIDGE LOCATION COST TO UPGRADE WEIGHT LIMIT NE 17th Street $42,100 12 Tons SW 27th Street (UGB) $36,000 12 Tons NE 41st Street $38,900 11 Tons SW Glacier Avenue (UGB) $31,250 14 Tons Holmes Road $31,250 12 Tons Johnson Market Road $49,200 15 Tons (posted) NE King Way (UGB) $32,100 13 Tons Tetherow Road $152,700 10 Tons Wilcox Avenue $27,300 16 Tons Woodside Road $55,600 15 Tons Gribbling Road $86,000 5 Tons (posted) Cascade Lakes (Fall River) $65,500 5 Tons (posted) BIKE FACILITIES The 1979 Deschutes County Comprehensive Plan directed that "The County shall develop and adopt a County -wide systems plan for bike paths (bikeways) and trails which provides access to various destinations in and between urban areas and rural service centers." The Deschutes County Bicycle Advisory Committee was formed in 1988 (pedestrian component added in 1996) to respond to this policy statement. In March 1992, the County adopted a Bicycle Master Plan as a resource element of the Deschutes County Year 2000 Comprehensive Plan. The Bicycle Master Plan provides recommendations for policies, classifications of bike facilities, location of bike facilities, bicycle parking and other transportation issues related to bike facilities. Bicycle facilities include bikeways, both paved and unpaved, and parking. Currently, bikeway design falls under the general design criteria section of the County's Title 17 (Subdivision Ordinance). It states that: 1. Bikeways shall be designed in accordance with the current standards and guidelines of the State of Oregon Bicycle Master Plan, American Association of State Highway and transportation Officials (AASHTO) ,Guide for the Development of New Bicycle Facilities, and the Deschutes • County Bicycle Master Plan. Page 76 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 - 1U?3 2. All collectors and arterials shown on the County Transportation Plan map shall be constructed . to include bikeways as defined by the Deschutes County Bicycle Master Plan. 3. If interim road standards are used, interim bikeways and/or walkways shall be provided. These interim facilities shall be adequate to serve bicyclists and pedestrians until the time of the road upgrade. The most prominent element of the County bicycle system is its paved, on -road bikeways. The County and cities for several reasons have placed emphasis on these routes: The existing system of improved County roads, totaling approximately 750 miles, generally provides the most efficient and safest route for bicycle commuters and recreational cyclists traveling to and from home, work, school, and shopping. • The state gas tax revenues are only available for bicycle lanes or paths constructed within public rights-of-way. • Maintenance is easier for public agencies as part of their normal road maintenance. Paved Bikeways Bicycles are legally classified as vehicles, which may be ridden on most public roadways in Oregon. There are four basic types of paved bicycle facilities in Deschutes County: . Shared Roadway - On a shared roadway facility, cyclists share the normal vehicle lanes with motorists. Shared roadway facilities are common on urban residential streets and on narrow rural roads. Shared roadways are acceptable on all streets, other than new construction of arterials and collectors. In places that bicycle travel is significant, these roadways are signed as bicycle "routes". Shoulder Bikeway - Smooth, paved, rural roadway shoulders provide a good area where cyclists can ride with faster moving motor vehicle traffic with few conflicts. The majority of bicycle travel on the state highway system is accommodated on shoulder bikeways. Shoulder bikeways may be used on any uncurbed street section. A shoulder bikeway shall be provided on all new construction of uncurbed arterials and collectors. In places that bicycle travel is significant, these roadways can also be signed as bicycle "routes". Bike Lane - Where bicycle travel is substantial and where adequate width is available, a portion of the roadway may be designated for preferential use by cyclists. Bike lanes shall be provided on all new construction of urban collectors and arterials, and on rural road segments designated as bicycle "routes". Bike lanes are more common in urban rather than rural areas. • Bike / Multi -use Path - A bike path is a bikeway that is physically separated from motorized traffic by open space or a barrier. Bike paths may be located within the roadway right-of-way or within a dedicated bike path right-of-way. Bike paths are normally two-way facilities. Bike paths may be multi -use paths if sufficientwidth is provided. They generally serve corridors not • served by other bikeways or pedestrian facilities and where there are few crossing roadways. Page 77 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 - 1074 Unpaved Bikeways With the advent of mountain bikes, previously unused trails and poor roads are opened up to potential use as inexpensive bike routes that require little more than right-of-way and signage. Deschutes County has many primitive roads and trails, most of which are on National Forest or Bureau of Land Management land, some of which are located close to urban areas. There are approximately 1,300 miles of forest highways and 450 miles of trails within the County, of which most are open to bicycles. The County controls about 500 miles of unimproved public rights-of-way. Trails leading from southwest Bend to Benham Falls and along the Deschutes River to Sunriver are two examples of routes that offer enormous recreational potential. The U.S. Forest Service has taken the lead in recognizing the growing popularity of mountain biking and has designated many trails and roads in the County for that use. Cyclists have always used unpaved roads and paths (smooth and hard -packed) where paved routes were unavailable. Where their incorporation into the bikeway system is appropriate, they may be classified as shared, unpaved roadways or unpaved bike paths. With the advent and growing popularity of mountain bikes, even rough, unpaved routes have become popular bikeways, creating a new classification: • Mountain, Bike Trail/Route - This category is designed to accommodate bicycle travel on unpaved roads and trails. Mountain bike trails are primarily recreational, although in some cases they may provide an interim transportation facility. Mountain bike riding is intended to be as natural an experience as possible and any improvements beyond that absolutely required . for safety may deter from this experience. Often mountain bike trails are combined withnordic ski trails and with roadways that are otherwise closed to motorized vehicle traffic. Mountain bike trails generally are not shared with pack animals. Most often the only improvement needed to existing facilities is signing. • Alternative Routes Typically, main bike routes are chosen because they are the most direct, desirable routes. Alternate routes were identified in the Plan to enhance and supplement, rather than supersede the main routes. Alternate routes are usually the most cost effective or immediate way to provide for bicycle movement through a difficult section. As such, they may serve in a primary capacity until the main route can be improved for bicycle traffic. Several high traffic sections with bike facilities in the County have alternative routes identified in Table 2.2311 Page 78 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 - 10*15 Table 2.2.T11 Alternative Routes (Formerly considered "parallel bikeways") Bike Facility High Traffic Area Alternate, Route Location U.S. Highway 20 North of Bend O.B. Riley Road U.S. Highway 97 Sunriver Entrance to La Pine South Century Drive and Huntington Road U.S. Highway 97 Sunriver to Bend Forest Service Road #41 (unpaved) U.S. Highway 97 Bend to Redmond Old Redmond -Bend Highway or Cline Falls Highway Bikeway Maps The adopted bike facilities in the Deschutes County Bicycle Master Plan are shown on Figures is 2.2.F16-18. Typical Design Standards Table 2.2312 lists the typical bike design standards currently used in Deschutes County. Page 79 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 - 1076 • Table 2.2.T12 Current County Bikeway Design Standards (Adopted March 1992) • Page 80 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) On/Off Width Vertical Horizontal:. Super- Sight Distance Pavement ROW Road? Clearance Alignment elevation: Structure :-,Multiuse Grade Distance Bike Path Off 10' min. 10' min. 35' 2% min. 2% 131' 2" A.C. on Possible 15' 12' if multiuse path centerline 5% max. 4" min. curve 5% 140' aggregate radius base min. 8% 152' Mt. Bike Off 2' trail (new), 6' T min. Yes Trail clear min. 10' preferred Bike On New urban Same as No Lane arterial or parent collector 6' roadway Existing road or rural arterial or collector 4' IMuldeNo e ay y On curb, 20- 50 BADT 4, Same as parent roadway No Existing curb, travel lane less than 11 4' Existing curb, 20-50 BADT 5' Shared Roadway On For new rural roads other 2.5' Same as parent No than local orNote: roadway primary A.C. is asphalt -concrete access BADT is bicycle average daily trip • Page 80 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) • 169 a 1077 Other Facilities Resort Communities There are four resort communities in the County that have developed independent bicycle networks. These networks, being privately owned, funded and maintained, are available to owners and guests of the individual communities and are not open to the general public. However, these bike facilities shall meet County construction standards and shall not impede movement within the countywide system. • Sunriver - Sunriver is a large resort community located fifteen miles south of Bend and several miles west of Highway 97. Sunriver has a permanent population of approximately 1,300 people and a seasonally larger population of guests, vacationers and part-time residents. The Sunriver Owners Association owns approximately thirty (30) miles of paved off-road bicycle paths within the resort. • Black Butte Ranch - Black Butte Ranch is a planned resort community located approximately ten miles west of Sisters off of Highway 20. The 1,830 -acre community has a resident population of approximately 300 people and a seasonally larger population of guests, vacationers and part-time residents. The Community has approximately sixteen (16) miles of paved off-road bicycle paths. • Eagle Crest Resort - Eagle Crest Resort is a 1,300 -acre destination resort community of single-family homes and condominiums located approximately four miles southwest of Redmond. The current resident population is approximately 75 with an added 300 people as overnight or seasonal guests. Eagle Crest has approximately three to four miles of bicycle paths from six to eight feet wide. • River Meadows Recreation Homes - River Meadows is a 160 -acre private residential development located eight miles southwest of the Sunriver Resort on the Deschutes River. The development has approximately 1.5 miles of bicycle paths surrounding the development. PEDESTRIAN SIDEWALKS/WALKWAYS Sidewalks are currently required along some street frontages (all streets in La Pine) for new developments only in the Unincorporated Communities of La Pine,Terrebonne and Tumalo. The County standard for sidewalk width is five feet. Although most of the County's improved sidewalks occur in La Pine (Figure 2.2.F19), there are also short sections along the south sides of B Avenue and Smith Rock Way in Terrebonne, but nowhere else in the rural areas of the County. Page 81 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 - 1078 PUBLIC TRANSPORTATION Intercity Public Transportation Greyhound - Greyhound runs three daily departures from Bend. Two go northbound (to Yakima at 9:55 a.m., and Portland at 9:55 a.m.), and one southbound (to Klamath Falls at 9:15 a.m.) on Highway 97 through Deschutes County. Stops include: Redmond at the McDonald's on S. Highway 97, Bend at the Greyhound terminal on Highway 20 just east of Pilot Butte, Wickiup Junction at the rideshare center at Burgess Road and Highway 97, and Chemult (Klamath County). Greyhound also runs one daily eastbound and westbound bus between Portland and Bend via Prineville and Madras. Approximately five to ten passengers ride on weekdays and several more on weekends. • CAC Transportation - CAC Transportation runs one daily round trip bus from Bend (Riverhouse Hotel @7:OOa.m.) via the Redmond Airport (@7:20a.m.), Big "O" store in Redmond (@7:25a.m.) to Portland (Airport @ 10:45 a.m. and Union Station @ 11:15 a.m.). The return bus leaves from Portland (Union Station @ 1:30p.m. and Airport @2:OOp.m.) arriving at the Riverhouse in Bend at approximately 5:45p.m. • The People Mover - The People Mover operates one round trip bus between John Day/Prairie City (leaving 7 a.m.) and Bend/Redmond (leaving 3:30 p.m.) on Mondays, Wednesdays, and Fridays. The People Mover operates a 15 -person lift -equipped van. The Deschutes County stops are located at the Greyhound station on Highway 97 in Redmond (at McDonald's) and at the Greyhound terminal on Highway 20 in Bend. Total ridership from all the communities along the route averages five to ten passengers per trip. • Porter Stage Lines - One daily bus runs between various cities on the Oregon coast and Bend, traveling via Eugene and Sisters. The bus uses the Greyhound terminal located on Highway 20. It arrives from Eugene at 5:05 p.m. and departs at 5:30 p.m. • Valley Retriever Bus Lines — One daily bus operates Monday through Saturday. It arrives at the Greyhound Bus Terminal in Bend from Newport, Albany and Corvallis at 9:20 a.m. It departs at 9:30 p.m. back to Albany. One run per day operates via Salem. Fixed Route Transit There is currently no traditional fixed -route local transit service inDeschutes County. However, the Mt. Bachelor Ski Resort Super Shuttle does operate during the winter months on a fixed - route and schedule. • Mt. Bachelor Super Shuttle and Employee Shuttle - The ten -vehicle fleet transports more than 90,000 employees and guests between Mt. Bachelor and Bend each year. The bus functions as an employee and public (guest) shuttle to the ski area from their 580 space park & ride lot at the corner of Simpson and Colorado in Bend. The Super Shuttle service operates several morning and afternoon trips on weekends only, beginning Thanksgiving weekend, then daily from mid-December through mid-April. Although historically a free service in past years, for the 97/98 season, the shuttle will cost a nominal fee to help defray operating costs. Page 82 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 1079 • Local Demand Responsive Transportation Deschutes County has a network of special transportation providers who serve the elderly and disabled population. In most cases, the general public does not have access to these special transportation services. There are several providers of special transportation services in the County, ranging from public to private, both profit and non-profit. • City of Bend Dial -A -Ride - The City of Bend operates this service and a form of fixed- route/demand responsive system called a "scheduled route" for residents of the City of Bend and the urban area within approximately a three-mile radius of the City limits. This service is available to elderly residents aged 60 or above and disabled residents of any age. The demand responsive service operates from 8 a.m. to 8 p.m. on weekdays and 9:00 a.m. to 4:30 p.m. on weekends. The scheduled route service operates from 6:30 a.m. to 5 p.m. on weekdays only. • Central Oregon Council on Aging (COCOA) Dial -A -Ride - Located in Redmond, the Central Oregon Council on Aging (COCOA) is a private non-profit agency that operates a demand responsive dial -a -ride system for senior citizens aged 60 and older and any disabled citizens. COCOA will transport the general public on a space -available basis. COCOA provides service outside the Bend urban area in the following locations: La Pine - The service area includes the Fall River area east of theDeschutes River, north to Vandevert Road, and south to include Jack Pine Village. Trips out of the service area to Bend are offered one day per week with a stop inSunriver. Service is available four days per week in the La Pine area; service hours are 8 a.m. to 3 p.m. Monday, Tuesday, and Thursday, and 8 a.m. to 5 p.m. on Wednesdays. Redmond - The service area generally encompasses a three-mile radius of the city center five days per week and extends to a five -mile radius two days per week. Trips toBend are offered two days per week via the Madras and Sisters dial -a -ride vans. Service is offered Monday through Friday in the Redmond area from 9 a.m. to 4 p.m.. A pre - scheduled shopper van is available Monday and Thursday. Page 83 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) • • I � a> U -0(,9 X cots) -2 wa0 0 169 1081 P* -- Cl) -2:-V_ U. C%� cu E 75 00 3L >m, .� 0 0 (DA C(D L jF3 0 8 -0 3-5 CL< s -0 C-0 M" -C :3 5 T cu m co c = 0 M,C 0 Z) (D W (L a- of Ix Z) LL cu cnpaL LLI Z F- 0 M 0 Z ui -pN 194jeVy sainqose(I - Dlo- g" 4, sMS TM %109 100 H sI 18=1 oullo CO) 0-8 ui cn 4-1 C4 (n 1� (D 101- 0 • • 0 165 1082 co +� E s rn zLL N O to C)a= v 0 m W 70 cu Oki om�YQ�z V L- >%M p .�..I i Q O L J O m mom""E'`S . O N L. C�� C O 0) 'C O p O O C w O L acn cnCL 13- .� LL N I DI •Ody - C_ C l0 m m ' a c O co ca 0 3 o c m U U J O � U m o •L O '�\ O i fi t, L8 S %1 R j L 8 o m a a • � y ��wny � OR 31 tea. o to o a� O n � U CD W cn CD N 0 L' • 169 —1083 I 169 1084 . Sisters - The service area generally encompasses the vicinity of Sisters including the Cloverdale and Tollgate communities. Travel to Redmond is offered two days per week and to Bend one day per week. Service in Sisters is offered four days per week. The Redmond shoppervan operates from 9 a.m. to 4 p.m. Monday and Thursday; the Bend van (via Redmond) runs from 9 a.m. to 3 p.m. on Wednesday, and local service is available Tuesday from 10 a.m. to 3 p.m. • Opportunity Foundation of Central Oregon - The Opportunity Foundation of Central Oregon is a private non-profit agency that operates a demand responsive special transportation service to their program clients (70-100/day), primarily adults with disabilities. It has a residential and work center located in Redmond (and branch work center in Bend). Their service area is comprised of the Bend, Redmond, Terrebonne, and Tumalo areas in Deschutes County. Trip purposes include access to medical services, community resources, special events, recreation, home visits, competitions, and job sites. Service hours vary depending on community and work sites. Residential Assistance Program (RAP) - RAP is a private, non-profit organizatbn that provides residential care and vocational training for developmentally disabled clients. Their service area is Deschutes County, but the five residential facilities are located in Bend, and the primary services are also located in Bend. Service is provided 24 hours per day (residential) but the vocational element is provided from 10 a.m. to 3 p.m. Monday through Friday. • Disabled American Veterans - The Disabled American Veterans Chapter 14 in Bend operates a daily weekday shuttle to the VA Medical Center in Portland. This service is limited to any veteran needing transport to the medical center. • Volunteer Services - The Oregon Department of Human Resources (DHR) Volunteer Services links DHR clients with volunteer drivers. Service hours are generally normal office hours Monday through Friday. • Central Oregon Resources for Independent Living (CORIL) - CORIL is a private, non-profit organization that provides supported employment, recreational opportunities and independent living services. CORIL provides van transportation for its clients. • Access Express - Access Express is a private, for-profit medical transportation service which is available to the general public. TRANSPORTATION DEMAND MANAGEMENT (TDM) Currently, the County, ODOT and the City of Bend jointly fund Commute Options for Central Oregon. This organization began in 1990 as a volunteer citizen's group working towards solutions to traffic congestion and pollution. They are responsible for maintaining the Central Oregon Rideshare list, promoting Commute Options Week each Spring, and acting as transportation consultants to businesses, cities, counties and other agencies interested in alternative commuting methods such as carpooling and teleworking. Page 88 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 1085 • RIDESHARE (PARK AND RIDE) FACILITIES This plan makes reference to rideshare lots, which are more appropriate for the carpooling emphasis in Deschutes County, rather than park & ride lots which usually involve a fixed route transit stop (such as the Mt. Bachelor Super Shuttle). InDeschutes County, the lack of a public transit system has hampered the development of a network of commuter rideshare lots. However, the first officially designated lot is located in Wickiup Junction at the southwest corner of Highway 97 and Burgess Road. This lot is signed and paved, and has an average observed usage of approximately six to seven cars per day. Two new sites, one in Sisters and the other in south Redmond were installed in October 1997. Staff has also observed what appear to be informal rideshare areas both in the North and South County. These locations are generally used by five or fewer cars per day. Figure 2.2.F20 shows the location of the existing rideshare lots. Itis likely that several informal lots exist within shopping center parking areas, etc. Central Oregon Rideshare Central Oregon Rideshare is a carpool matching service available to Deschutes, Crook and Jefferson County residents free of charge. The matching service is essentially a database of interested individuals which is maintained by Commute Options for Central Oregon. The program is a partnership between ODOT, the City of Bend, Deschutes County, the Oregon Department of Energy, OSU Extension Service and Commute Options for Central Oregon. RAILROAD 0 Passenger Rail • Other than the occasional excursion train from Portland to Bend, no regular passenger rail service is currently available in Deschutes County. The nearest scheduled passenger rail service available to Central Oregon residents is the Amtrak "Coast Starlight" train which runs one train each way once daily (weather permitting) between Los Angeles and Seattle. The station (platform) is in Chemult, located approximately 60 miles south of Bend along Highway 97. Freight Rail The recent merger between the Burlington Northern and Santa Fe railroads provides freight operations on a trunk line running through Deschutes County (Figure 2.2.F21). This line connects with the Union Pacific main line at Biggs in the north and with the Southern Pacific mainline at Chemult to the south. The Burlington Northern/Santa Fe line usage varies between seasons and may increase since the merger. The line provides direct rail connections for shipping to markets in the U.S., Canada, and Mexico. Page 89 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 0 0 A 169 1086 CN LL z C%� -W Et 0 N EcD 00 ts -a 4) (D ID r (D 0 4) = CL r_ 0 NJC cm 0 C 8 CL.< , -� -� LL 25 0 cS-= 0 06 CL co 4) cm cm lli W C 0 z z 0 E (D ami M t'- 0 m ��;7 8 z F: 0 Ci) LLI CD a. >ui a. R C Ln IL F— 0 C.) V^` X NU) 0 0 • • • 169 •= 1087 r LN c cv z y . N o� cNi L Mr oa ♦V 0 Q a C C m C LL c •� C7 � o :3 d Cl) V cr- Xc C a o U CL co m m� CO J C C U � m � m t a 0 m NA a aid O F... 5.2 W cc CD U S 2 H W C U) � O♦^ W O V/ w N co 169 - 1088 MOTOR FREIGHT/TRUCKING •U.S. Highways 97, 20 and OR 126 all carry intercity and interstate freight trucking. Approximately 14 trucking companies currently operate in Deschutes County. No state highways within Deschutes County are currently designated as State Trucking Routes. AIR TRANSPORTATION With the passage of SB 1113 in 1995, ODOT is proposing that the County establish an "airport zone" for each of the public use airports in the County to assure the continuation of airport and airport -related uses there. State Rule OAR 660-13, was adopted in December 1996 by the Land Conservation and Development Commission. In July 1997, the state passed HB 2605 which modified Oregon Statutes regarding airport planning and will have an as yet undetermined effect on OAR 660-13. Currently, County airport-specificzoning exists at the Bend Airport (AD Zone) and the Sunriver Airport (Airport District within the Planned Community Zone). There are seven existing public use airports in the County. Four of these airports have improved (paved) runways, and offer a range of services, from the availability of commercial passenger flights arriving and departing daily at Redmond Municipal Airport, to the Sisters (Eagle Air) Airport which offers no services or runway navigational aids. Figure 2.2.F22 shows the location of the four public -use airports inDeschutes County, while Table 2.2314 identifies the current level of development for the improved airports. Figure 2.2.F23 identifies the locations of the private or "personal -use" airports in the County. Public -Use Airports 0 Regional/Commercial Service Redmond Municipal Airport - The Redmond Municipal Airport is located in the southeast corner of the City of Redmond, south of OR 126 and east of Highway 97. Non-stop commercial flights to and from Central Oregon are available via Portland and Seattle. Horizon Air and United Express provide a combined ten daily non-stop flights to Portland. In addition, Horizon Air has two daily non-stop flights to Seattle, whereas United Express provides through service via Portland directly to Seattle. From Portland, daily connecting flights are available to other national as well as international destinations. Redmond also provides airfreight package express service via FedEx, Airborne and UPS Air. For planning purposes, the Redmond airport is classified as a small commercial service or business -class general aviation airport (SCSB). Annual enplanements (boardings) for the ten-year period between 1987 and 1997 are shown in Table 2.2T13. The average growth in boardings has been seventeen percent per year, but the last three years have only seen a more moderate eight percent growth per year. Municipal For planning purposes, the Bend and Sunriver airports are classified as medium size general aviation (MGA) airports due to runway dimensions and operational characteristics. • Bend Municipal Airport - The Bend Municipal Airport is a public general aviation Page 92 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 - 1089 airport located 5.5 miles northeast of Bend on Powell Butte Highway. It provides charter flights, service, and rental cars. • Sunriver Airport - The Sunriver Airport is a privately owned general aviation airport located at the Sunriver destination resort 15 miles south of Bend and several miles west of Highway 97. The airport is open to the public year-round offering fuel and service. Rental cars can be arranged as well as transportation to theSunriver Lodge. The Sisters (Eagle Air) Airport is classified as a small size general aviation (SGA) airport. • Sisters Airport - Twenty miles northeast of Bend, the Sisters Airport is a privately owned, public -use general aviation airport located 0.25 miles north of the Town of Sisters on Camp Polk Road. The airport is open to the public, but no instrument navigation aids, fuel or services are available. The airport is unattended and supports locally based aircraft, but primarily accommodates recreation -oriented traffic. The airport has certain operational limitations, which are associated with runway orientation, prevailing winds, and high elevation terrain located approximately 2,000 feet northeast of runway #2. In addition to the four public -use airports previously listed, the following airstrips are registered aviation facilities with ODOT Aeronautics as of December 1994(Figure 2.2523). These facilities may or may not be currently in use. They are mostly private "personal use" airports and are in most cases no more than dirt landing strips. Private -Use Airports and Heliports: Recognized by ODOT as having three or more based aircraft in 1994: • Cline Falls Airpark • Juniper Airpark • Pilot Butte Airport Less than three based aircraft in 1994: • Don Stevenson Ranch Airport • Fall River Fish Hatchery Airport • Gopher Gulch Airport • Pine Ridge Ranch Airport • The Citadel Airport • St. Charles Heliport • Whippet Field Airport • La Pine Heliport • Freight Wagon Field Airport • Sage Ranch Airport • Cinder Butte Heliport (6 mi. W of Redmond at Cline Falls) (10 mi. SE of Bend) (S. of Pilot Butte in City of Bend) (4 mi. S of Bend) (31 mi. SSW of Bend at Fall River) (3 mi. NW of Bend) (5 mi. NE of Sisters) (9 mi. NE of Sisters) (2 mi. E of Bend at the Medical Center) (6 mi. NE of Sisters) (S edge of La Pine) (5 mi. S. of Redmond) (9 mi. SE of Sisters) (3.4 mi. N of Redmond) Page 93 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) • L 169 - 1090 Airfreight Service Airfreight is available at the Redmond Airport through United Express and Horizon Air. Express package services are provided by Federal Express (FedEx), Airborne, United Parcel Service (UPS), and the U.S. Postal Service Express Mail. Table 2.2.T13 Roberts Field - Redmond Municipal Airport Enplanements 1987-1997 ROBERTS FIELD - REDMOND MUNICIPAL AIRPORT ANNUAL ENPLANEMENTS (boardings) 1987-1997 Month January February March April May June July August September October November December Total 10 -Year 94-'97 Average Average Per Year Per Year 1986 1987 1988 1994 1995 1996 1997 Growth Growth 1,882 4,002 4,880 6,988 7,869 8,510 8,610 18% 7% 1,696 4,507 4,627 6,335 10,477 8,813 8,526 23% 15% 1,895 5,218 5,136 7,086 8,567 8,748 9,062 22% 9% 1,6281 4,337 4,530 6,651 7,194 7,791 1 8,630 22% 9% 1,800 3,919 4,136 6,755 8,150 8,308 9,105 19% 11% 1,907 4,135 4,880 8,118 9,435 9,507 9,834 19% 7% 1,954 3,935 4,803 8,671 10,254 10,052 9,968 18% 5% 2,079 4,375 5,497 9,527 11,067 10,531 10,730 1 19% 4% 2,212 3,438 4,460 8,434 8,375 9,843 9,965 16% 6% 1,970 3,165 4,241 7,864 8,456 9,014 9,175 16% 5% 3,187 2,964 4,130 7,386 7,621 7,578 n/a 3,619 4,408 5,081 8,917 8,309 8,835 n/a 25,829 48,403 56,401 1 92,732 1 105,7741 107,530 1 93,605 1 17% 8% Source: City of Redmond Page 94 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 - 1091 Table 2.2.T14 • Deschutes County Public Use Airport Inventory Airport Redmond' Bend' Sunriver Sisters Planning Classification SCSB MGA MGA SGA Number of Runways 2 1 1 1 Runway Surface Asphalt Asphalt Asphalt Asphalt Lights HIRL MIRL LIRL None Runway Elevation 3,077' 3,453' 4,159' 3,168' Approach Type Precision (P) and Non -Precision (NP) Visual (V) and Non -Precision (NP) Non -Precision (NP) Visual (V) Annual Operations (Est) 35,000 28,800 10,800 1,400 Runway Length (#4-22) 7,040' (P) (#10-28) 7,000' (NP) 5,005' 5,500' 3,550 Runway Width 150' 75' 65' 50' Imaginary Surfaces PS — Primary Surface 1,000'x7,400' 500'x5,405' 500'x5,900' 250'x3,950' RPZ — Runway Protection Zone (P) 1,000'x2,500'x1,750' (NP) 500'x1,700'x1,010' (NP) 500'x1,000'x800' (V) 500'x1,000'x650' (NP) 500'x1,700'x1,010' (V) 250'x1,000'x450' Precision Approach Surface 1,000'x40,000'x16,000' Non -Precision Approach. Surface 500'x10,000'x3,500' (#16) 500'x10,000'x3,500' 500'x10,000'x3,500' Visual Approach Surface (#34) 500'x5,000'x1,250' 250'x5,000'x1,250' rizontal Surface (Radius) 10,000' 10,000' 10,000' 5,000' orizontal Surface (Elevation above sea.level) 3,227' 3,603' 4,309' ,318' 3,318- C Conical Surface (irregular) 7:1 slope 7:1 slope 7:1 slope 7:1 slope Classification Standard Assumptions: Runway Length Annual Operations Approach Tvpg (Planning Template): SGA = Small General Aviation Airport 3,000' 10,000 Visual MGA= Medium General Aviation Airport 5,000' 30,000 Non -Precision (one min.) SCSB= Small Commercial Service/Business Airport 6,000' 50,000 Precision (one min.) Sources: ODOT Airport Land Use Compatibility Guidelines, November 1994; and Deschutes County, 1997 8Data derived from Airport Master Plan Update 1988-2008. 9Data derived from Bend Municipal Airport Master Plans, 1980 and 1994 Page 95 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 0 169 - 1092 WATER -BORNE TRANSPORTATION No commercial river transport services or port districts are located in Deschutes County. PIPELINE TRANSPORTATION The Pacific Gas Transmission Company operates two natural gas transmission lines from Canada to California that generally follow the Highway 97 corridor through Deschutes County. Page 96 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) :7 • • L N w N LL p r N CL 42_ E N E ^, Q a� N N o U L .2 0 a� EL CL "(D o 1 CZ m 0 •r C9 •- c 'c s o U Ua»UU aW yry cc y- d co � O Z p Z w o ca U C « m J a i■• O U 0 w Z a� w a 8 f-ts N i w WQMLu ryocc 1;4 tom. L) �y 0�,�� �� E Z 30 o� �- a C W m ♦..+ cn<< tc-14w� ,. 3 � •r- > R U) O U w �a F- CO C i V Cl) ^, W o Q • • • M tv W N 3 v, LL �s m o= z CL N Q 9 3 cNi N0) o :? U > M O`Q p C �>+ da L -> J o =L � ' LLUa»n0 a' ry cu �IL o Z a z am m 0 Q • Q -Q A O _ U c z ZCL M -=i Q `� r a� = W 8 w Q 20 Z ° >a am pi Ix H U U- W 3�■ w y � � ■ ^,��-est � � ��'� ■ = N co i- O M ■ ���E Z a NOON w W ■ ~ a m ^ rn` N aU U >-•C:> a Z a Q cC z w � o w w o W CO >_ ~afQ a)z LLa = -a) _ a (j) O 'U^ CV♦\ W 0 s _ O o� cP a � � U c Ae cis N C X c -2 w(L0 • • 169 -� 1695 rj r4s 0 ' � 1 / V `Y U _ C N X co w r_ O • • f �IR ■ ' e1� All Mier ,~� 1P. 0-1 ■���`.��1�J.��■�■ •��{�1 �I� ■I �i Aql 7�:_• �J. , I,� III ��3- -�: l �� ■r■ A ji1■1■■.IL�11a' SII -�r\� >■I��i ." X11!1, �7■t�iC::' diel■■� , ..■f iii 1 �.3f ;...1� _�:::1��P:■%`'�� _ �' u _ MEIN 0 771-1-1111 rj r4s 0 ' � 1 / V `Y U _ C N X co w r_ O 41 0 • 169 - 1096 0 • • 169 - 1097 orli• F f rl � `�_•` ` I WN t�f �� ��� �`_��'".`�� Tf4,, _ , .�1 Ili • / � s„ i �a ��1_ > o. r,: � 1 I/ X �'7''�' L Pr nlli �•• _ ��' �i 1,111) , I �WT�1 (N'SST RIMI+tlS EHIM. ME - to F.___ ilia .._,,.,..:_.__ _ .............. ,,,, ,,...,..,..r.,.. 1 I' 169 - 1099 2.3 EXISTING LAND USE, POPULATION AND EMPLOYMENT ANALYSIS OF EXISTING LAND USES AND VACANT LANDS From the review of land use patterns, locations, densities and types of development, staff is able to analyze the current travel patterns in the county and the transportation needs of the residents. A key element in this analysis is the identification of all vacant developable land and currently platted parcels within the county. Developable land in the county occurs in several different land - use categories. The focus of this chapter is the identification of the Unincorporated Communities, the MUA-10 and RR -10 zones (Exception Areas), and the other areas that also have some development potential. The location of these developable parcels and vacant land has a bearing on where future county residents will live and work. Current Land Use Patterns In general, Deschutes County has historically developed in a linear pattern along the main highways that traverse the county. The Highway 97 corridor fromTerrebonne south to La Pine is the most developed, followed by the Highway 20 corridor between Sisters and Bend. Most of the development in the County is confined to a three-mile wide band along the major highways. Bend, Sisters and Redmond have developed into regional nodes that provide goods and services for the larger geographic areas that surround them. These cities have urban growth boundaries (UGBs) which limit residential and commercial development to specific densities and locations. The County TSP addresses the areas outside of the UGBs. • Unincorporated Communities (UC) • Some unincorporated areas in the County have developed and remained as local -serving commercial uses, providing goods and services geared specifically for the surrounding rural residential and farming uses. These local -serving communities are defined by OAR 660-22 as Unincorporated Communities. However, not all UCs are categorized the same. The County maintains land use data on every property in the County, with special consideration devoted to the UCs because these are the only areas outside of UGBs that can develop commercial and industrial uses. In the County, there are 13 designated Unincorporated Communities (Figure 2.3.F1 and Table 2.331), under the following subcategories: • Urban Unincorporated Community -La Pine, Sunriver • Rural Community - Terrebonne, Tumalo • Rural Service Center- Wickiup Junction, Alfalfa, Brothers, Hampton,Millican, Spring River and Whistle Stop • Resort— Black Butte Ranch, Inn of the Seventh Mountain • Other Exception Areas—Wild Hunt, Deschutes Junction and Deschutes River Woods Page 103 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) �A �A � 0 16 N 1100 LL cn (D z cyi E cNi E 0 (D Cc E 0 t5 0 (D (1) E CL L- LL 0 0Z M La- c -r- SO :3 0 �a a)xr -6-0 cu cc Go a. 0 o CL S'o mE In CL z 0 0 W (A 0 (A 2 00 cn z w U) CO) W 0 Cf) co • • 169 - 1101 Table 2.3.T1 Unincorporated Community Summary Community Total Existing Lots Total ` Developed Lots Total Vacant Lots Properties With Development Constraints Total Area (acres). Potential New Lots New Lot % of Total Alfalfa 5 2 3 0 21 1 0% Black Butte Ranch 1,290 1,140 150 174 1,830 150 3% Brothers 2 1 1 2 49 14 0% Deschutes Junction 4 2 2 4 19 3 0% Deschutes River Woods 2 1 1 1 5 10 0% Hampton 3 3 0 3 95 57 1% Inn of the 7h Mountain 473 371 102 465 102 2% La Pine 404 232 172 4 969 1,269 29% Millican 1 1 0 1 36 28 1% Spring River 19 4 15 19 12 0 0% Sunriver 4,338 3,311 1,027 858 3,373 0 0% Terrebonne 569 409 160 60 786 1,233 28% Tumalo 270 155 115 270 700 1,354 ..31%,, Whistle Stop 10 7 3 10 8 2 0% Wickiup Junction 55 26 29 53 1 79 92 2% Wild Hunt 1 5 5 0 2 2 17 0% Total 7,450 5,670 1,780 1,068 7,983 41332. 100% The individual UC's vary in the extent of current development and degree of development potential. Areas such as La Pine have over a thousand potential new lots (if public water and sewer were available) versus communities like Millican with 28 potential lots. Table 2.331 shows that Tumalo, La Pine and Terrebonne are the rural service centers that possess the most potential for regional impact from the development of new lots (mostly residential) in the County. Activity Centers The individual trip purposes of County residents were not identified in the Oregon Travel Behavior Study. However, studies in other areas have shown that the main sources of vehicle trips are journeys to work, school and shopping. The activity centers for the unincorporated communities are mainly schools (La Pine, Terrebonne and Tumalo) and local -serving retail. The fringe areas of urban growth boundaries (UGB) also attract trips from eural residents who rely on schools and services there. Page 105 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 M 1102 40 MUA-10 AND RR -10 EXCEPTION AREAS The remaining unincorporated properties in the County, outside of UGBs and Unincorporated Communities, are either developed with low density residential, recreational, or agricultural uses, or are vacant. Of the existing lots that can be developed, most are found in the Rural Residential 10 -acre minimum (RR -10) and Multiple Use Agricultural 10 -acre minimum (MUA-10) zones (Figure 2.3.F2). In 1979 the county identified lands that were not suitable for commercial farm or forest use. These lands are known as "exception areas" because they are excepted from Statewide Planning Goals 3 (agriculture) and 4 (forest). There are currently 23,995 tax lots in these zones, and of those, 10,814 (45%) are vacant. Eighty percent (80%) of the existing vacant residential lots are less than one acre in size, and can still be developed (barring any other land use constraints) even though they now fall in a 10 -acre minimum zone. The exception area locations roughly correspond to the Unincorporated Communities previously identified, but cover much more area. Table 2.332 identifies the distribution of the existing MUA-10 and RR -10 lots in the exception areas throughout the County. The table indicates that the most of the lots are less than one acre in size, and are located in the South County areas ofsunriver South and La Pine North. Based on the number of existing vacant lots in these two areas alone, the potential exists for the development of approximately 6,300 new residences. While many of the existing lots have development constraints (i.e., floodplain), the actual development potential remains high. • Currently, there are 252 existing 20+ acre, divisible tax lots in the County. If these lots were legally divided, there would only be 739 (approx.) new ten -acre lots created, amounting to less than ten percent (10%) of the total vacant parcels in the County. • Potential Impact The analysis of potential development impact areas (PDIAs) is addressed under the population projection section in Chapter 3. Oregon State University students under an ODOT grant, which paralleled the work done by Deschutes County Staff, identified in the previous section, identified the PDIAs. When the cumulative effect of both the rural service centers and the MUA-10/RR-10 zones are considered together, the development potential becomes clearer. Table 2.333 summarizes the overall impact of the amount of vacant, developable land in the County. Future PDIA impacts to specific roads is addressed in Chapter 3. Addressed separately, the UC and MUA-10/RR-10 areas have different types of development potential. The UCs have the most potential for the creation of new lots (of varying sizes) with the least constraints to development. These UC areas occur primarily in Tumalo and Terrebonne. The MUA-10 and RR -10 areas have the most vacant existing lots, but also have more constraints to development. These exception areas are mostly in the South County between Sunriver and La Pine. Page 106 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) • • 169 - 1103 Table 2.3.T2 MUA-10 and RR -10 Exception Area Data MUA-10 Exception Area Total Lots Developed Lots Vacant Lots Constrained Lots Lots < 1 acre Potential New Lots % of Total Lots Plainview 669 434 235 273 331 35 0.5% Terrebonne 981 598 383 313 700 25 0.4% Tumalo 1,442 1,061 381 769 794 84 1.4% Bend East 1,525 1,310 215 72 890 10 0.2% Redmond West 1,498 1,134 364 707 1,167 30 0.5% MUA-10 Total 6,115 4,537 1,578 2,134 3,882 184 3.0% RR -10 Exception Area Deschutes River Woods 2,553 1,646 907 1,144 2,494 92 0.5% La Pine North 6,234 3,457 2,777 6,718 5,585 23 0.1% Sisters 2,015 1,135 880 690 1,541 201 1.1% Bend East 813 390 423 2 637 106 0.6% Bend North/Tumalo 730 321 409 362 601 51 0.3% Redmond/Terrebonne 483 210 273 239 344 64 0.3% Sunriver South 5,052 1,485 3,567 5,025 4,861 18 0.1% RR -10 Total 17,880 8,644 9,236 14,180 16,063 555 3.0% MUA-10 & RR -10 Total 23,995 13,181 10,814 16,314 19,945 739 Table 2.3.T3 UC / MUA-10 / RR -10 Cumulative Potential Impacts County Land Category Total Existing Lots % of Total Total Developed Lots Total Vacant Lots Potential New Lots % of Total Properties with Constraints Unincorporated Communities 3,112 11% 2,359 753 4,332 85% 1,068 MUA-10 6,115 23% 4,537 1,578 184 4% 2,134 RR -10 17,880 66% 8,644 9,236 555 11% 14,180 Total 27,107 100% 15,540 11,567 5,071 100% 17,382 Potential New Development (vacant lots + potential lots) 16,638 Page 107 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 0 0 0 fA ej 7X N 7 cr 00 40 (> Cd X cu Lu CL 0 CN 169 1104 LL W cyj (D 7- r E= cu E.9 (D Duj AY x 4) < 0 N S _j Oz, `o aU co> LL C.0 t6 im'i= C C " < , -r- =I 7, 3 w o 5 0, cu 0 (L w ir,, 2 W. =) 0 Saoco Z A? 0 CL 0 !9 Cl) Q V) (D 0) C.) -0 < x CD D w IDm C, 0 w V) 0 w co U. -i < z < Z 0 w z 2 w LLJ 0 P z W;� .0 L <Ne 0 CL 2 LLJ Z Z =) 0 D 0 F- Z w 3 LU m d a 0 m > Z LL, cc> a. CO Cut) a w CP Cf) co 3 (D 0 fA ej 7X N 7 cr 00 40 (> Cd X cu Lu CL 0 169 -1105 Development Constraints In Deschutes County, several types of overlay zones exist, whose purpose it is to guide the location, or siting of new development on particular properties in an effort to lessen the impact of that development. Examples of zones which could influence MUA-10 and RR -10 areas include: • Flood Plain Zone (FP) — Seeks to protect the public from the hazards associated with flood plains; to conserve important riparian areas along rivers and streams for the maintenance of fish and wildlife resources; and to preserve significant scenic and natural resources while balancing the public interests with those of individual property owners in the designated areas. • Landscape Management Combining Zone (LM) -to maintain scenic and natural resources of the designated areas and to maintain and enhance scenic vistas and natural landscapes as seen from designated roads, rivers and streams. • Wildlife Area Combining Zone (WA) - to conserve important wildlife areas in Deschutes County; to protect an important environmental, social and economic element of the area; and to permit development compatible with the protection of the wildlife resource. Examples include deer winter range areas, significant elk habitat, and antelope range and deer migration corridors. • Surface Mining Impact Area Combining Zone (SM/A) -to protect the surface mining resources of Deschutes County from new development which conflicts with the removal and processing of a mineral and aggregate resource while allowing owners of property near a surface mining site reasonable use of their property. • Airport Height Combining Zone (AH) -to protect persons and property on the ground in the airport environs, as well as pilots using the airport facilities. This combining zone also seeks to preserve the function of public -use airports as increased development pressure around airports continues to threaten their existence. These zones generally have the effect of guiding rather than precluding development. On the other hand, in some County locations, the issue of septic system feasibility does have the potential to limit development. Taken as a whole, the combination of existing vacant lots and potential new lots in UC's and MUA-10/RR-10 areas could have a significant impact on the function of the County's transportation system. Since most of the exception area lots are located in relatively compact corridors in the County, if even half of the 16,638 lots develop, the resulting 41,600-66,552 potential new daily auto trips (5-8 trips per day per dwelling) could put a strain on existing transportation facilities in the future. Other Development Areas Outside of the RR -10 and MUA-10 zones, much of the remaining land in the county falls into the Exclusive Farm Use (EFU) or Forest Use (FU) zones (Figure 2.3.F5), and as such, should not develop with a significant amount of residential use. In spite of the RR -10 and MUA-10 development potential, the vast majority of county land still remains in public ownership (United States Forest Service, Bureau of Land Management, State of Oregon), and therefore is unlikely Page 109 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 - 1106 to be developed. Figure 2.3.F6 identifies the County lands that are currently zoned either Open Space (OS) or Flood Plain (FP). For all practical purposes, Open Space properties have minimal development potential, while Flood Plain areas will allow structural development with a Conditional Use Permit if an alternative location outside the flood plain in not available. Another potential development area is the Rural Industrial (RI) and Surface Mining (SM) areas shown on Figure 2.3.F5. Even though these parcels are spread throughout the county, they do not amount to a significant amount of developable land. These parcels generally have the potential for localized impacts to the surrounding communities, rather than impacts to the region as a whole. POPULATION Each year, The Center for Population Research and Census at Portland State University estimates population for each city and county in Oregon. Deschutes County reviews the draft estimates and adjusts the estimates according to local trends before the final numbers are released. The 1995 estimates for each incorporated city and the total county are shown in Table 2.3.T4 Historically, the U.S. Census has recorded Deschutes County population every decade since 1920. Over the past 70 years, the population has increased an average of 37 percent every ten years, and as high as 104 percent between 1970 and 1980. In fact, Deschutes County has been the fastest growing county in Oregon for many years. Over that same 70 -year period, the percentage of people • living in the unincorporated areas of the County has steadily decreased relative to the urban areas. Although countywide population growth is expected to continue, the rate is expected to taper off as developable rural land is used up. Growth that will occur will be focused in the urban areas as they build out and slowly increase density. Table 2.3.T4 Deschutes County Population Jurisdiction 1995 Population Sisters Urban Area 945 Redmond Urban Area 12,585 Bend Urban Area 39,720 Unincorporated Area 40,850 County Total 94,100 EMPLOYMENT Current employment data for Deschutes County were derived from the 1996 Central Oregon Factbook and the Central Oregon Area Profile published by the Central Oregon Economic Development Council. Total employment in the County for 1995 equaled 34,608 employees. Of the largest employers in the County, only a few are located outside of the urbanized areas of Bend, Redmond or Sisters. Some of the companies have a dispersed workforce, but a main office located Page 110 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) • 169 - 1107 within an urban area. It is anticipated that the quality of life factors that have been drawing a skilled workforce to Deschutes County for many years will continue. That same attractiveness also contributes to the higher than average unemployment rate due to the number of available workers. The 1995 County unemployment rate was at 7 percent, compared to 4.8 percent for all of Oregon and a national average of 5.6 percent. Table 2.335 identifies the significant rural area employers. Table 2.3.T5 Deschutes County Significant Rural Employers Employer Location Number of Employees Bend -La Pine School District Primarily Bend 1,600 Mt. Bachelor (seasonal) Mt. Bachelor 850 State of Oregon Primarily Bend 762 Deschutes County Primarily Bend 650 Deschutes National Forest Primarily Bend 627 Sunriver Resort Sunriver 600 Black Butte Ranch Black Butte Ranch 184 Inn of the 7th Mountain Bend Area 170 Major Employer Total 5,443 Page 111 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) • • M 169 1108 w LL, M Cl) z W N � .-. aa) 3 O � co E� 4 L rnc c U v N fr cv a) C LL O Q N C .J 'O CL r O O �QQ� ;ZM LL C 'L O O C7 O O LL DawxZ)cn0Lu m m c0) m N Z O 6) C m 0 LL m T C (J O CL W �j N U qNq1 O W . m g z W o J. �J z 0 ¢ J /■� ujLL d' Q wz UUZ Uo� F a cn n , Xao Z z_ UJ. W m - s >.Zu & >_ Fd 0 o Jc _) x ai V Cl) S! 0 • I 169 1109 W LL M O z GO • N N 3 ,� N O0 T `° L O: U C U. O O � � c f0 U � m N N O Q O fl -a V 75 fC0 aa� J LL o a Q Uca U •C U 'O C C •C C •C 'C 7 7(9 O Q a j O Z) CL wirZ) Li- 00ro y 2 01" o O a �■ � `V � a m i ` C �J 49 m m C U 0 m V J (`Rv M CLU Lc N m CLi U) N W w % CL O � v c� LLI o Z U Z Z o O J J m tr LU U- LL � J Q N = U ujN 3 rc3 v o Q U Z S Z ♦^ U) Z W a x � J_ m c w x > ♦� C0 • �CL ' W F- 0 Cl) • J� a)w • 0 /�. A I • LO 169 aeA110 LL 0 CMcn S S cNi VJV (D E cu 0 0 0 CD N a Cu O ki cu r -.Mr 0 3 4) CL'o 0 -1 C: 0 CL< C :3 :3 :3 o 00 CL co cu cr CL co U) ui z z z Z 0 d _j C: ir LLI W rim w Z z ul M CO Ir LLII-- K Z a. LLI Jc o w > cn 0 Cl) CO 169 - 1111 • How employees currently get to work is an important factor involved when addressing the future transportation needs of the County. Deschutes County "journey to work" trip data from the 1990 Census for each of the incorporated cities, and the County in general, are presented in Table 2.336. The results indicate that solo drivers dominate work trips in the County, particularly the unincorporated areas. This is not surprising given the lack of a traditional fixed -route public transit system, a generally low density residential development pattern, marginal winter weather, ample free work site parking and lack of significant vehicle traffic congestion. All these factors lead to a lack of commuter incentive to carpool, bike, or walk to work, or telecommute. According to the 1990 Census, in spite of the disincentives to using alternative modes,Deschutes County did achieve a 21.5% mode split when looking at all the alternatives to driving alone to work. The time it takes employees to travel to work gives an indication of how far their commute is and if there is an opportunity to capture some of those trips with alternate modes. Table 2.3.T7 shows the comparison between communities and the unincorporated area based on information from the 1990 Census. On average, bicycle and walking are possible alternatives to vehicular travel when the trip distance is 3 miles or less for cycling trips or'/Z mile for walking, which equates to approximately 10 minutes of vehicular travel. It is likely that home to work commute times currently greater than 10 minutes are not good candidates for alternative modes. A more reasonable approach would be to target those employees with demand management techniques such as telecommuting and ridesharing. Based on the data, the unincorporated areas have the least propensity for alternative modes such as walking and cycling based on the lower percentage of travel times less than 10 minutes. However, it is the percentage of bicycling and walking trips that the State Transportation Plan targets for Deschutes County to double over current levels. Table 2.3.T6 1990 Deschutes County Journey To Work Trip Mode Trip Type Bend % Redmond % Sisters % Unincorporated % Private Vehicle Drive Alone 7,852 75% 2,323 75% 164 58% 28,975 78% Carpool 1,343 13% 400 13% 46 16% 4,766 13% Motorcycle 19 0.2% 10 0.3% 0 0.0% 62 0.2% Public Transit 31 0.3% 0 0.0% 0 0.0% 63 0.2% Bicycle 263 2.5% 18 0.6% 11 3.9% 436 1.2% Walk 497 4.8% 160 5.2% 39 13.8% 1,146 3.1% Other 62 0.6% 35 1.1% 0 0.0% 270 0.7% Work at Home 359 3.4% 155 5.0% 22 7.8% 1,558 4.2% Total Trips 10,426 100% 3,101 100% 282 100% 37,276 100% • Page 115 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 -° 1112 Table 2.3.T7 1990 Deschutes County Travel Time To Work Travel Time Bend % Redmond % Sisters % Unincorporated % < 10 minutes 3,261 32% 1,212 41% 145 56% 8,148 23% 10-20 minutes 5,106 51% 655 22% 23 9% 16,241 45% > 20 minutes 1,709 17% 1,079 37% 92 35%—r 11,347 32% Total Commuters 10,076 100% 2,946 100% 260 100% 35,736 100% • • OREGON TRAVEL BEHAVIOR SURVEY In general, rural areas normally lack data regarding the travel behavior of residents. The U.S. Census database has a limited usefulness due to the configurations of the tracts used to group the information and the age of the 1990 data. 1 n 1996, ODOT funded a consultant study to perform a travel behavior phone survey of rural residents in eight counties in Oregon. The survey respondents kept a travel diary for two days, documenting their trip frequency, characteristics and purpose. A total of 1,208 households were recruited to do the survey, with an actual 775 completing valid surveys. The full report is included in Appendix E. The following is a report summary: Surveys Completed Representative zip codes Overall response rate Average Trip Generation Percentage who telecommute Percentage with flexible /shift work schedules Percentage full or part time students Percentage who use private vehicle Percentage who walk Percentage who bike Percentage who use something else 775 households 97701, 02, 07, 56, 59, & 60 32% 8 trips per household per day 8% 32% 24% 88.3% 6.5% 0.8% 4.4% Page 116 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 - 1113 w 169 - 1114 • 3. TRANSPORTATION FORECAST • 3.1 GENERAL BACKGROUND Travel forecasting generally involves a series of data inputs, conversion of the data into future vehicle or person trips over some future planning period and distribution and assignment of those trips to the road network. In most urbanized areas, the transportation modeling process is done with computer programs that can be highly refined to deal with small geographic areas. Within Deschutes County, both Bend and Redmond have benefited from the use of computer modeling to forecast future road volumes. In those places, the urban areas could be divided into small, multi - block areas known as traffic analysis zones. In simple terms, once the traffic analysis zones or "TAZs" are identified, the computer assigns trips to those zones based on whether an individual zone has more trip attractions (employment, retail, etc.) orproductions (residential). Finally, the computer identifies the expected traffic volumes on the affected streets. However, the drawbacks to computer modeling for a large county include the expense, the inaccuracy of the data and the timeliness of data updates. Currently, there is no travel forecasting computer model for the unincorporated areas oiDeschutes County. Without a model, two basic alternatives could be used. The simplest "trending" alternative is to project historical traffic growth trends out towards some future year. The other, "cumulative analysis" alternative, involves the use of existing traffic, historical growth rates, population, employment and dwelling unit forecasts, and the location of likely future growth, to project traffic. Potential development impact areas(PDIAs) and the County Geographic Information System (GIS) database *were used to identify the future growth areas. Under an ODOT grant, students from Oregon State University identified PDIAs throughout Deschutes County in 1995. For the most part, PDIAs are groupings of exception areas that are currently zoned by the County as either: RR10, MUA10 or UC. The results of the PDIA analysis turned out approximately the same as the results of the rural exception land inventory that was done concurrently by Deschutes County. The majority of the land under these zones is already subdivided with individual lots, many less than one to two acres in size. Any land that exists within these zones that is not currently subdivided, and has the potential to be subdivided or partitioned, would need to meet the ten -acre minimum lot size. The vacant existing lots and the potential new lots (ten -acre) were added together to estimate the potential number of dwellings that could be expected in these areas. Depending on the area and existing road volumes, either one or both analysis methods were utilized to reach the final projections. Where practical, staff divided the PDIA areas into groups (Figures 3.1.F1 -F4) that could be expected to add traffic onto selected County roads. The roads identified for analysis were those that had significant traffic volumes in 1996 based on their current functional classification and level of improvement. The PDIA areas, combined with the most recent existing traffic volumes, formed the basis for the analysis used to arrive at the future road volumes. Both analysis methods were used to come up with a reasonable traffic projection. While not as precise as a computer model, this cumulative analysis method does give a relatively good idea of future traffic impacts using the best available data. Page 117 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) ' oap 0 a) U co N C X c wa0 169 1115 c LL cu 3 W (DZ a M 0 N41. �_ .. C E EL E a v U cm LL cu t 7 i N> >1��8 S 0 OVOC Z 4-a C C 0 CL mm � � n c a m c m J A f m C U 0 w U N 0 N m � ID Q' W E to Q z s�K •tad °° LU AY 97 -11GHw * , Ik, lee�1S 416E m ,�"�; v / U E N gtiWay ♦J m lea-llS Pi£4 "'0 0 o U U U o ' oap 0 a) U co N C X c wa0 • • -r�-+ 1 6 9 - 1116 N W U. EC z CU CL3 M `' , p< a) cn AAV- '' W L 0 Q ._ .F.J� cn c aci c ♦ ^ V 4-av ^' V/ Y3c�m 0 ca O o o d 2QU w a. m _ c� owwco n C U o m CL U f m � _m c s 8 Peon SGWIOH Fryrear oad N Q = QD Cloverdale Road C7 �a 3; �Q O oma F I J }� N rk �; PEON Wjo 41 L1J < Z N • • • � S _ o 0 0 rj U �■+ Q N C X co 2 w0-0 C W U.3 �^ C ■ 3 ■ Q. w m M Co per` O m 08 � Q � E■ E c LL _ a° O m U j Y je C Ncu pL:m:72 q1 C m =1 C Y E }+ C 7 7 (p m O m DCAa:ofm o Um 0co€4 a � a m � c a m C L m J W m C U 0 n0 � U � m m � r N J' N WO N = F 2 Lu Q ' peoa (gweH imlreW � $,&t 6 S. s+ rh P �'r r r dy �SiS r'a O 'AM ID o m do w UwO W N C U o Cl) N � S _ o 0 0 rj U �■+ Q N C X co 2 w0-0 • 0 • 169- _ 11118 Y LL co W 3 c o E11 m n C6 n m O m L. /7 �♦ rnQ�aQ O Q U E-- O C U V C 3 U- co d m c o = > o i o �pm m c O 7 N O V No J c�m.cUa ao��c� c O w , c (V,/] a a Ir(n Cl) � o m 0 � U a CD 0, o®000 a N O 6 6 C l0 �. m C U 0 CL U � N 70 N N � ■ LU N g 0 c U � m tea• m MH Z a o b�u �' � u� w' w o o w .4uhH a m :.�= o co jr N W C L EQ OP2w peayy N c U W � m _j (L y0 Cl)= v~i , a) C0 Cl) U W C) • 169 - 1119 3.2 POPULATION AND EMPLOYMENT FORECAST POPULATION FORECAST Historically, the U.S. Census has recorded Deschutes County population every decade since 1920. Although countywide population growth is expected to continue, the rate is expected to taper off as developable rural land is used up. The majority of new residential growth will be focused in the urban areas as they build out and slowly increase density. Table 3.2.T1 and Table 3.232 indicate the trend of reduced overall population growth and the reduced share of the countywide population in the unincorporated areas of the County relative to the urban areas. The rapid growth of rural subdivisions in the 1960's and 1970's has been effectively halted through implementation of state land use laws in the early 80's. Therefore, the growth that will occur is expected to continue building out existing platted lots rather than creating new subdivisions. As stated previously in Chapter 2, the Center for Population Research and Census at Portland State University estimates population for each county in Oregon. The draft forecast is circulated to cities and counties for comment before final adoption. Deschutes County refined the state forecast by coordinating with each of the cities in Deschutes County to come up with a revised forecast. The population projections were allocated between the cities and the unincorporated areas to arrive at a coordinated population forecast, which was then submitted back to the state. The state then revised its estimates and approved the final population estimates, which are shown in Table 3.233. Table 3.2.T1 Historic Deschutes County Population (Cities) Jurisdiction 1970 1980 % Growth `70-`80 1990 % Growth 180-190 1995 % Growth 190-195 City of Sisters 516 696 34% 679 1% 775 9% City of Redmond 3,721 6,452 73% 7,163 11% 10,585 47% City of Bend 13,710 17,263 25% 20,469 18% 30,630 49% Cities Total 17,947 24,411 36% 28,311 16% 41,990 48% Unincorporated Area (Rural+UGB) 12,495 37,731 201% 46,647 23% 52,110 11% Euiiotal 30,442 1 62,142 1 104% 1 74,958 20% 94,100 25% • Page 122 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 _ 1120 Table 3.2.T2 Projected Deschutes County Population (Urban Areas) Jurisdiction 1990 1995 2000 2005 2010 2015 2016 Sisters UGB 900 945 1,095 1,262 1,391 1,539 1,568 Redmond UGB 8,635 12,585 17,186 22,515 28,204 32,409 33,250 Bend UGB 32,558 39,720 46,447 52,428 57,861 63,330 64,424 UGBs Total 40,093 53,250 64,728 76,205 87,456 97,278 99,242 Unincorporated Area (Exception Areas + UCs) 32,865 40,850 48,118 56,638 63,774 69,936 71,168 County Total 74,958 94,100 112,846 132,829 151,230 167,231 IF172,427 172,427 • Table 3.2.T3 Projected Deschutes County Population (Cities) Jurisdiction 1990 1995 2000 2005 2010 2015 2016 City of Sisters 679 775 902 1,025 1,148 1,271 1,298 City of Redmond 7,163 10,585 14,501 18,852 23,753 27,388 28,226 City of Bend 20,469 30,630 35,929 40,240 44,667 49,044 50,006 Cities Total 28,311 41,990 51,332 60,117 69,568 77,703 79,530 Unincorporated Area (Rural+UGB) 46,647 52,110 61,675 72,712 81,662 89,528 92,898 County Total 74,958 94,100 112,846 132,829 151,230 167,231 172,427 Page 123 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) • Table 3.2.T4 169 - 1121 Deschutes County Population Distribution (Cities) Jurisdiction 1970 Share of Total 1980 Share of Total 1990 Share of Total 1995 Share of Total City of Sisters 516 2% 696 1% 679 1% 775 1% City of Redmond 3,721 12% 6,452 10% 7,163 10% 10,585 11% City of Bend 13,710 45% 17,263 28% 20,469 27% 30,630 33% Cities Total 17,947 59% 24,411 39% 28,311 38% 41,990 45% Unincorporated Area (Rural+UGB) 12,495 41% 37,731 61% 46,647 62% 52,110 55% County Total 30,442 1 1 62,142 11% 74,958 1 19% 1 94,100 1 2.57 C. Table 3.2.T5 Historic Deschutes County Housing Unit Data10 Jurisdiction 1970 Housing Units 1980 Housing Units 1990 Housing Units Average Annual Growth Vacant Units % Vacant Occupied Units Persons per Occupied Unit City of Sisters 251 369 370 2% 81 22% 289 2.35 City of Redmond 1,440 2,678 2,932 5% 90 3% 2,842 2.52 City of Bend 5,039 7,848 9,004 4% 478 5% 8,526 2.40 Cities Total 6,730 10,895 12,306 3% 649 5% 11,657 2.43 Unincorporated Area (Rural+UGB) 4,833 17,213 23,622 20% 6,062 26% 17,576 2.65 County Total 11,563 28,108 35,928 11% 6,711 1 19% 1 29,217 1 2.57 • io Sources: 1990 US Census and Deschutes County. Page 124 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) • 169 -1122 Once the population forecasts are developed, the housing units can then be forecasted. The occupied or vacant status of housing units becomes an important criterion in determining the impact of current as well as future growth. While not significant in the urban areas, the number of vacant housing units in the unincorporated area, as shown in Table 3.235, is relatively high. The high number of vacancies is related to the proliferation of seasonal, second or vacation homes that occur in the unincorporated areas. The high number of vacant units would tend to skew the population per housing unit numbers if the analysis used the total housing units rather than occupied units. The housing unit forecast depends on the actual build out of the developable lots and land as well as the rate of development. Staff did not have housing unit and vacancy rate data for the exception areas by themselves, so staff estimated that the current population per occupied housing unit ratio (2.65) and vacancy rate (26%) for the exception areas would be approximately the same as the rates for the Rural+UGB areas. These rates were assumed to remain constant over time, therefore, the future rural population (30,316) was divided by the housing unit ratio (2.65) to come up with the future number of units needed. This assumption is valid so long as the number of future units does not exceed capacity. Future Capacity: 15,937- 4,144 (vacant) = 11,793 units Future Need: 30,318 people / 2.65 = 11,441 units 352 surplus units Table 3.276 identifies the number of housing units needed in the unincorporated areas to accommodate the anticipated population increase by 2016. Historical building permit information from Deschutes County for the five-year period between 1990 to 1994 shows that 750 new homes were constructed per year on average. If this rate of development continues throughout the twenty-year planning horizon, theoretical buildout of all available lots would occur in approximately twenty-one years. When the number of non -buildable lots are considered, the buildout of available lots could occur sooner. Based on the analysis, the projections are sufficiently close to warrant the assumption of full build- out by 2016. EMPLOYMENT FORECAST Based on projections from the State Department of Economic Analysis, employment inDeschutes County is expected to remain healthy through 2016. The number of jobs added to the Central Oregon economy will keep pace with the increase in population over the same time period. The state expects that Deschutes County's share of jobs statewide will grow slightly through 2016 then flatten out and ultimately drop slightly through 2040. Table 3.277 identifies the non-agricultural employment forecast for Deschutes County, while Table 3.2.T8 shows the historical and projected distribution of jobs within the County, and assumes that the ratio of jobs to population remains the same over time. Page 125 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) db Table 3.2.T6 169 - 1123 Projected Unincorporated Area Housing Units Jurisdiction 1990 1995 Projected 2016 1990 2016 Build -out Reserve 2040 Population Population 2016 Additional Persons Additional Housing Units 2,094,256 2,253,736 County Population Population Since 1995 per Occupied Units Needed Vacant Available 84,000 86,500 Percent of State Total 2.6% 2.9% 3.2% Unit 3.8% @ 26% 4.1% Unincorporated 32,865 40,850 71,168 30,318 2.65 11,441 4,144 11,793 Area (Exception Areas) County Total 74,958 94,100 172,427 15,937 Table 3.2.T7 Deschutes County Non -Agricultural Employment Forecast Jurisdiction 1990 1995 2000 2005 2010 2015 2020 2030 2040 tate Total tate 1,244,600 1,416,900 1,601,718 1,718,659 1,814,276 1,882,653 1,947,702 2,094,256 2,253,736 County 32,793 40,936 51,000 61,000 69,000 74,500 79,000 84,000 86,500 Percent of State Total 2.6% 2.9% 3.2% 3.5% 3.8% 4.0% 4.1% 4.0% 3.8% is Source: State of Oregon, Office of Economic Analysis, January 1997 Page 126 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) db Table 3.2.T8 169 - 1124 Deschutes County Employment Distribution Forecast (Cities) Jurisdiction 1990 1995 2000 2005 2010 2015 2016 % of Total City of Sisters 273 338 420 503 568 614 622 0.8% City of Redmond 2,725 3,372 41194 5,016 5,674 6,126 6,209 8.2% City of Bend 10,103 12,500 15,549 18,597 21,036 22,713 23,018 Cities Subtotal 13,101 16,210 20,163 24,116 27,278 29,453 29,849 39.5% Deschutes River Woods CDP 1,045 1,293 1,608 1,924 2,176 2,349 2,381 3.2% Three Rivers CDP 550 680 846 1,012 1,145 1,236 1,253 1.7% Terrebonne CDP 386 478 594 711 804 868 879 1.2% UGBs 17,711 22,275 27,789 33,237 37,597 40,594O 41,1'38 54.5% reincorporated Area (Rural+UGBs) 19,692 24,726 30,837 36,884 41,722 45,047 45,651 60.6% County Total T32,793 40,936 51,000 61,000 1 69,000 1 74,500 75,500 000/01 Note: CDP= census designated place Table 3.238 shows that a small portion (6.1 %) of the total number of jobs withinDeschutes County are located outside the UGBs in the unincorporated areas. Historically and currently, theUGBs continue to be the leading employment locations in the County and will continue to be in the foreseeable future. The data indicate that work trips from the rural residential areas will continue to be drawn to the cities and UGBs. 3.3 TRAFFIC FORECAST As discussed previously, the lack of a computerized traffic model for the unincorporated areas of Deschutes County led to a cumulative analysis process to be used as a predictor of future traffic volumes. The County was divided up into sections that enabled a more focused traffic analysis. The areas to be analyzed generally followed the mapped areas identified in the Chapter 2 inventories of arterials and collectors. The traffic forecasts were only applied to the more significant County arterials and collectors in terms of current and potential ADT, and all the Access Oregon Highways (AOH) state highway segments. Where practical, the PDIA analysis started with the most current traffic volume data available for state and County roads. The number of possible new residential Page 127 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 -1125 units were then converted to vehicle trips (@ 8 trips/unit), then those trips were allocated to the road network at a rate of three percent (3%) per year until theoreticalbuildout. Using an ADT rate of 8 trips/unit in this analysis is based on results forDeschutes County from the Oregon Travel Behavior Survey (Appendix E). The commonly used national average of 9.6 trips/unit is based on mostly urban uses. The result is future year average daily trip (ADT) road volumes, and peak hour volumes at major intersections. Where the PDIA analysis was used, the results were averaged with trend results to come up with the final forecast. In other areas that were not practical for PDIA analysis, only the 20 -year trend projection was used to arrive at the final estimates. DESCHUTES COUNTY ROADS FORECAST The results of the County road forecast identify very few road segments that are projected to operate at volumes beyond reasonable capacity. It was assumed that any road segment with fewer than 9,600 projected ADT would operate at a LOS of "D" or better, and that LOS "D" is acceptable for County arterial and possibly some collector roads. Of all the County roads, only Baker Road leading into Deschutes River Woods is projected to operate at LOS "E" in 2016. Additional roads approaching LOS "E" are located in the South County and include Burgess Road west of Huntington Road in La Pine and South Century Drive nearSunriver. As most County roads consist of only two lanes, the road volumes (ADT) can be directly tied to level of service (LOS) for analysis purposes. Significant County road volumes are identified in Table 3.3.T1 and on Figures 3.351-F3. The complete listing of traffic and LOS projections is in Appendix I. ODOT STATE HIGHWAY FORECAST ODOT provides yearly traffic counts on all the state highways running throughDeschutes County. The 1996 traffic tables were used as a basis for future highway traffic projections. The ODOT Transportation Planning Section provided future (2016) traffic (ADT) and level of service (LOS) estimates for each of the state highways in Deschutes County. For the analysis, it was assumed that truck percentage, directional distribution and geometrics remain the same throughout the planning horizon. ODOT used historical growth rates based on the last twenty years of traffic volume table data. The yearly growth ranged from 0.0 to 11.4 percent. It was also assumed that the number of access points remained constant. Whereas the County road analysis related LOS directly to ADT levels, several highway segments may have high ADT levels but a correspondingly low LOS because of the presence of multilane and passing lane sections. Therefore, the most important analysis tool for highway sections becomes the LOS value rather than ADT. For multilane sections in the County, the forecasted traffic volumes are well within the capacity limits through the year 2016. However, several sections of the state highways will be reaching capacity thresholds for two-lane sections. The sections projected to approach capacity and operate at level of service (LOS) "D" or worse are: • Highway 126 through downtown Sisters and on either side of the City of Redmond, • Most of Highway 20/126 between the Jefferson County line, through Sisters and Bend to Powell Butte Highway, • Highway 97 from the Jefferson County line through Terrebonne, • Highway 97 from Cottonwood Drive south to central La Pine, and • Highway 372 from Bend to Dillon Falls Road on the way to Mt Bachelor. 0 The highway road volumes are identified in Table 3.332 and on Figure 3.3.F4. Page 128 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 1126 Table 3.3.T1 Top County 2016 Rural Road Volume Estimates and LOS Ranking 2016 2016 Functional Est. Rank Rd-Sg Dir Road Name From To ADT PM Peak Class LOS 1 3006-10 BAKER RD HWY 97 LAKEVIEW DR 13,660 1,366 Collector E 2 3161-50 SE 27TH ST FERGUSON RD RICKARD RD 10,630 1,063 Arterial E 3 4106-20 BURGESS RD PINE DR GLENWOOD DR 9,550 955 Collector D 4 4106-30 BURGESS RD GLENWOOD DR LOST PONDEROSA RD 8,290 829 Collector D 5 3006-20 BAKER RD LAKEVIEW DR SHOSHONE RD E 7,180 718 Collector D 6 4112-10 SOUTH CENTURY DR SEWAGE TREATMENT RD SPRING RIVER RD 7,170 717 Collector D 7 4106-40 BURGESS RD LOST PONDEROSA RD DEER FIELD DR 7,040 704 Collector D 8 4101-30 HUNTINGTON RD BURGESS RD EVERGREEN LN 7,020 702 Collector D 9 2177-10 LOWER BRIDGE WAY HWY 97 NW 27TH ST 6,710 671 Arterial D 10 2303-10 NW CHINOOK DR NW 43RD .05 MILE WEST OF 43RD 6,240 624 Collector D 11 4106-50 BURGESS RD DEER FIELD DR STEARNS RD 5,790 579 Collector D 12 1171-10 COOK AVE TUMALO RD HWY 20 5,650 565 Collector C 13 4192-10 SPRING RIVER RD SOUTH CENTURY DR SOLAR DR 5,540 554 Collector C 14 1148-80 CLINE FALLS HWY UGB - TUMALO TUMALO RD 5,280 528 Collector C 15 4112-25 SOUTH CENTURY DR VANDEVERT RD HUNTINGTON RD 5,120 512 Collector C 16 3181-70 DESCHUTES MARKET RD YEOMAN RD BUTLER MARKET RD 5,100 510 Arterial C 17 3181-50 DESCHUTES MARKET RD HAMEHOOK RD J D ESTATES DR 5,075 508 Arterial C 18 3181-60 DESCHUTES MARKET RD J D ESTATES DR YEOMAN RD 5,075 508 Arterial C 19 3181-40 DESCHUTES MARKET RD UGB - BEND HAMEHOOK RD 5,050 505 Arterial C 20 3181-20 DESCHUTES MARKET RD DALE RD PIONEER LOOP 5,000 500 Arterial C 21 3181-30 DESCHUTES MARKET RD PIONEER LOOP UGB - BEND 5,000 500 Arterial C 22 4111-10 DAY RD BURGESS RD NORTHWOOD DR 4,970 497 Collector C 23 3181-10 DESCHUTES MARKET RD HWY 97 DALE RD 4,930 493 Arterial C 24 4112-30 SOUTH CENTURY DR HUNTINGTON RD SNOW GOOSE RD 4,890 489 Collector C 25 4106-10 BURGESS RD HWY 97 PINE DR 4,800 480 Collector C 26 1148-70 CLINE FALLS HWY EDGE HILL DR UGB - TUMALO 4,640 464 Collector C 27 3518-45 POWELL BUTTE HWY MCGRATH RD BUTLER MARKET RD 4,620 462 Arterial C 4112-05 SOUTH CENTURY DR HWY 97 SEWAGE TREATMENT RD 4,610 461 Collector C 3518-60 POWELL BUTTE HWY NEFF RD HWY 20 4,560 456 Arterial C 0 4106-60 BURGESS RD STEARNS RD DORRANCE MEADOW RD 4,545 455 Collector C 31 3182-60 BUTLER MARKET RD UGB - BEND HAMBY RD 4,380 438 Arterial C 32 2130-40 S CANAL BLVD SW HELMHOLTZ WAY SW 61 ST ST 4,310 431 Arterial C 33 4111-20 DAY RD NORTHWOOD DR DEEDON RD 4,280 428 Collector C 34 1148-60 CLINE FALLS HWY CONNARN RD EDGE HILL DR 4,250 425 Collector C 35 4101-40 HUNTINGTON RD BURGESS RD UGB - LAPINE 4,220 422 Collector C 36 3022-10 CINDER BUTTE RD BAKER RD LAKEVIEW RD 4,105 411 Collector C 37 3518-35 POWELL BUTTE HWY MILE POINT MILE POINT 4,000 400 Arterial C 38 3518-40 POWELL BUTTE HWY MILE POINT MCGRATH RD 4,000 400 Arterial C 39 3518-50 POWELL BUTTE HWY BUTLER MARKET RD ERICKSON RD 4,000 400 Arterial C • Code: ADT: LOS: > 16,300 F 9,600 - 16,300 E 5,700 - 9,600 D 3,400 - 5,700 C 1,700 - 3,400 B < 1,700 A Note: Numbers are Deschutes County estimates. LOS estimates are based on the Highway Capacity Manual and a 10% peak hour traffic flow being modified to establish a desirable flow. Page 129 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) • ,• 169 __1127 z U. M M LL o� I Ns 1 0 eil �T N 7 O O O N U C ft as .Q N C X ct5 w D-. O +� E Q ^ v T UQCL U C m 0 cu Z �C<oo0J aQU.0 o?:� occ`uc`o�v .� C) "(D 0 rSa.��H�U O Ll.! �N't00 N • ,• 169 __1127 z U. M M LL o� I Ns 1 0 eil �T N 7 O O O N U C ft as .Q N C X ct5 w D-. O • �l c� 00 O gym• V !R 1� co 2 N C r-0) -2 l0- ii0 169 1128 o�� N c z �. 3 Eo0 �Mo��cmCU m M rC6, Ld:E-- o M .0000 cc o°''��Q'� 0.m>,mC L ����cc c c ��♦♦ c0 V/ _JJ'�wwmo m, m, �_I00 � LL yN k5 U- O W C%4 a m c m a o, m m � � a c Lr i J m C U � 0 a m U c s9fA t 1..1 psoN dwe4ua4S O N J' Z Rod o CC.-) Y f zva�warp I.i PQMeH < Pia 3a)peW saIn4osa0 i r 4-0 7 w Er1 OW W O ■ Byer f w�� o O OR ` N 17e>ir �a03tlypr. r v a Y T>J O c G V♦ �4 110 c� 00 O gym• V !R 1� co 2 N C r-0) -2 l0- ii0 r 0 0 169 1129 W M z CIO LL ca3 M C) 3 M = c m U 4) 0 w E oo L 0 Jc QQ'r-oN-40) C�aO � - co LL E U C C 7 0 C o Lr) cnCLwQ)DU �w _ o .W N a m a I° a C o U � a ° m U Yl m � m L m c P J N V y 0 ui ,F21,�ed N � m O N U o TA r 0 o ap d s _ U (is X c0 w 0- 0 169 - 1130 • Table 3.3.T2 ODOT 2016 Highway Volume Estimates and LOS Ranking Highway 2016 2016 Est. Rank Hwy # Name Route # Location Mile Point ADT PM Peak LOS 1 4 DALLES-CALIF. HWY. US 97 COTTONWOOD DR. 151.10 19,140 1,914 F 0 - 136 4 DALLES-CALIF. HWY. US 97 SOUTH OF YEW AVE. (09-020) 125.00 36,950 3,695 C 1 37 4 DALLES-CALIF. HWY. US 97 KLAMATH COUNTY LINE 172.19 7,590 759 C Code: Generalized ADT: 2 4 DALLES-CALIF. HWY. US 97 "A" AVENUE (TERREBONNE) 115.87 16,350 1,635 E 2,400 - 4,800 3 15 MCKENZIE HWY OR 126 LOCUST ST. 92.95 14,860 1,486 E Numbers reflect ODOT 4 4 DALLES-CALIF. HWY. US 97 SOUTH CENTURY DR. 153.09 14,420 1,442 E 5 17 MCKENZIE-BEND US 20 CLINE FALLS HWY. 14.77 13,760 1,376 E 6 16 SANTIAM HWY. US 20/126 MCKENZIE HWY 100.03 13,710 1,371 E 7 4 DALLES-CALIF. HWY. US 97 LAPINE STATE REC. RD. 160.60 13,170 1,317 E 8 4 DALLES-CALIF. HWY. US 97 PAULINA LAKE RD. 161.76 12,990 1,299 E 9 4 DALLES-CALIF. HWY. US 97 1 ST STREET (LAPINE) 167.49 12,990 1,299 E 10 41 OCHOCO HWY OR 126 REDMOND CITY LIMITS 2.32 10,830 1,083 E 11 16 SANTIAM HWY. US 20/126 BLACK BUTTE RANCH (09-014) 93.19 9,660 966 E 12 16 SANTIAM HWY. US 20/126 CAMP SHERMAN RD. 90.91 9,360 936 E 13 372 CENTURY DR. OR 372 DILLON FALLS RD. 7.60 5,330 533 E 14 15 MCKENZIE HWY OR 126 HWY 20 92.32 16,360 1,636 D 15 15 MCKENZIE HWY OR 126 ELM ST. 92.51 15,880 1,588 D 16 4 DALLES-CALIF. HWY. US 97 VANDERVERT RD. 155.51 13,350 1,335 D 17 4 DALLES-CALIF. HWY. US 97 BURGESS RD. ,165.20 12,990 1,299 D 18 4 DALLES-CALIF. HWY. US 97 JEFFERSON COUNTY LINE 112.86 12,900 1,290 D 19 17 MCKENZIE-BEND US 20 COUCH MARKET RD. 12.28 12,270 1,227 D 20 17 MCKENZIE-BEND US 20 TWEED RD. 10.07 11,960 1,196 D 21 16 SANTIAM HWY. US 20/126 SANTIAM PASS RD. 99.53 11,890 1,189 D 22 17 MCKENZIE-BEND US 20 INNES MARKET RD. 9.71 11,660 1,166 D 23 16 SANTIAM HWY. US 20/126 TOLLGATE RD. 98.33 11,150 1,115 D 24 7 MILLICAN-BURNS US 20 ERICKSON RD. 4.55 11,060 1,106 D 25 16 SANTIAM HWY. US 20/126 INDIAN FORD RD. 94.91 10,400 1,040 D 26 17 MCKENZIE-BEND US 20 FRYREAR RD. 7.87 10,300 1,030 D 27 4 DALLES-CALIF. HWY. US 97 OR 31 (FREMONT HWY.) 169.67 10,180 1,018 D 28 17 MCKENZIE-BEND US 20 CLOVERDALE RD. 4.77 9,980 998 D 29 17 MCKENZIE-BEND US 20 HARRINGTON LOOP 3.21 9,830 983 D 30 17 MCKENZIE-BEND US 20 OR 126 0.11 9,670 967 D 31 41 OCHOCO HWY OR 126 CROOK COUNTY LINE 3.58 8,930 893 D 32 15 MCKENZIE HWY OR 126 HELMHOLTZ WAY 109.64 8,880 888 D 33 16 SANTIAM HWY. US 20/126 JEFFERSON COUNTY LINE 80.77 8,530 853 D 34 372 CENTURY DR. OR 372 KIWA BUTTE RD. 11.96 3,480 348 D 35 15 MCKENZIE HWY OR 126 HWY 20 93.08 5.810 581 C -D 0 - 136 4 DALLES-CALIF. HWY. US 97 SOUTH OF YEW AVE. (09-020) 125.00 36,950 3,695 C 1 37 4 DALLES-CALIF. HWY. US 97 KLAMATH COUNTY LINE 172.19 7,590 759 C Code: Generalized ADT: LOS: Multilane highways: > 22,900 F 13,500 - 22,900 E 7,900 - 13,500 D 4,800 - 7,900 C 2,400 - 4,800 B < 2,400 A Note: Locations in BOLD denote permanent recorder stations. Numbers reflect ODOT estimates as of 7/97. Page 133 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) • • (n 1 6 9 1131 O w U. J M z M � 3 3 L L }+ E :r • — W E :a o U- ui Ein0N m (D d d m io U V V U C 0 N N N N N rte''! 0000OCAfnQ C • V E.• w -w 000000 m�.> 5 Nc •c •c>0o>>y0>Uc Z O pU �� _3dpot0 c c 'T— a i m v c E a a� �Q 0 m m J c -6-0 Z a U y U) U Q' W t- HIGtiWAY 27 0 Om N Z a 1..� r CU W Y G • -� U) W Q LL �`/ = U2LL J W Z Q �� w=k{ 2� yW� ~wo =Wo 3i 3 O t ,� v,N o U o U J � m Z D C Z; C� u Cl) w Ja U w u~, o C0 l 'S N O O m c� s U c� M CD c =x m a.0 169 - 1132 169 - 1133 • 4. TRANSPORTATION NEEDS ANALYSIS 4.1 TRANSPORTATION FACILITY DEFICIENCIES Chapter 2.2 identified the range of existing transportation needs forDeschutes County including the following issues: • High accident locations • Pavement condition problem locations • Roadway width deficiencies • Transit deficiencies • County road capacity problems • State highway capacity problems The findings from Chapter 2.2, combined with the results of the transportation estimates in Chapter 3, form the basis for establishing the needs of the County transportation system over the next 20 years. These identified needs taken together with the results of the public participation process direct what policies and projects ultimately comprise the draft system plan covered in Chapter 5. 4.2 PUBLIC INVOLVEMENT AND INTERAGENCY COORDINATION Citizen involvement and interagency coordination is an important component of the Transportation • Planning Rule (TPR). A vital step in developing a transportation system plan (TSP) is to identify a public and interagency involvement process that brings citizens, special transportation interest groups, transportation providers, community economic interests, federal, state and local agencies and other jurisdictions into the planning process. Early involvement in the TSP process is important in identifying issues, establishing community understanding and confidence in the process, setting community goals and objectives and developing an appropriate work program. Deschutes County recognizes the importance of public outreach in the TSP process by creating a public involvement plan to maximize the opportunities the public would have to comment on the TSP and be an integral part of the planning process. Community involvementwas achieved through the holding of public meetings and open houses in the community and at the regular meetings of the County Planning Commission. In addition, several project newsletters were produced and mailed to a community mailing list and placed at public buildings throughout the County. The second project newsletter contained a mail -back survey regarding road development standards and maintenance. Several news articles appeared in the Bulletin and other community-based newspapers. The outreach process is identified in Table 4.271, Interagency coordination was achieved by the formation of a County Transportation Technical Advisory Committee (CTAC), which held scheduled monthly meetings for the duration of the project. Representatives on the CTAC included staff from ODOT, the County, and the cities of Bend, Sisters and Redmond. The following is a chronology of the public outreach effort for theDeschutes County TSP: • County Transportation Technical Advisory Committee (TTAC) established to review products and guide the project. Comprised of staff from the County, and the cities' of Bend, Redmond Page 135 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) C� 169 - 1134 and Sisters, the committee meets on a monthly basis for the duration of the project. • The County Planning Commission is designated as the project's citizen advisory committee, and is kept informed through periodic staff presentations for the duration of the project. This committee plays an important role in guiding the direction of the project and approving the products generated by the TSP process. • County staff regularly attends meetings of the Bend Urban Area Transportation Committee, the Bend Transportation Technical Advisory Committee, and the County Bicycle Advisory Committee to coordinate the County TSP with the preparation of the Bend TSP. The following specific activities occurred during the course of the project: • Project Newsletters were created and distributed to provide updates to the community on the status of the TSP project. • Community meetings were held to solicit input and present concepts to the general public. Meetings were held in the unincorporated communities of La Pine,Tumalo and Terrebonne. • The local print media and radio and television stations carried feature stories on the County TSP. • The second project newsletter contained a mail -back transportation survey that was filled -out and returned by 74 people. The survey questions and the voting results are included in Table 4.23.2. Most of the responses were clear cut as to a yes or no answer. If no answer received at least a 50 percent majority of votes, the result was considered even. While the sampling was statistically too small to provide direction, the results provide a sense of what road standards County residents want, and where improvements should be made. Page 136 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) • • 0 169 Table 4.2.T1 Deschutes County TSP Public Outreach Chronology 1135 Project Activity Date(s) County Board of Commissioners Worksession 1. April 14, 1998 Worksession/Public Hearing 2. April 29, 1998 County Planning Commission (Citizen Advisory TSP Status Report 1. January 12, 1995 Committee) 2. April 13, 1995 3. January 25, 1996 4. June 13, 1996 5. November 6, 1997 6. December 3, 1997 TSP Public Hearing 7. January 22, 1998 8. February 26, 1998 9. March 26, 1998 Central Oregon Board of Realtors TSP Status Report 1. December 15, 1994 Bend Chamber of Commerce Transportation TSP Status Report 1. March 22, 1995 Subcommittee County Transportation Technical Advisory Committee Regular Meeting: (TTA Q) 1. December 8, 1994 14. September 12, 1996 2. January 12, 1995 15. October 10, 1996 3. March 30, 1995 16. February 13, 1997 4. June 8, 1995 17. April 10, 1997 5. August 10, 1995 18. May 8, 1997 6. October 26, 1995 19. June 12, 1997 7. December 14, 1995 20. July 24, 1997 8. February 8, 1996 21. September 11, 1997 9. March 14, 1996 22. October 30, 1997 10. April 11, 1996 23. December 11, 1997 11. May 9, 1996 24. January 29, 1998 12. June 13, 1996 25. March 12, 1998 13. July 11, 1996 Local Television News Coverage (Z21) and Local Interview with Project Manager 1. April 13, 1995 Radio Coverage (KBND), (KICE) 2. December 16, 1996 3. December 4, 1997 4. January 15, 1998 South County Transportation Advisory Committee TSP Status Report 1. November 14, 1995 2. December 12, 1995 3. July 26, 1996 4. January 15, 1997 5. April 16, 1997 Project Newsletter distributed to: Spring Edition 1. May 5, 1995 City of Bend Fall Edition 2. December 9, 1996 County Admin. Bldg. Central Oregon Board of Realtors Central Oregon Builders Association County Libraries Community Meeting La Pine 1. June 29, 1995 Terrebonne 2. May 20, 1996 Terrebonne 3. August 22, 1996 Bend 4. December 16, 1996 North County 5. December 17, 1996 South County 6. December 18, 1996 Tumalo 7. March 5, 1997 Transportation Survey Countywide 1. December 9, 1996 Page 137 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) • Table 4.2.T2 TRANSPORTATION SURVEY RESULTS 1.69 _ 1136 Deschutes County should: Overall Yes % No % No % Results Opinion 1. Just maintain current roads, not pave existing unimproved No 28 38% 42 57% 4 5% roads. 2. Work towards paving local roads to full local road width Even 35 47% 26 35% 13 18% standards (28'-36'). 3. Pave local roads to a lesser width, as long as they're Even 33 45% 34 46% 7 9% paved. 4. Consider a range of revised (reduced) residential street Yes 56 76% 12 16% 6 8% widths that are sized for anticipated traffic, rather than using a single standard. 5. Complete a system of striped bike lanes on all collectors Yes 37 50% 31 42% 6 8% and arterials. 6. Install sidewalks along at least one side of all rural No 26 35% ° 38 51% 10 14% collectors and arterials in rural communities. 7. Just work towards getting sidewalks along the highways in No 26 35% 38 51% 10 14% rural communities. Not build (or require) sidewalks in any rural area as long as Yes 41 55% 27 36% 6 8% there's enough shoulder area to walk on. 9. Give the roads with the highest traffic volumes, the highest Yes 57 77% 14 19% 3 4% maintenance priority. 10. Change road requirements in rural areas to allow narrower Yes 37 50% 30 41% 7 9% paved streets without curbs or sidewalks, with just enough width to satisfy emergency vehicles. 11. Focus on extending or creating a grid street layout for new Yes 44 59% 21 28% 9 12% subdivisions. 12. Not promote a grid street pattern, unlimited cul-de-sacs No 24 32% 40 54% 10 14% are ok. 13. Allow partial width street improvements for new Even 26 35% 25 34% 23 31% developments. 14. Not allow new developments unless the adjacent streets Yes 50 68% 16 22% 8 11% are improved to full County standard. The survey respondents agreed with the following statements, listed in order of highest to lowest majority: • Give the roads with the highest traffic volumes, the highest maintenance priority. (77%) • Consider a range of revised (reduced) residential street widths that are sized for anticipated traffic, rather than using a single standard. (76%) Page 138 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 _ 1137 • Not allow new developments unless the adjacent streets are improved to full County standard. (68%) • Focus on extending or creating a grid street layout for new subdivisions. (59%) • Not build (or require) sidewalks in any rural area as long as there is enough shoulder area to walk on. (55%) • Change road requirements in rural areas to allow narrower paved streets without curbs or sidewalks, with just enough width to satisfy emergency vehicles. (50%) • Complete a system of striped bike lanes on all collectors and arterials. (50%) TRAFFIC CONGESTION ISSUES Outside of the urban areas, traffic congestion at intersections may be more of a perceived problem rather than a capacity issue. Over the course of the public involvement process, the following locations were identified as having a congestion problem usually during a peak hour on most days of the year. • Deschutes Junction (Tumalo Road) at Highway 97 (overpass under construction); • South Century Drive at Highway 97 (main access to Sunriver); • Venture Lane at South Century Drive (Sunriver Business Park); • Cook Avenue / OB Riley Road at Highway 20 (Tumalo); SAFETY ISSUES During the course of the public involvement process for this project, as well as other concurrent outreach efforts for the La Pine, Terrebonne and Tumalo projects, several areas were identified that have design, and/or access, or other problems that contribute to an unsafe situation. Several of these areas, identified with "()" have already been addressed with a corrective project or have projects in design or the land use review process. • Deschutes Junction crossing at Highway 97 (approved project); • Intersection of Highway 242 and Highway 20/126 in Sisters (approved project); • Intersection of Highway 20 and Highway 126 at ODOT truck scale in Sisters; • Intersection of Burgess Road and Highway 97 (completed project); • Intersection of Cook Avenue/OB Riley Road and Highway 20; • Intersection of Rosland Road and Wickiup Junction frontage road (under design); • Excessive speeds on Highway 97 through Wickiup Jct., and lack of a center left turn lane; • Excessive speeds on Deschutes Market Road; • Lack of a southbound deceleration lane on Highway 97 at South Century Drive; • Winter icing on Highway 97 between Bend and La Pine; • Deer migration corridor across Highway 97 south of Bend; • Unsafe pedestrian crossing of Highway 97 in Terrebonne and La Pine; • Insufficient shoulder width for bikes on Baker Road; • Insufficient shoulder width on OB Riley Road betweenTumalo State Park and the top of the grade; • Need for "escape" routes from rural subdivisions; Page 139 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 -m 1138 • Intersection of Coyner Avenue and Northwest Way; • Intersection of Smith Rock Way and 11th Street in Terrebonne; • Intersection of Highway 126 and Helmholtz Way; • Intersection of Burgess Road and Huntington Road (light added); • Intersection of Burgess Road and Day Road; • Intersection of Highway 20 and Old Redmond -Bend Highway; • Excessive speeds on NW 43rd/Chinook Avenue between Lower Bridge Way and Crooked River Ranch; • Need for additional east -west connection to Huntington Road between La Pine State Recreation Road and Burgess Road. • Secondary access from Highway 97 to Deschutes River Woods; REGIONAL LONG-RANGE NEEDS The community also identified the following long-range needs to be considered: • Wickiup Junction realignment of Highway 97 and construction of a railroad overcrossing; • Secondary access to Crooked River Ranch; • Northerly connection to Highway 20/126 from residential developments north of Sisters; • Additional east -west access to residential areas between Spring River and La Pine; • East side and west side bypasses around Bend; • Commuter fixed -route transit (bus or rail) between Bend, Redmond,Prineville and La Pine; • New medium size general aviation airport south of Sunriver. • Enforcement • BEND "EAST SIDE BYPASS" The discussion for an "east side bypass" around the City of Bend can be traced as far back as the 1950's. This idea was also incorporated into the original Bend General Plan. In that plan, an expressway facility was described that would skirt the southern and eastern edge of the UGB, as a possible facility that would meet the future transportation needs of the community. Although the document acknowledged that the need for the facility might not be achieved within the time frame of the Plan, it did urge that the corridor be preserved for some type of future facility. In subsequent updates of the General Plan, the east side bypass was eliminated from the circulation element of the Plan and hence, no right-of-way was ever preserved. In the study of the Bend Parkway, one of several alternatives considered was another version of the east side bypass. This one deviated from the original plan by connecting to Highway 97 on the north near Cooley Road. One key issue that led to the rejection of theeast side Bypass alternative was the traffic data forecasts. The bypass was projected to capture only 10,200 of the 75,000+ vehicles expected to travel through Bend's central corridor by the year 2015. Other traffic impact and land use issues were also identified. Many of the landowners on theeast side objected to the intrusion of a major roadway into a rural area. This applied not only to the bypass itself, but also to the east -west arterials that would have to be upgraded to connect to the bypass. Another concern was the potential of the bypass to foster development pressures outside of the UGB. This would have been inconsistent with the road planning requirements recently defined by the state Transportation Planning Rule (TPR). • Some public sentiment for the idea of an east side bypass has remained even though the decision Page 140 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) • 169 - 1139 was made to build the Parkway. In light of this interest, the County and the City of Bend have pledged to continue to evaluate the need for the bypass as the community grows. Unfortunately, lost opportunities for right-of-way acquisition for a bypass have been lost In recent transportation modeling conducted as part of the latest Bend General Plan update, the north -south travel needs of the community remain satisfied by the present proposed system ofarterials and collectors. Therefore, the need for a new major transportation facility, such as an expressway or bypass, has yet to be demonstrated. In all likelihood, any single new major facility east of Bend will be both costly and disruptive. Since the new road would need to have limited access to function correctly, a host of questions over access points, grade separations and right-of-way requirements remain. A reasonable, cost- effective alternative to a single, high cost major facility may involve the upgrading and linking of the existing County arterials and collectors located just east of the Bend UGB. With the addition of possible lower cost road links and some roadway upgrades, the distribution of future north -south traffic throughout a grid system of existingarterials and collectors could have the following benefits: • Less capital and ongoing maintenance costs, • Less disruption to existing residents, • Opportunity to retain the rural character of the area, • Less pressure to create and develop commercial areas east of 27th Street, • Maximization of access to individual properties, • Maintain lower overall speeds, • Maintain emphasis on use of the Parkway by autos and through trucks, and • Preserve the major taxpayer investment in the Parkway. TRANSIT NEEDS Intercity Transit Since 1997, ODOT has been evaluating intercity transit service throughout the state. The main focus has been the level of service for transit operations that link majorintermodal centers (Portland), with outlying cities and urban areas. Desired levels of service are based for the most part on residential population. The other area of concern is the public transit connection between residential areas and the nearest regional airport with commercial passenger air service. For Deschutes County, this means that the Redmond Airport should be accessible via public transit to most of the residents in the County, but especially to the residents of Bend. Currently, only taxi service and several hotel/resort shuttles serve the airport. Therefore, state goals are not currently met. The other area of transit concern is the lack of a single transit station/facility that is open to multiple users, both public and private service providers. Although the logical placement of this facility is within the Bend urban area (and therefore outside of thisTSP's jurisdiction), any such facility would have countywide implications. The facility should provide adequate overnight and long-term parking areas, bicycle parking and rest -room facilities. The current Greyhound Station on Highway 20 is privately controlled and is neither convenient for all users, nor does it provide adequate space for parking. Page 141 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) • 169 - 1140 Bend -Redmond Commuter Shuttle In 1997, ODOT funded a study to address the issue of a fixed -route commuter transit system between Bend and Redmond. The study was initiated by Commute Options for Central Oregon to comply with the terms of their grant -funding agreement with ODOT. The complete Study is included in Appendix H. The Study includes a commuter survey, and information regarding potential ridership, and costs. The summarized results of the Study are: • There is community interest in such a shuttle system • Daily ridership could average 100 with fares $3.00 or less • Operation would be limited to weekdays only • Direct routing with few stops • 12-15 passenger vans • One-half hour average travel time • Capital cost for a 3 -van system would be approximately $150,000 • Annual operating costs of $165,000 for vans and $30,000 for marketing, etc. • 3-5 van fleet might be able to recover 45% of operating costs through fares (a.k.a. farebox recovery ratio) • Further study would be required prior to implementation. The results of the Bend -Redmond commuter shuttle study could also be loosely applied to a shuttle system between La Pine and Bend. REGIONAL PROBLEM SOLVING PROJECT In 1996, using a grant from the Department of Land Use and Conservation (DLCD),Deschutes County initiated work on regional problem solving for southern Deschutes County. One main problem addressed was the fire protection hazard related to the many rural, isolated subdivisions which were created prior to land use planning regulations. The subdivisions are located mostly in heavily forested areas subject to major lightning storms during periods of extreme fire danger. Several of these subdivisions have only one paved ingress/egress that could easily overloaded during a mass evacuation. A fire management study was completed, which included recommendations for the general location of new local roads from the isolated subdivisions to be used as fire escape routes, emergency equipment access roads and fuel breaks. The subdivisions were recommended to have at least two alternative routes of access, usable by emergency fire equipment and residents, and be oriented 140 degrees apart to assure that at least one travel route is available during a major wild fire incident. The isolated subdivisions with only one currently available route are shown in Figure 4.2.F1. Page 142 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) • w 169 a W 3 in 0 0 N U Z a O O ca Q O U) OL 0 0 mV CLID v � � 1141 LL. N NT W LL a is 169 - 1142 169 - 1143 1* 5. TRANSPORTATION SYSTEM PLAN The purpose of the Transportation system Plan is to guide the development of a safe, convenient and efficient transportation system that promotes economic prosperity and livability for all County residents. As required by the Transportation Planning Rule (TPR), Deschutes County proposes to adopt standards and policies in this Transportation System Plan (TSP) that comply with the requirements to provide a multi -modal approach to solving transportation issues. The Rule identifies the specific actions required of jurisdictions based on their population. For most urban areas, the Rule requires an alternative analysis to compare various new project options versus an alternative that proposes to build only existing funded and committed projects. Many of the alternatives have goals such as an increase in mode split share and reduced vehicle miles traveled (VMT). These goals are measurable in many urban areas or areas with a Metropolitan Planning Organization (MPO), but not in rural Deschutes County. The logical alternative choices in the County would be to: • Pursue an alternative that programs only the identified projects in the current County Major Roads Capital Improvement Plan (MRCIP) and gradually shifts funding from new capital projects to more preservation and maintenance. Over time, capital improvements to address traffic and safety problem areas will proceed on a prioritized basis. The long-term effect is that preservation and maintenance of the existing system becomes a higher priority than relieving congestion and solving safety issues. This is often referred to as the "no build" alternative. is• Adopt a "build" alternative, which tries to keep pace with anticipated growth by focusing funding on building capacity -enhancing and safety oriented projects, while also attempting to maintain the existing road network. • Adopt a combination alternative, as recommended in this TSP, which includes a mixture of new projects to enhance roadway capacity, improve safety while also maximizing preservation and maintenance. The alternative also shifts emphasis to non -auto modes as much, as is practical to meet the intent of the TPR. This Plan balances the need to reduce the reliance on single occupant vehicles given the community's needs, geography and demographics, with the need to solve safety and operational problems. At the same time, the system needs a significant effort in maintenance over the next twenty years to preserve the investment already made by the community. Additionally, the Plan encourages ridesharing, telecommuting and eventually fixed -route transit. The current Deschutes County Comprehensive Plan contains a short section on transportation that includes several goals and policies. The TSP uses the existing goals and policies as a starting point and adds new goals and policies in light of the increasing demands imposed by the TPR. This Plan contains brief descriptions of the required facilities and issues, followed by a complete listing of goals and policies that cover the following areas: • Coordination and Implementation of the Transportation System Plan; • Arterial and Collector Street Plan including road network policies, Access Management, Functional Classifications, Road and Street Standards, Level of Service and Capacity, and Page 144 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 -.1144 . Facility/Safety Improvements; • Public Transportation Plan; • Bicycle / Pedestrian Plan; • Air/Rail/Water/Pipeline Plan; • A Transportation System and Demand Management Plan (TSM & TDM). The Plan also makes recommendations regarding short-term and long-term transportation projects on state and County facilities that will be needed over the next 20 years. The project list was based on: • Evaluating the capacity of the County road system and the state highway network within Deschutes County. • The results of state accident database analysis. • Input from the County Road Department. • Efforts to enhance alternative modes of transportation through compliance with the Transportation Planning Rule. • The input received from the citizen review committee (County Planning Commission) and the public outreach process in general. The identified projects were prioritized based on the following criteria: Most Important: Solving safety problems Important: Maximizing the use of pedestrian and bicycle facilities Location of schools and fire stations Project cost, cost per average daily trip Anticipated traffic volumes (2016) 5.1 COORDINATION AND IMPLEMENTATION OF THE TRANSPORTATION SYSTEM PLAN Based on the requirements of the Transportation Planning Rule (TPR),Deschutes County intends to have the Transportation System Plan be the beginning of an ongoing procedure to periodically analyze, prepare and plan for the transportation needs of Deschutes County residents and visitors. Toward this end, the following goals and policies are intended to assist in the implementation of the Deschutes County Transportation System Plan, and thereby meet the requirements of the TPR. Goals 1. Achieve an efficient, safe, convenient and economically viable transportation and communication system. This system includes roads, rail lines, public transit, air, pipeline, pedestrian and bicycle facilities. The Deschutes County transportation system shall be designed to serve the existing and projected needs of the unincorporated communities and rural areas within the County. The system shall provide connections between different modes of transportation to reduce reliance on the single- occupancy vehicle. 02. Have an ongoing transportation planning process and maintain a transportation plan that meets the needs of the County and its residents. The transportation plan and Page 145 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 1145 facilities of Deschutes County shall be coordinated with the plans and facilities of incorporated cities within Deschutes County, adjacent counties and the State of Oregon. Policies 1. Deschutes County shall: a. Identify local, regional and state transportation needs; b. Develop a transportation plan that shall address those needs; c. Review and update the plan every three to five years; d. Continue to coordinate transportation planning with local, regional and state plans by reviewing any changes to Deschutes County local transportation plans, regional transportation plans, the Oregon Transportation Plan andODOT's State Transportation Improvement Plan (STIP); and e. Continue public and interagency involvement in the transportation planning process. 2. Deschutes County shall notify ODOT concerning: 0 a. All land use proposals or actions that would create access onto a state highway or add >100 ADT to any County road intersection with a state highway; b. Any proposed land use or development within 500 feet of a state highway or public use airport within the County; and c. Required ODOT road approach permits. 3. Deschutes County shall protect approved or proposed transportation project sites through: a. Access control measures; b. Review of future large development and transportation projects that significantly affect the County's transportation system; and c. The imposition of conditions of approval on developments and transportation projects that have a significant effect on the County's transportation system. 4. Deschutes County shall coordinate local plans and land use decisions with state transportation plans, including the Oregon Transportation Plan, modal plans and corridor plans. These plans provide ODOT policies and performance standards for statewide highways within Deschutes County. The statewide plans also provide the framework for access management on state facilities to protect the capacity and function of the highways. Page 146 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 - 1146 5. The lead agency for transportation project review in Deschutes County shall be: a. Deschutes County for projects outside UGB's; b. The affected city for projects within the UGB's; and c. The State of Oregon, Deschutes County and affected cities on projects involving state-owned facilities. 6. Transportation Projects a. The County shall have a list of transportation projects, adopted by the Board of County Commissioners in accordance with the policies set forth below. b. The initial Transportation Project List shall be set forth in Table 5.11.T1 of the Transportation System Plan adopted as part of the Resource Element of the Comprehensive Plan. The Board shall update the Transportation Project List periodically by resolution adopted by the Board, without need of a formal amendment to the TSP. c. New transportation projects shall be included on the County's Transportation Project List. A transportation project proposed for addition to the list shall be subject to an individual land use review only if applicable administrative rules or land use regulations require such review. is d. Transportation or development projects that require a plan text amendment or a conditional use permit may be required to fulfill conditions or implement mitigation measures before approval is granted. Mitigation and conditions may include, but are not limited to: • • Improvement of surrounding roads; • Limits on level of development; • Revision of development placement; • Addition or redesign of access; • Addition of traffic management devices such as traffic signals, medians, turn lanes or signage; and/or • Improvements that reduce transportation impacts. Deschutes County acknowledges that land use designations have a significant impact on the overall transportation system and any alterations shall be completed with consideration to traffic impacts on the County road system. e. The findings of compliance with applicable statewide planning goals, acknowledged comprehensive plan policies and land use regulations, shall be coordinated with the preparation of any Environmental Impact Statement (EIS) required for a proposed transportation facility that is identified on theDeschutes County Transportation System Plan. Page 147 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) • • 169 - 1147 5.2 ARTERIAL & COLLECTOR ROAD PLAN Oregon State Historical Society Photo COUNTY ROAD NETWORK The findings in this Plan conclude that the County road network currently in place, except for several specific road segments, should be adequate to serve the County needs over the next twenty years. Given the rural nature of x Deschutes County and the fact that the majority of new development will take place on existing lots with existing access, few additional roads are anticipated. New road corridors to isolated subdivisions and new roads linking urban and rural areas are the main exceptions. Any new roads that will be created most likely will be the result of new developments and would therefore be part of land use development review or would be for secondary access or emergency ingress/egress to isolated subdivisions. Unforeseen large developments such as destination resorts normally have a private road system but their impacts to the County road network would be assessed at the time of land use approval. The majority of road -related projects will consist of safety-related or other upgrades, maintenance and repair. Upgrades, maintenance and repair should be actively pursued to maintain the integrity of the system and not jeopardize the current conditions. Pedestrian, bicycle and transit modes of transportation require wider, smoother roadways. These improvements also benefit automobile and truck traffic by making the roads safer and more efficient. The County's position is that the main purpose of the County -owned road network is to move people and goods as efficiently as possible between and to the incorporated cities in the County, not as a means of increasing urban scale developments in the unincorporated communities of the County. The County recognizes the importance of having a natural and seamless transition of jurisdiction for County roads within urban growth boundaries to their respective city jurisdictions as the cities continue to grow. Goal 3. Establish a transportation system, supportive of a geographically distributed and diversified industrial base, while also providing a safe, efficient network for residential mobility and tourism. Policies 7. Deschutes County shall: a. Consider the road network to be the most important and valuable component of the transportation system; and Page 148 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 °- 1148 • b. Consider the preservation and maintenance and repair of the County road network to be vital to the continued and future utility of the County's transportation system. 8. Deschutes County shall not add any miles of new road to the system unless the following issues are satisfied: a. The need for the road can be clearly demonstrated; b. The County can financially absorb the additional maintenance requirements; c. The condition of the road proposed for acceptance into the County system must meet County road standards; d. An accrued benefit can be shown to the County's economic growth; and e. An overall increase in efficiency in the County road network can be demonstrated. 9. Deschutes County shall make transportation decisions with consideration of land use impacts, including but not limited to, adjacent land use patterns, both existing and planned, and their designated uses and densities. 10. Deschutes County shall consider roadway function, classification and capacity as criteria for plan map amendments and zone changes. This shall assure that proposed • land uses do not exceed the planned capacity of the transportation system. • 11. Roads in Deschutes County shall be located, designed and constructed to meet their planned function and provide space for motor vehicle travel and bike and pedestrian facilities where required. 12. Deschutes County shall manage the development process to obtain adequate street right-of-way and improvements commensurate with the level and impact of development. New development shall provide traffic impact analysis to assess these impacts and to help determine transportation system needs. The guidelines for traffic impact analysis shall be located within the Deschutes County Road Standards and Specifications document upon its adoption. 13. Transportation system improvements in Deschutes County shall comply with the Americans with Disabilities Act. 14. Transportation safety in Deschutes County shall improve for all modes through approved design practice and sound engineering principles. 15. Deschutes County shall acquire the necessary right-of-way through the development process to correct street intersections, substandard road geometry or other problems in order to improve the safety of a road alignment, consistent with constitutional limitations. Page 149 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 _ 1149 16. Deschutes County shall support efforts to educate the public regarding hazards 0 related to travel on the transportation system. 17. Deschutes County shall support public and private efforts to acquire right-of-way for new secondary access roads to isolated subdivisions. STATE HIGHWAYS Each of the Access Oregon Highways (AOH) in Deschutes County has a specific role in the statewide transportation network, as well as the County system. The 1991 Oregon Highway Plan specifies the design, access management and level of service requirements that need to be applied to these highways. Deschutes County supports ODOT policy to develop highways through a "four - phased" approach. The four phases of development take place incrementally as the traffic volumes increase and the level of service decreases. Beginning with a standard two-lane rural highway, the improvement phases are as follows: 1. Addition of passing or climbing lanes 2. Widening to a four -lane section 3. Adding grade -separated interchanges and raised medians 4. Develop full grade -separated interchanges and frontage roads Through a coordinated analysis effort between ODOT and County staff, the probable locations of future passing and climbing lanes on the state highways in Deschutes County were identified. Also identified were the four -lane extension to Highway 97 from La Pine south to Highway 31, along with the probable locations of future grade -separated interchanges. The projected highway lane additions and interchanges, shown on Figures 5.2.F1 and 5.2.F2, are in conceptual form. Actual locations and design would be the result of detailed engineering work occurring during project development. No signals are appropriate on state highways outside ofUGBs, Terrebonne or La Pine. Instead, as intersections develop safety or operational problems, they shall be grade - separated, restricted or closed (where there is alternative access). The following descriptions identify the roles the state highways are expected to play in Deschutes County over the next twenty years. US Highway 97 Highway 97 is the principal north -south route through central Oregon, extending from California to the Columbia River. It serves as the main thoroughfare through the cities of Redmond and Bend, and the unincorporated communities of La Pine andTerrebonne. Congestion on Highway 97 has been mostly a problem within the communities of Bend and Redmond, due to the increasing volumes of truck traffic combined with local traffic generated by the rapid growth experienced in recent years. The Highway 97 Strategy (Appendix D) contains the goals and policies that govern the future development of the Highway 97 corridor. Outside of urban areas, the highway is characterized by two, three, and four -lane sections. The ultimate plan is for a continuous four -lane section to be built throughout the corridor, except for the sections through unincorporated communities such as Terrebonne. In those communities, traffic calming and pedestrian safety are more important than through traffic movement. In most cases, the time delay to drivers passing through the small rural communities is insignificant compared to the overall travel time along the corridor. Page 150 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 - 1150 • Highway 97 is considered a Category 2 access management facility outside of urban areas, except for the specific sections through the communities ofTerrebonne, Wickiup Junction and La Pine which are Category 4 (definitions can be found on page 17). The Category 4 section in Terrebonne extends from Lower Bridge Way south to 11th Street. The section inWickiup Junction extends from Drafter Road south to Burgess Road. The La Pine section extends south from 1st Street to 6th Street. The Terrebonne section has already been redesigned to be pedestrian -friendly by the eventual inclusion of sidewalks, landscaped strips,bulbed intersection comers and a center median. The La Pine section will be studied in 1998 as part of an approved state Transportation and Growth Management (TGM) grant. The La Pine section will be challenging due to the existing four -lane section through the community. Significant issues regarding Highway 97 in Deschutes County that must be addressed with project design and/or land use ordinances include: • The increasing traffic volumes north of Terrebonne, especially at Lower Bridge Way; • Traffic calming through Terrebonne, Wickiup Junction and La Pine; • Local road and direct driveway access onto the highway; • North and south connections to the Redmond "bypass"; • The needed grade -separated interchange at South Century Drive (Sunriver); • The realignment of the highway on existing ODOT right-of-way east ofWickiup Junction and the grade separation over the railroad; • The excessive speeds through the rural communities; and • The possible grade separation between Yew Avenue and Deschutes Junction. • The opportunity to enhance the parallel local road network to redistribute local trips that would otherwise need to use the highway (such as paving FS Rd. #41 between Sunriver and Bend). US Highway 20 Highway 20 is the principal east -west route through Central Oregon. As the principal route for trucks and autos from the Willamette Valley over the Cascades to central Oregon, all traffic passes through downtown Sisters, then splits east of Sisters to either Redmond (on OR 126) or Bend. The ODOT Highway 20 corridor planning process is currently underway, and not expected to be completed before this TSP is adopted. However, policy direction and identified projects resulting from the corridor work can be added to the County's adopted TSP when completed. The Tumalo section was studied (with Terrebonne) in 1997 as part of an approved state Transportation and Growth Management (TGM)grant. The community focused on the need to reduce accidents and ease the burden of crossing three lanes of high-speed traffic on Highway 20. The high volume of truck trips in the Tumalo area is seen as a contributor to the overall problem, and is not anticipated to diminish during the next twenty years. Highway 20 is considered a Category 3 access management facility west of the Sister's UGB, Category 4 within Sisters (similar to Terrebonne), Category 2 between Sisters and the Bend UGB, and Category 4 east of the Bend UGB (definitions can be found on page 17). The critical areas of the corridor are: • The increasing traffic volumes west of Sisters that may necessitate additional passing 0 lanes Page 151 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 - 1151 • The intersection of Cook Avenue in Tumalo which will require an eventual grade is separation • Safety problems at the intersection of the Old Redmond -Bend Highway, which will also require an eventual grade separation • Local road and direct driveway access onto the highway between Sisters and Bend • Improvements to the Powell Butte Highway intersection if land uses intensify at the Bend Airport and/or accelerated growth occurs in Crook County. Oregon Highway 126 (OR 126) OR 126 passes west to east through Sisters and Redmond and on to Prineville, before connecting to US Highway 26 and on to eastern Oregon. OR 126is the principal route for trips passing through Deschutes County heading to Eastern Oregon and Idaho. With the completion of the Cline Falls interchange in 1997, there are few transportation issues remaining or anticipated on this facility. No new interchanges or medians are proposed. The primary issues are related to the highway as it passes through the City of Redmond. Areas outside of the Redmond UGB that could develop problems include: • The intersection of Helmholtz Way if rapid development in and around Redmond continues; • Access to a possible new state park expansion at Cline Falls; • Local road and direct driveway access onto the highway between Sisters and Redmond; and • The substandard section east of Redmond. Other Oregon Highways (OR 27, OR 31, OR 370 & OR 372) The remaining highways in the County are not considered AOH facilities, and as such, do not warrant the same priority for projects nor are they anticipated to carry significant traffic volumes. Each of these highways, except for OR 27, is currently considered a Category 4 facility. None has identified high accident rates or safety problems. With the exception of OR 370 (O'Neil Highway), none has much direct private access or potential for intensified land use. OR 27 is considered a Category 6 facility, with no plans to be paved. ACCESS MANAGEMENT PLAN Roads accommodate two types of travel: local travel and through traffic. Arterial streets are intended for through movement of traffic while local roads are designed to give direct access to the abutting properties. Collector roads provide a link between the local and arterial roads, balancing accessibility and function. Historically, the state and local governments corrected many congestion problems by constructing new bypasses, grade separations or major street improvements. However, such solutions are expensive and are fast becoming infeasible under current funding levels. Arterial roads without access management can over time become overused for short distance trips and local access to property. Land use changes along these overburdened arterials results in • increased trip generation and traffic conflicts, as businesses normally desire to locate on high traffic arterials. The lack of adequate access management and insufficient coordination of land use Page 152 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 - 1152 development, property division and access review can contribute to the deterioration of both the arterial and collector road network. Traffic signals, new road approaches and driveways can decrease speed and capacity, and increase both congestion and hazards. Access management includes the control of vehicular access to major roadways. Partial access control, which is often found on major arterials and highways, is provided by limiting or prohibiting driveway access, left turn movements and cross traffic at intersections. These limitations increase the capacity of an arterial to carry through traffic at the desired speeds without requiring the addition of more travel lanes. Coordination, planning and proper policies can help avoid these problems and costly solutions. Goal 4. Establish an access management system adequate to protect the quality and function of the arterial and collector street system. Policies 18. Deschutes County shall designate access and land uses appropriate to the function of a given road. 19. Deschutes County shall require new development to minimize direct access points onto arterials and collectors by encouraging the utilization of common driveways. 20. Wherever practical, access to state highways shall be provided via frontage roads, 18 alternative local roads or other means, rather than direct access to the highway. • 21. A non-traversible median on state highways shall be installed by ODOT when operational or safety issues warrant installation. Directional breaks in the median shall be provided as needed to allow safe traffic operation. 22. Access requests onto Deschutes County arterials and collectors for new partitions, subdivisions and commercial and industrial development, shall be processed with the following access management classification system in mind: a. Public road access spaced at no less than every 500 feet onarterials and 300 feet on collectors. b. If either safety or environmental factors, or the unavailability of adequate distance between access points requires placing access points at lesser intervals, then access shall be denied or the best alternative placement shall be chosen. On road segments that are already severely impacted by numerous access points or on road segments which abut exception areas, adherence to the above standards may be either unreasonable or counterproductive toinfill of exception areas. In such cases, these standards may be relaxed by the County Road Department Director to accommodate the aforementioned special conditions. Page 153 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) • 169 1153 W � LL E'_� U p o 'E N W_ L O J CO. a N ._ ■� C O J ` map-QU > LL U C m'O aw?3c05o c 0 ^` zoacaa0:3in •y O C: Q c LU LU O HIGHWAY 21 O `m inGo a m c a t tm C m J 9 ry m � C U CL U Z Z w O U J J Z W LL Z � J LL � J r,qL! �5 n LU a = ix swo Z w 3 �s�b MH��H v w ~ a= Pj LU co > 10 g 9 _^ N Cl)c� U N� O w _ H a �° U Q (%� Cl) YQ 3 A `) Y/ C7 2 o UA W 0 • e I jin :t2 CE) X ca -2 cm w a- 0 169 11-04 LL (D(1) E (D 0U) %.j — L6 a) Cra 0' 1! < 0 a) EL 17y V- 0 o�_�cLvc�umc -j > r- cn 0 LL O CD 0 *�Zllo 8 0 qj co CL m O AM CL ...... ..... M W 0 M�o 0U) co 116 W Z Alp LU w F- > .r Z U) LU ii > (L U) (1)0 Cl) a) cl) ♦ e I jin :t2 CE) X ca -2 cm w a- 0 • 1.65 - 1155 FUNCTIONAL CLASSIFICATION Functional classification describes how the public road system should operate. Roads are grouped by their similar characteristics in providing mobility and/or land access. Within the County, there are six rural road classifications and nine urban classifications. Further coordination is needed between the County and cities in Deschutes County regarding the functional classification of County roads within city limits and urban growth boundaries. Currently, the County maintains approximately 123 miles of roadway within city limits and urban growth boundaries. The County lacks funds to upgrade these roads to city urban standards. Strengthening and revising Urban Growth Management agreements with cities may be an effective way to pursue tight coordination on this important issue and reduce the long-term financial burden to the County. As an example, the County and the City of Bend have agreed that as of July 1, 1998, all roads within the Bend UGB will become the responsibility of the City of Bend. This shift reduces the County's urban road mileage by approximately 70%. The following changes to functional classification are identified on the Deschutes County Transportation Plan Map, designated as Exhibit "A" to Ordinance No. 98-044. Bend TSP The draft Bend Transportation System Plan is proposing only one change in functional classification to a County road within the UGB. However, with the recent management agreement, this road will become the jurisdiction of the City of Bend. The functional classification of all other roads that cross the Bend UGB between the City and the County have been coordinated. Yeoman Road from 18"' street east to the outer (ultimate) urban growth boundary is currently classified as either a future or current arterial depending on segment. It proposed to change to a corresponding future and current collector. Redmond TSP The draft Redmond Transportation System Plan proposes several classification changes to County roads within and around the UGB. The Redmond TSP also splits the existing arterial classification into two new categories, "major arterial" replaces "principal arterial" and "minor arterial" replaces "arterial". The collector category is also changed by creating a "Major" and "Minor" classification. The difference is that bike lanes are not required on "Minor" collectors. The designation of County roads outside of UGBs shall remain consistent with the County functional classes of Rural Arterial and Rural Collector. The County shall require at least a four - foot shoulder bikeway along those sections of road within the County that are extensions of designated Minor Arterials and Major Collectors on the Redmond Plan. Rural Arterial to Rural Collector: • Hemholtz Way (43rd) between Maple Avenue and Obsidian Avenue. • Northwest Way north of Maple Avenue. • Maple Avenue between Hemholtz Way (43rd) and Northwest Way (27th) Street Page 156 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 - 11;)6 Rural Collector to Rural Arterial: • 27th Street between Maple Avenue and Hemlock Avenue. Other Changes: 9th Street classification as future arterial north of Maple Avenue / Negus Way is eliminated. County Roads Several roads within the rural areas of the County road network are in need of reclassification. The reclassification of these roads is warranted based on either their current and projected average daily traffic (ADT), or planned functional role in the transportation network. In most cases, a projected level of service "D" or worse triggered the change from collector to arterial. One exception to this is the reclassification of Forest Service Road #45. This road is expected to have high peak seasonal use between Sunriver and Mt. Bachelor, and should therefore be reconstructed to a rural arterial standard. Several roads currently classified as arterial are recommended to revert to collector status because they don't have a projected level of service of "D" or worse, and serve as a parallel route to a state highway. The original Transportation Element of the County Comprehensive Plan made several recommendations as to reclassifications at that time. As time has passed, some of these roads have not experienced the anticipated traffic while others are playing larger roles than originally planned due to accelerated development pressure. The County emphasis is for County roads to remain rural, have lower traffic speeds, and reduced cost to upgrade, repair and maintain. New local roads for secondary access to rural isolated subdivisions have been identified as part of the Regional Problem Solving Project. In some cases, there is an existing dirt road across private or government land, but no dedicated right-of-way. Figures 5.2.F3a and 5.2.F3b identify proposed new roads as "corridors", subject to future engineering and design, rather than specific alignments. The Sunriver Business Park is also in need of a future secondary access or intersection treatment such as a roundabout. With increasing development of commercial uses in the Park along with the increasing traffic volumes on South Century Drive, the single entrance/exit onto South Century Drive will become inadequate. Any solution may be problematic due to the established development pattern, the electric substation location, the forest -zoned land, and the Harper town site to the south. Figure 5.2.F3c identifies possible solutions to the problem by establishing a new access to Huntington Road. In the interim, an upgrade project to South Century Drive is identified in the Project List. The project would add a continuous two-way center turn lane from the entrance at Sunriver to the intersection at Spring River Road. Roads classified as "future" in Figures 5.2.F4a-5.2.F4d are currently in need of either dedicated right-of-way, paving to County standard or both. The Figures identify the complete County Road System Plan. The County recommends the following changes in functional classification based • on the current and projected traffic volumes, as well as the need for coordination between jurisdictions: Page 157 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 165 - 1157 491 Upgrade Functional Class Rural Collector to Rural Arterial • Baker Road from US 97 to Brookswood Blvd. • Burgess Road from US 97 to Day Road. • South Century Drive from US 97 to Spring River Road. • Cline Falls Highway from OR126 to Second St. (Tumalo). • Spring River Road from South Century Drive to FS Road #45. • Forest Service Road #45 from Spring River Road to Century Drive. Rural Local to Rural Collector • Stevens Road from Bend UGB to Ward Road • Nelson Road from Waugh Rd. to Powell Butte Highway • Billadeau Road from Ward Rd. to Arnold Market Rd. • Reed Road from US 97 to Darlene Way (edge of La Pine Community) • Hunnell Rd. from Tumalo Rd. to Bend UGB. • Rogers Rd. from Old Redmond -Bend Hwy. to Hunnell Rd. Rural Local to Future Rural Collector • Lazy River Drive to Tamarack Dr. • • Tamarack Drive from Lazy River Dr. to 4th Street 4th Street to Whittier Drive • Whittier Drive to La Pine State Recreation Road • Solar Drive to Milky Way • Upland Road from Milky Way to Savage Drive • Savage Drive from Upland Road to Winchester Drive • Winchester Drive From Savage Drive to Browning Drive • Browning Drive from Winchester Drive to Stagestop Drive • Stagestop Drive from Browning Drive to Bonanza Lane • Bonanza Lane from Browning Drive to South Century Drive • Sunrise Blvd. from Day Rd. to Burgess Rd. Downgrade Functional Class Rural Arterial to Rural Collector • Holmes Road from OR126 to Lower Bridge Way • OB Riley Road from Bend UGB to Johnson Market Road • Lower Bridge Way from Holmes Road to 43rd Street • Deschutes Market Road from US 97 to Bend UGB Rural Collector to Rural Local • Horse Butte Road from Knott Road to end. • • Arnold Market Road from Rickard Rd. to Billadeau Rd. Page 158 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 - 1158 IsDeschutes County functional classification goals and policies are as follows: Goal • 5. Designate access and land uses appropriate to the function of a given road. Policies 23. Deschutes County shall: a. Coordinate the County Transportation System Plan with the transportation system plans of the cities of Bend, Redmond and Sisters. The County shall emphasize continuity in the classification of roads and appropriate design standards for roads that link urban areas with rural areas outside the urban growth boundaries. The County and affected city shall agree on the functional classification and design standards of County roads within the proposed UGB area. b. Request the transfer, or an agreement to transfer with specific timelines and milestones, jurisdiction of County roadways within the urban growth boundaries to their respective cities at the time of annexation. County policy also directs that any developer of property who proposes annexation and who has frontage on a road that does not meet city standards shall have the primary responsibility for upgrading the road to applicable city specifications. Roads shall be upgraded prior to or at the time of annexation, or the developer shall sign an agreement with the city to upgrade the road, at the time of development. Transfer of road jurisdiction shall require the approval of both the County and affected city in accordance with the provisions in ORS 373.270. Page 159 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 0 C: 169 - 115-9 N ? O 0 db • • �I _ • 1 .� 1 1 . 1 Isar s--.,-•.-�ti ■I.n .,tilt, .■11%irionn tuG .,,p; 1 /x11111111; L��-{i SIIIrYa�11� 111.: Itlt�-i— ' • ��11\Il 1ptl I _IIIb■■11111111 � � � _ ::::, _ �� i.��llllll■11111111111111, _I11111111111■1■IIa -'�/1111■1111111111111111 Illllllltl.11l■11■11 ■ 11 _ 1a-�IIIIIt11111111111111111 11� -- _ .'�Ilanmfmnhan■■ IIIIIIII■■IIIIIIIIIII � � 1i �Qhl., .■■ .1h.�1n�i� � � ,•.. ��ll��lhl� :=.:'a_T:��_ ■111■ ■111 111 -.1� _... i��$ �, -.�` I.1 -1 11111 i, �3 �in/��t `�\ ■. _ WN ■ _■� _ -i-_=.111!.1 �lllllllllll 11'nt ; .;._ MA ' _ - :IIIItII �:ll.. C\\IIt 411II Y a■ \II VIII ...._--- 1 I.h ::::" Itlllliili I■ � xtl .. ■ ■■T -.G1__•• I ; :11h1 111111III1111 111111111111■Oc111 11 ���1 ���C , 11 11'-� ,1111 . 1111 L.LhL—IIIIIO ' 11111 'll■■��jj _� i:' 11t11111t11111111■r'�y ■1_I� �■ �-: -- 1111111111■Il :..■lila..\�5a?I?I .1■=- ■ lcpll•��� I.1 • n"""��I• ', � �'�_-IG_el.Ll iii �r fs nu-u1n11Pl1i-1"Ila:a:a:a.a� • 11111111111'11011 ....:.:..IIIc 11111111'.■ .T.. , ITu a■minnnnnunu■ _n.l nalnntinl Ir-rl �,� , ■ 111111111111111111 ____ ..gel lla.. _: a: :■__-__1_�_-1111111=�____I_• -==i1■■�jr.�■ ■�i:7 = _ nIr_ -_ ■n _��•• r'i___ .- �-'��� nill__irr ' IIIIIIO -111111111111111,■ Q•L_-�•-:-:-- •_:n IOIIIII-iiu, �:•_� �■I:- 5.1111. , '•---I�III--Alli:: 11'/I IIIc - E=G1- 1111 i.:Al-_.. I�iLII�. -111, .e.,1,�1.11■■■■ � X111 X1111 11. �. • _— ■ --111■IIII■IIIII_ ■ ' ►:r- �r. ■ Ilhl�� OO_. ___ _■ � 1x11-��------------ ilil lipi a �-��IIII:i►�rnl\.rY' r ■1■ Iln_ .1:11 IU fi?_7f IZ jPl�eil,�+lie . =:"LVi7:�N:1_.Il.tlil:: • _ '.L.+'.��,ti �inuii����`••--�J-. f11111111..�y r rata..���1u1a■11�■\.:_..kip.. Illl�lli��������i��iiii� �'. ILII II 1 . cacg ..n�P9■1 � I ILr1�I�R�11�II�. 1011 III_lili�pi`I�wIDi�Gtafalt;�, •���� �i�\4� � N ? O 0 db C • 169 — 1160 co 1 °r 169 - 1161 Page 10- of 23 Z Ordinance lb -041 - 3 L U M O O W LL L.L m �' o z N . _ o 3O O U -0 n' O N�.N U O� Z(o U) -FD ° n' Wai L W cu U O'C (p CL Na LL w BB a ABB 111 Q m �rn o ee ap A2jn NAO Hinos > "' a � O• � C 0 0 0 m U � t U N W U Z M= U Z Oil a) N U cn N 0 Page 10- of 23 Z Ordinance lb -041 - 169 — 1162 Ordinance 'ill" 14" _T C E M U w LL CU c N O O cc o 03 L6CL ■� Ca o c c 3 m 0 o O 3.2 a) Z .2 o o c �� p J C za) U =Q0 a:, -!L) -Fu �- a- iAofW- wUaH N C C C l■ a rn � c m N N � J � � U � o � U 1 ££ 0 Y N U UJ gni O FLN � � O U o � i 0 KKxhibitPage V3 2.32. Ordinance 'ill" 14" 0 • • 169 - 1163 a) cu U M Q� U z a ` m 3 o U) 4) cc 4) Z LO u> 0JZIrp aWU` 2Zcn vJ moo IJ • N 3S1� 9-3L C 16 a uo w rn m RE ii ESN m HE m N 0 T B� � a o O N RE �o w U U v N J H N �•� O X966 •.., 0: g �b• ;� +� gz o o ' � U O • cn •••..... 0 0 �/1 Odd d V ♦, ❑O W O �4 00 4 Q El 0 • 169 1164 cu W M U LLmz 0. • _Z _m-_ .� 0 �o_ . LO E cu Qm U m O C C O C J aQU O oma° m . _ -. -. m s.i C 7 7 L m m m 0 LL Y x Yp 0 a L d j cn U., Q a (I :_ LOc N. c m m J v 'IS 4161 m c U° O�WestW By SX � lit A / AeM 271o4wle MN J S 43rd Street J C L a �y si/e O E 2 pZl w04-yon8 O U N 7 0• eac°aa C V/ a) LJJ A �O N Q 11 aIepJBAOIO • • 169 - 1165 Cu w .m E� L O z V ''fp CO) a?a� N L Ja N QU r/ n—V- O D-7 . N C N<j (p W C.r 7 7 :7O NaO 0dWLLwLLU- m0 Q LL J jRo.dLL Johnson Ranch y Q , � n C m ; C � 7 U rn w Y O O fh C m 00 U mm o N, o ❑ � C a O U 10 peoa dwequalgCO J o w a M c�`a�R� Z rn ♦^ v J �\ = U U Z W 3 E a RaHoia uosHai j 3 `m v moi` Q peoa laWeyy sainyosa o ' � ^ . � • B< ' • Sue • l6`° 2�1h o° m LO peoa IlauunH F COO . ash a p/o o wY CO v �Ao ,•? w O b�/�� °o . oa0 any�oo OBR�eh� . ✓ c=i � Qf y w ?� M V O o ❑ m O v, I w ' p MSO N . . . Up suyor Cu / � 4A o �• U 7 • Cr w U. N �a O L LO 0 E Cc ♦� O 0 2 c w U `off LL 0 V > m�a00 N • � �� a ao m c 0 2, N Co U o ... .. .. 0 CL U N m • d L g CL OD ' _. ... ` .. co to v , � N Cl) 0 169 1167 cu 3 z LL < LMNL_ Cl) -0L6 (U W 4-0Q cu I --U M N (D C aU V, dIxcn LL D c c c l0 a m 0) rn rn N � Q C d TJ m � T FMe2r ftd.d C a U m Ir 3 w � d � C s N L � .O by�Lj'Pa N O .I.Vi.A010 DLI M) O o C2 .va 4"Jo QQ,L P8 �I `O� Zo �5 U) O o� Q nCl) W N a U ^n W 04 169 -1168 4) 40 CU W IT C � LL z Q o N O � � 3 s m LO CU o n o ^♦ m � W O � LI. ¢- 0 � o�C7 aQU o= o c m m E c a. w Cr_ m LLC C 00 C (O a Ab, rn a6p'b, e-oaa � a Y J m 'IS is L9 o Deschutes Market Rd. m z U N pad peoa lauunH d 2 vs' p � ABm46'H slle=l aui10 z od a W O N O Pb levee 6urvao J i U T N ♦ ^ m � GO�yo^ W C �p O `° UU 7 7 � 'pa su11100 CD Exhibit Q Q Page 164 of 137- N Ordinance 4b' cg A C7 169 - 1169 ROAD AND STREET STANDARDS Historically, County road and street standards and specifications have been located in various places throughout the County Zoning and Subdivision Ordinances, making it a difficult task to implement standards uniformly and update them as needed. Through this TSP, the County pledges to create a separate standards and specifications document, which shall enable the County to periodically update or change specifications or road project procedures without a Comprehensive Plan amendment. The likely location for the new document or chapter shall be in Title 12 (Road Department) of the Deschutes County Code. The new document shall reflect the County's desire to no longer have urban road standards, only rural road standards, including specific standards for the unincorporated communities of La Pine, Terrebonne and Tumalo. Goals 6. Develop and adopt a document or chapter of Road Standards and Specifications that shall control all aspects of construction related to roads, pedestrian walkways and bicycle facilities occurring outside designated urban growth boundaries inDeschutes County. 7. Develop and adopt criteria for the requirement of various levels of traffic analysis for each new rural development The traffic analysis requirements shall be located in the Road Standards document. Policies 24. After County adoption of the Deschutes County Road Standards and Specifications document, all new and reconstructed Deschutes County rural roads shall be built to those identified standards. In the interim, rural road dimensions outside of the unincorporated communities of Terrebonne and Tumalo shall match the requirements set forth in Table 5.2.T1, which replaces current Table "A" located in Title 17 of the Deschutes County Code. The City of Sisters Road Development Standards shall apply within the Sisters Urban Area. The Road requirements for the unincorporated communities of Tumalo and Terrebonne are governed by the previously adopted tables located in Appendix G. 25. Road, pedestrian and bicycle projects occurring in unincorporated areas within urban growth boundaries shall be governed by the respective city's road and street standards. Those requirements shall be coordinated between the city, the County and the applicant during the land use process according to procedures to be identified in the Deschutes County Road Standards and Specifications document. Page 170 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 1.69 - 1170 Table 5.2.T1 • Table "A" Minimum Design Standards (1) Road Type Functional Class Right -of- Way Widt I Surface Width (587) Turn Lane Width Surface Type Base Depth (6 Maximum Grade (8) Design Speed Minimum Tangent Minimum Curve Curb Type La Pine Urban Unincorporated Community (2) Arterial Principal 80'-100' 60'-80'(3) 14' (see note #3) 6% (see note #3) 16" Minor 80' 36'-52' 14' 3" AC 10" 6% (see note #4) 16" Collector 60'-80' 36'-48' 14' 3" AC 8" 8% (see note #4) 16" Local Commercial 60' 36'(9) --- 2" AC 6" 10% (see note #4) 12" Local Residential 60' 30'(9) --- 2" AC 6" 10% (see note #4) 12" Alley 20' 15'-20' (12) --- 2" AC 4" 10% (see note #4) --- Rural Areas Arterial Principal 80'-100' 36'-70' (3) 14' (see note #3) 6% (see note #3) --- Minor 80' 28'-32'(12) --- 3" AC 10" 6% (see note #4) --- Collector 60' 28'-30'(12) --- 3" AC 8" 8% (see note #4) --- Local 60' 20',24' (13) --- 0-9 or 2" AC 6" 10% (see note #4) < 10 acres 60' 20' --- 0-9 or 2" AC 6" 10% (see note#4) --- Oition >_ 10 acres 60' 20' Aggregate 5" 10% (see note#4) --- Special Roads Industrial 60' 32' --- 3" AC 10" 6% (see note #4) --- Private --- 20',28' (11) --- 0-9 or 2" AC 6" 12% (see note #4) --- Frontage 40'-60' 28' --- 3" AC 8" 10% (see note #4) (10) • (1) City of Sisters road and street design standards shall apply within the Sisters Urban Area. Standards for the Terrebonne and Tumalo Rural Unincorporated Communities are contained in Title 18. (2) Design standards in this title for the La Pine Urban Unincorporated Community are considered interim until new standards are developed as part of the La Pine Bicycle, Pedestrian and Local Street Plan. (3) Design shall be in accordance with Oregon Department of Transportation Design Standards. (4) Design shall be in accordance with AASHTO standards. (5) Pavement widths are variable, depending on such factors as anticipated traffic volumes, and whether the road section involves turn lanes, bike lanes, and whether frontage roads border an arterial or collector, etc. (6) The required base depth may be increased when a C.B.R., or R -valve is required by the Road Department. (7) Cul-de-sac bulb to be constructed with a 45 -foot minimum radius. (8) Increase in grade of 2 percent may be allowed in unusually steep areas. (9) 30' minimum street width allowed in single-family zoned residential areas or 36' minimum street width in multi -family zones. A lessor street width may be approved through the variance procedure. (10) 12" standard for urban frontage roads, and no curb for rural frontage roads. (11) 20' allowed for cul-de-sac's and roads with low anticipated traffic volumes as long as separate multiple use paths are provided. 28' road required (including the required 4' striped shoulder bikeway in each direction) for circulator and primary subdivision access roads and other roads when separate multiple use paths are not provided. (12) The larger of the two widths is necessary if a shoulder bikeway is required (4' for collector and 5' for arterial). (13) 20' allowed for cul-de-sac's and roads with low anticipated traffic volumes. 24' width required for circulator and primary subdivision access roads. Page 171 of 232 — EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 - 1171 ROAD MANAGEMENT SYSTEM Road management is an orderly scheduling of pavement preservation, maintenance, repairs and improvements to meet serviceability goals and provide safe, comfortable and economical transportation while striving to achieve the best possible value from available funds. Routine maintenance activities are carried out on a daily basis. Road sections requiring more extensive work are prioritized and then selected for improvements based on an evaluation of pavement condition. Local road standards need to evolve over time as a given road experiences more traffic. A dirt or aggregate surfaced road may be adequate for access to individual properties. However, as additional properties begin to use that road for access, it may no longer be adequate. At a certain point, the owners of property using the road for access will need to join together and participate in the improvement of the road through the formation of a special road district or local improvement district. Goal 8. Maintain the County road network pavement in good to excellent condition. Policies 26. Deschutes County shall continue to maintain and preserve the County road network through its pavement management system which guides a program of paving, repairing, reconstruction, drainage clearance and vegetation control. 27. After safety-related issues, the highest volume road segments shall be the next priority for County road maintenance and repair. 28. If and when gravel or dirt roads are paved by the County, the main controlling criteria shall be: density of surrounding development, traffic volumes, road classification, gap filling, potential school bus routing efficiency and emergency evacuation potential. LEVEL OF SERVICE Levels of service (LOS) describe the service quality on two lane roads or highways as determined by average travel speed, percent of time delay due to the inability to pass, roadway capacity utilization, or intersection delay. LOS ratings generally apply to collector and arterial streets only. LOS is defined by a range of designations from "A" to "F". LOS "A" is completely unimpeded traffic flow while "F" is highly congested. Table 5.232 identifies the relationship between two-way average daily traffic volumes, level of service and the percentage of daily traffic that occurs during the peak travel hours of the day (K factor). While several road segments are expected to reach LOS "E" over the next 20 years, most County roads will be at LOS "D" or better as long as population growth does not exceed the projections. ODOT highway policies dictate that anything over LOS "C" outside of urban areas is unacceptable. For rural highway segments in Deschutes County, ODOT projects several to exceed LOS "D" over the next 20 years. Page 172 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 - 1172 0Table 5.2.T2 Maximum Average Daily Traffic Allowed for Various Levels of Service K Factor Level of Service A B I C I D E Average Daily Traffic Volume (ideal conditions, i.e., level terrain, etc.) 10% 2,400 1 4,800 1 7,900 1 13,5-0-0--T-22,900 Goal 9. Maintain a level of service of "D" or better during the peak hour throughout the County arterial and collector road system over the next 20 years. Policy 29. Deschutes County shall continue to monitor road volumes on the County arterial and collector network. The County Road Department shall continue to be the department responsible for monitoring volumes and shall strive to count each arterial and collector at least once every four years. The Road Department shall periodically examine the traffic volumes to identify level of service deterioration. CAPACITY 0 County Roads Traffic volumes on County roads were estimated using a combination of trending analyses and the Potential Development Impact Analysis work done by ODOT forDeschutes County. It was assumed that any road segment with fewer than 9,600 projected ADT in 2016 would operate at an LOS of "D" or better, and that LOS "D" is acceptable for County arterial and collector roads. Of all the County roads, only Baker Road (LOS "E") leading into Deschutes River Woods is projected to operate at worse than LOS "D" in 2016. Additional roadsapproaching LOS "E" are located in the South County and include: • Burgess Road west of Huntington Road in La Pine. • South Century Drive near Sunriver. These two road segments shall be monitored by the County Road Department and counted at least every two years instead of the usual 4 -year cycle. ODOT State Highways ODOT provides yearly traffic counts on all the state highways running through Deschutes County. ODOT used historical growth rates based on the last twenty years of traffic volume data. The yearly growth ranged from 0.0 to 11.4 percent. It was also assumed that the number of access points remained constant. Whereas the County road analysis related LOS directly to ADT levels, several highway segments may have high ADT levels but a correspondingly low LOS because of the presence of multilane and passing lane sections. Therefore, the most Page 173 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 - 1173 important analysis tool for highway sections becomes the LOS value rather than ADT. For multilane sections in the County, the forecasted traffic volumes are well within the capacity limits through the year 2016. However, several sections of the state highways will be reaching capacity thresholds for two-lane sections. The sections projected to approach capacity and operate at level of service (LOS) "D" or worse are: • Highway 126 through downtown Sisters and on either side of the City of Redmond. • Most of Highway 20/126 between the Jefferson County line, through Sisters and Bend to Powell Butte Highway. • Highway 97 from the Jefferson County line throughTerrebonne and Cottonwood Drive south to La Pine. • Highway 372 from Bend to Dillon Falls Road on the way to Mt Bachelor. Goal 10. Maintain the current arterial and collector system in the County and prevent degradation of the capacity of the system. Policies 30. Deschutes County shall monitor County arterials and collectors to help in the determination of when road improvement projects are necessary. 31. Deschutes County shall continue to work with the ODOT and the Cities of Bend, Redmond and Sisters to coordinate solutions to highway and non -highway road issues that cross over jurisdictional boundaries. 32. The County shall establish requirements and adopt standards for secondary access roads to isolated rural subdivisions. BRIDGES Deschutes County owns and manages approximately 120 bridges throughout the County. The County Road Department performs routine maintenance and repairs as necessary. Several of the bridges are signed for weight limitations in the five to fifteen -ton range because they are structurally deficient. Five bridges on higher volume roads are signed with 25 -ton weight limits. Since the recent replacement of the Fall River Bridge in 1995, no significant bridge problems have been identified for correction or reconstruction. Goal 11. Maintain a safe and efficient network of bridges on County roadways. Policy 33. Deschutes County shall monitor the condition of County bridges on a regular basis, and perform routine maintenance and repair when necessary. The County shall also explore additional funding sources when major reconstruction or replacement of bridges is necessary. Page 174 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 - 1174 TRUCK ROUTES Currently Deschutes County has no designated truck routes or hazardous materials routes on County roads. However, several roads are signed tonot allow trucks over a certain weight due to bridge limitations. Oregon is one of the few states that currently allow oversized tractor -trailer vehicles referred to as Longer Combination Vehicles (LCVs) on certain highways. Two types of LCVs, triple trailers and heavier double trailers (105,000 -Ib weight limit) are allowed to operate in Oregon without a special permit. Truck traffic is generally confined to industrial, commercial and surface mining areas. State highways serve the majority of truck traffic and are most suitable for truck use. The County shall continue to designate state highways as the desired through truck routes in the County. The draft 1998 Oregon Highway Plan proposes to designate U.S. 97 as a State Trucking Route. This designation could mean that additional funds would be available for improvements to U.S. 97. Outside of the state highway system, trucks should be limited to travel only on arterial roads. Goal 12. Develop a plan of designated truck routes. Policy 34. Deschutes County shall designate that long-haul, through trucks, be limited to operating on Principal Arterial and Rural Minor Arterial roads as designated in the County transportation network, except in emergency situations and when no . reasonable alternative arterial road is available for access to commercial or industrial uses. HAZARDOUS MATERIAL ROUTES The transport of non -radioactive hazardous materials (NRHM) is guided by Part 397 of the Federal Motor Carrier Safety Regulations. The Federal Department of Transportation defines hazardous materials (HAZMAT) and regulates their packaging and shipping. ODOT designates the NRHM routes in Oregon. Currently, there are no designated NRHM routes in Central Oregon, which means HAZMAT can be transported through Deschutes County without any restrictions. In order to establish a new NHRM route, the County would need to work with ODOT to make findings on various federal criteria such as population density and proximity to hospitals and schools. The creation of NRHM routes requires a deeper understanding of the movement of these shipments than is currently available, therefore no routes will be designated in this Plan. However, the County shall work with ODOT to determine if any Deschutes County highways should be candidates for designation as NRHM routes. Goal 13. Develop a plan of designated hazardous materials (NRHM) routes. Policy 35. Deschutes County shall work with ODOT to determine the feasibility of designating 0 NHRM route(s) through Deschutes County. Page 175 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 - 1175 FACILITY / SAFETY IMPROVEMENTS In 1996, the grant -funded Deschutes County Safe Communities program was initiated in an effort to reduce transportation -related injuries of all types. Program staff used the state accident database, from the Accident Data Unit at ODOT, to evaluate accident data for the period 1991- April 1995. During this time period there were a total of 2,518 crashes reported on County roads and highways outside of urban areas. Of the total number of accidents, 70 were fatal, 1,073 involved injury (170 serious), and 1,375 were property damage only accidents. Safe Communities staff has also identified the difference in accident rates between the County in general and the rural areas. Countywide, fatal accidents accounted for 1.2 percent of the total number of accidents, while fatal accidents just in the rural area accounted for 2.8 percent of the total. Injury accidents made up 4.4 percent of the County total, while in just the rural areas; they accounted for 6.8 percent of the total. The Safe Communities Group identified the process of reengineering high incident areas, where the greatest number of accidents occur, as the most important issue that should be addressed within the first year of the program. However, it could also be argued that the number of accidents alone is not the only indicator of need for corrective measures. A location with very high traffic volumes and a high accident rate may be safer than a location with low volumes but a high accident per average daily trip (ADT) rate. The "high priority" projects in the Project List subsection of this Plan includes improvement projects recommended to improve safety. Goal 14. Maintain a safe and efficient network of roadways. 0 Policy • 36. Deschutes County shall develop and maintain a prioritized inventory of safety - deficient facilities on the County road network and give highest priority to correcting safety issues. Page 176 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 5.3 PUBLIC TRANSPORTATION PLAN SPECIAL TRANSIT SERVICES Fixed -Route Transit There is currently no traditional fixed -route local transit service in Deschutes County. However, the Mt. Bachelor Ski Resort Super Shuttle does operate during the winter months on a fixed -route and schedule. The County will continue to work with service providers such as Mt. Bachelor to secure additional funding as well as increase promotion of their services. Future Fixed -Route Transportation Options 169 - 1176 Prineville to Silver Lake Stage In 1997, ODOT funded a study to address the issue of a fixed -route, commuter shuttle transit system between Bend and Redmond. The Study includes a commuter survey, information regarding potential ridership and costs. The results indicated that the most feasible operation would be a 3 -van system with reasonably direct routing and few stops. The travel time between Bend and Redmond would average 30 minutes. The capital costs would be approximately $150,000, with annual operating costs of $200,000. Average dailyridership could average 100 if fares were $3.00 or less. Further study would be required prior to implementation. If the County were to establish a rural transit "district" to include a Bend -Redmond shuttle, another potential transit route could be from La Pine to Bend. Although no formal study has been done on this, similar results as the Bend -Redmond Study would be expected. A major difference in a La Pine -Bend shuttle would be the limited number of stops in La Pine and Wickiup Junction, and a probable diversion to serve Deschutes River Woods. To achieve its potential, a commuter shuttle service needs good connections to sidewalks, bikeways, fixed -route transit systems and rideshare lots. Currently, there is no fixed-routstransit in Bend or Redmond, the sidewalk and bicycle networks are generally fragmented and there are few rideshare lots. Because of these limitations, a shuttle service should attempt point to point travel as much as possible, which means working with larger employers to encourage the service. Figure 5.3.F1 identifies the potential routes and stops for a County rural transit system. The need for a public transit center has been identified and shall be supported byDeschutes County. The center would include adequate parking and restroom facilities, and provide the opportunity to transfer between multiple intercity and local service providers. The most likely transit center location is in Bend, but additional locations in Redmond and possibly La Pine/Wickiup Junction may also be established. The County shall cooperate with ODOT and Page 177 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 - 1177 is local jurisdictions in establishing future transit facilities as needed. Local Demand -Responsive Transportation Deschutes County has a network of special transportation providers who serve the elderly and disabled population. In most cases, the general public does not have access to these special transportation services. There are several providers of special transportation services in the County, ranging from public to private, both profit and non-profit. The following are the existing service providers in the County: • City of Bend Dial -A -Ride • Central Oregon Council On Aging (COCOA) Dial -A -Ride • Opportunity Foundation of Central Oregon • Residential Assistance Program (RAP) • Disabled American Veterans • Volunteer Services • Central Oregon Resources for Independent Living • Access Express With limited funding options, no significant expansions in these demand responsive programs are planned. Short-term capital needs have been identified for several dial -a -ride service providers and are included in the Project List. INTERCITY BUS AND PASSENGER RAIL • The following intercity bus services are planned to continue as the primary (and only) public transit options in the County. The focus shall be to maximize the efficiency of these services as land use changes occur. The County realizes it has no control over the market driven forces that allow private transit providers to thrive or just survive. Increased emphasis shall be placed on the transit/rideshareconnections possible in the South County as the population increases. The County shall continue to work with the cities of Bend and Redmond as they investigate the possibility of fixed -route local transit systems. Without a local transit system to distribute trips, a commuter system linking the rural and urban areas of the County is less likely to succeed. • • Greyhound • CAC Transportation • The People Mover • Porter Stage Lines • Valley Retriever The Oregon Transportation Commission in November 1992 adopted the Oregon Rail Passenger Policy and Plan. It provides a comprehensive long-range plan for railroad passenger service in Oregon in coordination with the Oregon Transportation Plan. Unfortunately, passenger rail service for Central Oregon was ruled out as not being cost-effective. However, as conditions change and the population of Deschutes County continues to increase, the County shall monitor the feasibility for future passenger rail service and work with ODOT and the community on future transit/rail options. Page 178 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 1.69 °- 1178 Goals 15. Enhance the opportunity for intermodal connections throughout the County transportation system. 16. Increase the existing level of special services provided. 17. Establish rural transit service for Deschutes County residents. 18. Decrease barriers to the use of existing services. Policies 37. Deschutes County shall work with ODOT, the cities of Bend, Redmond and Sisters, and transit service providers to study countywide rideshare facility needs, and investigate public transit possibilities including potential transit stops for a regional or commuter -based transit system. Those possibilities shall include bus and rail, and if economically feasible, the County shall seek such services as are found to be safe, efficient, and convenient in serving the transportation needs of the residents of Deschutes County. 38. Deschutes County shall continue to work with special service providers, ODOT, and the cities of Bend, Redmond and Sisters to secure additional funding as well as increase promotion of those special transit services that may be underutilized. • 39. Deschutes County shall identify and monitor the needs of the transportation disadvantaged and attempt to fill those needs. • Page 179 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) Possible County Transit System 5 0 5 10 15 20 25 30 35 40 45 Miles MEM ® Possible Transit Stop 0 Unincorporated Community NPossible Transit Route Principal Arterial (State Highway) Rural Arterial Rural Collector Sunriver Resort UGB (Bus routing to be determined) 0 County Line Map Created: 8/14/98 by Deschutes County Long -Range Planning Deschutes County TSP N W E S Figure 5.3.F1 Page I ga of Ordinance • 5.4 BIKEWAY AND PEDESTRIAN PLAN In March 1992, the County adopted a Bicycle Master Plan as a resource element of the Deschutes County Year 2000 Comprehensive Plan. The Bicycle Master Plan provides recommendations for policies, classifications of bike facilities, location of bike facilities, bicycle parking and other transportation issues related to bike facilities. Many of the goals and objectives of that Plan have been implemented and/or are still valid. With the adoption of the latest version of the Oregon Bicycle and Pedestrian Plan by the Oregon Transportation Commission on June 14, 1995, the 1992 County Bicycle Master Plan is no longer relevant. The new state Plan contains several changes from earlier versions, which will have an effect on the Deschutes County Bicycle Master Plan. The most significant change is the new emphasis on pedestrian facilities, which were not addressed in the previous Plan. 1.69 - 1180 Based on need and road characteristics, all roads open for public use should be considered for the potential to improve bicycling and walking. Facilities should safely accommodate the majority of users. Roads designed to accommodate cyclists with moderate skills will meet the needs of most riders; special consideration should be given close to school areas, where facilities designed specifically for children should be provided. Roads designed to accommodate young, elderly and disabled pedestrians serve all users well. Rural Bikeways On most rural roadways, shoulder bikeways are appropriate, accommodating cyclists with few conflicts with motor vehicles. In general, the minimum shoulder widths recommended by Oregon Bicycle and Pedestrian Plan for rural highways are adequate for bicycle travel. These standards take into account traffic volumes and other considerations. Shared roadways are adequate on low-volume rural roads, where motor vehicle drivers can safely pass bicyclists due to the low likelihood of encountering on -coming traffic. Shoulder bikeways can be added to roads with high bicycle use, such as in semi -rural residential areas or close to urban areas. It may be appropriate to stripe and mark shoulders as bike lanes near schools or other areas of high use. Even adding minimal -width shoulders can improve conditions for bicyclists on roads with moderate traffic volumes. On roads with high use, it may be necessary to add full -width shoulders in areas of poor visibility due to topography. Rural Walkways In sparsely populated areas, the shoulders of rural roads usually accommodate pedestrians. There are, however, roadways outside urban areas where the developing urban character Page 181 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 1181 creates a need for sidewalks, such as on highly developed commercial strips or in residential clusters along county roads or state highways. How and where pedestrians cross arterial roads is potentially more important that pedestrian travel along roads. Road volumes will dictate at what locations special pedestrian treatments may be warranted. It is anticipated that much of the focus will be on the state highways as they travel through rural communities. These locations have the highest concentrations of pedestrians and activity centers. Pedestrian treatments will be analyzed in concert with traffic calming strategies on the highways. Where sidewalks are not provided, paved shoulders should be wide enough to accommodate both pedestrians and bicyclists. Paved multi -use paths provided on one or both sides of a roadway in a rural community may be appropriate for providing access to schools. These paths will also serve the needs of young bicycle riders. Through the site plan review process, the County shall continue to monitor pedestrian facility design, and require appropriate facility designs to comply with provisions of the Americans with Disabilities Act (ADA). This Plan identifies policies, bike and pedestrian facility classifications, design standards and construction and maintenance guidelines. Many of the design standards apply to urban rather than rural areas. However, they are in this plan because they may apply to specific projects, new neighborhoods, or urban unincorporated communities. This TSP contains a list of suggested improvements on the Deschutes County Road System to accommodate bike and pedestrian facilities. Completion of these projects will considerably enhance the network of bike and pedestrian facilities throughout the County. The TSP recommends standards and design guidelines for bicycle and pedestrian facilities set by the 1995 Oregon Bicycle and Pedestrian Plan. All traffic devices used in conjunction with bikeways are required to meet the standards set forth in the nationalManual on Uniform Traffic Control Devices (MUTCD). Design Standards Shared Roadways There are no specific bicycle standards for most shared roadways; they are simply the roads as constructed. Shared roadways function well on local streets and minor collectors, and on low-volume rural roads and highways. The majority of rural roads in Deschutes County are shared roadways. He for mile, shared roadways are the most common bikeway type. Shared roadways are suitable in urban areas on streets with low speeds - 40 km/h (25 MPH) or less -. or low traffic volumes (3,000 ADT or less, depending on speed and land use). In rural areas, the suitability of a shared roadway decreases as traffic speeds and volumes increase, especially on roads with poor sight distance. Where bicycle use or demand is • potentially high, roads should be widened to include shoulder bikeways where the travel speeds and volumes are high. Many urban local streets carry excessive traffic volumes at speeds Page 182 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 - 1182 • higher than they were designed to carry. These can function as shared roadways if traffic speeds and volumes are reduced. There are many "traffic calming" techniques that can make these streets more amenable to bicycling on the road. Wide Curb Lanes A wide curb lane may be provided where there is inadequate width to provide the required bike lanes or shoulder bikeways. This may occur on retrofit projects where there are severe physical constraints, and all other options have been pursued, such as removing parking or narrowing travel lanes. Wide curb lanes are not particularly attractive to most cyclists; they simply allow a motor vehicle to pass cyclists within a travel lane. 19, 119' To be effective, a wide lane must be at least 4.2m (1 4ft) wide, but less than 4.8m (1 6ft). Usable width is normally measured from curb face to the center of the lane stripe, but adjustments need to be made for drainage grates, parking and the ridge between the pavement and gutter. Widths greater than 4.8m (16ft) encourage the undesirable operation of two motor vehicles in one lane. In this situation, a bike lane or shoulder bikeway should be striped. Shoulder Bikeways • Paved shoulders are provided on rural highways for a variety of safety, operational and maintenance reasons: • • Space is provided for motorists to stop out of traffic in case of mechanical difficulty, a flat tire or other emergency; • Space is provided to escape potential crashes; • Sight distance is improved in cut sections; • Highway capacity is improved; • Space is provided for maintenance operations such as snow removal and storage; • Lateral clearance is provided for signs and guardrail; • Storm water can be discharged farther from the pavement; and • Structural support is given to the pavement. Recommended Shoulder Bikeway Design Standards Road ADT under ADT 250- ADT 400- DHV 100- DHV 200- DHV over Class 250 400 DHV* 100 200 400 400 Rural 1.2m (4ft) 1.2m (4ft) 1.8m (6ft) 1.8m (6ft) 2.4m (8ft) 2.4m (8ft) Arterials Rural 0.6m (2ft) 0.6m (2ft) 1.2m (4ft) 1.8m (6ft) 2.4m (8ft) 2.4m (8ft) Collectors Rural Local 0.6m (2ft) 0.6m (2ft) 1.2m (4ft) 1.8m (6ft) 1.8m (6ft) 2.4m (8ft) Route Page 183 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 - 1183 "ADT is the average daily traffic, which is expressed as a 24-hour volume. DHV (Design Hour Volume) is the expected traffic volume in the peak design hour (usually at commuter times); usually about 10% of ADT in urban areas, higher on rural highways with high recreational use (camping areas, beach access, ski resorts, etc.) Width Standards In general, the shoulder widths recommended for rural highways in the ODOT Highway Design Manual serve bicyclists well. The above table should be used when determining roadway shoulder widths. When providing shoulders for bicycle use, a width of 1.8m (6ft) is recommended. This allows a cyclist to ride far enough from the edge of pavement to avoid debris, yet far enough from passing vehicles to avoid conflicts. If there are physical width limitations, a minimum 1.2m (4ft) shoulder may be used. Shoulders against a curb face, guardrail or other roadside barriers must have a 1.5m (5ft) minimum width or 1.2m (4ft) from the longitudinal joint between a monolithic curb and gutter and the edge of travel lane. (F) Ii= -1 lid -1 firl 16+R461) cuft pa"*q or Vwovkt.1m44)9W W*Ww • On steep grades, it is desirable to maintain a 1.8m (6ft), (min. 1.5m [5ft]) shoulder, as cyclists need more space for maneuvering. Note: many rural roads are 8.4m (28ft) wide, with fog lines striped at 3.3m (11 ft) from centerline. The remaining 0.9m (3ft) should not be considered a shoulder bikeway (min. width 1.2m {4ft)); these are still considered shared roadways, as most cyclists will ride on or near the fog line. Pavement Design Many existing gravel shoulders have sufficient width and base to support shoulder bikeways. Minor excavation and the addition of 75-100mm (3-4") ofasphaltic concrete is often enough to provide shoulder bikeways. It is best to widen shoulders in conjunction with pavement overlays for several reasons: • The top lift of asphalt adds structural strength; • The final lift provides a smooth, seamless joint; • The cost is less, as greater quantities of materials will be purchased; and • Traffic is disrupted only once for both operations. When shoulders are provided as part of new road construction, the pavement structural design should be the same as that of the roadway. On shoulder widening projects, there maybe some opportunities to reduce costs by building to a lesser thickness. 50-100mm (2-4") of asphalt and • 50-75mm (2-3") of aggregate over existing roadway shoulders may be adequate if the following conditions are met: Page 184 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 - 1184 • There are no planned widening projects for the road section in the foreseeable future; • The existing shoulder area and roadbed are stable and there is adequate drainage or adequate drainage can be provided without major excavation and grading work; • The existing travel lanes have adequate width and are in stable condition; • The horizontal curvature is not excessive, so that the wheels of large vehicles do not track onto the shoulder area (on roads that have generally good horizontal alignment, it may be feasible to build only the inside of curves to full depth); and • The existing and projected ADT and heavy truck traffic is not considered excessive (e.g. under 10%). The thickness of pavement and base material will depend upon local conditions, and engineering judgment should be used. If there are short sections where the travel lanes must be reconstructed or widened, these areas should be constructed to normal full -depth standards. Sidewalks The standard urban sidewalk width is 1.8m (6ft), exclusive of curb and obstructions. This width allows two pedestrians (including wheelchair users) to walk side by side, or to pass each other comfortably. It also allows two pedestrians to pass a third pedestrian without leaving the sidewalk. • Where it can be justified and deemed appropriate, as in most rural areas, the minimum width may be 1.5m (5ft); on local streets, circumstances may include a combination of width constraints or low potential usage. 171 The minimum width for sidewalks directly adjacent to a motor vehicle lane is generally 1.8m (6ft). Greater sidewalk widths are needed in high pedestrian use areas, such as urban central business districts. Obstructions The standard sidewalk width is clear of obstructions such as sign posts, utility and signal poles, mailboxes, parking meters, fire hydrants, trees and other street furniture. Obstructions should be placed between the sidewalk and the roadway, to create a "buffer" for increased pedestrian comfort. Movable obstructions such as sign boards, tables and chairs must allow for a 1.8m (6ft) clear passage. Obstructions should not be placed in such a manner that they impair motorist visibility. Clearance to vertical obstructions (signs, trees, etc.) must be at least 2.1 m (7ft): Page 185 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 1:8 m M s a m 1,8 m (w) • Where it can be justified and deemed appropriate, as in most rural areas, the minimum width may be 1.5m (5ft); on local streets, circumstances may include a combination of width constraints or low potential usage. 171 The minimum width for sidewalks directly adjacent to a motor vehicle lane is generally 1.8m (6ft). Greater sidewalk widths are needed in high pedestrian use areas, such as urban central business districts. Obstructions The standard sidewalk width is clear of obstructions such as sign posts, utility and signal poles, mailboxes, parking meters, fire hydrants, trees and other street furniture. Obstructions should be placed between the sidewalk and the roadway, to create a "buffer" for increased pedestrian comfort. Movable obstructions such as sign boards, tables and chairs must allow for a 1.8m (6ft) clear passage. Obstructions should not be placed in such a manner that they impair motorist visibility. Clearance to vertical obstructions (signs, trees, etc.) must be at least 2.1 m (7ft): Page 185 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 1:8 m M s 169 -1185 Cars parked perpendicular or diagonally to sidewalks can be obstructions if there is excessive overhang. Wheel stops or blocks can be used to prevent narrowing the usable sidewalk width: Reducing overhang from parked cars Shy Distance An additional 0.6m (2ft) shy distance is needed from shoulder -high vertical barriers such as buildings, sound walls, retaining walls and fences: 1.8 M 0.8 m Planting Strips Note: ADA requires that 'objects protruding from walls (e.g. signs, fixtures, telephones, canopies) with their leading edge between 27" and 80" (685 and 2030mm) above the finished sidewalk shall protrude no more than 4" (100mm) into any portion of the public sidewalk." (ADAAG 14.2.2) Sidewalk against wall Well-designed urban streets include planting strips. A planting strip should be 1.5m (5ft) wide or greater (min. 0.9m [3ft]), and landscaped with low -maintenance plantings. The extra separation from motor vehicle traffic decreases road noise, prevents water in puddles from splashing onto sidewalk users and generally increases a walker's sense of security. Planting strips offer many other benefits to pedestrians: • Room for street trees; • Room for sign' posts, utility and signal poles, mailboxes, parking meters, fire hydrants, etc.; • When wide enough, a place for a motor vehicle to wait out of the stream of traffic while yielding to a pedestrian in a driveway. • The opportunity to line up sidewalks, curb cuts and crosswalks at intersections: Sidewalk with planting strip • An enhanced environment for wheelchair users, as the sidewalk can be kept at a constant side slope, with the slope for driveways built into the planting strip section: • An opportunity for aesthetic enhancements such as landscaping (plants should be selected that require little maintenance and watering, and whose roots will not buckle sidewalks); Page 186 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 1186 0 • Less runoff water, decreasing overall drainage requirements. • • • Wide planting strip adds room for turn movements • A place to store snow removal during the winter. High -Speed Corridors Q 1111111t%*s piarttiatq stip s-kWwoM y ss4o4's _ stt Planting strip at driveway (and effect on cross -slope) Where constraints preclude the use of the same width throughout a project, the planting strip can be interrupted and resume where the constraint ends: Trees, street furniture and other objects should not reduce visibility of pedestrians, bicyclists and signs. Planting strip constraints Sidewalks must not be placed directly adjacent to a high-speed travel lane (design speed 70 km/h [45 MPH] and above). Acceptable buffers include a planting strip, a shoulder barrier, a parking lane or a bike lane. Buffers are also beneficial on lower speed facilities. Page 187 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) • Bridges Surfacing 169 -1187 The standard width for sidewalks on bridges is 2.1m (7ft) (min. 1.8m [6ft]), to account for a shy distance from the bridge rail - some pedestrians feel uncomfortable walking close to a high vertical drop. The bridge sidewalk must not be narrower than the approach sidewalk; in instances where the approach sidewalks are of differing widths, the lesser of the two widths may be used on the bridge. Sidewalks on bridges with design speeds greater than 65 km/h (40 MPH) require a vehicle barrier at curb line. The preferred material for sidewalks is Portland Cement Concrete (PCC), which provides a smooth, durable finish that is easy to grade and repair. Asphaltic Concrete (A/C) may be used if it can be finished to the same surface smoothness as PCC. A/C is susceptible to break up by vegetation, requires more frequent maintenance and generally has a shorter life expectancy (15-20 years versus 40 years or more for PCC). Brick pavers can provide an aesthetically pleasing effect if the following concerns are addressed: • They should be laid to a great degree of smoothness; • The surface must be slip -resistant when wet; and • Long-term maintenance costs should be considered. Unpaved Paths In general, the standard width of an unpaved path is the same as for sidewalks. An unpaved path should not be constructed where a sidewalk is more appropriate. The surface material should be packed hard enough to be usable by wheelchairs and children on bicycles (the roadway should be designed to accommodate more experienced bicyclists). Recycled pavement grindings provide a suitable material: they are usually inexpensive and easy to grade (this should be done in the summer, when the heat helps pack and bind the grindings). Though originally conceived to provide a facility for bicyclists separated from motor -vehicle traffic, paths often see greater use by pedestrians, joggers and skaters, and sometimes equestrians. The planning and design of multi -use paths must therefore take into account the various skills, experience and characteristics of these different users. Well-planned and designed multi -use paths can provide good pedestrian and bicycle mobility. They can have their own alignment along streams and greenways, or may be components of a community trail system. • Paths can serve both commuter and recreational cyclists. Many inexperienced cyclists fear Page 188 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 16-9 - 1188 motor vehicle traffic and will not ride on streets until they gain experience and confidence. A 40 separated path provides a learning ground for potential bicycle commuters and can attract experienced cyclists who prefer an aesthetic ride. The key components to successful paths include: • Continuous separation from traffic, by locating paths along a river or a greenbelt such as a rail -to -trail conversion, with few street or driveway crossings (paths directly adjacent to roadways are not recommended, as they tend to have many conflict points); • Scenic qualities, offering an aesthetic experience that attracts cyclists and pedestrians; • Connection to land -uses, such as shopping malls, downtown, schools and other community destinations; • Well-designed street crossings, with measures such as bike and pedestrian activated signals, median refuges and warning signs for both motor vehicles and path users; • Shorter trip lengths than the road network, with connections between dead-end streets or cul-de-sacs, or as short-cuts through open spaces; • Visibility: proximity to housing and businesses increases safety. Despite fears of some property owners, paths have not attracted crime into adjacent neighborhoods; • Good design, by providing adequate width and sight distance, and avoiding problems such as poor drainage, blind corners and steep slopes; and • Proper maintenance, with regular sweeping and repairs. The separation from motor vehicle traffic can reduce some maintenance requirements, such as sweeping the debris that accumulates on roads. Crossings is The number of at -grade crossings with streets or driveways should be limited. Poorly designed crossings put pedestrians and cyclists in a position where motor vehicle drivers do not expect them at street crossings. Access Limiting crossings must be balanced with providing access. If a path is to serve bicyclists and pedestrians well, there should be frequent and convenient access to the local road network. Access points that are spaced too far apart will require users to travel out of direction to enter or exit the path. The path should terminate where it is easily accessible to and from the street system, e.g. at a controlled intersection or at the end of a dead-end street. Directional signs direct users to and from the path. Security Multi -use paths in secluded areas should be designed with personal security in mind. Illumination and clear sight distances improve visibility. Location markers, mileage posts and directional signing help users know where they are. Frequent accesses improve response time by emergency vehicles. Maintenance Multi -use paths require special trips for inspection, sweeping and repairs. They must be built to a standard high enough that allows heavy maintenance equipment to use the path. Page 189 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 - 1169 • On -Street Facilities As bicyclists gain experience and realize some of the advantages of riding on the road, many stop riding on paths placed adjacent to roadways. This can be confusing to motorists, who may expect bicyclists to use the path. The presence of a nearby path should not be used as a reason to not provide adequate shoulders, bike lanes or sidewalks on the roadway. Paths Next To Roadways Multi -use paths should not be placed next to roadways; half of the bicycle traffic will ride against the normal flow of motor vehicle traffic, which is contrary to the rules of the road, with the following consequences for bicyclists: • When the path ends, bicyclists riding against traffic tend to continue to travel on the wrong side of the street, as do bicyclists getting to a path. Wrong -way travel by bicyclists is a major cause of bicycle/automobile crashes and should be discouraged. • At intersections, motorists crossing the path often do not notice bicyclists coming from certain directions, especially where sight distances are poor. • Bicyclists on the path are required to stop or yield at cross -streets and driveways. • Stopped motor vehicle traffic on a cross street or driveway may block the path. • Because of the closeness of motor vehicle traffic to opposing bicycle traffic, barriers are often necessary to separate motor vehicles and bicyclists. These barriers are obstructions, complicate maintenance of the facility and waste available right-of-way. 0 Separated paths along roadways should be evaluated using the following guidelines: • Bicycle and pedestrian use is anticipated to be high; • The adjacent roadway is a heavily -traveled, high-speed thoroughfare where on -road bikeways and sidewalks may be unsafe; • The path will generally be separated from motor vehicle traffic, with few roadway or driveway crossings: • There are no reasonable alternatives for bikeways and sidewalks on nearby parallel streets; • There is a commitment to provide path continuity throughout the corridor; • The path can be terminated at each end onto streets with good bicycle and pedestrian facilities, or onto another safe, well-designed path; • There is adequate access to local cross -streets and other facilities along the route. • Any needed grade -separation structures do not add substantial out -of -direction travel; and • The total cost of providing the proposed path is proportionate to the need. This evaluation should consider the costs of: 1. Grading, paving, drainage, fences, retaining walls, sound walls, signs and other necessary design features; 2. Structures needed to eliminate at -grade crossings; and 3. Additional maintenance, including the need for specialized maintenance equipment. Notes: In many cases, the best choice is to improve the roadway system to accommodate cyclists and pedestrians, which may require connecting up local streets or improving nearby, parallel streets. Page 190 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) • 169 1190 Width & Clearances 3m (11 Oft) is the standard width for a two-way multi -use path; they should be 3.6m (12ft) wide in areas with high mixed-use. Faster -moving bicyclists require greater width than pedestrians do; optimum width should be based on the relative use by these two modes. High use by skaters may also require greater width. -"=`M-T-2+ The minimum width is 2.4m (8ft). However, 2.4m wide multi -use paths I are not recommended in most 3.1' situations because they may p11(0 become over -crowded. They should + only be constructed as short t m connectors, or where long-term (311) usage is expected to be low, and 1,5 3.0 m with proper horizontal and vertical 4"j ff*L alignment to assure good sight EPwmptaipmeawt 43.6M(tr) distances. in ""se ma) Multi -use path standards Although one-way paths may be intended for one direction of bicycle travel, pedestrians will often use them as two-way facilities. Caution must be used in selecting this type of facility. If needed, they should be 1.8m (6ft) wide (min. 1.5m [5ft]) and designed and signed to assure one- way operation by bicyclists. A 1 m (3ft) or greater (min. 0.6m [2ft]) "shy" or clear distance on both sides of a multi -use path is necessary for safe operation. This area should be graded to the same slope as the path to allow recovery by errant bicyclists. The standard clearance to overhead obstructions is 3m (1 Oft), min. 2.4m (8ft). Where a path is parallel and adjacent to a roadway, there should be a 1.5m (5ft) or greater width separating the path from the edge of roadway, or a physical barrier of sufficient height should be installed. Typical Pavement Sections The use of concrete surfacing for paths is best for long-term use. Concrete provides a smooth ride when placed with a slip -form paver. The surface must be cross-broomed. The crack -control joints should be saw -cut, not troweled. Concrete paths cost more to build than asphalt paths, but long-term maintenance costs are lower, since they do not become as brittle, cracked and rough with age, or deformed by roots and weeds as does asphalt. Multi -use paths should be designed with sufficient surfacing structural depth for the subgrade soil type to support maintenance and emergency vehicles. If the path must be constructed over a very poor subgrade (wet and/or poor material), treatment of the subgrade with lime, cement or geotextile fabric should be considered. Page 191 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 0 169 - 1191 Grades & Cross -Slope AASHTO recommends a maximum grade of 5% for bicycle use, with steeper grades allowable for up to 150m (500ft.), provided there is good horizontal alignment and sight distance. Extra width is also recommended. Engineering judgment and analysis of the controlling factors should be used to determine what distance is acceptable for steep grades. If use by pedestrians is expected, ADA requirements must be met: the grade of separated pathways should not exceed 5%, to accommodate wheelchair users. Based on AASHTO recommendations and ADA requirements, 5% should be considered the maximum grade allowable for multi -use paths. The standard cross -slope grade is 2%, to meet ADA requirements and to provide drainage. Curves should be banked with the low side on the inside of the curve to help bicyclists maintain their balance. At -grade Crossings of Thoroughfares `Q 40 IN o Multi -use path bridge At -grade crossings introduce conflict points, and grade separation should be sought, as most path users expect continued separation from traffic. The greatest conflicts occur where paths cross freeway entrance and exit ramps. Motorists using these ramps are seeking opportunities to merge with fast moving traffic; they are not expecting bicyclists and pedestrians at these locations. When grade separation structures cannot be justified, signalization or other measures should be considered to reduce conflicts. Good sight distance must be provided so vehicle drivers can see approaching path users. One method is to provide a median island on multi -lane roadways as a refuge: Where a path must cross a roadway at an intersection, improvements to the alignment should be made to increase the visibility of approaching path users. One method is to curve the path slightly, so that it is not parallel to the adjacent roadway: n.a ro tx► The width of multi -use path structures is the same as the approach paved path, plus a 0.6m (2ft) shy distance on ItNI both sides. For example, a 3m (1 Oft) wide path requires a 4.2m (14ft) wide structure. ons tom► Page 192 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) • is • s L---- 4.: M (141, --.{ Under -crossings 16.9 - 1192 Undercrossing Dimensions The standard overhead clearance of under -crossings is 3m (1 Oft); a 2.4m (8ft) min. may be allowable with good horizontal and vertical clearance, so users approaching the structure can see through to the other end. Undercrossings should be visually open for the personal security of users. Illumination is needed in areas of poor visibility. There are advantages and disadvantages to both overcrossings and undercrossings: Advantages: They provide an opportunity to reduce approach grades, as the required 3m (1 Oft) clearance is less than the clearance required for crossing over a roadway. If the roadway is elevated, an undercrossing can be constructed with little or no grade. They are often less expensive to build. Disadvantages: They may present security problems, due to reduced visibility. An open, well -lighted structure may end up costing as much as an over -crossing. They may require drainage if the sag point is lower than the surrounding terrain. Over -crossings Advantages: They are more open and present fewer security problems. Disadvantages: They require longer approaches to achieve the standard 5m (17ft) of clearance over most roadways. With an additional structural depth of 1m (3ft), the total rise will be 6m (20ft). At 5%, this requires a 120m (400ft) approach ramp at each end, for a total of 240m (800ft). This can be lessened if the road is built in a cut section. Railings, Fences & Barriers Fences or railings along paths may be needed to prevent access to high- speed highways, or to provide protection along steep side slopes and waterways. A height of 1 m (4.5ft) keeps a cyclist from falling over the railing or fence. Openings in the railing must not exceed 150mm (6") in width. Where a cyclist's handlebar may come into contact with a fence or barrier, a smooth, wide rub -rail may be installed at a height of 1 m (3ft). Page 193 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) is • • 169 -1193 Where concrete barriers are used, adding tube railing or chain link fencing may be necessary to achieve the required height. "Cattle -chute" effect Geometric Design �t � .. • � , �OE Fences should only be used where they are needed for safety reasons. They should be placed as far away from the path as possible. Duplication of fences should be avoided, such as fences on the right-of-way and fences to keep pedestrians off highways. Care must be taken to avoid a "cattle chute" effect by placing a high chain-link fence on each side of a path. Split path discourages motor -vehicle access. One method branches the path into two narrower one-way paths just before it reaches the roadway, making it difficult for a motor vehicle to gain access to the path: Short Curb Radii Short curb radii (1.5m [5ft]) make it difficult for motorists to enter a path from the roadway. Bollards Barrier posts ('bollards") may be used to limit vehicle traffic a sw� curb on paths. However, they are often hard to see and cyclists may not expect them. When used, they must be spaced wide enough (min. 1.5m [5ft]) for easy passage by cyclists and bicycle trailers as well as wheelchair users. A single �►owa bollard is preferred, as two may channelize bicyclists to the middle opening, creating conflicts. They should not be placed right at the intersection. They should be painted with bright, light colors for visibility. I Curb Cuts Curb cuts for bicycle access to multi -use paths should be built so they match the road grade without a lip. The width of the curb cut is the full width of the path when the approaching path is perpendicular to the curb and a minimum of 2.4m (8ft) wide when the approaching path is parallel and adjacent to the curb. Greater widths may be needed on downhill grades. Page 194 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) • 16-9 - 1194 Drainage Multi -use paths must be constructed with adequate drainage to avoid washouts and flooding, and to prevent silt from intruding onto the path. Vegetation astman All vegetation, including roots, must be removed in the preparation of the subgrade. Special care is needed to control new growth, such as the use of soil sterilant or lime treatment of the subgrade. Plants that can cause other problems should be controlled, such as plants with thorns that can puncture bicycle tires. Paths built in wooded areas present special problems. The roots of shrubs and trees can pierce through the surface and cause it to bubble up and break apart. Preventive methods include removal of vegetation, realignment of the path away from trees, and placement of root barriers along the edge of the path. An effective barrier is created with a 300mm (12") deep metal shield; greater depth is required for some trees such as cottonwoods. Paths with Heavy Use If a path must handle a high number of users, it should be wider than standard (3.6m or more). A separate soft - surface jogger or equestrian path may be constructed with bark mulch alongside the paved path. Multi -use path with additional jogger/equestrian way Stairways Where a connection is needed to a destination or another path at a different elevation, a stairway can be used where the terrain is too steep for a path. A grooved concrete trough should be provided so bicyclists can easily push their bicycles up or down. Stairway provides easy access for bicycles and pedestrians Note: Stairways are usually provided as a shortcut and do not meet ADA requirements; the destination should also be accessible along a flatter route, even if this route is longer and more circuitous. Page 195 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) • 169 -1195 Sidewalks Without Curb & Gutter Most sidewalks are separated from the roadway with a curb. The main functions of a curb are for drainage and as a positive separation for motor vehicles. Curb and gutter add substantially to the cost of sidewalks in areas where no storm drain system is in place. In situations where sidewalks are needed, but the high cost of curb and drainage cannot be justified, or where curbs don't fit the character of the street, two designs enable sidewalks to be constructed without curb and drainage: sidewalks behind the ditch and soft sidewalks. Sidewalks Behind the Ditch On roads with a rural character, where drainage is provided with an open ditch, and where there is sufficient right-of-way, sidewalks may be placed behind the ditch. The sidewalk should be built to the same standard as curbed sidewalks: 1.8m (6ft) wide (1.5m [5ft] min.). If the traffic on the road is high, bicyclists should be accommodated with on -road bike lanes or shoulders. Gravel driveways should be paved back 5 m (15 ft) to avoid debris accumulation on the sidewalks. "Soft Sidewalks" A "soft sidewalk" has no curb separating the roadway from the walkway. This treatment may be appropriate in areas of moderate precipitation and lowtraffic volumes and speeds. A brick paver strip, gravel or other permeable material separates sidewalks, so runoff water can percolate. A change in surface texture is needed for vision -impaired pedestrians to detect the edge of walkway with a cane. Practices To Be Avoided • Obstructions in sidewalk The full sidewalk pavement width should be maintained to the extent possible. Permanent fixtures such as mailboxes, poles and sign posts should be placed outside of thesidewalk, or the sidewalk should be enlarged or wrapped around to avoid these obstructions. • Narrow Sidewalks Though ADA does specify a 1 m (3') minimum clear passage, this is inadequate for pedestrian use. The 1.5m (6) ODOT minimum standard should be applied wherever possible. Page 196 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) • • • 169 1196 • Discontinuous Sidewalks Sidewalks must link up to each other, or to a defined origin or destination point. • Steep Cross -Slope Severe cross -slopes hinder movements of wheelchair users. Where the ADA 2% minimum cannot be achieved, attempts should be made to reduce cross -slope as much as possible. • Broken Pavement Sidewalks in poor repair are difficult for wheelchair users to negotiate. Even able-bodied pedestrians have difficulty walking through badly broken pavement. • Encroaching Vegetation Bushes, shrubs and trees can reduce sidewalk width and obscure visibility. Maintenance should be scheduled to ensure that plants are trimmed on a regular basis. • Inaccessible Crosswalks Any open leg of an intersection should lead to a sidewalk. • Unmarked Crosswalks Walkways along a road provide mobility in one direction, but a successful pedestrian network also requires safe and convenient crossing opportunities. Wide roads carrying large traffic volumes can be obstacles to pedestrians, making facilities on the other side difficult to access. Safe street crossings also benefit motorists: an automobile driver parking on one side of the road may desire access to points across the street. A pedestrian system with sidewalks and crossing opportunities allows a driver to park once and walk to several destinations. Most pedestrian crashes occur when a pedestrian crosses a road, often at locations other than intersections. Mid -block crossings are a fact that planners and designers need to consider: people will take the shortest route to their destination. Prohibiting such movements is counter-productive if pedestrians dash across the road with no protection. It is better to design roadways that enable pedestrians to cross safely. Crosswalks Defined Oregon law defines a crosswalk as the prolongation of a curb, sidewalk or shoulder across an intersection, whether it is marked or not. Outside an intersection, a crosswalk is created with markings on the road. If a pedestrian is in a crosswalk, all drivers on that half of the street are required to yield the right of way to the pedestrians. See ORS 801.220 in Appendix I for the complete legal definition of a crosswalk. Page 197 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 -1197 • Improving Crossing Opportunities To increase pedestrian crossing opportunities and safety, two approaches can be considered: • Designing roads that allow crossings to occur safely by incorporating design features such as raised medians or signal timing that creates gaps in traffic; or • Constructing actual pedestrian crossings with pedestrian activated signals, mid -block curb extensions, marked crosswalks, etc. Issues Safe and convenient pedestrian crossings must be considered when planning and designing urban roadways. The following issues should be addressed when seeking solutions to specific problems: Level of Service (LOS) & Design Standards Appropriate design standards take into account the needs of all users. Pedestrian access and mobility should be considered when determining the desirable LOS for a roadway. In some areas, pedestrian needs should be elevated above the needs of motorized traffic (e.g. downtown, near schools or parks). Pedestrians are less visible and less protected than motorists; well-designed roads take this into account. In general, there is an inverse relationship between traffic volumes or speeds and the ease of pedestrian crossing, which can lead to conflicting goals when determining priorities for a roadway: Some motor vehicle designs may reduce pedestrian crossing safety (e.g. a high number of wide travel lanes increases the distance a pedestrian must cross); Some designs that facilitate pedestrian crossings may reduce capacity (e.g. pedestrian signals); Other design features benefit all users (e.g. improved sight distance at intersections and raised medians). In some cases, actual travel speeds may be higher than is appropriate for the adjacent land use, and improvements that facilitate crossing may be useful in reducing traffic speeds to desirable and legal limits. Minor collectors and residential streets often carry more fast-moving traffic than the street is designed to carry. The design of a road should not encourage excessive speeds; even a major arterial can be treated for pedestrian safety without degrading capacity. Land Use As the number and density of pedestrian -accessible origin and destination points increase, so does the demand for pedestrian crossings. On corridors with scattered development and residences, it is difficult to predict where crossings may occur. On corridors with concentrated nodes of activity, special crossing treatments are easier to justify at locations where crossings will likely occur (apartment complexes, senior citizen centers, schools, parks, shopping areas, libraries, hospitals and other public or institutional uses). Page 198 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 - 1198 • Planners and elected officials must work together to ensure that land use is compatible with the roadway design, and vice versa. Transit Stops To access a transit stop, most transit users will have to cross a road on one leg of their trip. Cooperation between public transit agencies and transportation designers is essential to ensure safe pedestrian crossings. By coordinating land use, roadway design and transit stops, passengers will be more secure when boarding or leaving a bus, and walking to or from their destination at either end of the transit trip. Signal Spacing Signalized intersections may be the preferred pedestrian crossing points at peak traffic hours; other crossing opportunities close to signalized intersections benefit from a "platooning" effect, ,as traffic signals create gaps in traffic. The effect decreases: • As the distance from the signalized intersections increases; • As traffic volumes increase at peak hours; or • If poor access management allows vehicles to continually enter the roadway. Access Management *, I LEGEND t Mt Many uncontrolled accesses to a busy road r -- rimPa hof Pedro& �s MMdecrease pedestrian crossing opportunities: when , $ a s Ir,�s►COMM a gap is created in the traffic stream, motorists entering the road fill the gap. Pedestrians seeking refuge in a center turn lane are unprotected. One access management tool benefits pedestrian77-7-7 crossing: well-designed raised center medians ,. provide a refuge for pedestrians, so they can cross one direction of traffic at a time. However, eliminating road connections and signals also eliminates potential pedestrian crossing m opportunities. Creating an urban freeway can increase traffic speeds and volumes. Concrete barriers placed down the middle of the road (rather than a raised median) effectively prohibit pedestrian crossings. Perception of Safety at Crosswalks Some studies have indicated that pedestrians may develop a "false sense of security" when crossing a road in marked crosswalks. Other studies have indicated that motorists are more likely to stop for pedestrians in marked crosswalks, especially where the right-of-way laws are enforced. Proper design makes it clear who has the right-of-way. Grade -Separation & Out -of -Direction Travel • Though grade -separation may seem to offer greater safety, excessive added travel distancewill discourage pedestrians who want to take a more direct route. Grade -separation must offer Page 199 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 1199 obvious advantages over an at -grade crossing. A structure that is unused because of inconvenience creates a situation whereby pedestrians are at risk when they attempt to cross the road with no protection. Maintenance The effectiveness of a design will be lost if maintenance is excessively difficult or expensive. Forethought must be given to the practicality of future maintenance. Facilities will be effective over time only if they are in good condition. Examples of design features to be avoided include: • Blind corners that can accumulate debris; • Restricted areas that cannot accommodate sweepers or other power equipment; and • Remote areas requiring hand maintenance, such as sweeping. Solutions No one solution is applicable in all situations as the issues will usually overlap on any given section of road. In most cases, a combination of measures will be needed to improve pedestrian crossing opportunities and safety. Raised Medians These benefit pedestrians on two-way, multi -lane streets, as they allow pedestrians to cross only one direction of traffic at a time: it takes much longer to cross four lanes of traffic than two. . Where raised medians are used for access management, they should be constructed so they provide a pedestrian refuge. Where it is not possible to provide a continuous raised median, island refuges can be created between intersections and other accesses. These should be located across from high pedestrian generators such as schools, park entrances, libraries, parking lots, etc. • In most instances, the width of the raised median is the width of the center turn -lane, minus the necessary shy distance on each side. Ideally, raised medians should be constructed with a smooth, traversable surface, such as brick pavers. If a median is landscaped, the plants should be low enough so they do not obstruct visibility, and spaced far enough apart to allow passage by pedestrians. Curb Extensions Also known as "bulbs, neckdowns, flares or chokers," curb extensions reduce the pedestrian crossing distance and improve the visibility of pedestrians by motorists. Curb extensions should be considered at all intersections where on -street parking is allowed. The crossing distance savings are greatest when used on streets with diagonal parking. On arterials and collectors, space should be provided for existing or planned bike lanes. Reducing pedestrian crossing distance improves signal timing if the pedestrian phase controls the signal. The Page 200 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 - 1200 speed normally used for calculating pedestrian crossing time is 1.2m (4ft)/sec., or less where is many older pedestrians are expected. The time saved is substantial when two comers can be treated with curb extensions. Illumination Non -signalized intersections also benefit from curb extensions: reducing the time pedestriansare in a crosswalk improves pedestrian safety and vehicle movement. Mid -block crossing curb extensions may be considered where there are pedestrian generators on both sides of the road. However, entrances to buildings should be placed close to intersections, existing signals or crosswalks, where possible. The appropriate road authority establishes mid - block crossings. Many crossing sites are not well lit. Providing illumination or improving existing lighting can increase nighttime safety at many locations, especially at mid -block crossings, which are often not expected by motorists.. Crosswalks Marked crosswalks are generally located at all open legs of signalized intersections. They may also be considered at other locations. Combined with curb extensions, illumination and signage, marked crosswalks can improve the visibility of pedestrian crossings. Crosswalks send the message to motorists that they are encroaching on a pedestrian area, rather than the reverse, which is often the common assumption. There is considerable debate concerning the usefulness and safety of crosswalks. If a crosswalk is not working, some possible problems include: • Enforcement — more rigorous enforcement of traffic laws is needed for motorists to understand that it is their duty to yield to pedestrians in a crosswalk, marked or unmarked; • Location — marked crosswalks must be placed in locations where they are visible and where obstructions such as parked cars and signs do not affect sight lines; • Traffic movement — many turning vehicles at nearby intersections or driveways can compromise the crosswalk; • Users — Some people need extra help crossing a street and crosswalks alone may not be sufficient; for example, young children lack judgement and may need the positive control given by signals. A traffic study will determine if a marked crosswalk will enhance pedestrian safety. This is usually in locations that are likely to receive high use, based on adjacent land use. Crosswalks should be 3m (1 Oft) wide, or the width of the approaching sidewalk if it is greater. Two techniques to increase the visibility and effectiveness of crosswalks are: Page 201 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) • 169 -° 1201 • Striped (or "zebra") markings, which are more visible than double lines; • Textured crossings, using non -slip bricks or pavers, which raise a driver's awareness through increased noise and vibration. Colored pavers increase the visibility of the crosswalk. Islands & Refuges At wide intersections, there is often a triangular area between a through lane and a turn lane unused by motor vehicle traffic. Placing a raised island in this area benefits pedestrians by: Raised islands at intersections • Allowing pedestrians to cross fewer lanes at a time, and to judge conflicts separately; • Providing a refuge so that slower pedestrians can wait for a break in the traffic stream; • Reducing the total crossing distance (which provides signal timing benefits); and • Providing an opportunity to place easily accessible pedestrian push buttons. An island can also be provided in the middle of an intersection. An island must be a minimum of 1.2m (4ft) wide, preferably 2.4m (8ft) or more. Islands must be large enough to provide refuge for several pedestrians waiting at once. For wheelchair accessibility, it is preferable to provide at -grade cuts rather than ramps. Poles must be mounted away from curb cuts and out of the pedestrian path. Pedestrian Signals A pedestrian activated signal may be warranted where the expected number of people needing to cross a roadway at a particular location is significant. Anticipated use must be high enough for motorists to get used to stopping frequently for a red light (a light that is rarely activated may be ignored when in use). Refer to the MUTCD for pedestrian signal warrants. Sight -distance must be adequate to ensure that motorists will see the light in time to stop. Warning signs should be installed on the approaching roadway. Pedestrian signals may be combined with curb extensions, raised medians and refuges. Page 202 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 - 1202 40 Signing Recommended signs include both advance warning signs and pedestrian crossing signs at the crossing itself, and regulatory signs at intersections to reinforce the message that motorists must yield to pedestrians. These signs should only be placed at warranted locations, because excessive signage leads to signs being missed or ignored. Intersections For Both Bicyclists & Pedestrians • Unusual conflicts should be avoided. • Access management practices should be used to remove additional conflict points. • Signals should be timed so they do not impede bicycle or foot traffic with excessively long waits or insufficient crossing times. • Good intersection designs are compact and avoid free-flowing movements. • Simple right angle intersections are usually the simplest to treat for bicycle and pedestrian movement. The problems are more complex at skewed and multiple intersections. For Bicyclists • Good design creates a path for bicyclists that is direct, logical and close to the path of motor vehicle traffic; only in rare cases should they proceed through intersections as pedestrians. • Bicyclists should be visible and their movements should be predictable. • Bike lanes should be striped to a marked crosswalk or a point where turning vehicles would normally cross them. The lanes should resume at the other side of the intersection. For Pedestrians • All legs of an intersection should be open to pedestrians. • The pedestrian's path of travel should be direct with minimal out -of -direction travel. • Pedestrians should not have to travel over an excessive expanse of uninterrupted pavement. • At signalized intersections, pedestrian signal heads should be clearly visible - this requires that they not be placed too far from the nearest safe refuge. • Additional pedestrian refuges should be used to decrease crossing distances. Pedestrian Crossing Marked or unmarked, crosswalks are the continuation of the sidewalk. They should be kept as short as possible. This can be achieved by: • Making the radius of a corner as short as needed to accommodate design vehicles. The effective radius takes into account parking and bike lanes: Page 203 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) • 40 • 169 _ 1203 11 El Ri -Acbmi c mb Rade Ra - Wkcb" RGOUS Effective radius with bike lanes and parking • Using a short radius (1.5m [5ft]) on one-way streets, where no turn movements are allowed at a corner, the radius can be very short: Corner with no possible turn movement on a one- way street • Using curb extensions, as they make pedestrians more visible to motorists. At signalized intersections, they improve signal timing by reducing the time needed for the pedestrian phase. • Using islands to interrupt extremely long crosswalks. See Figure 74, page 111 for an illustration of islands; and • Lining up curb cuts with the crosswalk. Other Innovative Designs This concept is presented as information, to help come up with new solutions to common intersection problems. Modern Roundabouts A roundabout is a method of handling traffic at intersections commonly used in Europe, Australia and Japan. Roundabouts are now gaining acceptance in this country. Early attempts at roundabouts were often not successful for several reasons, mainly: Page 204 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 0 • 169 - 1204 3� �$ 21; ti • The radius was too small (creating difficulties for trucks); • The radius was too large (encouraging high speeds); • The right of way was not clearly defined (causing confusion and collisions); or • Pedestrians were allowed access to the middle of the roundabout. Modern roundabout design has several distinctive features: • A radius large enough to allow movement by trucks, but small enough to slow traffic speeds; • A visual obstruction, through landscaping, that obscures the driver's view of the road ahead, to discourage users from entering the roundabout and proceeding at high speeds; • The right of way clearly established: drivers entering the roundabout yield to drivers already in the roundabout; and • No bicycle or pedestrian access to the center of the roundabout, which should not contain attractions such as fountains or statues. One of the major advantages of roundabouts is the reduced need for travel lanes, as traffic is constantly moving (signals create stop -and -go conditions for motor vehicles - extra travel lanes are needed to handle capacity at intersections). Page 205 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 - 1205 Other advantages include: • Reduced crash rates; • Reduced severity of injuries (due to slower speeds); • Reduced costs (compared to traffic signals, which require electrical power); and • Reduced liability by transportation agencies (there are no signals to fail). Most of the advantages and disadvantages of roundabouts affect motor vehicle flow, but there are advantages and disadvantages for bicyclists and pedestrians: Advantages for pedestrians and bicyclists • The reduced cost frees funds for other purposes, including bicycle and pedestrian facilities; • The reduced need for travel lanes frees right-of-way for other purposes, including bicycle and pedestrian facilities; • Traffic flows at a more even pace, making it easier for bicyclists and pedestrians to judge crossing movements; • Pedestrians have to cross only one or two lanes of travel at a time, in clearly marked crosswalks; • Bicyclists negotiate intersections at speeds closer to that of motor vehicles; and • Mid -block crossing opportunities may be improved if the number of travel lanes can be reduced. 0 Disadvantages for pedestrians and bicyclists • Traffic flowing more evenly may reduce pedestrian crossing opportunities as fewer gaps are created; • Pedestrians are responsible for judging their crossing opportunities; there is no signal protection provided, though pedestrian signals can be added at special sites; and • Bicyclists must share the road and occupy a travel lane; by riding too far to the right, they risk being cut off by vehicles leaving the roundabout in front of them. Goals 19. Adopt a Countywide system plan for bike and pedestrian facilities which provide access to various destinations within unincorporated communities and between urban areas and unincorporated communities. 20. Provide and maintain a safe, convenient and pleasing countywide bicycle and pedestrian system that is integrated with other transportation systems. 21. Establish bicycle safety, education and enforcement programs for all ages, improve riding skills, achieve observances of traffic laws, increased awareness of cyclist's and pedestrian rights, and monitor and analyze bicycle accident data to determine safety problem areas. Page 206 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 - 1206 40 Policies 40. Deschutes County shall coordinate local plans for pedestrian and bicycle facilities with the 1995 Oregon Bicycle and Pedestrian Plan. The statewide plan provides a framework for a local bicycle and pedestrian system and design standards. 41. Deschutes County shall require bike facilities at locations that provide access within and between residential subdivisions, schools, shopping centers, industrial parks, and other activity centers when financially feasible. 42. Deschutes County shall: a. Balance the plan with a variety of facilities to meet the needs of different cyclists; b. Plan for bicycle access between the County's urban and rural areas; c. Develop a bikeway system, to be updated yearly and including a map for the public that describes the opportunities for bicycling in Deschutes County; d. Establish priorities for facility construction and maintenance based on need and resource availability; e. Evaluate the plan regularly to monitor how well the facilities meet the goals of the Plan; f. Upgrade rural road shoulder widths to County standards during road modernization or maintenance projects involving overlays as funding allows; g. Require bicycle and pedestrian facilities to satisfy the recreational and utilitarian needs of the citizens of Deschutes County; h. Make potential use, safety and the cost of bikeway construction, the primary considerations when designing specific bikeways; L Emphasize the designation of on -road bikeways, where conditions warrant due to safety reasons and the cost of construction and maintenance of separate bike paths; j. Expend resources for the maintenance of existing bikeways and to keep pace with the development of new bikeways; k. Designate that the Deschutes County Bicycle and Pedestrian Advisory Committee facilitate the coordination of all bicycle and pedestrian planning in the County to assure compatibility; 1. Designate that the Deschutes County Bicycle and Pedestrian Advisory Committee assure that the Plan remains up-to-date and that implementation proceeds according to the Plan; Page 207 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 - 126? m. Work with affected jurisdictions to acquire, develop and maintain a series of trails along the Deschutes River, Tumalo Creek, and the major irrigation canals so that these features can be retained as a community asset; and n. Adopt standards for trail system right-of-ways and trail improvements that are based on the type of planned trail use and reflect the standards of the 1995 Oregon Bicycle and Pedestrian Plan. ON -ROAD ROUTE SELECTION The integrity and usefulness of the bicycle system mandates that future development is designed with bicycling in mind. Goal 22. Coordinate on -road County bikeways with known existing and proposed state and city bikeways. Policies 43. New public and private land developments in Deschutes County shall accommodate and tie into the bicycle system, and shall provide their residents and employees with appropriate bicycle facilities. 44. County arterials and collectors may use shoulder bikeways or shared roadways. These bikeways shall be upgraded to bike lanes when highway reconstruction occurs and the traffic volumes warrant lanes. 45. Deschutes County shall facilitate safe and direct bicycle and pedestrian crossings of arterial roads. 46. On -road bikeways shall be constructed in accordance with the specifications set forth in the 1995 Oregon Bicycle and Pedestrian Plan. OFF-ROAD ROUTE SELECTION On -road bike facilities are generally preferred due to their lower cost and easier maintenance. However, paved and unpaved off-road bike paths could cater more to the recreational and fitness riders, and also offer an automobile -free route for inexperienced and younger cyclists. Well-placed paths could also serve commuting traffic. A paved multi -use path should be of sufficient width to accommodate multiple user groups such as jogging strollers androllerbladers. The opportunity exists in Deschutes County to create off-road, separate multiple -use paths in some circumstances: • Along maintenance "ditchrider" roads adjacent to main irrigation canals. • Major utility easements. • Short connector routes between adjoining subdivisions, and between subdivisions and adjoining schools and parks. Abandoned roadways. Page 208 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 - 1208 40• Additional bicycle paths within destination resorts and new recreational communities now in the planning stage. • Heavily impacted forest trails. Goal 23. Identify a system of off-road paved multiple use paths to be included in the County transportation system. Policies 47. Developers in Deschutes County shall be encouraged to design paths that connect to the countywide bikeway system and that provide a direct route for commuters. In some cases, it may be appropriate to relax a requirement, such as for a sidewalk on one side of a residential street, in favor of a comparable bike path in the development. However, the use of a bike path shall not change the on - road bikeway requirement for arterials and collectors. 48. Deschutes County shall facilitate mountain bike routes and the creation of paved off-road multiple -use paths. The County shall identify routes and incorporate them into its transportation system where appropriate. Particular attention shall be given to obtaining and keeping rights-of-way for uninterrupted routes linking areas within the County. Natural corridors such as rivers, irrigation canals, ridges and abandoned roadway and rail lines shall receive special attention. Proposed developments may be required to provide such identified rights-of-way as part of their transportation scheme in order to maintain the integrity and continuity of the countywide system. 49. The County shall work with local agencies and jurisdictions to acquire, develop and maintain those sections of trail that are located outside ofUGB's, but are part of a trail plan or map that has been adopted by the local jurisdiction and the County. 50. Off-road paved multiple use paths shall be constructed in accordance with the specifications set forth in the 1995 Oregon Bicycle and Pedestrian Plan. FACILITY REQUIREMENTS The TPR has various requirements relating to bicycle facilities such as bike parking amounts and areas, and employee considerations such as shower and changing facilities. Most of these requirements have already been implemented through Deschutes County ordinances, but are reinforced here with goals and policies. Goal 24. Maintain the existing development requirements for bicycle facilities inDeschutes County. Page 209 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) • • 169 - 1209 Policy . 51. Deschutes County shall maintain and update as necessary, the existing ordinance requirements for bicycle facilities found in Title 18.116.031, or such other location that it may be moved to within the Deschutes County Development Code. Page 210 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 - 1210 • 5.5 AIRPORT PLAN LJ Redmond Airport 1946, United Air Lines inaugural service AIRPORTS The continued operation and vitality of airports registered, licensed or otherwise recognized by the Department of Transportation is a matter of State and County concern. There are currently 18� registered airports in Deschutes County. Four of these are public use airports; two of which, Bend Municipal and Redmond Municipal -Roberts Field are publicly owned while Sisters Eagle Air and Sunriver airports are privately owned. These airports have improved (paved) runways, and offer a range of services, from the availability of commercial passenger flights arriving and departing daily at Redmond Municipal Airport, to the Sisters (Eagle Air) Airport which offers no services or runway navigational aids. Cline Falls Airport, Juniper Airpark and Pilot Butte Airport are privately owned private use airports with more than three based aircraft. There are three heliports: St. Charles Medical Center, La Pine and Cinder Butte, all with fewer than three based aircraft. The eight remaining airfields; Don Stevenson Ranch, Fall River Fish Hatchery, Gopher Gulch, Pine Ridge Ranch, The Citadel, Whippet Field, Freight Wagon and Sage Ranch Airports are all privately owned, private use airfields with 2 or fewer based aircraft. The Redmond Airport Master Plan, adopted in 1988, is currently in the process of being updated, and when completed, will guide the future use of the airport. The Master Plan will include an inventory of existing facilities, land use, aviation forecasts, a demand/capacity analysis, airport plans and a development program. The Bend Airport Master Plan is also planned for an update in the near future. No changes or expansions to the Sisters andSunriver airports are envisioned at this time. However, the possibility of a new public general aviation airport located in the South County has been discussed. The airport would be funded by private interests and will continue to be monitored by Deschutes County. Currently, LCDC has administrative regulations (OAR 660-13) which were adopted in 1996. These regulations apply to airports that, in 1994, were the base for three or more aircraft. However, with the passage of HB 2605, the regulations were revised by the 1997 Oregon Legislature, which will require DLCD to update the rules to incorporate the changes made by the Legislature. For purposes of this TSP, the County will not alter current land use regulations in response to the current regulations (OAR 660-13) which have been revised by the Oregon Legislature. While the content of the new regulations is not yet known, the County policy shall be to develop ordinances to comply with the new regulations once they are adopted by DLCD. Goal 25. Protect the function and economic viability of the existing public -use airports, while ensuring public safety and compatibility between the airport uses and surrounding land uses for public use airports and for private airports with three or more based aircraft. Page 211 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 - 1211. • Policies 52. Deschutes County shall protect public -use airports through the development of airport land use regulations. Efforts shall be made to regulate the land uses in designated areas surrounding the Redmond, Bend, Sunriver and Sisters (Eagle Air) airports based upon adopted airport master plans or evidence of each airports specific level of risk and usage. The purpose of these regulations shall be to prevent the installation of airspace obstructions, additional airport hazards, and ensure the safety of the public and guide compatible land use. For the safety of those on the ground, only limited uses shall be allowed in specific noise impacted and crash hazard areas that have been identified for each specific airport. Protecting the privately owned, private -use airports, with three or more based aircraft, shall be accomplished by development of specific land use regulations for these types of airports. The function and economic vitality of privately owned, private -use airports with two or fewer based aircraft shall also be accomplished through land use planning. Each airport's specific level of risk and usage shall be used to guide the continued safe aeronautical access to and from these airports considering the type of aircraft approved to use the airfield. 53. Deschutes County shall: a. Continue to recognize the Redmond (Roberts Field) Airport as the major commercial/passenger aviation facility in Deschutes County and an airport of regional significance. Its operation, free from conflicting land uses, is in the best interests of the citizens of Deschutes County. Incompatible land uses shall be prohibited on the County lands adjacent to the airport; b. Cooperate with the cities of Bend, Redmond and Sisters in establishing uniform zoning standards, which shall prevent the development of hazardous structures and incompatible land uses around airports; c. Take steps to ensure that any proposed uses shall not impact airborne aircraft because of height of structures, smoke, glare, lights which shine upward, radio interference from transmissions or any waterimpoundments or sanitary landfills which would create potential hazards from waterfowl to airborne aircraft; d. Allow land uses around public -use airports that shall not be adversely affected by noise and safety problems and shall be compatible with the airports and their operations; e. Work with, and encourage airport sponsors to work with the Federal Aviation Administration (FAA) to enforce FAA -registered flight patterns and FAA flight behavior regulations to protect the interests of County residents living near airports. f. Adopt regulations to ensure that developments in the airport approach areas shall not be visually distracting, create electrical interference or cause other safety • problems for aircraft or persons on the ground. In addition, efforts shall be made to minimize population densities and prohibit places of public assembly in the Page 212 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 1212 • approach areas; g. Continue efforts to prevent additional residential encroachment within critical noise contours or safety areas without informed consent; L h. Specifically designate any proposed airport facility relocations or expansions within County jurisdiction on an airportmaster plan or airport layout plan map, as amended, and establish the appropriate airport zoning designation to assure a compatible association of airport growth with surrounding urban or rural development; L Maintain geographic information system (GIS) mapping of the Airport Overlay Zones and provide timely updates; j. For those airports in Deschutes County without adopted master plans, the County shall, as a minimum, base any land use decisions involving airports on LCDC airport regulations, upon adoption of those regulations by LCDC, which implement HB 2605; k. Participate in and encourage the County -adoption of airport master plans for all public use airports and at least an airport layout plan for the remaining ODOT- recognized airfields in Deschutes County; I. Encourage appropriate federal, state and local funding for airport improvements at public -owned airports; and m. Discourage future development of private landing fields when they are in proximity to one another, near other public airports and potential airspace conflicts have been determined to exist by the Federal Aviation administration (FAA) or ODOT Aeronautics. Page 213 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 40 • 169 - 1213 5.6 RAIL PLAN FREIGHT RAIL PLAN Goals 26. Maintain the existing levels of freight rail activity throughout the County while also encouraging expanded usage by commercial and industrial companies. 27. Increase the safety of existing at -grade crossings and work towards the eventual replacement of all at -grade crossings, with gate -protected or grade -separated crossings. Policies 54. Deschutes County shall: a. Work cooperatively with affected local jurisdictions and railroad operators to reduce land use conflicts and increase safety at all at -grade crossings; b. Encourage efforts to improve the condition of rail lines throughout the County in order to retain the effectiveness and competitiveness of freight rail; c. Not endorse the abandonment of any rail lines unless they are to be converted to trail use through the federal "Rails to Trails" program. Once converted, the trails shall be incorporated into the County Bikeway/Trail System; d. Not endorse any activities that would diminish existing rail service; and 0 Page 214 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 - 1214 e. Work cooperatively with affected local jurisdictions, businesses and railroad 40operators to protect all rail spurs that currently serve businesses or have the potential to serve freight rail uses from abandonment or incompatible zoning. 5.7 WATER PLAN A water-bome transportation plan is not applicable in Deschutes County. 5.8 PIPELINE PLAN Many miles of pipeline in Deschutes County currently carry power transmission lines, cable television, telephone, natural gas, water and sewage. The County encourages the continued use of pipelines to carry goods across County boundaries and for distribution within the County. 5.9 TRANSPORTATION SYSTEM MANAGEMENT (TSM) AND TRANSPORTATION DEMAND MANAGEMENT (TDM) PLAN Although not urban, Deschutes County still has the potential to use several TSM and TDM strategies in order to help preserve the function of major County roads and state highways. Transportation System Management (TSM) TSM improvements focus on optimizing the carrying capacity of roads by alleviating congestion and 9- reducing accidents. Examples of TSM strategies include: • Minimizing the number of access points • Channelization of turning movements • Creation of continuous turning and merging lanes • Raised medians • Signalization An important aspect of TSM is that public agencies work closely with affected businesses to fully evaluate impacts from changes to access. In addition, TSM must account equally for the needs of all modes of travel, particularly that bike, pedestrian and transit movements and safety are not compromised in exchange for improving roadway capacity. Goal 28. In order to optimize the carrying capacity of the County road system, provide cost effective transportation improvements and implement strategies that shall improve the efficiency and function of existing roads. Policies 55. Deschutes County shall adopt land use regulations to limit the location and number of driveways and access points on all collector and arterial roads; Page 215 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 - 1215 56. Deschutes County shall ensure that land use actions support the access management 40policies of the Oregon Department of Transportation (ODOT) along state highways; and 57. Deschutes County shall implement transportation system management measures to increase safety and reduce traffic congestion on arterial and collector streets, and protect the function of all travel modes. 58. Deschutes County shall promote safety and uninterrupted traffic flow alongarterials via the following planning considerations: a. Clustering of all types of development and provisions for an internal traffic circulation pattern with limited arterial access shall be encouraged; b. A minimum setback of 50 feet from arterial rights-of-way shall be required; c. Recommendations on speed limits shall be forwarded to the State Speed Control Board. Transportation Demand Management (TDM) Unlike TSM strategies, which focus on physical changes, TDM targets driver behavior, mode choice and employers to lower the traffic demands on the roads, especially during the peak travel times of the day. Examples of TDM strategies include: • Alternative or flexible work schedules • Ridesharing/carpooling • Transit use • Bicycling/walking • Parking management • Working at home/telecommuting (teleworking) TDM strategies often involve and education and promotion effort to encourage changes in single occupant driving behavior. Therefore, TDM strategies require a concerted community and/or employer effort and commitment to realize the greatest results. A "tool box" of TDM strategies suitable for Central Oregon is included in Appendix M. Also significant is that, of all the different strategies used to relieve congestion, TDM efforts in Bend, Redmond, Sisters, Prineville, and Madras can all affect the County and each city because of the employee commute patterns throughout the tri -county area. Goal 29. Reduce peak hour traffic volumes on County roads and diminish the exclusive use of single -occupant vehicles. Policies • 59. Deschutes County shall: Page 216 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 °- 1216 a. Encourage businesses to participate in transportation demand management efforts through the development of incentives and/or disincentives. These programs shall be designed to reduce peak hour traffic volumes by encouraging ridesharing, cycling, walking, telecommuting, alternativelflexible work schedules and transit use when it becomes available; b. Work with business groups, large employers and school districts to develop and implement transportation demand management programs; c. Continue to support the work of non-profit agencies working towards the same TDM goals as Deschutes County; d. Encourage programs such as van or carpooling (rideshare) to increase vehicle occupancy and reduce unnecessary single -occupant vehicle travel; e. Continue to pursue the development of park and ride facilities and consider the siting of a rideshare facility, based on identified needs, when realigning County roadways, considering the sale of surplus property, or reviewing land use applications for developments that could benefit from such a facility; f. Pursue the development and utilization of telecommunication technologies that facilitate the movement of information and data; g. Support efforts to educate the public regarding the actual costs related to travel on the transportation system and encourage transportation demand management alternatives; and h. Establish and make available a transportation demand management program to County employees, to serve as a role model for the community. 5.10 DESCHUTES COUNTY TRANSPORTATION PROJECT LIST The list of expected transportation projects needed over the next twenty years is provided below. The projects chosen were a result of the following analysis: • Analysis of County roadway accident data provided by the state. • Using capacity analysis on County roads based on the forecasted growth. • Knowledge and experience of the County Road Department. • Public input • Efforts to enhance non -auto modes of transportation to conform to requirements of the State Transportation Planning Rule (OAR 660-12). The project list is broken down into two categories: • A list of previously -committed projects, which in most cases, the County has an obligation . to fund and/or construct; and • A prioritized detailed project list of the remaining needs in Table 5.1131. Page 217 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 1217 The method used to prioritize the projects involved a criteria -ranking system. The complete ranking matrix is located in Appendix J. Categories were created then divided up by level of importance as follows: Most Important: Solving safety problems Other Important Criteria Included: Maximizing the use of pedestrian and bicycle facilities Location of schools, parks and fire stations Project cost, cost per average daily trip (ADT) Pavement condition index Anticipated traffic volumes (2016) Safety related issues were automatically placed at the top of the list, then were ranked by cost and future traffic volumes within their category. Projects that add or enhance bicycle and pedestrian facilities and/or have access to schools, parks or firestations, received extra credit. The rankings for each category were added together to result in a numerical score or "rank total". The lower the "rank total" number was, the higher the project was rated. The rankings for bike and pedestrian projects within the communities ofTerrebonne and Tumalo were defined by a community planning process that took place in 1996-'97, and were to be used as general guidelines. Goal 30. Have an annual review of the Transportation Project List for the purposes of • prioritizing, adding or deleting projects. Policies 60. The Deschutes County Board of Commissioners shall review the Transportation Project List annually to add, delete, and/or reprioritize projects, and may do so by adoption of a resolution. 61. The County Board of Commissioners has the authority to add projects to the list at any time if whole or partial private sector (developer) funding becomes available through the land use process, and the potential financial benefit to the County can be demonstrated to the satisfaction of the Board. 5.11 SHORT-TERM IMPROVEMENT PROJECTS The proposed short-term projects identified below, consist of the previously committed projects and the remaining prioritized projects that ranked "high". ODOT highway projects that ranked "high" are included due to their relative importance, although the status of future state funding is questionable. PREVIOUSLY COMMITTED PROJECTS Road Improvements Estimated Cost None $0 Page 218 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) • 169. � 1218 Transportation System Development Estimated Cost PINEBROOK SOUND WALL $40,000 (County obligation through Parkway agreement) Area Bend UGB Action Construct sound wall between Parkway and Pinebrook Subdivision Schedule 2000-2001 Bike & Pedestrian Improvements Estimated Cost None $0 Transportation System Management (TSM) & Transportation Demand Management (TDM) Improvements Estimated Cost None $0 Traffic Safety Improvements Estimated Cost DESCHUTES JUNCTION OVERCROSSING (Phase 2) $900,000 Area Deschutes Junction / Rural Action Phase 2 construction of east side overcrossing connections Schedule 1998-1999 Bridge Improvements Estimated Cost None $0 Right -of -Way Acquisition Estimated Cost None $0 TOTAL Previously Committed Costs: $ 940,000 PRIORITY PROJECT LIST Table 5.1131 identifies the high priority and other priority projects that form the -basis for future road improvement work in Deschutes County over the next twenty years. This project listing shall be reviewed annually by the County Road Department and the Board of Commissioners for additions, deletions and re -prioritization. Figure 5.1111 identifies the high priority projects. Subtotal Projects Rated "High": Subtotal Other "Priority" Projects: Subtotal Bridge Projects: $ 11,051,080 $ 43,957,740 $ 647,900 SUBTOTAL FOR ALL PRIORTIZED IMPROVEMENT PROJECTS: $ 55,656,720 SUBTOTAL PROJECTS RATED LOW (SEE APPENDIX J): $ 57,139,174 TOTAL 20 -YEAR LIST OF PROJECTS: $112,147,994 Page 219 of 232 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) C7 N J co rn N co It CD co rn O Z w U Z Q Z 0 m m_ X W N ch N O O N N a� rn ca •�..0 Of 01 0) m Cn _0.�_ 2) _O1 _O Ol 2) _m LM O 0 _) S S S S S S S S S S S S S S S = S as R 000 0 0 00 0 0 00 O 0 O 0 O 0 O 0 N 0 co 0 Op 0 O p p H N O O O O O O O O O O O O O O Cl O O O O O c0 O n to N O N �y O O O O O �o o 0 �o �o 0 O W) O O O O n n M �o O m Cl) c0 ClLO O O a M U M O_ O_ _O O O N u'� P- ap n CA CA CA CA EA M r• w 69 m, fR Ki f+9 fA 69 CO W CV cep O O Oa O O O O p O 0 O O O O Oa Cl Cl Cl O O O o m p O O O O O O O O O O O O O Cl O O O O O O O O O O O O 0 O 10 N E p io O O O O O O O O O N 0 O O n O O C7 Q N O N O Co O N O p� n O M o ap co a0 IL a0 � d9 w 6a,� f!► V3,� v► q e m V 0 co to R O V O co N N ch c0 N N N N 7 G' N N N N N W O O IpA O N m (b N m m a) m m Nm m m 0 a) m 0 0 o CL u_ E m mm m m m m m m m m o m o cV tnv�U�� U ¢ U U U d U. ¢ ¢ c c» m cmi o 'C m o 0 o 0 m o o o o o o L00 N ca O U a) J N V V Q Q U Q U U U Q U U Q U U Q U LL Q Q _ T T m t m aS rn� m = Ycc IM O p W :E In y C m N 0 O 'O 30 N d N L 21 _ O 21 J --S ,9 v E m u m o— Z O O d 4 C �n 0 m O a1 O O O a1 E T l0 T c6 T m T m T m T ca T m ~ ami a) m 0) m 00) rn c .0 `m a� a� g = c C M Co m= C m C C m m - m > > O > O > O > O > O > 0 E E E rn ~ c E E E ` `0 in .6 ca ca ca .6 -a -a 2 U)« M C tea)• ca Y « C C C C C C C C C m m o C= = C N N ~ d p U N Q p Q V O W Z r o ¢ C)Cr L L C .L.+ L m r E m E N }y (L r} Zoo a a m ain ZH H a� N W OMOOOO m mm���mmmm _m m W m m= 1 �m S cr Qww °mom mQ g z W 0 4.0 0 OJ 3 O 7 o O n n o U y N Ci a' m N } m } .. L o 0 } C W W S W ?� W E ZZ d S S Q F- S !0 S o_ = w o U. C `�' (b w 2 Q �¢ ¢ £ tea- m z CD OWE = S v~) N = U' S CO W o N v o Q = 2 } d ` cFm } Q h- o S } Q f -a S Z w J •� o W a gQp H zm a w o Q a Q 3 a f- Z W a m E Q U 0 OC W 0 UO >—a, J E. d C O 00 W � cn co S o W it d v >¢ Q 0 d' O S 0 d = o S m>— z= z U z Y ` d O LL z ¢ O v CL= >, LL��- cw7 O'.O+ �pQ z H a 2 m £ w�� w O� o c �0� ll = j to a cn a U wpa o it O S z co S o co U O U a a f- co rn N co It CD co rn O Z w U Z Q Z 0 m m_ X W N ch N O O N N a� rn ca • • • co rn N C) ob 0) O z LU U z Z 0 O m F- m X W N M N O N N N rn m a. T T T T 2:- T T T T T O O O O O O O O O O O O O _ _ = a` a` a a` a a O O O O O 0 O O O O 't N O Itp O N O O N p O N p p O O O O O O O O O O O (O P CO O) (O O co O O O fD O co O O W O O La f0 co n N CDCq a^O �O COO fA K N v3 Go 69 vs w69ui W to O O 40 40 O O O O O O O p O O 00 O C O 00 O O O O C O C r- O C �_ O O r C O O O O O O O U O O R IT v N N a) O � N O eq tH fA w W is in � 40 O 1A 69 O) fA fA 69 W O 7 N N O n' 7 N N N N N N CD m t e} fn m N N N m m p w m E m E m E m E m E m Em c6 m E m E T CU co ca co ca co°Dco m �- co co co to co U Q a J = a) (7 ` c6 O O O U O O O n m m iy m m O O V d m O m m m Q N tq U U Q Q U U U E LL 0 3 = o' d rn > E c m ci C N r m C � d �p C m y0 c V '0 O C C ca f0 N ca @ N N f > > > > > > > cc O CL O V O O 2 O O O O CC yrU y ad ca ca M ca .6 C O C— O :° m O a C O C a� C O C m C m '0 C O C C m 0 'O C d C a> fC U �_ V 'O U _ U 'O 'O v o =s 0 3 W- � 9 9 �: °c. o 0 0 o ¢ CO v U W O z 3 N R ¢ R O S O O z a o w ¢ w ZOW S C d) d O w QJQ } d w Z5 0: Z iv (D ~ o N CO LU N _ Ow 0 m Q U) p 0 U U O ` R O m W FX W U' U t .+ U' ¢ J S z W g cn Z m C N J V F- Q J J w m w Y n D d 00 C1 a W U v W W W > S S H } ¢ J ¢ C C S w O O Z p z Q w Y 0 z Ft wa. J 0 W E10.2 CL a > m� m0 W o M a �o d v0 u) in o 0 CL N m _E = D V o w 0 �, a w N w > +� m aY ;� o L SCO � w •� o3 C� U. Ix w oCD W w m a w Qa = o v, 0 W U O a`� p v S J J z W m^ C C L m o rn U T 3 A o V C m �p m i S O `_ d 0¢ J J �' w Y m O U R O S rnm m t l0 -+ 'Q jF� m E O 0 to H w G �p E O O S ¢ 2 a.° a: ?fn 0) CO cn W F- N a to m ¢ co rn N C) ob 0) O z LU U z Z 0 O m F- m X W N M N O N N N rn m a. N co t0 O N M ��,, N R N It N N It M to N N N p — N 2 co N N co N N N N Cl) N U $ E E E E E E E E $ E E E E E O O O O O O O O O O O O O O O .2.2.2.2 O O O O O O `aaa` C40 a a `aaa`a`` a a a a a ````aaaaa aaaaa (14 O o M sf N N N 001 co coS Cl) co 'CC N OWN 'V OOO1p0Ln f0 o U O o U O co O N M n O M i0 N M tp O � {OP. � lO A O P- LO N N N O r tlY -W N to CO coO M O ((D �� M CV fh n Fs Fs► es Fs v► is v� es 64 0 00 Q s U V U w 0 0 0 C. 0 o 0 0 0 0 0 0 0 o 0 O 0 o 0 0 0 0 0 0 o 0 0 0 o0poo0 0 0 0 p 0 0 Cl 0 o 0 0 0 p o p M p o 0000 c o,�,Ln0 0 ,�000,�,� I- O f0 f0 O co p LL'f I� M CO p tC) N R CO N 't CO N _ a0 r O r- O CD O O to O n n N O f, N M O N CO N M co co Cl) n Ot0 O p o o O C,j r (D Im N y� M H fA b9 64 EA fA E9 fs fA EA Es EA is fA MfA e 613. to N co t0 O N M ��,, N R N It N N It M to N N N p — N 2 co N N co N N N N Cl) N U n OD co N co It 0 Cb 0) O z w U z Q z O m F- m x w N M N O N N N N O) m a $ E E E E E E E E $ E E E E E E m m E E E E E E E vcin 0 0 0 0 0 0 C40 �co0) Cl) 0)C*) ci 0 co 'CC W 'C o U m 'O o U o U U o 0 0 'O U U U 'Cm m m m U U U U 0 00 Q U V U U. •0 T �. c c d O T 0 O,v_yc0) m m m m y y y y a) v c 3 3 3 3 0 L y T T T T T T T T T T T TEi Y Y Y Y m c O L O L m m m m f6 m c m (O fa m m f6 m L L m L a) Y y r-0 p c m c O c a >> O O m > O > O > O > O (1 2 > O m > O > O > O > O > O a a a a '0 5>>> Y a) Y Y Y Y ma m@ Wo M .a ca C ad ca ca ad N ca C ca ad 0 0 0 y 0 0 0 0 3 y 3 3 3 3 0 m c a) G CD c 0 c aD C o cc m d 0 c a) C a) c a) c d o y y y y a) j0 a) a) N N v a s a a a a a 'O a a a cQc11 ,a_ ,v_ y'ap y y y y 20 a 3: m 3: 3: C a a a a aaaaa zoarhininLo Lu LU 9 a' O Q }J O Z O O Y w � Z ' m u 2 Q m ir = m m a m O m LU a Z Co c an d a g CO z J w U O m o n rn rnQ c 0 ~ ~ ix Lu 0 y Q O m N m W Q d W m W W 3 0 Q Q ? y L f0 fn t- y y N E02) -0 m U� C� H � 50� m O O z >}O >Q a' 2 J :D 00 D Z o yL 0)2 0 pf > d Qin > pfnL O S O m Jaz ¢ a a U) z3U HDU w comu)i Uv)mU=i 3: > U p O WO Q 2 O w co a Z O Q W z it Q 0w V W y m p m m z== _z J 2 a to f- z 2 g z a } w d U a o a o 0 fn W O F- w W =am W=0 m J J_ m C13 o �� O 3 N co C m p0 N> S�2 N � W = O Q D U O m C7 m 0 D (%)am W �[ C7 QZ� J 3 m� C9 S m m .� m a O m y N> O U >L mNUY Q rn t fA L -�2 O U > > m 02O w Omz w O� 0 O O = ip Comwmv) ti) O m=iZC) d m0 z W 0 m m H w Q Y >LU L_ 0 1=- � m � 0 0 h- m m F- N Y UO Q Cl) w 0 D = J D = _ 2 w w Z _ d N yo0oN a a a v d m d o m J w } W } C = W W J O = in J p J J z ~ �2 im Vi t N N Vi m Q O Q } Q � O W m 3 z 2 S } 0p e .2 O � m r Y Y o a) m m o > L rntLQt 0 0 m a m z O m Z 0 to --)-a: (1) an.2zmmUin2ao it: mao n OD co N co It 0 Cb 0) O z w U z Q z O m F- m x w N M N O N N N N O) m a `o_o_ o `o- o o `o- `o `o -o_ o `o o `000 a. aaaaaaaaa an`.a as a a a a n.n.aa a` as o 0 00 000 00000000 O O O O O O O O � O O O N 0 ^ (Cl 0010 O Co Co O O o 0 0 0 0 (n 0 0 0 00 O O 0 OOO-000000 O O O O I=t O P9 O O O co LO N 01 O O W) to OO NN OON to 00 O O 0 O LO 'o C5 O ccoon v NN O(O(O(00001(p O N N N N r N N N N '� N _� O 431 M M M M M M M M M M p M M M M M M M p r M p M p M N M M p M M 0 0 0 C. 0 0 0 0 0 0 0 000 O O O O O (CD O O O 00 00 00 O O O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O O O O O O O O O O O O OOO 0000000 000 00 O O O r O O (D C6 C6 t0 U')O O LO CO O O N N OO N w 6O O p N O on O 0 Ln N 1 O v NNO(O(oWOMM(0�M N N N N r N N N I M r- t0N MMMEAMMMMMMp M M M Mp rp M M M M M to M 6464 'C C — O O (CO O O e} v (o a a m Nd o m 00 N�N(O et oN Y y N 7 N VL N (V N N N N Ln N N N N N a L- 0 m mm m m m m m m co m m m m m m m m m �0 m m m m E E E EE EE E E E E E E E E E E E E m E E E E E m m m m m m m m m co co Co CO m m m m m m - m m m m m CIO (o0)0)0)cotn0)0)0) Cl) C40 Cl) Cf)0) Cf) 0) Co c U0 Q ti U UU 0 vvvvv.0cmic0AU ccoiu v0 v v � m mmma�0i m �m 0 0 0 0 0 o o- 0 0 0 0 0 0 0 0 J J J J J Q J J U J J J J J J J J Q U Q U U U U U U •N C m m m C N 0) 01 m N N m N m O N V Z N W O u) D C 0 0 y N O N y 0 m o O n.0 Y Y a o Y O L a y C C m m C m u) O C N N N t0 (0 m m m m (0 (0 f0 coo33o3cao �[YY :2 :2 2�[YY y 0 y y 120 m2 1220 O O 0000 O 00 m m m N U) m 0 m m m N N N N C C C 3 3 3 in in 3 in 3 3 3 c c c c :° 10 :° m m 0) N 0 m m C C C C C C C C C :0 :O V N 'O :O :O N N N tm/1 N N N m N 0 m 01 m m N m O O O In O O w w O a 0 0 0 r r r r M M M > » > x > > > >, L w 0 Q W w >p a s a �_m m m E Ln z gW<a m WO c c NL a1L v NL E m o o D N �UD� Z >> d d o Z'Uc cc cO L. p mx~ a o= OYYLn NLn NLnN O Vi N Lc O m m m m m •N Y ` LL O h m J Q U U m00u1o(noictnu6 c�oo:3U)W (low 'a U O WZ�OU'� U �� TUU.-v.-vr» r v U) CO W 0 umiLL 0 -1Jtofn m fn z z 7 = N N R d w w >> > m 3 3 0 F- w p D C C« x m a m" '� a N> O O a �..� Q m N>> N j j a 'C.. CO`1 N m (ice 'p F- Q' 0: m n� as«cL�crf0 Oma« :o cccc O Ui 'CSD M w0)y N S}rn !n N N 01 m Of lL U co !A ` o y m m m O O J S ¢ > w � 00�Qvi<(6 Co N > m m0m00 w. -.(~n ty4� �i Z Q p U�UUI-ate.-w 0w u1zr a r z axxx 0co o a d N O O (� NG 00 p Np N ZJ�v) J m ; oo .a c o =�- O U) O J� x m a1 a1 > m 0 a�coi>> d =_ d > > > a1 aG� Z �)LL W� C N d C«�« CQ�- _ C C C N �'rr 'a. d U wowm w w M >fn(n >s«t >YOL 12 > > > N cQ O C mU xzz Q� x Ll v U rna0) UU UUP W m w a O wY d Ea t >U$ N n 00 co N co O 00 0 z w U z Z_ 0 m F- m_ X w N M N %6- 0 M N N N 0) m a • • .7 4 rr r+. 11 n n A 00 rn co N 00 O CO 0) O z W U z Q z O m E- m X W N M N 4- 0 v N N N (o a O ` O ` O O .2 .2 O O O O O O O 0 0 0 0 0 0 a a a a a a` a a` a` cL a` a` a 0 0 Cl 0 0 0 0 0 0 0 CD a ,w 00t 00 000 Ct ui o 0 0 0 0 m m mmm m E E E E E E in coo coo 0 4' 0 r 0 0 40 u) D ui to C4 n O 0 ,-, 0 y C 0 O 0 0 O O 0 wlrf -� m m m m m m y U) U) W U) Co U) w �uv ��� w U� to 6 ci U w U m U m O O IL a o O o 00 00 Ct 00 000 0 1°0 0 0 0 c Q =°000000 O CD O CD O w O O O O � O co C O— 0) N ral CD tn 07 O O T r N Oto Ovnf00 O O O O O O O O O G C tONCO. -f.- N• 64 � N i OD 64 � CN Cl) r N N ui N N• 64 � Cl) � rA w V). W K! f�9 EA fA W w O O O M N co N N N N N N 7 N N cn !A m m m m m m m m m m m m p y m m m m m E mE E E E EEE E E E E w a o c c c c c m co — U m co m co m m coco m m m coU)co m m m m cn c c c c c oto a Q� O F, mC '—mm —C U mU mm iy G•�C'Cm co`0— mCm O ~ a_ U U C N U a1 an d U0 U m' E E m y m m v v m m m c rn c rn 0 0 0 0 0 ami ami m — m — m — m _ m m z z m m m z z z o _ 0 _ 0 0 _ _ m d m m m m m m > O > O > O >`mm O c a n m `m a nrn m ad cd 06 ,6 m m Ey m y m m m Emmmmmm c v c v c v c v aa) `o rn3 rnrnrnrn ami m m m m 1= o) rn rn rn F� z»> 7 F - w m m Z ¢ = o 0 ui 3 t •3 T m — 0) m g Q u p Y W N 0 m Co 0: Q O .y, m `c° o p waw O U O y O id a) �j�W W QJ H @ O o CD c O zQp�t- m o p �0 cnu� Q m W �U= a v)�rmiat 0VLoi o W w m ca Ul rn Z 0 p W Q 3 c 3 co c c O c m c co z C)i a g c E ' 'y m JQ W J wpfn = 0r'00JN C Q Q 0) m j Z+m Q Q warn JLU F -W OkL d c v U m M 3 3 Z= 0 N N y U OO``= p�o �O``v'- C a C E p O. N } Q d W N o p o N w 3 C O = w o m tu o Q> mc. w a c���V)0Q w _ H W Z ,�0N v~i�-1 = C moo 3 N o N O O M W �� WO •fl EL33D W 2 g Q U 3 10 0= H a a k •+ 3 w O O)N N N N m tf V W W W 0- y Z `Un N W �:.i=> > > > m►iC)F-zz=� 00 rn co N 00 O CO 0) O z W U z Q z O m E- m X W N M N 4- 0 v N N N (o a • 000000 J J J J J J O A t0 tO tf1 tC fO tO a N N N N N N 00 0 0 0 0 0 0 0 0 0 0 O O (0 N ON O Co UO 0) N � I t` M to K c'7 CD M EA ca tss 6% tH to !a to to 6 6 0 6 -C2. 6 C t- ro rn m � to to to to v v v v v m a to m et ro rn 3 rn rn rn rn CLCD anon D Z > N O rl� N N th tN LO tott0 CIA � Ix LL Y W W Y tj W to W 0 Z W U n 0 (n c!) Q NO?Y;�O O � M p r r a? 111L to co N O to - tC ti cri cfl r - C% 69. EA 03, O a a a� U) _ a� L Y a O U 'C to a2.Om v ' O O o a o .o }-n. 0 �°0 0 F- 0 F- �a N � N O � Q L m w o w H N 169 - 1224 co 0) co N v 0 ao to O Z W U Z Q Z 0 O m F- m X w N M N O U) N N N CD Q_ • • • sou U) w LUF— U) �i 169 — 1225 C O C 7 •C a W co m OL E C L° a E J NO' z m D m U c O O p a. O O •C O L o� y t 4�a 1-=QU= s N 0 L C_ 4: N N N N m Q N CQ=Qi/i��lL Q �Q Z �• C O C 7 !16 Sp • f! N m •N ANO • • a. pp ' N . • go o - Z �• An � W !16 Sp .CIE . a • • • 20o d � • • t(A �•, • • . �o sau scu ••��ror a '•••�• •. . lb es LL p ssu o sou s u LL 'r V I W CY) UL 0. U) 0 U Jc: ♦0 V I (1) 0 • f! N m •N ANO • • pp ' N • go o - Z �• An � W m .... .CIE . a • • • 20o d � • • t(A �•, • • . �o sau scu ••��ror a '•••�• •. . lb es LL p ssu o sou s u LL 'r V I W CY) UL 0. U) 0 U Jc: ♦0 V I (1) 0 169 -1226 w 169 - 1227 • 6. TRANSPORTATION FINANCE PLAN 6.1 CURRENT FUNDING SOURCES Historically, the County Road Department has had the responsibility to propose projects, acquire funding, schedule improvements and construct or contract for the construction of transportation projects in the County. Each year, the Road Department has submitted a list of prioritized projects called the Major Roads Capital Improvement Program (MRCIP) to the County Board of Commissioners for approval. The TSP now augments the existing MRCIP process by providing a long-term project listing along with the short-term plan in the MRCIP. In the past, the MRCIP has contained five -year's worth of projects. The MRCIP shall continue to be updated and adopted by the County Board of Commissioners each year but it will now only contain three -year's worth of projects. The MRCIP could also form the basis for a special bond measure discussed below. Traditionally, funding for local and state roadway improvements has come from the variety of sources including: Federal Sources: • Revenue from timber sales on federal lands within Deschutes County • Grants State Sources: • Vehicle registration fees • State gas tax • Weight mile fees • Grants County Sources: • System Development Charge (SDC) funds (Bend UGB only, and ended as of March 1, 1998) 6.2 IMPROVEMENT COSTS When looking at the County road budget, an important consideration is the allocation of funds for maintenance projects within the cities, UGBs and the rural area. Current funds have been flexible as to how they are spent. The mix of maintenance operations versus capital projects is largely a policy issue, which could vary from year to year. Historically, the County has been responsible for maintaining (asphalt overlays, plowing, etc.) approximately 123 miles of roads within city limits and UGBs. The cities of Redmond and Sisters have taken over responsibility as annexation has occurred. The recent agreement with the City of Bend will transfer 70% of these road miles to the City. A similar agreement with the City of Redmond is in the works and will transfer a majority of the remaining road miles out of County jurisdiction. Depending on the combination of projects chosen for short-term implementation and long-term programming, the following are the costs for the County Transportation System Plan projects over the next 20 years. Page 227 of 232 — EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 - 1228 Irreviousiy Lommittea rrojects Total $ 940,000 IShort-term, High Priority Projects Total $11,051,080 IlLong-term, Priority Projects Total $43,957,740 n ge Projects Total $647,900 IlLong-term, Non -Prioritized Projec s Total $57,139,174 Total 20 -Year Combined Project Costs: $112,147,994 The ability of the County to fund needed projects is in doubt. With the limited future funding opportunities available, the project outlook is questionable. Under current funding levels there are no resources available for capital projects outside of the County's previously committed projects. In addition, if road preservation takes precedence over new projects, the projected funding available for road operations, maintenance and preservation (OM&P) alone over the next three years is already $8.1 million below the Road Department's estimated minimum desired level of OM&P. Projected Shortfalls: 1998-2002 $2.4 million 1998-2003 $2.8 million 1998-2004 $2.9 million $8.1 million The minimum desired level of OM&P is based on the Road Department's 1992-93 Operations Plan, which defined levels of service. The dollar figures from this study have been adjusted to reflect 1998 costs. Also, the mileage figures used to calculate the total OM&P costs have been adjusted to reflect the transfer of Bend UGB roads to the City of Bend as of July 1, 1998. If all the projects (excluding the non -prioritized projects) are combined into a twenty-year plan amount, the resulting $55,656,720 would amount to an expenditure of approximately $2.8 million per year. 6.3 POSSIBLE FUNDING SOURCES There are several potential funding sources for needed County transportation system improvements. Included are: System Development Charges, gas taxes, exactions, local improvement districts, special assessments fees and vehicle fees. These are sources that have been used in the past by agencies in Oregon. Due to diminishing current funding for today's transportation projects, it is necessary to seek several avenues for funding projects, and many of Page 228 of 232 — EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 - 1229 the funding sources may need to be adjusted to meet current and future transportation needs. • Unique or hybrid funding of projects is becoming necessary to assure implementation. In many cases, this means private/public cooperation rather than depending on user fees to fix every need. Examples of funding sources that generally cannot provide funds for roadways include: Property Tax General Funds, Car Rental Tax, Transient Lodging Tax, Business Income Tax, Business License Tax and Communication Services Tax. Although motor vehicle revenues fund many of the state highway, County and city projects within Deschutes County, major transportation projects may need to be brought to a public vote for approval. This would be necessary to supplement existing funding sources, which cannot keep up with growing needs. Specific projects would be defined in a ballot measure, such as the Major Streets Transportation Improvement Program (MSTIP) passed by voters in Washington County. Because of the need to gain public approval for transportation funding, it is important to develop a consensus in the community supporting needed transportation improvements. That is the value of the Transportation System Plan. Based upon current sources of funding, the cost of the needs far exceeds the projected funding over 20 years. Some of the difference can be made up by land use development exactions, where unimproved frontage is built to the TSP standards as projects are implemented. The state Transportation Planning Rule requires that any proposed TSP financing plan contain credible financial options. The Deschutes County calculations for possible funding sources are located in Appendix K. To overcome the projected funding shortfalls in existing revenue sources, and build identified projects from the Transportation Project List, the County may wish to consider the following funding options: • State Highway Trust Fund The state currently collects gas taxes, vehicle registration fees, fines and weight/mile taxes. These funds are pooled together, then a portion is returned to individual cities and counties through an allocation formula. As of January 1990: • The state keeps 60 percent. • Cities receive 16 percent, which is apportioned to individual cities based on their population. • Counties receive 24 percent, which is apportioned to individual counties based on the number of vehicles registered in that county. Countywide Gas Tax / Registration Fee The State, cities and counties can provide their basic roadway funding through a tax placed on gasoline. State gas tax is approved legislatively while local gas taxes are voter -approved. Vehicle registration fees can be enacted by ordinance. State Highway Trust funds are dedicated to roadway construction and maintenance, with one percent allocated to pedestrian and bicycle needs. This tax does not fall under the Measure 5 limits because it is a pay-as-you-go user tax. Several counties throughout the state currently have a local gas tax in place. Notably,Multnomah and Washington Counties use such a tax for funding road projects. Multnomah receives about $6 million per year, whereas Washington receives roughly $1.2 million. These counties contract with the State Fuel Tax Branch to collect and administer the tax. Gasoline distributors who deliver in those counties submit separate distribution reports along with their state report identifying how many Page 229 of 232 — EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 - 1230 gallons were delivered to each county. The state processes the county forms, calculates the tax revenue, subtracts the administration fee portion, and sends the county its revenue. As an example, Multnomah County retains 53% of its fuel tax revenue for road improvements in the unincorporated areas of the County, then distributes the rest to the cities on a per capita basis. If the fuel sales for Deschutes County were used in a similar gas tax formula, the County could expect the following revenues based on a 55% share. The fee calculations are located in Appendix K. Countywide gas tax: range per year = $ 151,884 @ Y2 cent to $ 1,518,844 @ 5 cents Vehicle Registration Fee: increase of $15 autos, $9 motorcycles, and $30 trucks = $ 434,835/yr. (Note: ORS 801.041 requires 40% of vehicle registration fees go to cities.) Street Utility/Road User Fee Already used in Ashland and La Grande, road user fees are a monthly or yearly assessment charged to residences and non-residential users of County roads. This fee is similar to sewer and water fees charged to users on a monthly basis. In Ashland, the fee is $1 per month per residence and business. In LaGrande, they charge $2.50 per water meter per month. These fees are not for capacity improvements, but for supporting local road maintenance based upon land use type and trip generation. The exclusive use of the fees for maintenance allows a more uniform distribution of spending and frees up other revenue sources for capacity needs. If a $1 per month fee per • dwelling were used in the unincorporated areas of Deschutes County, approximately $185,000 could be generated per year. Utility fees could be vulnerable to Measure 5 limitations, unless they include provisions for property owners to reduce or eliminate charges based on actual use. • Exactions Development exactions and contributions often pay for portions of many roads in and through new developments. The road, or improvements to a road, are many times paid for or built by a developer to County standard, then deeded to the County as a development condition of approval. This practice has been modified by Oregon case law over the years, but will continue to be used throughout the state. Developers of sites adjacent to improvements identified as SDC projects can be credited the value of their frontage work, which is included in the SDC project -list cost estimate. Rural System Development Charge (SDC) System development charges are authorized by state law, and have been used in Oregon and throughout the United States. They can be levied by local jurisdictions on new developments. The fees can be used for a variety of public services such as parks, roads, sewer and water. The basic principles in development of SDCs are that: There must be a reasonable connection between growth generated by development and the facilities constructed to serve that growth (generally determined by level of service or connectivity); and Page 230 of 232 — EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 - 1231 2. There must be a general system -wide connection between the fees collected from the • development and the benefits development receives. Charges are typically developed based on a measurement of the demand that new development places on the street system and the capital costs required to meet that demand. SDCs do not require a vote of the public. The SDC amount is assessed at the time of development approval or building permit issuance and based on the anticipated number of trips generated by the proposed land use. The charge is a means of requiring new developments to pay an equitable portion of the capital costs of improvements needed to accommodate growth. Charges to recently developed properties can be used to recover past and/or future growth -related improvements. However, they may not be used to recover costs for improvements to serve existing users and residents. By law, the funds must be used for capital improvements only and are not eligible to be used for operations or routine road maintenance. Currently, road SDCs are charged to new developments within the Bend and Redmond UGBs. Like all road SDCs, a countywide road SDC will not be adequate for complete project funding, but could form an important financing component for new capacity -enhancing projects. If a countywide SDC is implemented, it should be limited to arterial and collector road projects in the overall transportation network. A district -level SDC may be used, with the fees possibly varying from district to district. An example would be for SDCs to be applied to areas where the growth is expected to occur. These could be the existing County road maintenance districts. This method allows the benefits to apply directly to the residents of the SDC district. Different areas could have different charges that reflect the growth projected for that area. However, the administration of multiple districts, funds and creation of subjective boundaries may be problematic for a process that is by law, designed to be simple to understand and implement. Due to the variables of growth rates, state land use changes, and siting of destination resorts, SDC revenues can fluctuate over time and be difficult to program into a capital project list. General Obligation Bonds Bonding has been historically used as a funding alternative to spread the project debt over a voting district or districts. The residents vote to levy a special property tax, to be distributed equally according to assessed value of the voting district. These bonds are generally used to make improvements benefiting the entire district population. General obligation bonds are often the least expensive borrowing mechanism available to jurisdictions. When the bond issue is paid off completely, the levy is finished. Grants From time to time, grant funding becomes available. Grants are most often funding matches, whereby the local jurisdiction must contribute a percentage of the funds to complete the project. Often, the local contribution is an "in-kind" pledge of resources for planning, engineering and design services or materials from the local jurisdiction. However, some grants are 100% awards. Most grants are only to be used for capital improvements or planning studies, not maintenance. An example is the next (1997) version of the federal Intermodal Surface Transportation Enhancement • Act (ISTEA) nearing adoption, there will be funds available for such things fixed -route transit and off-street bicycle and pedestrian paths. Grant availability and possible awards are difficult to gauge Page 231 of 232 — EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) • 169 - 1232 from year to year. At best, the County should be prepared with eligible transportation projects that can be plugged into a grant category on short notice. Often these projects will not have alternate funding sources, and therefore must rely on grants, to be completed. Special Road Districts Special road districts provide a means for funding specific improvements that benefit a specific group of property owners. These districts require owner approval and a specific project definition. The residents forming the district agree to pay property taxes to support the special district. Road District Commissioners are appointed by the Deschutes County Board of Commissioners to operate the district. Local Improvement District (LID) Local residents can petition the County Board of Commissioners to forman LID to get their road improved. Usually a public dirt or gravel road, once improved under the LID process, the road may be accepted by the County as a "county" road to be maintained by the County. Property owners agree to pay for road improvements made underan LID. The trade off is that as LIDs form, the County becomes responsible for more miles of road maintenance, which spreads limited funds even thinner over the long term. Funding Summary The following are the estimated funds, which could be available to fund maintenance and/or capital road projects. Note: (SDCs assume 750 new houses per year @ $250 — $800 per unit) Source Per Year Amount 20 -Year Total Countywide Gas Tax $151,884 - $1,518,844 $3,037,680 - $30,376,880 Vehicle Registration Fee $434,835 $8,696,700 Road User Fee $185,000 $3,700,000 Public/Private Partnership variable variable System Development Charge $187,500 - $600,000 $3,750,000 - $12,000,000 Total Alternative Sources $960,000 - $2,740,000 $19,200,000 - $54,800,000 Page 232 of 232 — EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 -1233 • • 169 ~ 1234 Appendix A -- OREGON STATE TRANSPORTATION PLAN REQUIREMENTS Page Al of A7 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 1235 OREGON STATE TRANSPORTATION PLAN REQUIREMENTS The Oregon Transportation Plan was developed to meet the requirements of the Department of Land Conservation and Development's Goal 12: Transportation Planning Rule requirements for a statewide transportation system plan. It also carries out the federal Intermodal Surface Transportation Efficiency Act (ISTEA) requirements for a state transportation plan. The purpose of the plan "... is to guide the development of a safe, convenient and efficient transportation system which promotes economic prosperity and livability for all Oregonians." With the population increases that are forecasted by the Oregon Department of Transportation (ODOT) over the next 40 years, the state will require a strong and efficient transportation system to serve the needs of commerce and personal mobility. While most of the population growth will occur in the Willamette Valley, Deschutes County will continue to be one of the fastest growing regions in Oregon. As such, rural areas like the unincorporated areas of Deschutes County will increasingly need access to services and markets in urban areas. These linkages must be maintained and enhanced in order to serve both areas. The goals and policies identified in the Plan refer to specific actions needed to attain those goals. The actions that apply to Deschutes County are listed below. Goal 1 - Provide for a balanced, efficient, accessible and environmentally responsible transportation system that connects places, modes and carriers, while maintaining safety and financial responsibility. Action 1.a, Employ economic, social, energy, and environmental impacts as a part of the transportation planning and project design process. To be done on a total system basis rather than optimizing the cost effectiveness of one mode at the expense of another. Action 1.b, Develop pricing programs that charge road users commensurately with the total costs of operations and improvements. Programs could include: • Automobile emissions charges based on vehicle miles travelled (VMT) and relative vehicle emissions. • Road access charges for major trip generators. • User charges such as a gas tax. Action .1.c, Encourage multi -modal accessibility to employment, shopping and other commerce, medical care, housing and recreation, including adequate public transit access for the transportation disadvantaged. Action 1.d, Develop public transit, bicycle and pedestrian systems in urban and rural areas. Action 1.e, Positively affect both the natural and built environments in the design, construction and operation of the transportation system. However, where adverse impacts cannot be avoided, minimize or mitigate their effects on the environment. Page BZ of A7 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 - 1236 Action 1.f, Require that the regional and local transportation systems plans provide for the • safe routing of hazardous materials consistent with federal guidelines. Action 1.g, Require local and regional transportation plans to identify (a) major transportation terminals and facilities and (b) routes and modes connecting passenger and freight facilities with major highways and intermodal facilities. L Goal 2 - To develop a multi -modal transportation system that provides access to the entire state, supports acknowledged comprehensive land use plans, is sensitive to regional differences, and supports livability in urban and rural areas. Action 2.a, Require that the transportation system plans adopted by state, regional or local jurisdiction be sufficient to accommodate planned development within the respective jurisdiction. Action 2.b, Restrict access from state facilities for incompatible activities and development where land use plans call for rural or resource development. Action 2.c, Promote alternative modes and preservation and improvement of parallel arterials so that local trips have alternatives to the use of intercity routes. Action 24 Encourage regional and local transportation system plans and land use plans to avoid dependence on the state highway system for direct access to commercial, residential or industrial development adjacent to the state highway. Action 2.e, Promote the development of interurban bus and rail passenger service to improve urban accessibility and achieve land use goals. Action 2.f, Define appropriate minimum levels of service for all modes and for all potential users. Action 2.g, Improve rural highways, minimizing the interaction of passenger vehicles, bicycles, recreational vehicles and freight vehicles by providing passing lanes and paved shoulders, wherever practical. Action 2.h, Implement a statewide system of bikeways using current rights-of-way and creating new paths along rail beds, open spaces, and other public and private lands held by cooperating land owners. Action 2.i, Encourage modal alternatives to the automobile and truck where feasible in rural areas. Action 2.j, Revise regulatory systems in order to stimulate the provision of transportation . services by private companies in rural areas. Action 2.k, Consider acquiring and upgrading low density rail lines where current owners are seeking to sell or abandon them. Page A) of Al - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 16� - 1237 Action 2.1, Encourage stronger aesthetic land use controls outside of the rights-of-way 18 involving features such as utilities, billboards, urban design and rural development, directional signs for tourists and unique resources. Goal 3 - To promote the expansion and diversity of Oregon's economy through the efficient and effective movement of goods, services and passengers in a safe, energy efficient and environmentally sound manner. Action 3.a, Identify the present level of local, state and federal support for each of the various modes of freight transportation, including taxation, regulation, capital investment, and operating subsidy. Action 3.b, Provide more efficient railroad service through the reduction of conflicts at busy railroad crossings and rail yard areas by means of grade separations and development of alternative motor vehicle circulation routes. Action 3.c, Promote the growth of intercity bus, rail passenger and commuter air services to link all areas of the state with national and international transportation facilities and services. Action 3.d, Maintain, preserve and improve the highway system in order to provide infrastructure for the efficient movement of goods by truck and bus. Action 3.e, Promote the retention of desirable rail service and rights-of-way through existing railroad ownership or alternative private or public. ownership. Action 3.f, Facilitate development and operation of transportation hubs with statewide, interstate and international functions, as identified in the state transportation system plan. Action 3.g, Develop a tourism transportation action plan to identify facilities and services to serve tourism and incorporate in state and local transportation plans. Action 3.h, Identify certain transportation corridors as scenic routes and consider scenic values in corridor planning, improvements and maintenance. Goal 4 - To implement the Transportation Plan by creating a stable but flexible financing system, by using good management practices, by supporting transportation research and technology, and by working cooperatively with federal, regional and local governments, Indian tribal governments, the private sector and citizens. Action 4.a, Place priority on preserving, maintaining and improving the transportation infrastructure and services that are of statewide significance. Action 4.b, Manage such factors as the number, spacing, type and location of accesses, intersections and signals in order to operate the transportation system at reasonable levels of service and in a cost-effective manner. Page A4 of A-7 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) • 169 - 1238 Action 4.c, Protect the integrity of statewide transportation corridors and facilities from encroachment by such means as controlling access to state highways, minimizing rail crossings and controlling incompatible land use around airports. Action 4.d, Establish criteria in the Oregon Transportation Plan and modal plans to guide the development of MPO and other regional transportation plans. Action 4.e, Adopt MPO and other regional plans when they meet established criteria. Action 4.f, MPOs and counties shall carry out their responsibilities for transportation planning and development as described in the LCDC Transportation Rule (OAR 660-12). Action 4.g, Establish private sector participation in the transportation policy and systems plans at all levels of government in Oregon. Action 4.11, Provide stable, consistent funding for the implementation of this plan to encourage the private sector to commit similarly long-term investments. Action 4.i, When preparing and adopting a transportation plan, transportation plan element, modal plan, facility plan or transportation improvement program, conduct and publicize a program for citizen, business, local government and state agency involvement that clearly defines the procedures by which these groups will be involved. Action 4.j, Make information about proposed transportation policies, plans, and programs available to the public in an understandable form. Preferred Alternative The Plan identifies a "Preferred Alternative" that meets all policy goals by: • Identifying a multi -modal system including air, rail, auto, truck, bus, bicycle, pedestrian, waterway transportation and pipelines to be implemented over by the Year 2012. • Establishing minimum levels of service to be achieved by each mode of transportation. • Identifying other major improvements beyond minimum levels of service. • Identifying the transportation corridors and facilities which serve statewide and interstate functions. • Identifying transportation system and facility management processes that must be put into place, including local transportation demand management and financing principles. • Identifying land use patterns that must be put into effect to achieve the goals of the transportation plan. PageL5 of V - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 - 1239 • Identifying local, state and federal roles in implementing the plan and setting planning and performance criteria for modal implementation plans and local and regional transportation plans. • Estimating the financial requirements to implement the plan. The preferred plan makes several fundamental assumptions about the future of Oregon. Without these assumptions, the effectiveness of the plan would be limited. Regional and local governments will continue to contain development within established urban growth boundaries. 2. Urban areas will use compact and mixed-use development patterns to enhance livability and preserve open space. These patterns will also support transit and other alternatives to the automobile. 3. The transportation system will achieve the transportation -related economic and livability standards of the Oregon Benchmarks. 4. State, regional and local governments will cooperate to achieve the vehicle miles travelled reduction standard in the LCDC Transportation Rule. 5. In rural areas, automobiles will continue to be the dominant transportation alternative available for most purposes, although transit, intercity bus and rail options will grow. is 6. Telecommunications will develop substantially because of costs to motor vehicles. It will provide a significant alternative to making transportation trips. 7. The price for transportation services can reflect full costs and lead to expanded use of alternatives to the single occupant vehicle. 8. Most transportation services, other than public transit, will be provided by the private sector. 9. If the preferred plan cannot be implemented in its entirety, land use and system management strategies will still be implemented to the fullest extent possible. The Preferred Alternative includes the following specific recommendations, which apply to Deschutes County, to be in place by the Year 2012: • Walking and bicycle trips at double the present rate; • Intercity bus or commuter bus service available to cities of over 2,500 population; • Urban transit service available in communities over 25,000 population; • Intermodal passenger terminals established in Portland, ...and Bend/Redmond; • Expanded air freight handling capability at all commercial airports; Page A� of r7 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) E ] 169 1240 • Truck/rail freight reload hubs established in Medford, ...Bend; • Full implementation of the LCDC Transportation Rule. The preliminary cost estimate for the preferred alternative to be implemented statewide is approximately $12 billion over the next 17 years. This amount includes all local, state and federal commitments. Fifty-seven percent (57%) of the funding is earmarked for roads, streets, and highways, with the remainder pledged for new investments in railroads, ports, aviation, intercity bus, and transit. An important aspect of the Plan is the Oregon Benchmarks, adopted in 1991 by the legislature as state objectives. The benchmarks are identified in Table 2c. Table 2c Oregon Benchmarks Percentage of Oregonians living in areas that meet 100% governmental ambient clean air standards Percentage of Oregonians with less than 30 -minute 88% (one-way) home -to -work commutes Percentage of Oregonians living within 50 miles of an 75% airport with daily scheduled passenger air service Backlog of city, county, and state roads and bridges in 5% need of repair and preservation The Plan considers land use policies as the primary tool to guide development of the state while protecting its resources, livability, and developing its economy. For rural areas, land use planning is expected to promote development through the logical planning and extension of public infrastructure and the services necessary to support new industry and development. The transportation implications include the development of more compact, mixed use, pedestrian -friendly developments and that facilities are designed to support locally -adopted comprehensive plans. In rural areas, communities need to enhance levels of transportation and connections between modes to improve access and economic development. Page A7 of A7 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 1241 • Appendix B OREGON STATE HIGHWAY PLAN REQUIREMENTS .7 0 Page BI of 8� - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 1242 OREGON STATE HIGHWAY PLAN Level of Importance (LOI) This strategy classifies the state highway system into four levels of importance. Each LOI is defined in terms of primary and secondary function, highway features, and desired operating character. The following are the LOI for state highways in Deschutes County: ` LEVEL OFIMPORTANCE� :g 5 A` HIGHWA URBANIZING' � ......o� _�. �_.:. thin Ci Interstate None Statewide US 20 US 97 OR 126 Regional OR 31 (US 97 to Lakeview) District OR 27 (Crooked River Hwy.) Statewide OR 46 (Century Drive Hwy.) C OR 242 (McKenzie Hwy.) Regional Powell Butte Hwy. C O'Neil Highway 0 Level of Service (LOS) For each LOI category, there is a corresponding Level of Service (LOS) standard. These are meant to be minimum standards that guide operational and access management decisions regarding state highways. A total of six LOS standards attempt to quantify the level of comfort experienced by drivers depending on varying traffic conditions. Conditions range from free flow driving with little or no delays (LOS "A"), to extreme congestion at generally unacceptable levels (LOS "F"). In general, an LOS "E" is considered the limit of acceptable traffic congestion. The statewide LOS standards are as follows: LEVEL O 4 9 ,URBAN AREAS URBANIZING' RURAL AREAS IMPO�tTANCE thin Ci AREAS (YNithirt (Outside UGB) k Interstate None in Deschutes County Statewide C C B Regional D C C District D D C /0 Page gZ of 64 -EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 165 - 1213 . Access Management Policy The Access Management policy focuses on statewide access control measures and targets those areas of emerging development rather than retrofitting already built-up areas. The Highway 97 corridor between Redmond and Bend is an example of an emerging development area. The Plan identifies six access management categories into which specific highway segments will be placed. The segments will be assigned a category in conjunction with the development of highway corridor plans. At this time, the corridor plan for Highway 97 is being developed by ODOT, and category assignments have not yet been made. Therefore, it is assumed that the corridors for US 20, US 97, and OR 126 will fall into either category 3, 4, or 5. Congestion Management Tools Consider the following right-of-way and design techniques during project planning and development to reduce congestion and protect the AOH facility. Agreements with local government shall include an understanding in advance that certain of these methods may be used at some future time if area development threatens the facility. This is a listing of only those strategies that may be applicable to rural areas. • Use of access restrictions to control traffic volumes. • Use of landscaped areas or physical barriers as medians. • Grade -separated structures for cross streets, that are unconnected to the AOH facility. • Interchanges. • Frontage or other parallel roads. • Purchase of complete access control. • Right -turn (in/out) only access. Truck Load Restrictions The State Transportation Commission has set a goal of 96 percent of all Oregon highways be modernized to the point of being approved for continuous heavy truck (<80,000 lbs.) usage by the year 2010. It will be up to the ODOT Region Engineer to program reconstruction or resurfacing projects in the Six -Year Transportation Improvement process (TIP) to meet the Commission's goals. The remaining 4 percent of highways do not have the potential to carry significant truck traffic, therefore, they are to be left "as is". The following two "as is" segments are in Deschutes County: REGION HIGHWAY NUMBER DESCRIPTION COMMENTS 3 OR 242 Belknap Springs Jct. to Snowgate Scenic Route (McKenzie Hwy.) 4 OR 27 US 20 to Prineville (Crooked River Few Trucks, Gravel Hwy.) Surface Page 63 of M - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 +1244 • Six -Year Transportation Improvement Program (TIP) ODOT's Six -Year Transportation Improvement Program provides a schedule of state funding for the highest priority projects identified during the statewide planning process. Projects identified in the TIP comply with statewide planning goals and are assumed to be in compliance with local comprehensive plans. is • Page 54 of 64 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 - 1245 • Appendix C Access Oregon Highways (AOH) System • 0 Page 1�_L of S_4_ - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 - 12.6 is Access Oregon Highways (AOH) System The AOH system was developed to focus limited state resources on significant highway segments that provide access through and between major cities, regional centers and interstate cities. The primary goal is to maintain the efficient flow of traffic along these highways, protect right-of-way for future development, guide land uses by coordination with local comprehensive plans, and promote alternative modes and congestion management tools in areas that highway improvements are not cost-effective. Congestion management tools appropriate for rural areas include: • Use of access restrictions to control traffic volumes. • Use of landscaped or physical barriers as medians. • Grade -separated structures for cross streets. • Interchanges. • Frontage or other parallel roads. • Purchase of complete access control. • Right -turn only (in and out) access. In Deschutes County, Highways 20, 97, and 126 are all considered Access Oregon Highways. Goal: The goal of the AOH system is to provide for the economic growth of Oregon by moving through traffic safely and efficiently through and between geographic and major economic areas within Oregon, between Oregon and adjacent states, and to and through major metropolitan areas. • Objective 1: Achieve a network of high speed facilities which will provide maximum levels of service at the highest safe operating safe speeds possible with minimum amounts of delay in transporting goods and people between major economic centers and the interstate system, Implementation Strategy., 1.1 Design AOH facilities to achieve the highest safe operating speed when considering the cost effectiveness of design options, the characteristics, and growth potential of the areas the facility passes through. The operating speeds will in general be at least 55 mph in rural areas and lower density urban fringe areas. 1.2 Develop long-range plans to preserve and in some cases improve facilities so they can meet future traffic demand. In cases where improving an AOH facility to the full standard would either be very costly or produce significant adverse impacts to the surrounding community, a phased plan to achieve acceptable final standards should be developed. 1.4 In cases where the desired operating speeds cannot be met, consider a bypass or congestion management techniques. Congestion management techniques may include access controls, traffic metering techniques, land use controls and • complimentary street and road improvements or increased transit usage to assure that Page CZ of C4 - EXHIBIT B to ORDINANCE No. 98-044 (8/26/98) 1 6 9 °- 1247 design year through travel can be accommodated at acceptable operating speeds. 1.5 Where AOH highways traverse rural geographical barriers that prevent 55 mph operating speeds, establish the highest design standard compatible with the environment but consistent with economic efficiency. Objective 2: Protect the integrity of the AOH routes, which, along with the Interstate, are the most vital links in the state system. Implementation Strategy: 2.1 Consider the intrinsic statewide service value of the AOH facility to the state highway system when evaluating the impacts of adjacent land use. 2.2 In areas of potential development or redevelopment, discourage strip commercial development (direct access to the facility). 2.3 Where prudent, use AOH funds for access control purchase and protective right-of-way purchase. 2.4 Where applicable, include reference to access control in right-of-way documents and correspondence with private parties. 2.5 During project development on an AOH facility, establish two formal "check points" to confirm that a project still meets the goals and objectives of the AOH program: 1) during project scoping, and 2) prior to design approval. 2.6 Where applicable, consider multimodal options and design features for the movement of people and goods to reduce highway improvement needs. 2.7 If during the environmental and design processes it is found that a proposed AOH route cannot be justified, allow AOH funds to be used on other state highways that would serve the same function as the original AOH route. This applies only if the goals and objectives of the AOH system can still be met and the alternate route is approved by the commission for inclusion into the AOH system. Objective 3: Strengthen the partnership between Oregon State Highway Division (OSHD) and local government to achieve mutual highway and community goals. Implementation Strategy: 3.1 Develop projects as required under the Oregon Action Plan for Transportation 1989. The OSHD will work closely with local governments to provide highway improvements PageC3 of C4 - EXHIBIT B to ORDINANCE No. 98-044 (8/26/98) 169 - 1248 that will benefit all jurisdictions. 3.2 Encourage local jurisdictions to amend comprehensive plans during periodic review to recognize AOH corridors within their boundaries, adopt policies, which recognize the statewide transportation functions that those highways serve, and plan for adjacent land uses accordingly. 3.3 Do not proceed with work beyond a reconnaissance level on significant AOH projects that are not recognized in local comprehensive plans and protected by plan policies, which acknowledge the function that the project is to serve. 3.4 Listing of a project in the six-year Transportation Improvement Program does not automatically mean it will be constructed. Before environmental work proceeds on a project where local government is involved, review the purpose and scope of the project with the local government agency to reinforce the importance of maintaining the integrity of the AOH system. The project will not receive design approval, nor will it be constructed until a formal agreement between OSHD and the appropriate local government is signed. This agreement will contain local government and state commitments to insure that measures will be taken to protect the integrity of the AOH system. The formal agreement will specify, where applicable: a) The purpose and functional role of an AOH facility. b) The approximate description and scope of the proposed project. • c) Understandings on protective measures (median closings, street disconnections, local traffic circulation plans, land use controls, etc.) necessary to preserve the operation of the facility. d) Commitment that the local government accepts the major responsibility for future land access as local streets are developed and as properties are redeveloped if OSHD cannot maintain control over access. This will relieve the AOH facility of the land access function. e) Access management plans. Level of detail of plans and requirements can vary according to future chance of conflicting development. f) Responsibility of local government to assume irrevocable jurisdiction of the old road or other state highways that may be replaced by a new facility. g) A shared responsibility for congestion management, which would include some or all of the items listed below and may require local agency financial assistance and participation. 0 Page C4 of Cy - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) Appendix D is Highway 97 Corridor Study n U Page *l of T11 -EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 1249 169 - 1250 Highway 97 Corridor Study Overall Corridor Goal: to promote commerce by efficiently distributing goods and services, while enhancing travel safety, maintaining environmental integrity, and preserving regional quality of life. Key themes for the corridor include: • Enhancing Safety • Facilities Management and Improvement • Intermodal Connections • Interpretive Opportunities and Preservation of Environmental Quality • Economic Development • Partnering State policies, corridor goals and strategy objectives for the US 97 corridor within Deschutes County are as follows: A. Transportation Balance/Intermodal Connectivity Policy: It is the policy of the State of Oregon to provide a balanced transportation system. A balanced transportation system is one that provides transportation options a appropriate minimum service standards, reduces reliance on the single -occupant automobile where other modes or choices can be made • available, particularly in urban areas, and takes advantage of inherent efficiencies of each mode. Goal: The goal for the US 97 corridor includes maintaining and improving Highway 97 to serve the auto and truck travel needs as the primary modes in the this corridor, while maintaining and encouraging the use and connection of alternate modes, including rail, air and intercity bus service through the Corridor, especially in urban or urbanizing areas. The objectives described for each travel mode are intended to create a more balanced transportation system over time. Objective A 1 - Automobiles and Trucks Specific performance objectives for the highway are described in Section C, Highway Congestion, Facility Management and Roadway Conditions Objective A2 - Freight Rail Service The OTP calls for rail lines, including the Burlington Northern Bend Branch and the Southern Pacific Cascade line to be operated at not less than a minimum speed of 25 mph. • Partner with Burlington Northern (and Santa Fe) to maintain average operating speeds of 40-60 mph with the exception of 25 mph maximum speeds in the Deschutes River Canyon of the Bend Branch Line. Pae 2 of D13 - EXHIBIT "B" to ORDINANCE No. 98-044 8/26/98 169 121 Objective A3 - Highway/ Rail Freight Connectivity • Not applicable to the rural areas of Deschutes County. Objective A4 - Public Transportation Service The policy of the OTP is to provide intercity passenger transit service to/from cities or groups of cities with a population of more than 2,500 and located 20 miles or more from the nearest Oregon city with a larger population. The targeted minimum of one trip per day is currently provided by Greyhound Bus Lines. • Develop a coordinated public transportation system over time with multimodal alternatives and proper facilities. • Begin to establish a public transportation system in Bend that coordinates the role of special needs transportation providers and their services. Initially work with local jurisdictions within Deschutes County to establish a local bus service for the elderly and transit -dependent population with "dial -a -ride" service between the Redmond Municipal Airport, Bend, Sunriver and La Pine. Eventually expand to hourly service to selected destinations. • Explore rideshare, park and ride and other pilot programs for providing amenities and unique services that may benefit or supplement public transportation service expansion. Objective A5 - Intercity Bus / Passenger Rail Service and Connectivity A 1992 passenger rail study by ODOT concluded that any new Amtrak service through Central Oregon would be cost prohibitive for the potential benefit derived. • In cooperation with local jurisdictions, railroads, and others, explore development of enhanced intercity bus service as a first step to determining the feasibility of intercity passenger rail service from Redmond to Bend and possibly connecting to Chemult. • Partner with local jurisdictions and private transportation providers to ensure that intercity bus service and passenger rail service includes efficient and reliable intermodal connections (bus, taxi, rental car) to destinations and activity centers. Objective A6 - Air Service and Connectivity The Redmond Municipal airport currently exceeds the minimum level of three daily round-trip flights identified in the OTP. • In accordance with the Oregon Aviation Plan, provide continued support for airport facilities improvements and highway access management, including the Bend and Redmond Municipal Airport and Chiloquin Airport runway expansion plans. • Improve modal connections between Redmond, Bend and Madras airports with Page 93 of III - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 - 1252 surrounding major destinations and activity centers. Work with the private sector to provide transit express bus, taxi and car rental service, as the market demands. Objective A7 - Bicycle /Pedestrian Facilities Develop safe and convenient walkways, bikeways and highway crossings are the goals of the OTP. In addition, the Transportation Planning Rule advocates the provision of pedestrian and bicycle facilities that allow direct, hazard -free travel, such as sidewalks and bike lanes in urban areas. • Through all urban areas, as well as La Pine, Chemult, Crescent and Terrebonne, provide sidewalks and bike lanes on both sides of Highway 97 and safe and convenient pedestrian crossings. Improvements should occur primarily in conjunction with new highway projects or major reconstruction. Retrofit projects will be programmed based on need. • In cases where it is anticipated that there will be little use of a sidewalk or a bike lane on the highway and it would be of greater value to pedestrians and/or bicyclists to construct a parallel facility, then the parallel facility may be improved in lieu of the highway improvement. • All pedestrian facilities and crossings should be accessible to people with disabilities, including hearing, visual, mobility and cognitive disabilities. • Sidewalks should be buffered from the highway with adequate landscaping, shoulders and/or parking in areas with design speeds of 45 mph or above. • ODOT will work with the USFS, the public, and local jurisdictions to develop, where practical, bicycle facilities between Redmond and La Pine that are parallel to Highway 97 using dedicated easements and right-of-way along gas pipelines, old roads, railroads and irrigation canals. Also, work with local jurisdictions to improve local bike/pedestrian networks in Madras, Redmond, Bend and Klamath Falls urban areas. • Cooperate with local jurisdictions to expand the modal share of bicycling and walking trips to work within urban areas in the Corridor to at least double the state average. Objective A8 - Pipelines In order to make alternative fuel widely available and to support regional economic development opportunities, the OTP calls for adequate natural gas to be available every 100 to 150 miles on major transportation corridors, when economically feasible. • Encourage the Public Utilities Commission (PUC) and Pacific Gas Transmission Company (PGTC) to maintain or improve the natural gas transmission line and service provided to communities within the Corridor. 0 Pa4 Page*P of To -EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 1253 B. Regional Connectivity Policy..It is the policy of the State of Oregon to identify and develop statewide transportation system of corridors and facilities that ensures appropriate access to all areas of the state, nation and the world. Goal: The stated overall goal for the Corridor includes promoting commerce through the efficient distribution of goods and services. This will involve coordinating interstate transportation linkages and intrastate services, particularly for the transportation disadvantaged. Objective 81 - Interstate Transportation Connections Highway 97 provides direct access to Washington and California. In addition, the Burlington Northern, Southern Pacific and Union Pacific railroads and Amtrak Coast Starlight lines all provide freight and passenger service within the Corridor for goods and people moving throughout Oregon and the nation. • Partner with Burlington Northern, Southern Pacific, and Union Pacific railroads to identify rail freight transportation issues and to facilitate transfer of freight to rail. Objective 82 - Transportation Disadvantaged Services Transportation disadvantaged populations in the Corridor have their transportation needs met by a variety of service agencies. Coordination of these services could save money and allow for more efficient levels of transit service and reduced reliance on the automobile. • Work with local jurisdictions, public transportation providers, and community-based social service agencies to identify and respond to the needs of the transportation disadvantaged population. Coordinate the services of existing providers to serve all population segments more efficiently. C. Highway Congestion, Facility Management and Roadway Conditions Policy: It is the policy of the State of Oregon to define minimum levels of service and assure balanced, multimodal accessibility to existing and new development within urban areas to achieve the state goal of compact, highly livable urban areas. It is also the policy of the State of Oregon to provide interurban mobility through and near urban areas in such a manner that minimizes adverse effects on land use and urban travel patterns. Goal: The management goal for the Corridor is to provide for safe and efficient high-speed continuous flow operation in rural areas and moderate to high-speed operations of flow in urban and urbanizing areas, and rural development centers. The Corridor goal is to address overall congestion by working with local governments to accommodate local mobility needs while maintaining through travel needs, using Transportation Demand Management (TDM) programs, multimodal facilities and other strategies, in addition to highway capital improvements. The tendency of Highway 97 to act as a linear barrier to Page 95 of DO - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 - 1254 east -west movement of people, goods, and wildlife needs to be reduced, or at least should be minimized by careful design and improved facilities management. Objective C1 - Highway Level of Service and Travel Time • Maintain existing average overall travel times within highway corridors. • Provide highway design -hour LOS "B" in rural areas and "C" or better in urban areas, urbanizing areas and rural development centers. Lower levels of service in selected urbanized segments may be acceptable, as determined during the systems planning process. Objective C2 - Transportation Demand Management/ Rideshare Measures • Continue to expand and support TDM and pedestrian -oriented "mixed-use" development measures in Bend, Redmond, Madras and Klamath Falls urban areas. Build upon the existing Rideshare Program in Deschutes County with other TDM measures such as parking management provisions, traffic impact fees, and support for employer -based commute options such as vanpools, compressed work weeks/staggered work hours, walking, bicycling and telecommuting. • Step up outreach programs to help facilitate TDM objectives. Programs should focus on informing and educating local residents, employees and employers about available TDM measures, efforts and transportation options. Objective C3 - Transportation System Planning and General Planning Coordination • In cooperation with the cities of Madras, Prineville, Redmond, Bend and Klamath Falls and counties of Deschutes, Jefferson and Klamath, develop integrated transportation plans for urban areas and counties that are consistent with the statewide role of the Highway 97 Corridor as set forth by this Corridor Strategy and other state planning policies and goals. Objective C4 - Capacity Improvements • Alternatives such as access management, development of a good local road system and improved land use planning will be essential for effectively managing congestion and where practical, should be implemented prior to, or at least in concert with any capacity improvements. • Partner with local jurisdictions to plan, design and construct highway improvements along Highway 97 in accordance with volume/capacity, safety, environmental and needs analysis. • Within rural highway segments (between communities), focus capital improvements on providing high-speed, safe and continuous flow operation. Rural capacity improvements, particularly those near urban areas, should be designed to limit unplanned development Pagel76 of 913 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 - 1255 0 and changes in rural land use. • As funding becomes available, proceed with developing construction projects identified in the Statewide Transportation Improvement Program (STIP). • Provide spot safety and capacity improvements, which have favorable cost/benefit ratios, to enhance safe access for all modes to and from major destinations. • For sections of the Corridor south of La Pine that demonstrate substandard levels of congestion and safety performance, provide passing lanes at 3-5 mile spacing, with adequate shoulders to accommodate bicycles and emergency vehicles. • In high growth areas of the Corridor between Madras and La Pine that demonstrate substandard levels of safety and performance, provide roadway widening in accordance with a four -phased approach. Objective C5 - Truck Routes • Work with local jurisdictions to evaluate the need, feasibility, cost and desirability of truck route modifications (such as the North Canal Blvd. Option in Redmond). Support implementation where practical. Objective C6 - Facilities Management • Work with local jurisdictions to adopt and implement access management policies along the entire corridor that are consistent with the Oregon Highway Plan. Specific access management classifications should be adopted along Highway 97 during the Transportation System Planning and Comprehensive Planning process. • ODOT and local jurisdictions should adopt and implement consistent standards regarding left turn lanes, raised medians, driveway spacing, acceleration/decelleration lanes, turn refuges and means to enhance the local street network (e.g., better use of parallel local streetsand service roads) to safely handle local traffic, improve pedestrian access and crossings, and relieve congestion in urban and urbanizing areas, and rural development centers along Highway 97. Objective C7 - Interchanges and Grade Separations • Increased through and cross traffic volumes will generate high levels of congestion and poor safety performance at some intersections. ODOT policy does not allow signalization of rural intersections in 55mph highway segments. Consequently in rural highway segments, when intersections are projected to meet signal warrants, are on the Safety Priority Index System (SPIS), or are needed to address a strategic element of a more detailed system plan for a high growth area, plan for interchanges or simple grade separations. Other alternatives, such as median treatments, or local road closure will be . considered prior to planing for the grade separation, and if practical, will be implemented. As appropriate, seek cost participation by private developer(s) and/or the County. PageTl of _V�l - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 -1256 0 Objective C8 - Right -of -Way Preservation • Where cost-effective, sufficient right-of-way should be preserved for planned transportation improvements. Wherever practical, this step should occur through the local land -use process. Objective C9 - Roadway Conditions • Focus improvements on segments with above average accident rates, high congestion and a favorable cost/benefit ratio. • Consider new regional partnerships between ODOT and counties to share roadway maintenance and funding for capital improvements, particularly in areas experiencing economic downturns from reduced timber revenues. • Provide minimum paved shoulder of six to eight feet, in accordance with design standards, as roadway segments are modernized. • Develop an aggressive surface preservation program that achieves 88 percent fair or better conditions and reduces winter breakup pavement problems. D. Safety Policy: It is the policy of the state of Oregon to continually improve the safety of all facets of statewide transportation for system users, including operators, passengers, pedestrians, recipients of goods and services and property owners. According to the Safety Priority Index System (SPIS), in 1992 there were 27 high accident locations along Highway 97 and the accident rate in the section from Madras to La Pine far exceeded the statewide average. Goal: The Corridor goal is to identify and give priority to improving safety conditions along the Highway 97 Corridor through necessary improvements, while addressing problems associated with game crossing areas, speeding through rural centers and congestion in urban areas. Objective D1 - Traffic Calming • In selected small communities (e.g., Terrebonne, La Pine) consider traffic calming measures (e.g., curb extensions, signage, raised medians), Intelligent Transportation Systems (i.e., electronic monitoring), and facilities management measures to help slow traffic to posted speed limits and to improve safety. These measures will be planned and developed in cooperation with the local community. Objective D2 - Vehicle Recovery Zones • From Sunriver south to the peak of Spring Creek Hill, plan for separating the northbound and southbound lanes with a wide natural vegetation median wherever possible. Median Page V of TO - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 - 1257 40 vegetation will emphasize plant species that maximize motorist safety while minimizing ecological impacts including wildlife/vehicle collisions, non-invasive species and aesthetics. • Provide tree thinning in segments of Corridor to reduce sun glare/strobe effect, improve driver visibility, help melt snow/ice and possibly reduce wildlife -vehicle collisions, particularly between Bend and Modoc Point. Preserve selected trees and shrubs to improve aesthetics and ecological conditions. Objective D3 - High Accident Locations • In cooperation with local officials, identify and develop strategiues wherer warranted to provide proper signage and necessary mitigation measures at high -accident locations such as sharp curves, areas prone to icing, rock falls, significant wildlife crossings and areas of high pedestrian activity. • During the Corridor planning process, consider and plan for facilities management improvements such as acceleration/decelleration lanes, left turn lanes, and enhanced local street network and signalization (i.e., blinking yellow lights) to improve safety performance at high accident intersections. Objective D4 - Vehicle/Wildlife Collisions • Work with the Oregon Department of Fish and Wildlife during the County Transportation Planning Process to identify and implement measures to reduce vehicle -wildlife collisions. Consider fencing and passage, seasonally concentrated enforcement, driver education and signage as a means to improve safety to motorists and wildlife. • Medians in high collision areas should be designed to allow wildlife movement across the highway. Objective D5 - Enhanced Traffic Enforcement and Safety Education • Consider additional traffic enforcement measures such as electronic measuring in selected small communities (e.g., Terrebonne and La Pine). • Provide Intelligent Transportation System (ITS) techniques, such as automated signage, and advisory radio service to inform motorists about travel conditions (e.g., delays from congestion/accidents, seasonal wildlife migration, inclement weather, forest fires and rock falls). • Work with local jurisdictions to consider safety improvements related to cros-traffic movements on adjacent roads that are impacted by Highway 97. Objective D6 - Rest Stops and Driving Experience 0 • Ensure some type of a "rest area", with access to public or private commercial restroom Page of _'kJ - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 - 1258 facilities, is provided, and meets federal ADA standards for motorists, at spacing consistent with state standards. Consider the placement of seasonal "wildlife migration" signs at the rest area exit lane. • As sections of Highway 97 are improved or upgraded, attempt to enhance the visual experience of the drive to reduce boredom and mitigate accidents, especially between Spring Creek Hill and Sunriver. Consider a variety of means to enhance corridor landscape using vegetation management, scenic vistas, interpretive signage and vehicle pull-outs. • Given the importance of tourism to the regional economy, as well as the scenic and recreational potential of the Corridor, highway improvement design should reflect a high level of aesthetic sensitivity. This includes design of transportation facilities that improves facility appearance, as well as views from the facilities. This will require balancing addiitonal design costs with the functional nature of the improvement, and may require cost participation by local developers and/or jurisdictions. E. Environmental Impacts Policy: It is the policy of the State of Oregon to provide a transportation system that is environmentally responsible and encourages conservation of natural resources. Goal: To promote the efficient and effective movement of goods, services and passengers and to avoid, whenever possible, impacts to areas/locations of environmental and cultural significance, and create opportunities for scenic and interpretive signage, viewpoints, and turnouts, and to assure consistency with local and state agency plans and policies. Objective E1 - Scenic and Cultural Resources • Develop scenic and interpretive opportunities throughout the Corridor. • Utilize programs of educational signage for scenic resources, wild and scenic rivers, state scenic waterways, and other natural features consistent with Scenic Byways Program. • Encourage land use controls to protect corridor view sheds, (i.e., along mile 145.6-147.6 and 150.5-159.0). • Support the development of viewing and educational opportunities for the public, focusing on sensitive, threatened and charismatic wildlife (i.e., Swainson's hawks, bald eagles, antelope), and display the scenic, geologic, and recreational resources. Objective E2 - Emergency Response, Hazardous Materials Accident and Spill Management • Provide minimum shoulder width for emergency response vehicles, such as fire trucks. • • Manage shoulder vegetation to reduce wildfire hazard. Paged of1 1 -EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 - 1259 • In cooperation with local governments, Native American Tribes, federal/state agencies, Southern Pacific and Burlington Northern Railroads, and Pacific Gas Transmission Company, participate in regional emergency response and hazardous materials accident spill management programs for the Corridor. Objective E3 - Maintenance Plans for Environmentally and Culturally Sensitive Areas • In cooperation with state and federal agencies, develop maintenance plans, including special signing and crew training to avoid, minimize or mitigate adverse effects of highway maintenance operations on environmentally sensitive portions of the Corridor (e.g., scenic resources, federal wild and scenic waterways, state scenic waterways, wetland and riparian habitats). Encourage Burlington Northern and Southern Pacific Railroads and Pacific Gas Transmission Company to develop and abide by similar plans. Objective E4 - Wildlife Crossing Areas • In cooperation with federal and state resource agencies, local governments, Native American Tribes, and the public at large, develop strategies to allow the safe movement of wildlife across highways and the maintenance of their forage base and habitats, thus insuring healthy fish and wildlife communities. • In cooperation with local officials, Oregon Department of Fish and Wildlife (ODFW) and Oregon State Police (OSP) identify and implement strategies to address high wildlife crossing and accident locations. • In cooperation with ODFW, identify and reduce "attractive nusiance" aspects of highway developments that might attract and hold wildlife near roadways. Objective E5 - Wildlife Mitigation • In cooperation with ODFW, identify acceptable mitigation for engineering designs that increase wildlife impacts such as population loss or habitat loss. Mitigation measures could include wildlife water developments or habitat improvements (i.e., forage or cover). Objective E6 - Air Quality • Other than Klamath Falls, work with jurisdictions to maintain their attainment status. F. Social and Land Use Policy: It is the policy of the State of Oregon to develop transportation plans and policies that implement Oregon's Statewide Planning Goals, as adopted by the Land Conservation and Development Commission. It is also the policy of the State of Oregon to provide a transportation system • consistent with, yet recognizing differences in, local and regional land use and an economic development plan. PagejLtl of _1!) - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 - 1260 Objective F1 - Transportation -Land Use Integration • Work with local jurisdictions to optimize the local street network, utilize access management, and manage land use development patterns. • Work closely with small communities such as La Pine to consider refocusing their local comprehensive plans in accordance with an available land and existing/planned transportation infrastructure. Assist communities, as appropriate, in planning for the development of commercial centers on parallel or adjoining local roadways. • Support patterns of development that avoid or eliminate significant at -grade railroad crossings, whenever possible. Assist local jurisdictions in amending local comprehensive plans to avoid, consolidate and/or eliminate at -grade crossings. • Work with local jurisdictions to minimize landuse conflicts near airports. • Rural capacity improvements, particularly those near urban areas, should be designed to limit unplanned development and changes in rural land use. Objective F2 - Accommodate Elderly Users The growth rate for population over the age of 55 is projected to outpace the average overall populaton growth in the County 4 • Evaluate the needs of elderly transportation users, especially in urban areas where elderly population is rapidly increasing. Work with local jurisdictions to provide: better lighting and signage, paratransit service, transit connections to airports and medical facilities, and enhance emergency response systems. • Objective F3 - Social, Cultural and Recreational Resources • Avoid impacts to cemetaries, parks and historic resources, including: Peter Ogden Wayside Park; Robert W. Sawyer State Park; Terrebonne Ladies Pioneer Club; Harper School; La Pine Commercial Club Building; and the Vandervert Homestead. • Develop strategy to accommodate livestock crossing, with consideration for wildlife crossing needs. G. Energy Policy: It is the policy of the State of Oregon to assure provision of an efficient transportation system. The Highway 97 Corridor policy is to minimuze transportation -related energy consumption through the use of fuel-efficient modes of travel, enhance vehicle efficieincies, and improved design, construction and operation of transportation facilities. Page 912- of V%3 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 - 1261 • H. Economic Development Policy: It is the policy of the State of Oregon to promote the expansion and diversity of Oregon's economy through the efficient and effective management of goods, services and passengers in a safe, energy efficient and environmentally sound manner. Objective H1 - Strengthen Business and Industrial Base • Continue to work with existing business and industry to identify issues and concerns regarding Highway 97, while promoting Travel Demand Management (TDM) programs, including telecommunications. • Expand tourism by combining traffic calming measures with signs marking amenities and attractions in small communities; providing rest stops/scenic waysides; and developing interpretive sites within the Corridor. Objective H2 - Interpretive Corridor • Work with federal and state resource agencies, local governments, Native American Tribes, local businesses, and the public to identify scenic, environmental and cultural resources along the Corridor that can be protected, enhanced, and/or restored, while being developed as interpretive sites. • Consider partnerships with the above-mentioned groups in the development of funding and management agreements to develop and enhance interpretive centers and waysides. Objective H3 - Intermodal Reload Facility Only applies to urban areas within the Corridor. Objective H4 - International Air Freight Facility Only applies to Klamath Falls International Airport. Implementation The Corridor Strategy objective for the U.S. 97 Corridor are intended by ODOT to embody the overall goal for the Corridor and establish direction and provide guidance for corridor -wide transportation plans and enhancements over the next 20 years. The Corridor Stategy was endorsed by the Deschutes County Board of Commissioners in October 1995. Once endorsed, the Strategy became the guiding document for detailed transportation system planning and comprehensive planning, which will establish corridor improvement priorities for state funding; thereby ensuring that future transportaiton facilities and services optimise the needs of Oregon's Corridor stakeholders. Page213 of 1)%3 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 0 Appendix E • • 169 - 1262 OREGON TRAVEL BEHAVIOR SURVEY Page aL of _E3Z - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 a 1263 • Oregon Travel Behavior Survey Summary of Findings for Deschutes County r� Submitted to: Oregon Department of Transportation 555 13 St., NE Salem, Oregon 97310 Submitted by. NuStats International 3006 Bee Cave Road, Ste. A-300 Austin, Texas 78746 May 1997 • Exhibit Page 5? of f'3 2. Ordinance qR- VA4 169 ~' 1264 Table of Contents Executive Summary ...........................................................................1 II Sampling and Response....................................................................2 III Household Characteristics................................................................. 7 IV Person Characteristics.....................................................................11 V Travel Characteristics......................................................................15 VI Item Non-Response......................................................................... 21 Technical Appendix: Methods �/ Exhibit page U_ of E32 Ordinance`�- 0 0 • Deschutes County DESCHUTES COUNTY SUMMARY OF FINDINGS 1 Executive Summary 169 - 1265 Introduction The purpose of the 1996 Oregon Travel Behavior Survey is to provide information suitable for gaining an in-depth understanding of the activity and travel behavior of both households in non - metropolitan areas and the individuals within those households. The sampling approach used was designed to ensure that representative statewide data were obtained. The 1996 Oregon Travel Behavior Survey was conducted under the auspices of the Oregon Department of Transportation. This survey relied on the willingness of area residents to complete diary records of their daily travel. Recruitment of households was conducted through a "recruitment interview" in which respondents were informed of the survey, its purpose and the respondent's obligation to complete diaries. Data on households and household members were also collected during the recruitment interview. Participating households were assigned a "2 -day travel period", which typically occurred 10 days after recruitment. Household members were asked to recons travel information in their diaries for the specified 48-hour period. Immediately after the assigned date, households were contacted to retrieve the diary information. The survey consisted of a scientifically formulated sample design, appropriate instruments for data collection, a package of written materials to communicate with survey respondents, a toll-free survey hotline, and data collection, processing and reporting procedures that comported to standards of the Council of American Survey Research Organizations (CASRO). Data collection for Deschutes County was conducted from April to December 1996. Data collection resulted in 1,208 recruited households. Of these, 775 provided the necessary information to result in completed surveys. The total number of activities reported was 50,439, and the total number of trips was 11,445. These totals translate into an average of about 65 activities and about 15 trips per household for the two-day period. Average Person Trips Per Day • One-person households averaged 3.40 trips per day, • Two -person households averaged 5.84 trips per day, • Three-person households averaged 8.80 trips per day, • Four -person households averaged 13.11 trips per day, • Five -person households averaged 17.23 trips per day. The average rate for all households was roughly eight (8) trips per day. Summary of Methods The accompanying "Technical Memorandum" describes the sampling methodology in detail. Exhibit Page 6'1— of E3Z Ordinance 1%044 --------------------------------------------------------------------------------------------------------------------- Oregon Travel Behavior Survey Page 1 Deschutes County II Sampling and Response 169 - 1266 Sample Design The universe consists of households in the cities of Bend, Redmond, Sisters, and Terrebonne in Deschutes County. The household count for the study area was 29,400 households. It was determined using projections of annual growth rates from 1994 and/or 1995 commercial estimates. For purposes of the survey, a household was defined as "all persons currently living in the same dwelling who typically share meals together as well as share at least a part of their income." The Oregon Travel Behavior Survey used a random sample of telephone numbers in the study area. A random sample is one in which the probability, or relative chance, that any given household will be included in the sample is the same for all households in the universe. The sampling frame for the Oregon Travel Behavior Survey consisted of listed and unlisted telephone numbers for Deschutes County drawn in proportion to their distribution within the county. Due to the nature of the sampling frame requested in the survey proposal, households without telephones were excluded from the sample. The Deschutes County sample included the cities of Bend (zip codes 97701, 97702, 97707), Redmond (zip code 97756), Sisters (zip code 97759), and Terrebonne (zip code 97760). These zip codes account for 94% of the total households in the county. Response Rate The Oregon Travel Behavior Survey used a two-stage sampling process (household recruitment and household retrieval). In such a case, response rates for recruitment and retrieval stages are reported independently, and then an overall response rate is reported by multiplying the two rates. The recruitment rate is calculated using the following formula: Recruitment rate = Number of Recruited Households Number of Eligible Households in Sample The number of recruited households is known - 1,208 households. The number of eligible households in the sample is calculated from the dispositions recorded for each sample piece. Contact attempts yielded three types of sample dispositions: (1) Eligible Sample, (2) Ineligible Sample, and (3) Eligibility Unknown Sample (see Table II -1). In estimating the eligible households, the number of eligible sample units is combined with a pro -rated number of eligibility unknown sample units. The pro -rated number is determined by totaling the number of eligible and ineligible sample, and then identifying the portion of the total comprised by eligible or ineligible sample. The number of eligible households is then calculated by adding the proportion of unknown sample (61%) to the total number of recruited households. The recruitment rate for households in Deschutes was bu% or an enaime nousenows. Recruitment Rate Calculation Number of Recruited Households Total Number of Eligible and Ineligible Sample Proportion of Eligible Sample Proportion of Ineligible Sample Number of Eligible Households Recruitment Rate Exhibit g -------------------=-------or S----u-------------------------------------------------------Page -1;�------of--- T - Oregon Travel. Behavirvey Page 2 Ordinance -o4y Q6 is • • Total] Calculation Percent 1,208 1,684 + 1,097 2,781 1,684/2,781 61% 1,097/2,781 39% 1.684+729 2,416 1,208/2,416 50% Exhibit g -------------------=-------or S----u-------------------------------------------------------Page -1;�------of--- T - Oregon Travel. Behavirvey Page 2 Ordinance -o4y Q6 is • • • • • Deschutes County Table II -1 Final Sample Dispositions (n=3,976) 169 - 1267 Dispositions Fruencyeq Percent Total �rrj 21.2% Wednesday/Thursday 20.3% Thursday/Fnidw 22.2% ' 0.0% p ercent Eligible Sample Recruited 1,208 30.1% Second Refusal 396 10.0% Terminated in middle of interview 22 0.6% Over Quota 58 1.5% 1,684 Ineligible Sample _ 27..60/c Disconnected Number 589 14.8% Deaf/Language 15 0.4% Business/Government 344 8.7% Computer/Fax 116 2.9% Non -Qualified 25 0.6% Non -Resident 8 0.2% 1,097 Eligibility Unknown Sample a 30.0% First Refusal 419 10.5% No Answer 278 7.0% Busy 44 1.1% Answering Machines 354 9.0% Call Bads AppointmentstRequests 100 2.5% 1,195 a Total SarnoIpPieces 100.0"/6 The completion rate is the rate at which recruited households complete the survey process. It is a measure of sample attrition, which is one determinant of sample bias. This rate is calculated by dividing the total number of completed surveys (775) by the total number of requited households (1,208). A completion rate of 64% was obtained. The Overall Response Rate is calculated by multiplying the recruitment rate (50%) by the completion rate (64%) for a rate of 32%. The final day -of -week distribution is displayed in Table II -2. It shows a greater number of interviews completed for the beginning of the week, which should be taken into consideration during analysis. Table II -2 Travel Day of Week Distribution (n=775) =r Travel Da ";}Parrs=s Y ,. ,:Percent::. Monday/TuesdaY 36.4% Tuesd /Wed 21.2% Wednesday/Thursday 20.3% Thursday/Fnidw 22.2% Fridaypaturday 0.0% Su /M 0.0% y a Exhibit Page E( � of E3-4 Ordinance 9 e -'yy ---------------------------------------------------------------------------------------------------------------------- Oregon Travel Behavior Survey Page 3 169 - 1268 Deschutes County Survey Validation • The objective of validation was to estimate the precision of the survey results and evaluate the reasonableness of the survey results. The survey validation involved comparing regional population and housing characteristics with the 1990 STF-3A Census data for Deschutes County for reasonableness. In 1990 Deschutes County had 74,958 residents in 29,400 households; the total number of housing units was 35,928 while the number of occupied housing units was 29,217. During the study, 1,208 households were recruited, and 775 actually completed the survey. A completed household is one in which all members of the household completed a travel and activity diary. The following three tables (11-3, II -4, and II -5) compare survey data to Census parameters to identify potential biased estimates. Low-income households (under $10,000) are under -represented in the survey sample as compared to Census data (Table II -3). Several factors account for this discrepancy. First, it is likely that many of the households that refused to answer the income question fell into this category. Second, the survey contacted only telephone households, while the Census reached every household. Non -telephone households tend to have lower incomes than telephone households, and this bias is reflected in the data. Third, many low income households are hourly workers who are also multiple job holders. These people are difficult to reach via telephone because they are not home during regular calling hours. Fourth, many low income households also report low educational levels. Persons with low education are often intimidated by the survey diary package. When compared to Census data, two -person households are over -represented in the sample (Table II -4). The factors underlying this discrepancy include the following. Two person households typically do not have a large number of activities and travel to report. Therefore, the burden in terms of participation is relatively light. Large households, on the other hand, usually must report a greater number of trips. Therefore, the perceived burden of the survey is greater. In addition, to be 'complete all members of the household must have provided data. It is more difficult to retrieve activity and travel data from all members of large households. The sample distribution in terms of number of vehicles owned also diverges from the Census data (Table II -5). The sample contains disproportionately fewer zero, one, and two -vehicle households than the population. N ^ 11 _xhibit IVG 'age:E— of C32.._ -Ir linarlc@ ---------------------------------------------------------------------------------------------------------------------- Oregon Travel Behavior Survey Page 4 • • Deschutes County Table II -3 Household Income 169 - 1269 Income Recruited ' Households n=1208 Completed Households n 775 Census n=29,400 $0-$4,999 1.3% 1.5% 4.5% $5,000,$9,999 2.9% 3.4% 8.0% $10,000-$14,999 5.5% 5.0% 10.7% $15,000-$19,999 7.4% 7.0% 11.0% $20,000-$24,999 9.2% 9.3% 10.4% $25,000-$29,999 8.2% 9.2% 10.4% $30,000-$34,999 5.5% 5.3% 9.2% $35,000-$39,999 6.9% 8.3% 7.1% $40,000-$44,999 8.4% 9.5% 6.2% $45,000$49,999 7.8% 8.3% 4.7% $50,000$54,999 5.7% 5.7% 4.2% $55,000-$59,999 4.1% 5.2% 3.0% $60,0004100,000 10.5% 11.0% 7.3% $100,000 or more 3.8% 1 3.9% 3.2% Refused 12.8% 7.6% - Table II -4 Household Size Persons per .Household Recruited Households.. n=1208 Completed Households. n=775 Census Data n=29,400 1 Person 20.1% 22.1% 21.0% 2 Persons 42.9% 44.4% 39.5% 3 Persons 14.6% 14.3% 16.0% 4 Persons 14.7% 12.9% 14.9% 5 Persons 6.0% 5.4% 5.9% 6 Persons 1.2% 0.5% 1.8% 7 or More Persons 0.5% 0.4% 0.9% Refused 0.00/0 0.0% - ------------------------------------------------------------------------- Oregon Travel Behavior Survey Page 5 Exhibit Page . 8 of 32 Ordinance q a- °`ty Deschutes County Table 11-5 VahiMac nunilahlo nor Occupied Housing Unit 169 - 1270 :; - --:Rectiited;-.MCompleted.= : Census Vehicles Available Id s Data -hi ,.. `.. ; n .T16 &29,21.7 None 2.6% 2.7% 3.9% One 20.9% 23.1% 26.6% Two 40.6% 39.9% 43.3% Three 20.4% 20.3% 18.1% Four 9.4% 8.8% 5.4% Five or More 6.0% 5.2% 2.7% Refused 0.0% 0.0% - Exhibit d Page Eq of E32. Ordinance '9b -N4 ---------------------------------------------------- -------------------- Oregon Travel Behavior Survey • • • • • • Deschutes County III Household Characteristics 169 1211 The following tables provide information about respondents' households. Where available, collected data is compared to Census Data. Table III -1 Household Size by Income (Completed Households=775) -----------------------------------------------------------7------------ Oregon Travel Behavior Survey Page 7 (I able continues on neu page) Exhibit Q Page Eio of JE3z Ordinance q 8., °'N 'HH Size :,Row=.. Income 1 2 3. ` 4 5 ?. , .. .,... Total less Count 8 3 1 0 0 0 12 than Row % 66.7% 25.0% 8.3% 0.00/0 0.00/0 0.0% $4,999 Column % 4.7% 0.9% 0.9% 0.0% 0.0% 0.0% 1.50A $5,000 Count 16 7 2 1 0 0 25 to Row % 61.5% 26.9% 7.7% 3.8% 0.0% 0.0% $9,999 Column % 9.4% 20% 1.8% 1.0% 0.0% 0.0% 3A% $10,000 Count 24 14 0 1 0 0 39 .to Row % 61.5% 35.9% 0.0% 26% 0.0% 0.0% $14,999 Column % 14.0% 4.1% 0.0% 1.0% 0.0% 0.0% 5.00/0 $15,000 Count 16 27 6 2 2 1 54 to Row % 225% 47.9% 11.1% 3.7% 3.7% 1.9% $19,999 Column % 9.4% 7.8% 5.4% 20% 4.8% 14.3% 7.00/0 $20,000 count 24 27 9 8 3 1 72 to Raw % 33.3% 37.5% 125% 11.1% 4.2% 1.4% $24,999 Column % 14.0% 7.8% 8.1% 8.0% 7.1% 14.3% 9.3% $25,000 count 16 34 11 7 3 0 71 to Row % 225% 47.9% 15.5% 9.9% 4.2% 0.0% $29,999 Column % 9.4% 9.9% 9.9% 7.0% 7.1% 0.0% 9.2% $30,000 Count 13 13 5 8 2 0 41 to Row % 31.7% 31.7% 12.2% 19.5% 4.9% 0.0% $34,999 Column % 7.6% 3.8% 4.5% 8.0% 4.8% 0.0% 5.3% $35,000 count 14 31 5 11 3 0 64 to Row % 21.9% 48.4% 7.8% 172% 4.7% 0.0% $39,999 1 Column % 82%. 9.0% 4.5% 11.0% 7.1% 0.0% 11 8.3% -----------------------------------------------------------7------------ Oregon Travel Behavior Survey Page 7 (I able continues on neu page) Exhibit Q Page Eio of JE3z Ordinance q 8., °'N Deschutes County - 1 6 S 1272 Table III -1 (Continued) Household Size by Income (Completed Households=775) a kw. ,. ;HH Size.: '::,= �. Total $40,000 Count 9 32 15 10 8 0 .74 to Row % 122% 432% 20.3% 13.5% 10.8% 0.0% $44,999 Column % 5.3% 9.3% 13.5% 10.0% 19.0% 0.0% 9.5% $45,000 Count 6 30 12 12 1 3 64 to Row % 9.4% 46.9% 18.8% 18.8% 1.6% 4.7% $49,999 Cdumn % 3.5% 8.7% 10.8% 120% 24% 429% 8.3% $50,000 count 7 12 4 14 7 0 to Row % 15.9% 27.3% 9.1% 31.8% 15.9% 0.0% $54,999 Column % 4.1% 3.5% 3.6% 14.0% 16.7% 0.0% 5.7% $55,000 Count 4 16 10 4 5 1 40 to Row % 10.0% 40.0% 25.0% 10.0% 125% 25% $59,999 Column % 23% 4.7% 9.0% 4.0% 11.9% 14.3% 5.2% $60,000 Count 2 46 20 12 5 0 85 to Row% 24% 54.1% 23.5% 14.1% 5.9% 0.0% $100,000 Cdumn % 1.2% 13.4% 18.0% 120% 11.9% 0.0% 11.0% more Count 0 20 8 2 0, 1 30 than Row % 0.0% 66.7% 23.3% 6.7% 0.0% 3.3% $100,000 Column % 0.0% 5.8% &3% 20% 0.0% 14.3% 3.9% count 12 32 4 8 3 0 59 Refused Row % 20.3% 54.2% 6.8% 13.6% 5.1% 0.0% Column % 7.0% 9.3% 3.6% 8.0% 7.1% 0.0% 7.6% column count 171 344 111 100 42 7 775 Total % 22.1% 44A% 14.3% 129% 5d% 0.9% 100.0•/0 Exhibit 3 -.Page E I I of E 37- Ordinance 2Ordinance- 15221 ---------------------------------------------------- P -- on OregTravel Behavior Survey age • • • • Deschutes County 1 6 9 12 7 3 Table III -2 Household Size by Number of Vehicles Available (Cnmeleted Households=7751 ------------------------------------------------------------- Onegon Travel Behavior Sufvey Page 9 Exhibit Page lZ of 1637- Ordinance 3ZOrdinance 98-644 HHStre Vehicles 1 2', 3 4 8 6f Tofe1= Court 19 2 0 0 0 0 21 None Raw % 90.5% 9.5% 0.0% 0.0% 0.0% 0.0% Column % 11.1% 0.6% 0.0% 0.0% 0.0% 0.0% 2.7% Court 102 55 14 4 3 1 179 1 Row % 57.0% 30.7% 7.8% 2.2% 1.7% 0.60/0 Column % 59.6% 16.0% 126% 4.0% 7.1% 14.3% 23.1% Court 34 169 44 42 18 2 309 2 Row % 11.0% 54.7% 14.2% 13.6% 5.8% 0.6% Column % 19.9% 49.1% 39.6% 420% 429% 28.6% 39.9% Count 11 70 30 30 17 2 157 3 Row % 7.0% 44.6% 19.1% 19.1% 8.9% 1.3% Column % 6.4% 20.3% 27.0% 30.0% 33.3% 28.6% 20.3% Count 2 30 16 14 5 1 68 4 Row % 29% 44.1% 23.5% 20.6% 7.4% 1.5% Column % 12% 8.7% 14.4% 14.0% 11.9% 14.3% 8.8 Court 3 18 7 10 2 1 41 5 or more Row % 7.39'0 43.9% 17.1% 24.4% 4.90/6 24% Column % 1.8% 52% 6.3% 10.0% 7.2% 14.3% 5.3% Court 0 0 0 0 0 0 0 Refused Row % 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% Column % 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% IL 0.00% Column count 171 344 111 100 42 7F776Total % 22.1% 44A% 14.3% 129% SA% 0.97676 ------------------------------------------------------------- Onegon Travel Behavior Sufvey Page 9 Exhibit Page lZ of 1637- Ordinance 3ZOrdinance 98-644 Deschutes County Table 111-3 n...elUrsev Tvne IA11 14mminn llnifsl 169 - 1274 :{Type of Dwelling <Recnnted ti Househo" Ift ��aCompleted:: "households r Census Data Single, Detached 78.1% 78.1% 66.0° Multi Unit 8.0%. 8.1% 12.9% Mobile Home or Trailer 11.8% 11.6% 20.6% Other 2.0% 2.1 % 0.5% Refused 0.1% 7 7 0.1% — Table 111-4 n....s.ioe..ter Ctnt.tc Ineeminiad 14mmina Units) Ownership Status Reciulfed Completed ... Census: ...3 ._ .:: Households Households . ata f'4n 775 ,., Own 76.7% 77.7% 71.0% Rent 22.9% 22.1% 29.0% Other 0.1% 0.1% — Refused 0.3% 0.1% — Exhibit Page 13 of E3Z Ordinance 9 b - cyy -------------------------------------------------------------- Oregon Travel Behavior Survey Page 10 • • 11 169 - 1275 Deschutes County IV Person Characteristics • The following tables provide information about the respondents themselves. Where available, collected data is compared to Census Data. • • Table IV -1 Gender Recruited Gender-, Percentage 0=3,013 :. Completed Percentage- n='1,848 Census Data n=74,958 - Male 50.6% 50.6% 50.0% Female 49.3% 49.4% 50.0% Refused 0.1% 0.0% - Table IV -2 Age of Household Members r - yS ;Age Recruited Percentage =3,013 Completed - Percentage : n 1;848 Census Data 0-4 6.1% 6.4% 6.9% 5-9 7.5% 7.2% 7.5% 10-14 7.4% 6.3% 7.3% 15-19 6.0% 5.1% 6.3% 20-24 5.3% 5.0% 5.0% 25-34 13.5% 14.3% 15.1% 35-44 16.4% 15.1% 17.7% 45-54 14.8% 16.0% 11.1% 55-64 10.2% 11.1% 9.0% 65-74 8.2% 8.9% 8.8% 75+ 4.0% 4.4% 5.1% Refused 0.6% 0.2% - ------------------------------------------------------------- 6regon Travel Behavior Survey Page 11 Exhibit Page Et4 of E32 - Ordinance q s- c;q Deschutes County Table IV -3 1 nrivigim by Ppr,cnns 169 - 1276 - -----Recruited, Recruited" ==:Completed. CCensus- License Status „, Percentage;;; :.;>~ Percentage::.. '. Data Employed n=3;0.13 ''': n.=1,848 62.7% Licensed74.0% 75.9% - Non -Licensed 4.9% 4.1% 3.2% Not Applicable (under 21.1%.. 20.0% - 15 years of age) 26.1% 27,5 34.1% Refused 0.0% 0.0% - Table IV -4 C sor ,mo%* Q#'+iia by Pamnns 16 and older Table IV -5 TAIAAAMM■.�A c+�+..� by Fmnlnvpd Persons Telecommuteto Recruited`. ;;:;Completed.`::.;;.`: Census Recruited" :Completed `:.:Census n=1;563_ Employment Status Percentage - +:" n=2;334 ';' Percentage '_ n=1 455 Data n=57,230 Employed 67.0% 66.9% 62.7% Unemployed 6.8% 5.5 3.2% Not in Labor Force 26.1% 27,5 34.1% Refused 0.1% 0.1'/10 - Table IV -5 TAIAAAMM■.�A c+�+..� by Fmnlnvpd Persons Telecommuteto Recruited`. ;;:;Completed.`::.;;.`: Census Work? Percentage":_: ..-Percentage:: :. -Data n=1;563_ n=972 Yes 7.9% 8.0% No 91.9% 91.96/0 - Refused 0.2% Refused Table IV -6 ^2 -era __ r■_ -.ma a/Aa. QAhA.i■■In by Fmninvpd Persons Shift or Flexible Work Recwlted Completed Census: -Schedule Percen a 4 a PencentageData .S Yes 32.0% 31.9% No 28.9% 28.0% 1 - Refused 39.1% 40.1 % - Exhibit Page 15 of an Ordinance qR-oyy ----------------------------------------------------- ----12 ---------------------- Oregon Travel Behavior Survey age • • • • Deschutes County 169 r 1217 Table IV -7 I annth of Fmninvmpnt by Emoloved Persons gth!b mployment LenE Recruited ;. Percentage : ' n=1,563 Completed Percentage n .972),.'' r <Census Data Less than 1 year 17.3% 17.5% - 1 -1.9 years 12.2% 10.7% - 2 - 2.9 years 11.2% 10.8% - 3 - 3.9 years 6.5% 6.5% - 4 - 4.9 years 5.6% 6.2% - 5 or more years 42.70/c 41.9% - Refused 4.4% 6.5% - Table IV -8 Student Status by Full- or Part -Time Schedule Daranna 3 vparc and nlder K :Recruited ,Completed t h�Census� ,�;. Student Status Percentage 2 jPercentage;�Yata r> ,< . s . _ n-2,902 : n-�►778 :�. �: n..?,1,764 :.. Not Enrolled 74.0% 75.8% 74.7% Part -Time Student 5.8% 6.1% 25.3% Full -Time Student 20.1% 17.9% Refused o.1% 0.2% - Table IV -9 Gd�..•�tinn�l Attninmant by Pprsnnn 25 vears and older .,!,Eddcaddhal Attainment Recniited Percentage : =2,020 Completed Pen enrage ` n-1,291 .. Census None through 4th Grade 0.0°/a 0.0% - 5th through 7th Grade 0.3% 0.3% 8th Grade 0.8% 0.7% 9th through 11th Grade 4.4% 3.8% - 12th Grade 29.5% 27.8% - College Freshman to Junior 29.4% 29.9% - College Senior 19.8% 20.9% - Post Graduate Work 13.9% 14.7% - Refused 1.9% 1.9% Exhibit ------------------------------------ ------------------------ Oregon Travel Behavior Surveey Page 13 _ 4Y . Page IFIL of E 3 i Ordinance QS-v4�{ ------------------------------------------ Deschutes County Table IV -10 Ethnicity bv Person 169 - 1278 Ethnicity Recruited Percentage n=3;013 '. Completed Percentage n=1,848 Census. Data n 7..4;958 White, Not Hispanic 95.6% 94.7% 96.1% Black, Not Hispanic 0.1% 0.2% 0.2% American Indian, Eskimo or Aleutian, Not Hispanic 1.1% 1.3% 1.1% Asian or Pacific Islander, Not Hispanic 0.5% 0.7% 0.6% Other Race, Not Hispanic 0.8% 1.0% 0.0% Hispanic Race 1.2% 1.2% 2.0% Refused 1 0.7% 0.9% - Table IV -11 nicahmfv status of Persons 16 years and Older - - -----, - - - - - - - Recruited , ` ,,.: e Complted Census .; Disability Status Percentage Percentage Data:.:.. �... n=2;334:: n=57"584. n=57 , 230 With a mobility or self- 4.0% 3.80/a 4.1% can: limitation Without a mobility or 95.8% I I::!:96.0% 95.9% self -cane limitation Refused 1 0.2% 0.2% I- Exhibit Page of E3Z Ordinance ._36= ---------------------------------------------------------------------------------------------------------------- Oregon Travel Be#�avior Survey Page 14 • • • Deschutes County 0 V Travel Characteristics 169 - 12.19 Respondents were asked to record all activities over a two-day period. In this report, activity data is reported for the 775 households in the Deschutes County study. An average of 65.08 activities were reported by these households for the two-day period. As shown in Table V-1, the most frequently named activities are trips, meals, sleep, amusements (at home), personal hygiene, and work. The mean number of activities per household for Day 1 is 32.68 and for Day 2 is 32.42. The relatively small difference between the number of activities reported for each day indicates that the two-day diary worked as planned. While the diaries focused on respondent activities, infortnation on person trips made in conjunction with those activities was also gathered. The mean number of person trips per household was 14.77 for the two-day period. The mean number of trips for Day 1 was 7.41, and similarly an average of 7.37 trips were made per household on Day 2. The average daily trip rate by household size is shown in Table V-2. The majority of zero -trip households and households with only one to nine trips had an average income of less than $40,000. Households with incomes over $40,000 had higher trip rates. These data are shown in Table V-3. Table V-4 compares household size and trip rates. Smaller households generated fewer trips than larger households. For example, the majority of zero -trip households are households with less than three members, and there are no households with fewer than four members that had 50 or more trips. This data is shown in Table V-4. Respondents were asked to record mode usage for each trip taken. Of the 50,439 activities reported by respondents (shown in Table V-1), 38,994 took place at home or had no travel associated with them. For the remaining activities, the travel modes used in accessing the activities are shown in Table V-5. Table V-6 shows average reported trip times by mode. Private vehicle trips were, on average, the shortest. Walking trips and bicycle trips were similar in length, averaging about 18 minutes each. Trips recorded as 'other", often out of the area, took the longest and were approximately 156 minutes in length. School bus trips were approximately 26 minutes long. Public bus trips lasted approximately 33 minutes. . Exhibit Page j.g � of - E 3L Ordinance 4S-ow'f ---------------------------------------------------------------------------------------------------------------------- Oregon Travel Behavior Survey Page 15 Deschutes -County Table V-1 Activities by Type (n=50,439) 169 1280 Activity:... - - - 'F ueric Percent. Trip 11,445 22.69% Meals 8,418 16.69% Sleep 7,221 14.32% Personal Hygiene 4,074 8.08% Work/Work-related activities 2,994 5.94% Rest and Relaxation 1,240 2.46% School 1,519 3.01% Shopping 1,065 2.11%— Visiting 649 1.29% Pick -u ro ff Passengers 927 1.84% Household Obligations/Childrearing 639 1.27% Exercise/Athletics 374 0.74% Hobbies 268 0.53% Tag -along 101 0.20% Pet Care 122 0.24% Amusements at home 5.254 10.42% Amusements out of home 312 0.62% Religion/Civil Services 87 0.17% Out of area 127 1 0.25% Civic 106 0.211�1/1:1 Exhibit - Page. E I'l of EY? Ordinance 91"44 ---------------------------------------------------------------------------------------------------------------------- Oregon Travel Behavior Survey Page 16 • • • • • Deschutes County Table V-1 (Continued) Activities by Tvae (n=50,439) 169 °- 1281 Activity'Fre uen ' . ~:.: ':.PehcenY Medical Care 133 0.26% Personal Services 31 0.06% Casual Entertaining 16 0.03% Culture 4 0.01% Household/Personal Business 1,176 2.33% Professional Services 4 0.01% Household Maintenance 1,938 3.84% S or at Athletic Events 15 0.03% Incidental 51 0.10% Wait on Plane 10 0.02% Wait on Sus 113 0.22% Formal Entertaining 6 0.01% Table V-2 Average 1 -Day Household Trip Rate by Household Size Household Size Average Daily:. Trips One 3.40 TWO 5.84 Three 8.80 Four 13.11 Five 17.23 Six or more 17.72 I Y Exhibit 8 Page _ of _32-. Ordinance 0-041f ---------------------------------------------------------------------------------------------------------------------- Oregon Travel Behavior Survey Page 17 Deschutes County_- 1 6 9 "' 1282 Table V-3 9-mmu 14notcphnlri Trips by Household Income (n=775) ,,,7 •- _. r - - - Income Number of Under Over ` Trips :. 140.000.:. ` .:.540;000 >• :: `. Refused. :Total count 30 15 5 50 none Row % 60.0% 30.0% 10.0% Column % 7.9% 4.5% 8.5% 6.50/6 1 Count 146 80 18 244 to Row % 59.8% 328% 7.4% 9 Cowin % 38.5% 23.7% 30.5% 31.5% 10 count 133 123 25 281 to Row % 47.3% 43.8% 8.9% 19 Column % 35.1% 36.5% 424% 36-3% 20 Count 49 64 6 119 to Row % 412% 53.8% 5.0% 29 Column % 129% 19.0% 102% 15A% 30 Count 13 29 5 47 to Row % 27.7% 61.7% 10.6% 39 Column % 3.4% 8.6% 8.5% 6.1% 40 Count 6 16 0 22 to Row % 27.3% 727% 0.0% 49 Column % 1.6% 4.7% 0.0% 2.8% 50 Count 1 7 0 8 to Row % 12.5% 87.5% 0.0% 59 Column % 0.3% 21% 0.0% 1•0% 60 count 0 1 0 1 to Row % 0.0% 100.0% 0.0% 69 Column % 0.0% 0.3% 0.0% 0.1% more Count 1 2 0 3 than Row % 33.3% 66.7% 0.0% 70 Column % 0.3% 0.6% 0.0% 0.4% count 379 337 59 775 Total Row % 48.9% 43.5% 7.6% _]I 100.094 ----------------------------------------------------P� 18 Oregon Travel Behavior Survey C� • • to U Deschutes County 169 r 1263 Table V-4 2-Dav Household Trios by Household Size (n=775) Number of .. HH Size 'Total 2 8 ,. 4 8 6+ count 19 25 5 0 1 0 5o none Row % 38.0% 50.00/0 10.0% 0.00/0 2.0% 0.0% Column % 11.1% 7.3% 4.5% 0.00/0 2.4% 0.0% 6.50/6 1 Count 110 112 12 8 2 0 244 to Row % 45.1% 45.9% 4.9% 3.3% 0.8% 0.0% 9 Column % 64.3% 32.6% 10.8% SA% 4.8% 0.0% 31.5% 10 count 39 161 52 23 6 0 281 to Row% 13.9% 57.30/6 18.5% 82°/6 2.1% 0.0% 19 Column % 228% 46.8% 46.8% 23.0% 14.3% 0.0% 36.3% 20 Count 3 42 31 30 11 2 119 to Row % 25% 35.3% 26.1% 25.2% 92% 1.6% 29 Column % 1.8% 12.2% 27.9% 30.0% 26.2% 28.6% 1SA0/6 30 count 0 3 9 24 8 3 47 to Row % 0.0% 6A% 19.1% 51.1% 17.0% 6.3% 39 Column % 0.0% 0.9% 8.1% 24.0% 19.0% 429% 6.1% 40 count 0 1 2 12 6 1 22 to Row% 0.0% 4.5% 9.1% 54.5% 27.3% 4.5% 49 Column % 0.00/0 0.3% 1.8% 120% 14.3% 14.3% 2.8% SO count 0 0 0 3 4 1 8 to Row % 0.0% 0.0% 0.0% 37.5% 50.0% 125% 69 Column % 0.0% 0.0% 0.0% 3.0% 9.5% 14.3% 1.00/6 60 count 0 0 0 0 1 0 1 to Row % 0.0% 0.0% 0.0% 0.0% 100.0% 0.0% 69 Column % 0.0% 0.0% 0.0% 0.0% 24% 0.0% 0.1% more count 0 0 0 0 3 0 3 than Row % 0.0% 0.0% 0.0% 0.0% 100.0% 0.0% 70 Column % 0.0% 0.0% 0.0% 0.0% 7.1% 0.0% OA0/6 count 171 344 111 100 42 7 775 Total Row% 221% 44A% 14.3% 12.9% SA% 0.8% 100.0% ----------------------------------------------------------------------------------- Oregon Travel Behavior Survey Page 19 Exhibit Page' 'EZZ of Ordinance V -14S Deschutes County Table V-5 Trip Mode (n=11,445) 'Mode'.'. : Percent- Private Vehicle 88.3% Walk 6.5% Bi de 0.8% School Bus 4.0% Public Bus 0.2% Other 0.2% Table V-6 169 1264 Average "Reported" Household Trip Times by Mode (n=11,445) Exhibit " 5' Page E-- of E 32 Ordinance ib - ogy Mode: Mean Trip.. Len ih min. Private Vehicle 16.50 Walk 17.78 Bicycle 17.90 School Bus 26.35 Public Bus 32.80 Other (Airplane, etc. 155.96 ----->- ------------------- -- ---- -------------------- ----- ------ ------------------------- Oregon Travel Behavior Survey Page 20 • CJ • • • • -Deschutes County VI Item Non -Response 169 - 1285 The following tables show the item non -response for questions contained on the recruitment instrument. The non -response rate is the percentage of respondents who did not provide an answer to the item. As indicated in the tables below, all efforts were to minimize non -response. Table VIA Percent Item Non -Response - Household Questions 0=1,208) Household Variables Percent Non -Response Household Size 0.0% Household Vehicles 0.0% Home Ownership 0.3% Dwelling Type 0.1% Household Income 12.8% Table VI -2 Pprrpnt rtpm Nnn-Raseonse - Person Questions (n=3,013) Household Variables Percent Non -Response Relation to Head of House 0.0% Age 0.6% Race 0.7% Drivers License Status 0.0% Employment Status 0.1% Occupation 3.4% Industry 1.8% Shiftwork 39.1% Years at Work Site 4.4%. Student Status 0.1% Student Level - Head of House 1.2% Student Level - Others 0.3% Disability 0.1% --------------------------------------------------------------------------------------- Oregon Travel Behavior Survey Page 21 L Exhibit Page E Zy of Ordinance Technical Report on Methods TECHNICAL REPORT OF METHODS I Sample Design 1.69 - 1286 Eight (8) independent samples were drawn to represent the non -MPO areas of Oregon. The universe for the household activity survey consists of households in the Counties of Clatsop, Coos, Deschutes, Josephine, Klamath, Lincoln, Malheur, and Umatilla. The geographic distribution of the survey sites is shown on the map (Figure 1). A household was defined as "all persons currently living in the same dwelling who typically share meals together as well as share at least a part of their income." This definition therefore defines roommates, who only share expenses, or children away at college, as separate households. The size of the total universe was defined by the total number of households in the study area. There were 163,280 households in the study area; the household counts are projected by annual growth rates from 1994 and/or 1995 commercial estimates. Due to the nature of the sampling frame requested in the survey proposal, non -telephone households were excluded from the sample. The following sections summarize the distribution of households in the counties targeted for inclusion in the non -MPO study. Clatsop County Includes the city of Astoria and the adjacent (less than 7 miles from city center) communities of Seaside, Warrenton, and Hammond. These communities together are defined by zip codes 97103, 97138, 97146, and 97121. Together, this will include 96% of the county's households and be a small contiguous geographic area. Coos County Includes the cities of Coos Bay and North Bend as defined by zip codes 97420 and 97459. The Coos Bay zip also includes adjacent areas of Sumner, Millington, Charleston, and Coaledo. This includes 65% of the county's households and is restricted to the Coos Bay urban area. Josephine County Includes the Grants Pass zip codes (97526 and 97527). This covers 76% of the county's households. Klamath County Includes only Klamath Falls (two zip codes; 97603 and 97601). This covers 76% of the county's households. Deschutes County Includes the Bend, Redmond, Sisters, Terrebonne area. Entire area is very high growth. The six zip codes of 97701, 97702, 97707, 97756, 97759, and 97760 will cover 94% of the county's households. Umatilla County Includes Pendleton -Hermiston Corridor (97801,97838) and covers 60% of the county's households. Malheur County Only includes Ontario (97914) but covers 69% of the county's households. Lincoln County Includes the cities of Newport (97365, 97366), Lincoln City (97367), and Depoe Bay (97341). These zip codes cover 58% of the households in the county. -- Exhibit Page U-5 of E32 Ordinance. W044 • 0 • 0 Technical Report on Methods Figure 1 Map of Survey Sites IKE 165 r 1287 aooLMa DESCH...... COOS MALHEUR J` � HINE KL�4MATH is * Sample Size The proposed sample size for the 1996 Oregon Travel Behavior Survey was 3,400 households with complete activity and travel information. The sample was stratified by county and within counties by zip code, with a disproportionate distribution of completes across the counties. The goals by county are shown in Table 1. The estimated sample requirements for each county are listed in Table 2. The sample requirements took into account the unlisted phone rate, the rate of working phone numbers (both listed and random), the geographic hit rate (the rate at which phone numbers will be located in the desired county), and the response rate anticipated. Additionally, some degree of attrition was expected in terms of households that move in mid -survey process, deaths, and uncooperative response to the second part of the survey (approximately 30 percent). To account for these factors, NuStats determined that the number of desired recruited households was 5,030 and that approximately 16,000 sample pieces would be generated. --------------------------------------- --:-:-------�T-------- Page ii Exhibit d Page:: of1532- Ordinance 32Ordinance 99"°'4`i Technical Report on Methods Sample Size 1 400 2 400 3 400 4 400 5 400 6 800 7 300 8 300 Table 1 Areas to be Sampled County City Clatsop Astoria rcespvnse rcequ�re; . Seaside ncyu�ry :: Warrenton Hammond Lincoln Lincoln City g Depoe Bay Rate Newport Coos Coos Bay . . . d......... North Bend Josephine Grants Pass Klamath Klamath Falls Deschutes Bend ilandom Redmond :>;:::::;:. Sisters Terrebonne Umatilla Pendleton Hermiston Malheur Ontario Table 2 Estimated Sample Requirements 169 - 1288 97103 97138 97146 97121 97368, 97367 97341 97365,97366, 97391 97420 97459 97526, 97527 97603, 97601 97701, 97702, 97707 97756 97759 97760 97801 97838 97914 County. Total Recruitment Unlisted Woflan Wo..rkln Geo lit caeo-n�i rcespvnse rcequ�re; . rc�yur� ncyu�ry :: Needs Phone g Listed g Rate Listed Rate Rate d Total d Listed . . . d......... Rate Rite Rando ilandom :>;:::::;:. ..:;::::::RIwi m: Rate ....... _ ... ....... . . Clatsop 400 592 14.9% 85% 65% 90% 60% 55% 1,922 1,625 285 Lincoln 400 592 11.6% 85% 65% 90% 60% 55% 1,914 1,680 221 Coos 400 592 38.0% 85% 65% 90% 60% 55% 1,914 1,179 722 Josephine 400 592 32.3% 85% 65% 90% 60% 55% 1,914 1,287 614 Klamath 400 592 29.7% 85% 65% 90% 60% 55% 1,914 1,336 565 Deschutes 800 1,182 23.8% 85% 65% 90% 60% 55% 3,821 2,898 905 Umatilla 300 444 25.8% 85% 65% 90% 60% 55% 1,435 1,058 368 Malheur 300 444 17.5% 85% 65% 90% 60% 55% 1,435 1,176 250 Total 3,400 5,030 24.2% 85% 65% 90% 60% 55% 16,267 12,239 3,930 -- -- -- ----------- - Exhibit - Page iii Page E 47 of E 3Z Ordinance q % - 0,0i • • Technical Report on Methods 169 1289 II Instrument and Materials Design The design of data collection instruments and related materials was a critical stage of the data collection process. As a result, careful consideration was given during the design phase to establishing the relevancy of the project in the mind of the respondents and to ensuring that all materials were Gear and easy to use. The following sections describe the instrument and materials design. Press Release In coordination with ODOTs communication staff, a press release was prepared that provided general information about the household survey to the public, media, and local officials in each of the study areas. A contact telephone number for the project principal and project manager was made available to answer questions from the public, media, and local officials, as necessary. Advance Letter In coordination with ODOT, NuStats prepared an advance letter printed on ODOT letterhead and signed by an ODOT official and the NuStats project manager. The purpose of the advance letter was to establish the relevancy of the project in the mind of prospective participants. The letter was mailed to all listed sample households, (i.e., those telephone numbers for which an address was known prior to contact), at least seven days prior to the initial recruitment contact. Letters were mailed from the offices of NuStats' Oregon -based mailing subcontractor to ensure an in-state postmark. Recruitment Instrument The interview script was designed to provide the respondent with the name of the sponsoring agency, the purpose and anticipated benefits of the study, and an indication of the tasks that the household would be expected to perform. Computer-assisted telephone interviewing (CATI) was used during the recruitment phase to facilitate data collection. The data elements collected include the following: • Number of vehicles owned • Vehicle make • Vehicle model • Vehicle fuel type • . Is vehicle replacement or addition • Household size • Household member (HHM) relation • HHM Gender • HHM Age • HHM Licensed to drive • HHM Employment status • HHM Occupation • HHM Industry • HHM Telecommuting status • HHM uses shift or flexible work schedule • HHM Length of employment • HHM Work address • HHM student status • HHM School name, location • HHM School type • HHM Educational attainment • HHM Race, Ethnicity • HHM Disability • Type of dwelling • Own/buying or rent home • Household income (or income range) • Address verification . • Phone number verification ------------------------------------------------------------------------------------------------------------------------------- Page iv "(3r' Exhibit Page EUR of � Ordinance Technical Report on Methods 1 6 9 - 1290 Diary Log The travel diaries used for the study were specially designed to aid in the recording and retrieval of activity data. In order to facilitate carrying of the diary on the respondent's travel days, the diary was produced as a • 4* x 8* pamphlet. Respondents were asked to record all activities during a 48-hour period. Space was available on the personal travel dairy for recording up to 18 activities per day. Additional space was available in the back of the diary for notes. The following information was collected on each activity: • Description of the activity • Location of the activity (exact address and/or cross streets) • Start and end times • Whether or not the activity included or required a trip • Mode of travel Retrieval Instrument NuStats prepared a paper -and -pencil instrument to retrieve the activity and travel information from respondents. The retrieval instrument was designed to follow the same format as the activity diary to facilitate the recording of travel data. Household, person and vehicle information collected during the recruitment interview was reprinted on the retrieval instrument for reference by the interviewer. The retrieval instrument consisted of two forms: a household information sheet and an activity data sheet. The household information sheet contained four main sections. The first section included a label -containing the household information, including the respondent name that the package was addressed to, the household address, telephone number, income level, and scheduled travel date. The second section contained a label including information about each person in the household. This label included items such as each household member's name, age, and gender. The third section contained a label including information about the vehicles available to the household. The label included the year, make, model, and fuel type usage of each vehicle. The fourth section included result codes for calling attempts and a household contact record section. This section included space for the date, time, interviewer initial, result • code, and special contact notes for each call attempt. III Data Collection Procedures Before interviewers were placed on the phone, they went through a general training and orientation to the survey profession that was presented by NuStats field services manager who has nearly 10 years of experience. Subsequent to this training, they were placed on the phones in a probationary status. With probation, their work was strictly monitored both in real-time during their interviews and subsequently, with a detailed and thorough edit of their work. They received re-training as necessary during this probationary period. Prior to the start of this project, all surveyors received a project specific briefing prepared and given by the project manager. For this project, the briefing lasted from 4 to 8 hours. The briefings included several activities that are aimed at familiarizing interviewers with the geographical areas they are calling. They had access to maps of each of the survey geographies. These maps were strategically placed on walls in the field room. Local place name lists (organized for quick reference) were produced and made available to all surveyors and editors. Recruitment Attempts were made to recruit households approximately ten days prior to their assigned travel days. Recruitment calls were timed to be placed after the receipt of the advance letter and sufficiently in advance of the desired travel days to allow for the mailing of the travel diary and related materials. Up to six attempts were made to contact each household before a final disposition was made. The CATI system technology delivered sample and recorded the disposition of each call attempt, which assisted with managing the • sample. Once contact was made, recruiters asked to speak to a head of the household. Following the initial recruitment script, interviewers invited the household to participate. Once the household spokesperson ------------------------------------------------------------------------------------------------------------------------------- Exhibit �� Page v Page 9 Z9 of 32 Ordinance Technical Report on Methods. 169 - 1291 agreed, recruiters collected demographic information about the persons in the household and informed the respondent of the specified days for survey participation. They were also informed that they would receive a packet of materials including travel diaries before their specified travel dates. Mail Survey Materials Within three days following recruitment, each household that agreed to participate in the survey was mailed a packet of survey materials. The home address information for each household that agreed to participate in the study was reviewed the morning after data collection to check for incomplete information and obvious misspellings. Each mailing label contained the following information: Household Informant Name, Street Address, City, State, Zip, Sample Number, Household Size, and Cohort Number. The sample number was a unique number assigned to each telephone number (i.e., household) in the sampling frame. The household size indicated the number of persons in the household. The number was referenced when packaging to assure that there were enough activity diaries included for each household member. The cohort number referred to a household's assignment to specific travel days. Any problems spotted by the technical clerk were corrected directly in the recruitment data file, and address labels for each recruited household were produced. NuStats Oregon -based mailing subcontractor prepared the packets for each recruited household. Each package contained the following materials: • Cover letter (on top) • A brief brochure containing answers to commonly asked questions • "How to Complete the Diaries" instruction sheet • Trip Diaries (one for each household member) • Reminder Flyer • A pre -addressed, pre -paid envelope to mail back the diaries. Quality control steps on the packaging included a review of the package contents by the mailing subcontractor and tracking of returned packages. Any returned packages were tracked by sample number. A list of returned sample numbers (along with associated names, phone numbers, and cohort numbers) was produced daily. This list was provided to the interviewing shift supervisor who ensured that the information was corrected, each household's travel day rescheduled, and a new package sent. Reminder Call In order to maximize the number of completed households, each recruited household received a reminder call the night before their scheduled travel date. This phone call was also used to ensure that the packet of survey materials had been received, to answer any additional questions regarding the study and to again remind the household members to record their activities/trips on their travel days. Retrieval of Travel Information Immediately following each household's designated travel day, a NuStats interviewer contacted the household to collect the travel information. Efforts were made to collect the data as soon as possible after the travel day as to ensure that the data was 'fresh." In the event that a household could not be reached within a recall time period (usually one week), the household was rescheduled for another travel day. Collection of activity and travel data consisted of a structured interview with the original respondent who was recruited and/or other adults in the household as needed. The interview was recorded with paper and pencil on a specially designed instrument that guided the interviewer to probe for the specific data elements. The interview began by verifying household demographic data. Thereafter, the interviewer guided the respondent to provide his/her activities for the 48-hour period, using the diaries as a guide. Where possible and appropriate, the interviewer attempted to speak with other persons in the household and collect each individual's activity information. In the event such reporting was not possible, the adult head of household spokesperson who had initially been recruited read from diaries or obtained information directly from the other household member. ------------------------------------------------------------------------------------------------------------------------------- Page vi . Exhibit Page. "3° of 63z - Ordinance 0-644 °4y Technical Report on Methods 1 6 9 1292 Individuals who had not received their materials were rescheduled for a new travel day. In certain instances individuals who had misplaced or discarded their diaries were guided through an exercise of recalling specific activities for a 48-hour period that had occurred within the previous 3 days. At the end of the retrieval interview, respondents are informed to return their diaries in the pre -paid business reply envelope. They are informed to hang on to them for a few days before dropping them into the mail in case any clarification of correction follow-up calls are made in the next few days. IV Data Production Procedures Editing and Coding of Data In the process of editing, a review of respondents' answers in the travel information retrieval was made to reduce errors, inconsistencies, and incomplete responses in each questionnaire. The goal in the editing process was to do this while at the same time preserving the meaning and integrity of the collected data. To achieve the above goals, each retrieval questionnaire was checked for the following: Omissions Logical consistency Legibility and/or clarity. Omissions. The initial step in the editing process was to check each form to ensure that no data were omitted because of interviewer error or data unavailability. First, the data retrieval form was checked to see that interviewers completely filled out each section. All activities were checked for location information, including exact address, cross -streets, or a nearby landmark. Because of geo-coding requirements, postal route or PO Box numbers were not accepted in lieu of a street address. Address fields with postal route information were verified to ensure that an address could not be garnered (i.e., partial addresses). Correction calls were made to retrieve "missing" information unless the information was deduced from elsewhere on the questionnaire. (e.g., if two household members went on the same trip, information for both was reviewed.) Logical Consistency. It was possible that respondents may have reported conflicting information during the course of an interview. Since the interviewers were not always able to catch these inconsistencies while on the phone, the editors performed quick logic checks. Logic checks relevant to the project were: • Cross-checking the information about vehicles against the trip information provided. • Checking that trip information seemed to correspond with the age level of the household member. • Checking the logical flow of the travel patterns for the day. • Ensuring that complete trip information was reported for each trip. • Checking travel patterns and mode choice across all household members for consistency (e.g. if the mother reported taking a trip with her daughter, did the daughter's trip record reflect that trip?). If the questionnaire failed these logic checks, the respondents were called back for corrections. Checks for Legibility or Clarity. All entries (written or circled responses) were sufficiently legible and unambiguous to allow easy coding and keying. If anything was unclear, it was corrected by the editors. Data Entry and Tabulations Data entry involved the transfer of information from retrieval questionnaires into data processing form. Data entry was done within a computer-assisted environment. A customized data entry program was designed that conducted verifications, logical, and consistency checks at the point of entry. Elements of the "programmed" checks included: • Inputting the sample number only once and person number, day number, and activity numbers automatically increment to decrease data entry errors; ----- - - ° --------- ----••----------------• .�Pvii Page E N of K 2- ( n-Unance 0-b`'A • is El Technical Report on Methods 169 - 1293 • Only accepting values within the prescribed or pre -assigned range of response categories; • Only allowing work related activities for employed household members; • Only allowing licensed household members to be drivers on trips; 4 Automated time checks (trip start time could not begin before last trip end). When the program did not "accept" an entry, the data entry clerk verified and/or corrected information. In addition, a sample of each data entry clerk's work was verified by the data production staff manager. Data tabulations or data checks of recruitment and retrieval data were done on a weekly basis to ensure that the data were consistent and accurate, and to monitor non -response. • V Geographic Coding Procedures Home Addresses NuStats performed the geographic coding of home addresses using ESRI's (Environmental Systems Research Institute's) ArcView 2.1 for Windows software product. Home address geocoding of listed sample (for those records containing addresses prior to recruitment calls) was completed prior to loading the sample into the CATI system for calling attempts. For the listed cases that were not geocodable, they were replaced with new listed sample pieces for which a geocodes could be provided. Geocoding of unlisted sample was done following the recruitment call. If a geocode could not be provided for an address from unlisted sample, it was also replaced with a new record. Trip Ends NuStats coordinated the geocoding of trip -ends (activity/trip ending address points) with ODOT staff. Trip - end files were periodically posted on NuStats' BBS as data was collected and entered. ODOT staff would dial in and retrieve the files and perform . a first iteration of geocoding efforts. This was done primarily because ODOT staff members are more familiar with the area and could assist in more quickly identifying correct street name spellings, exact addresses using place names, correct intersecting streets for locations, or identifying cross -streets or exact address points for cases where only landmark information was provided. For cases where a geocode was not obtained during ODOT•s initial geocoding efforts, a data file was provided back to NuStats so that more in-depth address research and data cleaning efforts could be done. NuStats' geocoding group would geocode as many of the remaining unmatched address points as possible using the address research tools that were available. -------------------------------------------------------------------------------------------- : --------i ------ Page viii Exhibit Page E 3L of 163?. Ordinance is-oKK • Appendix F U • 169 - 1294 STATE HIGHWAY AND COUNTY ROAD LISTING Page FI of _f Z�*- EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 0 • 1 6.9 m 1295 A. N Q V V V V V V V V N N N V V N t0 O �.3 e: v w w o z} w o z}} w w O Z O Z} W O Z O Z} w o z}}}} w w w w O Z} w O Z O z} w O z}}} w w w 0 Z 0 Z 0 Z 0 Z 0 Z 0 Z 0 Z 0 z 0 Z} W O Z 0 Z 0 Z} w V� }} m yv — 7... t0 a0 a0 a0 a0 co O O w a0 V�2 ;: (n �! V) ;: V V V V V N 1n 1n v V V w N N O to F 0.7 11 9, lrb-. S J N M q N a0 R O R [L V a0 C co O a0 N O m N V N N N V N V N N Ln N Ln V N V N V N t0 N ap N a0 N a0 N O M O N ITT! N .- a0 N ? N V" N N (0 c'� V N (0 C� aD t0 C7 co N O L' C'p ` � 3 — t0 N N N N N N V N N N N N N N M M N N N N N N N N N N N N N V m a C F N N V< V V V N M N N N N N N V V N N N N N N N N N N N N N V N N N N M N Cl) V M N 2 J .R m$ O 9 N N t0 N 10 O aD r (0 w V r t0 w N Un N N V V O V (0 V N O V O V t0 O t0 (O a0 V O V V V N Co O to O 1n N Ln V O V t0 V V N M N M N M t0 h V� M V M V V V aD V ap V CO ao t0 r V t0 CL 3 z 3.� m CO O O to N N 7 N Un ' N r N to O N r N O M O M N O O e- N W M O r— M r a0 O r In a N a0 t0 N O M V M N V M V to M N UJ Ln O (0 Ip t0 N t0 r-: 0 ao w aD 0 OI O N r O O O 0 N 0 V 0 O 0 O) 0 O 0 0 0 M V (0 r 0 O N ri V N t0 r a0 LU W. ZQZ W LU }J W W z-? 1?~0 U �Yd 0� �Z ~ z � o C L) a F �z W z 0 aXo W z XF- aix 0 a o=wawa U� }� 0 oxx�� OH�HYOFZ �F ww g� pzoa�� �O =U w O��xaF-z o N wa°wg �}} J00Y w wYwo Y�xf-w W atoa� 3 W Z uoiZ�Q w x x F =} O x Q Z z> U Q aig a N N W w0F-LLxrnx O� U 0 w m 0 LL waw < N ai U O c7 o g In Q Q 0 x�c�a a N O Z > F C LU W J= W 0 x (i w J x Z S W O x H W 0 W Z Z J W C7 F- Z F fn 2 ... M F S W N d U Q a J a F Z W cr C W w 2 W Z Q' j Y LL' to 0 W x U Z Y LL W Q W m W J Waz�wozQooaaa���Xxgwag=oacYi��Q�o�zownmpOoz m?f-u�210wimlom KI 0 o 0 P 0 0 W �aOvi000m0to>gam Stn0Y�0 = D Z LL Q Q m U z W C� W a U) z W J E O Q w w w w w w C21? w U 2 nrrrrrrrrrnnrrrrrrrrrroo 00000000000000000000 O '$ 4) Of N 0 N 0 N 0 N 0 N 0 !n 0 N O N O h O y O to O N O N O fo O N O In Ol N O fo O O N h N h N N N to N N N y N N N N N N N U) N U) N N N y N N N N N CO N to N fn N y N Cl) N Cl) N to T 3 m.; a S' t E .. > w S m r �, � ,, =.ZCo 0 M • T C O U N N 169 - 1296 �r A � 3 e A W w O z} W 0000 Z Z Z Z 000000000000 Z Z Z Z Z Z Z Z Z Z Z Z O z 00000000000000 z z z z z z z z z z z z z z V Z} >. 0 L 7 V w rN 3 — co co co co co co 00 c0 co c0 O O O M co 0 w w In In C O M N O O O O O O - - - 00 `o j q 10 t0 V N N V N V N V N R N R N N r N V N O co O c0 N a0 M R N V N R N N C N N C N N Vic, Y N N N N N N N N N N N N 7 N R N N N 0. J r J 0 C > N N N N N N N N N N N N N N N N N N N N N C N N N N N N N N N N N N z H J .C.F. 3 > 2 V N O V V 1n O V 0 V a V 0 V 0 V 0 V 0 V 0 V 0 V w V 10 Cl) V to O V w M (0 M co M V M V M > N V Cl)Cl)N V N N NN N N N N N N O M w M 10 M w M Fq a 3 01 � 3 0 C a en O c0 V O sf M (C N 00 N_ 01 01 0 Go. M co. 1n N ch M O M N IQ N 00 N M to r r 0 10 0 r 0 m N N N M 0) 01 O O O 1- O W O 00 t0 N O M M O V V M r r N N M V c0 a7 O 01 01 01 a. stn ~ �w W WL z LL Z U m Ov w v F. ¢ W N _ cryo ��00 Cr UJ LU Y J N D O> Q Q Otm co DY&ir Q a O a' W z N F z z P O W ? > Q LU Z pa J S a' O W a D LU a p Y } � _ Z } 2 Z n N ix z ir z�wWpa O O Z OcnZ a= N xz JPO Q U ZUH D N p °°F-InNO J y U W r arU) LL O c N J J U Q co a Q U= o F y= _U a Y 0 y r rn z S IT Y W z m~ u U S] Z Q Y J N 0 Y O 0 O V Z J 0 (" T N N Z z H _LU J V W r� W W O U z O J 3 Q O J S W a LLQ M F- 0 a 2 O m �S J W JSC7m x UxU W a' > » Q coV) ZZZ ZU Z — �Ya x r, w W x W.w N Z G N x J 7 Y O Y Z z 0 U_ E 4 Z p O N O N O N O N O N O N O N O N O N O N O N c0 /0 fp 10 f0 c0 f0 •' f0 t0 M N V N V N V N r M r M r M r M r M r M r M r M r M r M p. 0) > N » MM MM MMM M 0 0 0 0 0 0 0 0 0 � O O O O O O O O O O 00000 00 t4e HIM 11111 1 l"p, ik it t1 w is rcl- 114- v«i : = 42 _ z tN r `� O _ 1 40 cri U C � y C X cctl W c. 0 • • 169 — 1297 Page _EY_ of FZ Ordinance S L OSS 0 0 0 0 0 0 a 0 v 0 v 0 a 0 a 0 v 0 v 0 W a 0 a 0 v 0 v 0 v 0 v 0 0 v 0 0$ a a 0 0 a 0 0 a 0 0 v 0 0 a 0 0 a 0 0 v 0 0 a 0 0 v 0 0 a 0 a 0 v v 0 a 0 > O 0 O 0 C7 0 (U 0 C7 0 C7 0 (9 0 C7 0 C7 0 C7 0 C7 0 C7 0 a 0� O LL LL LL LL LL LL LL LL o C7 0 U 0 CD 0 CD 0 C9 0 C7 U C9 C9 C7 C7 CD C7 O a CD 0 C9 0$ CD C7 0 C7 0 C7 CL U m m V. C C C C C C C C C C C C a m m v v a a a v a v a a a v v v v a v v a a a v a a v v v v v v v v v a a v v v v v v v m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m H �, L N L N L N L m L m L m L N L m L m L m L N L N L N L N L m L m L m L m L m L L A m L N L N L N L N L N L m L N L N L N L N L (9 L N L g L m L N L N L N L m L m L m L N L m m 0 (7 C) m CI Cn Cn C7 m C7 N N N N N r — N N N N N m m 0 m (7 P1 "I r N N N (A m .•. � N N N N N N N O O N N N Om C ` I z F J N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N NN N N N N N 9 t a •p m a 3 n N n N n N n N n N r N n N r N n N r N n N n N n N m N N N uY N m N N eh N (o t7 N N O N V N 7 N 0 N 7 N Y N a N O N V N R N o m 0 Cl) 0 M 0 (7 0 M 0 M 0 C7 N N N N m N m N 00 N 3$ d o 0 0 0 0 m 0 m 0 m 0 m 0 m 0 m 0 m 0 m 0 m 0 m 0 m 0 m 0 m 0 m 0 0 m m 0 m 0 m 0 m 0 m 0 m 0 m 0 m 0 m 0 m 0 m 0 m 0 m o Co 0 m 0 m 0 m 0 m 0 m 0 m 0 0 Im O N N ON V O N O N O N N O Y m m 1, O M M O O O O 7 W r m t` N � •E J � c � o � o � o � o .= � o � e c o .- -= o .= .= c 0 Ln m L) U m W H :� V 0 p S a Z H O N S O r Z O N O N p N a p p Q V N CoJ p D: O d a (OD p Co Cr Z (+r1 CIDz C 0: Cr LU to p c= an < v to mO U } O (n v p m U W X Y !- Z F- w= Cr O K p J m r J um7 M O p W N O 0 LL' p (� w Y W 0 O ¢ ~ p W = Q O N w Yr-g��agp�>� N Y W J Y w Z N�rwNC (7 M (n W W t O p�inavmm U F- F O } F- = U QS m H N L) O y 0z� Y m agaYwa m (gym ozawwvYaag}ac�0a0a rn C7 rnrnY5 00 i W,wQ m a¢�'S0a=a wo S } w F J O J o_ mC72 O =' U 9 m mOmrnwain�iSJLLN��LL0000xLL0�amzLLiwY O J 7 Z O X J J> j N Z w w rn O> J to O w U w 7 m 0 m J Z 5 w UCLLLLLL O O lo y In m U W 0 0 Cr p w ~ ZS?N O O o 1 O p er 0 Cr (L Z H a �i a r z H N rn m N v 0 O m n 0 r a U p J p J Q ,0 v O o OCY U, d O m 3 N p Cr Q O f0 Cr Z - W W W W �'' 0 O p S v O� w a(X (Op v N Cr U } F}- N= V C7 U W X Z �" W= S W a J m n LC)0 p Cy F 0 (n a S w ( p W h Co p S l] W Y W W rn O Q p ¢ 3 0 j W N Y L, W H C LL Y F- W z U a (+� F- !- (n W W Y w o H O H V H O p U J H to O d (� U m } R F- N R U Q w p h W (A m a N z Y O U V O Y g y O U w O d C p p F- p W C7 U W Y N 0 N 0 Y g g m Q N a (/) a o W U}} S N N} N O m m a O W C p_ M p a LL Y a z a w Y Q o C Y p Z 0. 0: FS- p LL U p O K p p LL m O N iJ S O r2 N w a� g J LL (n 2 LL 0 0 0 O S LL fn O m z LL i W C Q' (A MILLI 2 2 2 2 S 2 S S S 2 2 S S S 2 S 2 2 S S 2 2 S 2 2 2 2 2 2 2 2 S S 2 S N to N V N N N N N N y N to N N N to y N N N U N N N N N O �+ d5g55g55ggg5gg55555gg5�553�35g555ggg3g5 w W W Y W Y W w Y W w Y W Y W Y W Y W Y W Y W Y W Y W Y W Y w Y w W Y w Y w Y w W Y W w Y Y W W w w Y W Y W Y W w W Y W Y W Y W Y W W Y W W Y w Y w Y w Y w Y w W Y w Y E w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w O �.nt o (n Co m m Q O O p a p a a O a a a a a 0 Q¢ 0 0 Q a O a a O a 0 a 0 a p a Q 0❑ a a 0 a 0 a 0 a 0 a 0 a g p a p Q O Q O a p Q O Q O Q p Q p a (� `* m w rn w m w a dU��U����UUU�UU�����V���UU��UU��UU�U��� :i N N N N N (n to (n to to (n to N N N to N N (A N N N V (A N fA y U (n N N N V to W N N W L Q Q W C 2 O Q a¢ Q a Q U Q¢¢ U U U a U Q U a U Q U Q¢¢ U U U a¢ U U Q U Q¢ U U Q U Q U Q U Q U a V a V Q U Q¢ U U a U Q U Q U Q U Q U a V Q U Q U? 0 m 0 0: » m m m O r y N m m O N 7 m N m N O (h N M m M /7 O � N '� '� m a m � O N !n N a 10 m N m In O m N (4 m (O m m O 1� N n V r m r m f` O CQ N m a OD m m''''�v � yML a a v v v v e a c v v a a o v o o a a v v a v o v v< v v o o v o v v v o u- LL Exhi it Page _EY_ of FZ Ordinance S L OSS • 169 - 1298 =, m yv g y 0 v o v a 0 v 0 v 0 v 0 v 0 a 0 a v 0 0 v 0 a 0 v 0 0 a 0 a 0 a 0 a 0 v a 0 0 0 0 a a 0 0 v 0 0 a 0 0 v 0 0 v 0 0 v 0 0 v 0 0 a 0 0 0 0 v 0 0 v 0 0 v 0 0 v 0 0 m O o C7 0 O 0 (3 0 LL O 0 C7 0 O 0 C7 0 U' 0 CD 0 0 U' U' 0 C7 0 U' U' 0 U' 0 C9 0 U' 0 U' O C7 U' 0000000000000 LL (7 IL a m m , Q Y A m A H LL L N A L w L N M L L M L M L N M LL W w L w w L L N N w L N N L N N L N N L N 0 L N M L M L N M M L L N N M L N N L N W L N l0 L N M L N /0 L N M L N N C N W L N M L N 0 L N W L N M L N 0 L N W L N N L N I y t� 7� w o i — N N N N N N '.A C.0 yN 3 3421. 1 `o � C H N N N N N N N N N N N N N N N N N N N N N NN N N 1+1 N N N N N N N N N N Z J 9 > a m CL M M a a 0(0 N N N o Cl) n N n N m N m m N N Co N m N m N m N m N m N m N Co m N N m N m N a N v N v N AN N N a N v N a N IN N v N v N m N Oa, 3 m m m m M m n m m 0 m 0 m 0 m 0 m 0 0 m m 0 m 0 m 0 m 0 m 0 m 0 m 0 m 0 0 m m 0 m 0 m 0 m 0 m 0 m 0 m 0 m 0 m 0 m 0 m 0 m 0 m 0 m 0 m 0 Co o to I d m M m O m N O 0 0 m (0 4) O V N Co 0) W) m 0 IA m N Q7 10 11: M cD Co O N m O 0f N E J o o o c o o F- a (n s Z ¢ C y 0 J J R n M L" I Z ILL ui CX .1 Y F- LLJt= O W Z z � .0 O Q 0 O p J m ❑ p O K O U �I ❑ z_z W zz J O v �,{{ V a Z E, n -< Y o O ¢o_ o o �pn m tD m J 0 1LH mn Q LL V Y o N- d' o m o CD m U S N¢ Z o (0',1 }R' W } Q U n❑ F W m - h 1 C, n M d O M o m M Z� W Ur U Z Q d O Z (n W m M n d m O M n 2 Z 6 M n U Q g Q d O qa U d O d w O Y p a. y (n o m O m 0 N N 0 m M o M N v<� F- Z Z m W o v N y N_ Q Y Y W O Z N J Of N 0 (yJ 01 Z Z N N N g N (n Y O V 'C O O Q m O a. O O 0. w v U G It 2 R J O O m X X w R r 2 j j C H R X (j C 0 0 2 K X x T W W M X = I O to LL N LL N LL O Q N U Z W Q (L 0 LL V7 In LL w N LL LL X W N LL Q n. Q 0. N LL F' J w LL N Q LL W In IL Z W m m N LL 0 LL In LL to LL w LL LL N LL Q LL (n LL m (n LL !^ O ! O: O (n a N iN !?:Co w w Y O > z TI ;jc O ❑ C� Q Q CL J y w 0 , O I Y IM U W Y Q o Z m O C7 U z O = d �Im'4 01 N N n O Q' Q W w m o O a O o m m 10 (� Co W J o m 10 Q LL O W Y o N m W o o M N U Z U N } W } n } m' 010 1 0! O 0 n i oaOm�dZmd m z U LL o (n M O 6 M (b�4 M U J d¢d,{ O 0 3 w O V N o O 000xQH�o N m Cl) U p Z w o N O (n I II M O M O M W O m U W Q Z Q Z N w J n Q) N n T Z n o Q¢ Z Z N U w N N N Z m y Y (O V ' W N Y M Y N~ 0 M Z p O > a, N OLL Z II I d !m E ❑❑ N (n 0❑� U) N m}>> y O Q Q M❑ Q C (n X O m N Co 0 N H]> X ❑ N¢¢ J P O N J❑❑ C N N (n p U) m C7 O O R O In p X 0 Co N❑ M x D m to W J J J Q 0: (n W J m (n di lIm L Q- LL LL LL LL LL 7 U 0_ d LL fn LL LL LL W LL 0. 1 LL J LL LL LL 7 m w m w LL LL LL LL LL LL LL L. (p MIh J 1 ❑ O O O O p p❑ O O O O O O O❑ O }} y}}}}}}}❑ p❑w W W W W W W W W W W W w W W W w O p❑ 7 Z) » > J 7 7� 7 C v: ' m O ���� O O O cc irY 5g5535g5555gSg355(n(n(nzZZzzZZzzz> Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y W It 0 ww h W wwwwwww � F- F- F- w — F y -' W (min(`ni�vi(mi�xxgZQ¢zq¢Q¢�Q¢¢¢¢¢¢Q�wwwUUUUUUUUUU� w w w w z z z z z z z z z z z z z z z z x x x x x x x x x x z E mlm Z CI O C9 0 Q Z Q Z J J J J J J J J J J J J J J J J J J J J F 1' F- � 1"' 7 �"' 7» LL a I o R 2 >>]_= M M 7 Q D Q 7 Q J Q 7 J>»> Q Q Q Q Q Q > Q 7 Q 7 Q¢ 7 Q J Q¢ 7}} Y Y y>> Y 0 0 7 0 7�� 0 0 0 0 0 0 0 C 0_ mi G D, -! M m m mUU M M M M M d M M M dLLLLO dLLa(n (n (nm vl (n (n (nwmm(n (n (n m!�! O: I Ol (9Q�' .• tD WO n Od m O mN O M 1n N O M u7 M O N O O M m Nm O m M m O M m O M m m O N O M O I0 O N NN N O 1� O �f1 O T. O IN ! (b m 6 d DN m m m m m m m N m NNNO WNNOmmmmmmmmm e v Q< M M V O O O V O 0 0 0< O V a R O a M M M Y Y O V O O O C v v v ^{ Exhibit Page ES of �6 Ordinance q1- 044 C7 • 169 - 1299 E0 0 ao 0 0 0 0 0 a o ao 0 0 0 }4{ M C7 C7 C7 (7 C7 C7 C7 U' C7 C7 C7 LL C7 U' C7 C7 (7 �j Ii U. O 4 U ro m — ap 0 r2 m tD CO WN N O Co � M W N W V COl' m a a mi m m m m m Y m Fee N N N d N l0 N m N 7 7 7 7 m m m m m w m m N m m 7 7 7 m m m m m m m m m m m m U. O L m L N m L N L N L M m L m L Yl m L tll L m L N L N L m L N L H O L N O L m O L N O L m L N L N L m L N L N L m L M L N t N L m L N O L m O L b O L m L tll L N L N L m L N L m L m L m L m L m L m m 9 ^ 07 w v v N N N m N M e O v N N N N N N N N N P) N N N N N N N O O O e v N N r 3 fA C 9 N m O W W O O O O Pf t7 P7 O O O O O N 0 0 0 0 0 0 0 N J O mM G CV N N N N N N N N N N N N N N N N N N N N CI. N N N N N N N N N N N N N N N N N N N N N N 2 r J > v m w CD N N ml N 0 N m N t0 N m N m N 0- N N W N N N N N < t7 O C7 M l'7 N N N N N N N N m..... N N N N N N N N v O O O N O ml t0 aM 3 - N N 3$ d �. ' a� o 10 0 fD 0 tD 0 t0 0 tD 0 t0 0 f0 0 f0 0 <D 0 W 0 tD 0 w 0 0 0 0 0 0 0 0 0 f0 0 W 0 O 0 ml 0 O 0 w 0 Co 0 t0 0 Co 0 COI 0 tD 0 f0 0 tD 0 W 0 W 0 0 O 0 f0 0 t0 0 CoCo 0 w 0 O 0 O 0 W 0 m a� O O tD 0 O O N N f7 OR O OD O W n OD O OW1 < 7 w 0 W WN ON nO Cm 'E J oW 0 D o c o c o 0 0 0 0 0 0 0 0 0 0 0 of r } a w 0 w z¢ w > a W w C7 y C R ❑ Q Z U ❑ W N J z ¢ ❑ d O ❑ p r Y w > > Q� ZZI ❑ ❑ 2 ❑ ❑ Y ❑ m ¢ a Z Y j O r¢ c9 t- O❑ 0❑ Y W❑ a Q Q O U m m U Q r r m m p m p❑ 2 a o 0 J r 0 r fn r N r Z❑ w ❑ X Z O❑ w (.') p❑ Q p p p m m J x v� r Z❑ O rn LL W m J m O O ' z W O O r Q m Z m w '� LL m o rn y¢ ❑ O p m w N S 0 Q� O J x N O W x J Z W O J Cr O W N d 3 Y¢ 7 W r O X W J W J W J¢ z 0 O ❑ O _ O 3 Y 0 0 0 J O 3 3>> Z Q 2 m (7 m ¢❑ O w r m ❑❑ z z z o �. m z m 0 m 2.2.0- r❑ z m x x rn m m rn y m m S r❑ (L. :)l x > m z x (n w t9 on. w �} Cr Y f Y C a wz o Q z Y W C Q Q 3 p N w Q 2 ❑ p❑ Ctcr W S Y O U w ❑ a H z C J O OJ ❑ Cr Y W z ¢ z Q Zp U x U r z O C7 O m p ❑ O 0 r w r r y z ❑ N��uu> z, ZZ Q p z w p 2 Y 0❑ 0 x� 2 y C.7 z N O w J J W z O O r Q Z m J m J N N❑ y Q O z w m w m 2 O C7 w rn J QQ 2 t7 z J z O LL O LL O LL W W❑ 0' o r Y m m w m to rro,i = 0 O 0 m= S z n❑ Wr w w m w m M i z p❑ O m z n W N Q W T Q C J J J Q 0 0 0 0 0 Q Q 3 3 3 3 3 r 5¢ O C7 ¢❑ W Q¢ ❑ O `�i w Q LL LL Z d m 00 2 i 2 m r❑ z mnix 2 m m U) rn rn m rn 2 x❑ a❑ x r 3 x x w C7 m m rn r z ❑ m ❑ ❑ m ❑ m¢ ❑ ❑ m ❑ m ❑ m ❑ ❑ m ❑ m ❑ >❑❑❑❑ S C S r w Y r w Y r w Y r w Y r w Y r w Y r w Y m r m r } ¢ } Q r W r W r W r W r W r W r W r W r W r W r W J m W W W W m ¢ m Q m Q m Q m Q m ¢ m>> Q ¢ ¢ r Q w Y M w Y K 3 W 3 W C Q Y Q C Q Q 2 Q 0: Q K Q Q R Q¢¢ Y p p Y 2 Y Y C Y C❑ O❑❑❑ 0❑ 2 w 2 2 N 2 N 2 y 2 N 2 y 3 N 3 N 3 N❑❑❑ O f❑❑ O O m- f Q Q Q Q J J J J J J 1 J J J J W r W I r W r W r W r W F- W r r J r J r J Z Z m m a: r r¢¢ F - Q Q¢¢ Q Q Q¢ Q Q. O m m m m m m m> >> 7 7 D 0 0 0 to 0 to Co O O Z' U x N r J Q J Q¢ J J Q J Q J ¢¢ J J Q J Q¢ J LL r W Y O W J W J w J w J J g¢¢¢ J J J J Q J, J Q 2 U x O) x U x Ci x Ci m C% x U 2 S S W W W W N Z (q Z w S Cr g 3.. r 0 LL LL LL LL J LL J LL J LL J LL LL J LL LL J � J ❑ �' 7 r r r G ¢ �j 4 Z Q Z ¢ Z ¢ Z ¢ fn W VJ w (/7 w fA W UI w Vl w m W J W J W J w J 0 J 0 J 0 J O x O 2 O > S O S O ¢ Q¢ Q Q Q Q Q Q Q m Co m m m U U U U U U U❑❑❑❑❑❑❑ 2 2 2 x 2 2 S -a J J Q:Co z N N N W N y y z y y I I IZI O O _O O O O N O O O O O N O g O O O O d d d d d O O O O o O O b b O O O O n v: m m N M b1 m m m ONo d 8 ao w m m Oo m m_ N o_ o_ N N �' f7 f`1 07 P1 f7 l7 M l7 M 01 N f7 /7 M l'7 N N N N N N NCq N N Exhibit MX Page F(v of F mo Ordinance -614 • • 169 — 1300 �m>OL 9 m 0 0000 O O mm 08 O �8 aOa �O . 0 LL LL LL cD a c�0� z z z z z z O�O c�O� c�O� c� a m m ffiI O N m N N N O O N ^ O m o Q' O O O 9 V V 7 O 9 9 9 V O V O V 9 V D C V m 7 0 we 9 O 9 O 7 m 9 m 7 0 m m 9 '0 V C V YC. d m m d m N m d A N . d N d m d d A m d N d d CI C 0 C d m N d N d N �1 7 9 7 7 7 7 7 7 7 7 7 t0 l0 l0 {) T m m r LL L N m L 0 L N L N m L N L N t N L tl! . L tl1 L N L W L . t0 L . m� L W L N l0 L N l0 L N N L N L N L . L N L H m L tl! O IA O IR O W O tll O h O (A O IA O IA O H O y t tll l0 L Yl l0 L N L m L f/1 00 7` N N N N N N N O N N N Q 10 N U) N 0 0 0 Y O C7 N N N N f7 N M f7 V Pl P1 i C' q' m O O O O N 07 C7 O O M t7 N O m 0) Im O N N N N O O O u > qCm N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N z J. 9 > m mm t W W 0 w 0 0 V O Co w O m N N m w 0 0 O N V U0 u'1 Y7 W f0 t0 (D O OD Co O Co N n n N N N wm.. 3 3 L � w O O t0 t0 t0 tD � t0 t0 t0 f0 f0 t0 (0 t0 t0 t0 t0 t0 f0 t0 0 0 f0 0 t0 0 wN N $ N o$$ N N N ,� �n O) 0 tD 0 fD 0 l0 0 t0 0 f0 0 f0 0 t0 0 t0 0 t0 � O N C m O O N W O O O t0 . W O 0 W 7 n 0 O N N 0 O m O O O O N O a 0 tD W �0 O O m 0 n 0 10 0 N 0 V) 0 O 0 0 0 0 p 0 O 0 O 0 O 0 O 0 N 0 Ol O n N O N N N O in i0 N G y N O O N O O CX w w U.U. i w m o z 2 �I w Z 5 o< > Q ❑ w o ❑ C O y z Z J c Lu w2 Q = in 3 r 2>❑ m Q Z 0 m IW- r> W Q m O a z a p J o m¢ Y C<❑ Y Z w z ul w p m w z m w ❑ m r m r W O m Z O¢ m m w z C7 r m ❑ m O m 0 r to Q❑❑ g m m r Z r Z r Z r 2 r z 2 Z O 2 z U' N O U m r> w O U H W Q O N to 2 2 O J¢ 2 W> p r O 0 r O Q m W N a d d d d r W y Q LL N m .2 a c w w Z w Z w p F Y U w Y J m v°fi m 2 Y U 0 0 0 J O m p ai Z Q m 2 C7 �_ �_ �_ U r U LL ❑ i O O 2 o 0 o Z Z Z m z m S z z 2 W m Z Z z OU O N H❑ d w _� _� m w Q m w z U N w U 0, a y,N 616 C ❑ 2 w mw LL zw TI 3 U) W w m m' d M U) } Er ❑ ❑ Y ¢ z ❑ , m W m a �[ 4Iml , W Z Oy ¢ > w ❑ C U d' 0 2� Q 3 7 U¢-¢ W ❑ p N o> w w 1 W 3 m m z C a > z w W O a F U Z r w m d;L1a r m N o C w Z U w❑ 2 O S p o d' z Q> m O Q❑ r)- O wC❑ m r❑❑❑ m 0 D¢ O O r �- 1- r r p T Y❑ Q m z Q m< m S r§❑ m m 2w L�N,J C ❑ 0 p N W z W m 0 � w z~ N ❑ O 0 N U z z z z 0 z 2 r O¢ 2 U z U r> p n fD m w S z m W m> N Q 6Q. 0 0> w W w Y m Y 0U. a d a Q W m J CW7 Q °3211 g 3 0 0 0 Cr 3 U C7 3 C7 Q X 3 3 3 3 J 0 >>> 0 0 m w U❑ C J m m w 2 2❑ m w m; 0 m LL Z z Z z m z m 2 O z O 2 w z z z z C9 U O to r r a m U 2 2 2 7 2 2 m w¢ Co m z y N Q Q Q Q Q Q Q Q 3 3 3 3 3 3 3 3 a¢ a '¢ m m m X X it ¢ a AI (7 C7 t7 t7 C7 C7 C7 C7 3 r 3 r 3 r 3 r ❑ ❑ ❑ O ❑ d Z d Z p Z W � W � w � w � w � www � H � w � w � m Y Y '• � m E' 0 m m 0 m m 0 m m 0 m m 0 m m 0 m m ❑_ m m O m>> m W w VJ to V) Nmu m m C m m O 2 ❑ O 2 ❑ O>> 2 ❑ m m 7>>>>>>> m m m m m m m m Q a 0 0 ❑❑ m ❑ m ❑ O m ❑ r. Vii^ H m x�Q Q SSu S �Su �Su ��u Su Q W a Q❑❑❑ W m S LL'L S 5 LL 5 2 5 2 5 2 it 5>>}>> 2 it W J W J w J m w J W J W 0 W 0 W 0 J �Ju J �Ju J � Ju J �Ju J �Ju 5 J � Ju 5 J �Ju 5 J �Ju 5 J �Ju 5 J �Ju 5 Z J w Cr 0_' Cr g Cr g X g E m c I 1O 5 O 5 O 5 O O 5 O�PP 5 O S O 5 O Q Q w w w 0 0 0 0 m m m m m J J J 5 0 5 0 5$ 0 0 0 0 0 0 0 0 $ M 2 z z z Z Z Z Z O 0 0 0 0 0 0 0 LL a a m m a m m m m m m m$ m w� Z Z z z Z O I VO VN p 10 YI O 0 0 0 0 N N N O dl OO71f]f)1 r r n n N CS iv -E m N 101"10 N `A tb Lb 6S (� t7 W Cb N N (7 f7 f") f7 N N N N [7 N C) _ N N N C7 l7 Exhibit �Qu Page F 7 of r46 Ordinance g 8 - a'ly y X 72 l` 7 • L 1 6,9 1 301 mm m CI) ( n u W Q a F v NW2m a a a v W v v v v Wl0 v Q v v v Q G o ` aL vL m vLW vL m m d W m vLW W m vLW m m vLW vLW6 m m 9OOl T LL N N N N N LW N LG N LW N L N 0 h Ld A N 0 L N W L 0 L N L N l Ld W N 0 L N N L N I 0 L N 0 L N N L N W L N N L N W0 L N 1 t N 1 W N W N W N W Lv N N N LvW N LvW N LaA N N Lv0 N N LvW N N N .W E) 7 a t 3 O O 1N N M O 1 O N N N N O N Ch N N O O M M 0 yr ITINI- cL a o 0 0 0 0 m o O q NGq z H J N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N j 9 m S N O N N N O N N CO N 0 N � N N O N N O N N N O N N N tD N V N N N C7 N N O N m N Lf) N N N N N C7 N i(7 N N Y N n N (D N N N N N O N O N ID N IO N N P1 p a 00 o m 0 m 0 m 0 o 0 o 0 m 0 m 0 o 0 0 0 o 0 m 0 o 0 o 0 m 0 Ga 0 m 0 o 0 m 0 o 0 m 0 m o o O o 0 m 0 m 0 m 0 m 0 m 0 o 0 m 0 m 0 o 0 m 0 o o o m d o o 0 0 0 0 0 0 3 Lf) O7 m C7 q O O N m O rY O m n UO O r m N N q CT tO i n O) 7 In (P q n O) N O q W V O M fD O Ip J 0 0 0 0 0 0 0 GI C) C) 0 0 0 0 0 0 0 V 0 0 0 > O o Cr }o a z a ¢ 3 W It U O} w LU a S 'a p w a w 3 J o a w z 0 w w> w ¢ Q 3 0 o LL w > w w 0 3 0 o m Y W o It m¢> m o 3 w J Y 0 0 a Y> w~¢ !¢-• U x Co¢> Cr w¢> W p¢ O W p¢ U ¢ 0 3 C 0 3 0 7 J w W Cr O W z W z Z O S Cr a U S m z 0 m 2 U J U Z Q Co In Z� Z N W 2 J W p¢ J a¢ In a ¢ V Z 2 J CL Q m J Z p n m m m¢ J f- 0 Z y m W ¢ w p m W¢> p _W O N O N 0 w O In J Y O O } /y m Cr O O F Cr o w w w¢ a o CL 3 Z a 3 3 3 3 3¢ 3 3 3 z 3 0 g== a mp o w w 3 a o z P W z z z 5¢ i o z b U z z z z z U w m �n v� o x m � Un U 3 t- U H Z Z¢ Z d ¢ wCr } 3 w 0 a ° 3 Q O Q LU Y> (D 00 0 W> } 3 o � 3 O Q m w CNe w O W J U W Cn z D W Q 3 o w x W > O 3 m o m 3 O 0 FX 0 m x D 0 O W Z O z o O m O Y= V o 0.' 2 Q J W y d f W pO J w J a¢ J Z m Z F ::i ::� p 3 S= 0 !- n rn 3? W p y w m m J O N} 0 LL N D O ..1 n a Q Z Y O a 2 H i? -� W U W m O� S S m> t5 3¢ w > 3 3 O 3 V 3 Y 3 ¢ v¢ Q z 3 U 3 Z 0 Z —U' w a W w Q �Yc v¢ W Z 5 J m cD W Y O x m c� p W ¢ Y S o O, O J J Qd a U. w Z O H m O w z¢ x¢ rn O w z z U z z z z z m U v, m w m m 0 a x Co 7 S N O 3 H x U¢ SS S¢ S z it z Y Y Y 0 C 0 C 0 K 0 K 0 O X w w w w o m 0 o a • E. f- t- f f r t- F- F- z J O 0 ¢ 0 z 0 m o a w a w m w z we w m w a m� m O m 0 y m Z N y N N N m m m y �_ to y N N rn rn fA U rn f/1 N ti N S 0 y S C U U U U U W 2 J J w q H} m m H m S 2 2 S m S S G x 2 S 0 O 2 F- H- F- 0 S x W 0 0 0 W W W[ W S Q KQ w Q CQ z Y U. LL 0 p O V N m O m fnO S K ¢ Q ¢ ¢ W W W W m m w m O m O m O m O m ¢¢¢¢ m m m m m m Co w w w w ww 3z 3 3 3 3 3 3 3 3 w W w W w N w y w N O z z z z z Z Z Z Z N ti to y N ''AOA O O O O O O O O p O O ap O W O N O N O N p O MNm O O pp O O O O i,�' h n A GO$ddA CoN W O) O Y < O m tD tD0 GCI 0 0 �ACG N N N N N O Q O N N N N N N N N N N N N N N N V C; C1 Co m m f7 M Exhibit "X~ Page f 8 of Elio Ordinance '36 -AN Co W • • 169 - 1302 �m W p r N N u m a n m Y- am -0.0 n lL. L m L m L m L m L m L m N Y) N N N N m m N N N N N N N m m N N N N N N N L m L m L m t N L N L m O L m O L m O L a t N t N m 7 9` m Co (7 (n M V) N N N N N N O M N N N N N N N N N - N N O O N N N t 3 H L C 9- y (7 0- M 3 w m m O C v 2 H J N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N j 9 "m N N N (7 N N m m m N m m O Co N N O N N N N N N N N N N N N N N N N N N V N V N N N N N N O N O N m N m N m N N N N a 3 3 a m o 0 0 0 0 0 0 0 0 0 m 0 m 0 m 0 m 0 m 0 m 0 m 0 N 0 N o m 0 O 0 m 0 m 0 m 0 m 0 m 0 m 0 m 0 m 0 m 0 m 0 m 0 m 0 m 0 m 0 m 0 m 0 m 0 m 0 m 0 Co N d m CM m N N m m m N o o 7 n m v N m o m V o 0 o N 7 o (! rn N n r m (o 0 o N m m n e E J 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o c 0 0 0 0 0 0 0 0 0 LU w p m 7 zz m - Q m m m z Z Z D- ]0 Q W Cr O W Y W Y W Z O 41 p? r m N c7 V N p p m p 0 J 3 r O W (n m rn (n p O p z p J W m (n w U r U W m U W m U p n m w r (n r m r z 0 m 3 Z O w m r w r (n F v1 r (n r (n m m 0 m s Z J J a w S i 0 m p m w m S r O r¢ Z a. m p 0 m O Q. LL Z m z Q r p m W n W p m (+) (n S (n m W _W J r W U J p =000 0 m m m 0 m 0 U 2 Q Z S ' S J 2 z ap N 0 N 0 a W m z 0 W W J to O W W fall r S 0 to Z D Q 7 0 Q O 0 p Z O a. 4 (L m 0 m 3 f.. O w LL w Y Z U a� m J J J w (n m a Z O W C a m 0 r m O�� J O r Q Q O H x O � J J O 0 J O W a N N m$ J r O (n z L g w N 2 2 z 2 U W 7 Z 2 -, r W m Q w zen s o ¢ n CO, D m m r Z w ¢ m r Q a. 4a o Cr o w w w a w N (� v N z o > Y. O Z J W C t'n U m U m U p m r (n r r to O m r N �•' (n H N r (n r (n m O m Z J J¢ J (j �5 p m p>= m O r r Z p O >2 p p_ LL LL z m z N p m m w=_ J n N p (., m mLu w > m U J p (vmj O M O LL O a O a. O U m z (.( z¢ Z z O °' to a. N m Z z p w O Q¢ 0 0 Js p p d Z w Q g 3 W J_ J_ J f 3: W Z (n m a O U w CD O W (n r W a. r Ix o Z S Cr C O U a S X W J Lu J Q CL U' J a m 0 2 (n (n S J r o to Z m (n p p O a a a O O p m p m O m p m O m p m a >- Q w W w J J J J J W W m W m W m W w 0 0 p 0 p 0 O 0 W Y W m 6 m N m V m w m w m w m V Y 0 Y 0 Y 0 Y 0 Y 0 Y 0 m Q 0 Y m m J J Q J J Q J J a¢¢ J J J J 6 J J ¢¢ J J QJ % Q a Q Q z z m m O Z O O f 1Q Z w w w w w w m n m a a. n m n m n m J> > w N o z a m w w LL w w LL LL LL LL LL LL m w CrIr w W W W (n z m z O O O=_ a C7 m C7 m (7 m C7 m C7 m C7 m i 2¢ Z r> p o o z z z z z z z z z z z>> 0 0 0 3 3 > O O O O O O ¢ Q Q ¢ Q Q ¢ Q Q S ? ? J J J J J J J J J J J O o J J J o o O O O O O m m m m m m m U U U U U 010 010101 D IU 1U U 1 U 10 10 1 U I U 01010101010 UUUU OD U I U 1 U U Z (n z Z 2 0 0 N � O N O O Oo m 3 0 0 0 O O m m m m m m OND O O N N N N 01 N1 _O V V V O O V V a s O V N N N N l7 (7 Exhibit " B" Page F9 of F Ordinance q9 -6q4 • 169 - 1303 �m m � C7 Ch LLY N N U m a n m m x= a v m a d av m m v d v v v v v v v v a a a v v a a o a v a v v v a a v a a a a a a v v v o v U. b N N N N N N N N m L N L N L N L N L N L N m L m m L N m L N m L N m L N m L N m L N m L N m L N m L N m L m m L N m L N m L H m L N m L N m L N m L N m L m L m L N m L N m L m m L q m L m m L N m 7 :2 0) r 3 N N N N N M V O O O O O N N N M N O N N V 07 V t7 O M N m 3 `. Cm Z H J N N N N N N N N N N N N N N N N N N N N N N INI"Id" N N N N N N N N N N N N N N N d C 4 3 N N N N N N N N N N N N N N N N N N N N N N N N N N N ON N CD N G N O N O M N N N N N N N N N N N O N O N O O Om 0 CO O V CO CC) O n N Un O O 0) n O V O) V m V OO Un 0) Cn Ol O m 7 O n 0) n N O U� N CO 0) O p N .E J 0 0 0 0 0 0 o c c 0 0 0 0 0 0 0 0 c o o N 0 0,0 0 0 0 Z F C)� a O O H Y p U S OP w O ❑ o: ZJ > Z z O a: W O O❑ O m Cl O O?❑ X z U) W¢ ❑ S z F F W z z ¢¢❑ ❑ a w ❑ 2 w ❑ Y O 3❑ z U) 3 2 w J J O 7 J �- O 2 O z a z a O a (7 ¢ J Q z J 0 > rn ❑ ¢ a g w Z > Q Z O Q 2 (7 w O C w O J J X O W Z Q O s W m U N CO J y U W J W J W W W W J w J FJ- 1- a LL w O a U W Z W ai S H an °n' LL LL W Y U m J R' p a 0} 10- } m W Z M Z V _U O z a F O U O Z W O a' LL J O Q O¢ W O W Z w f� m O�� Q U¢ J W LL Q J a W O m W z S W Z 0 O 0 Q 0 M Z W S LL S ¢ O -� Z ¢ S a> O¢ U 3� U ❑ 0 Cr Crw O Y O m p p D o ¢❑ K 0 p 0 a ❑_ ❑_ W z_ W w Z g S Z o O J Q C O rn W O h J M n M Z o _Z 0 _z 0 J z z 0 z 0 U' W N W J Z J O O j Q Cr O S U O Cr n O Q 2 p Z O O p O Z> w p a O it W U H❑ cr LUm U z ZZZZ O) J CO N D. O. [1 d J W Q J Z Z N LL O) N D. N [D N ¢C Z N❑ z i o Cr O m Z O v m LL w a D m m z ir m W� o x a X W c� ❑ 0: ❑ ❑ ❑ ❑ ❑ z Q33 z s 3 3 z pQ� Cr W Cr W W W Y Cr J LL W W W W Q W W QQ3 W W W W ❑❑ Ix CrQ C W D Cr W 7 ❑ O O ❑ Y C `W S Y E< m O O❑❑ O O w H O O O S O O 0 D: 0 0❑ D: U U Z U ZQ U Z U w w Z 0 Z 0 m m CrC i O C7 C7 Cr y}} C z Z S U M S S X C M S}} U W W y p !A p y O y O to O to O h O QZ K K 2 Q: is Q Q Y Y W W C S C Y Y Y d' F- C H 2 �- Z 2 Z �. O Y Y Y Y Y} N Y Y❑ O O O O O O y} U U J J}} Y Y C N U to K U❑❑❑❑❑ 0 0 0 0 0 O O❑❑❑❑❑ O O O O w w w w LL LL W LL LL LL 0 0 0 (7 0 (� 0 10101 (9 O W O Z Z o 0) d. O o N O C'7 o v oo N �Op T O O d o N d O O N O 07 O v O Cn C$ O f` O o N o M d O q o U7 O O d O ch O N ci O_ CO) O O N O C) O O r O N r� O C] O d O N d O 0) d O ACb N N N Q) N V V V V a _ s �b 0) N O) N N) 0) 0) C+) Cl) O) i7 O7 V $ V V V V N N O) N 0) 0) V V m m M ZExhibit Page Fac of F..__ Ordinance 58" Oqq • • 169 - 1304 �m A N N N W N m W m m V... T m_ m H LL. L N l0 L N L N t0l0 t N t N l0 L N L N m L N m L N L N tom L N L N l0 L N f0 L N L N L N m L N L N w t N L N L N L N m L N l0 L N m L N N L N L N f0 L N {0 L N m L N m L N m L N m L N m L N m L N A L N N L N m L N m t N m L N m L N v �� w M N N N N O O N N Cf Cl) Cl) V O O a s N N N N N M f7 < ch N N t 3 y m C N N N O O O O O O O N O O O O O O O O O O O O O O O O O O O O O O `o >. m Cp N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N ( Z J 0 w w 01 m N f0 N fD N f0 N IO N fD N O N O N O N O N O N V N V N f'7 N N ONN No O O �f Y V O f7 N OD OD W W 7 M N N N d y ` t0 t0 f0 f0 i0 fD f0 fD t0 f0 t0 tD t0 tD fD t0 t0 tD tD t0 t0 t0 f0 tD f0 �O t0 f0 �O �D tD t0 t0 N N t0 fD t0 f0 tG t0 � C d UI r O t0 W M [7 RI O OD O f7 07 Co 0 O. 0 O. O N N GD f7 O Y V K O fO r r m 1 r C C C G C r C G (7 Ci � r O N r r � r r r r G C O O C G G C O it z ❑ m ❑ m w o v x M C O ❑ ❑ z 9 Lj Y W Q f¢¢ j>> Q z O w J o w y m x o w Y Z m z m LL a O r rn J m W m m Q rn W F O Cr w S o > J °° Q F ❑ LY w Z a F' m Ui w_ > Z L� N o N N o o p a O o Q m J J g m W m p m F- z F- z F- m rn F O❑❑ m m F❑ N J W w m Q C LU Cr❑ (7 m W S x m m J O x z J Q z Y O S Y J Q !A w m w g !x- m p w m U' '� m 2 J Y U' z Q LL O O J J J W O a O LL U Y x F- x m x O Z m w LY W O d' S Z a O LL �- Z O LL W F- Z m w Q d � m N a Z m m w w m z i 2 m _J J_ O" tD '� z 0 � W In U w CO.� F 8 Z LJL m U O Z z w w m O Z Z 2 J LL W O O C7 U F- F- S S s U Z Z Z x O Z, wo m O O O } w w Q W W ¢ xa:Y p W } O Z m J O0 0^ Z m m FN' Q ❑ p Z y U> 0 z F w F p¢ 3 m J> w f h N a¢ m p O y Z O m O Z O= J O J to Wm W J ❑ m w g m m a Z J m m O x w U F m N h LL m x o W m o o O J O O m m�, O Q J Z z 0 w x N C9 w c9 Z O . E Cr N m U F- W J Q ¢ J J HLL Z S ^ a o Q ❑ ❑ N F}- Y m 'J LL LL O F F- F- = O� Y m w¢ 3 3¢ 3 0° 3 3 a w D of vmi w i o J J C 3 w D 3¢ w U. x Z LL m U 2 z U m w Co Z Z U J LL w x❑ 0 F- F- Q S f O Z 2 x x S Z x -a O Cr Cr a 0 m 0 m o Lx m o Q a Q Q 0 0 0 0 ❑❑❑ ¢¢ O O Q O o❑ Q O Q O O m O m O m w Y w Y x U x U x U x U w m w w w w w w w x m m N 3 N N N 2 6 2 6 Z 6 Z O O O O O W Y W Y W Y Q z Q z z z Q > Q Y U W H W H W F- O to 0 0 m E p m } 0❑❑00 LY LY LY y 0 y 0 0 0 � 0 � 0 F- 0 F- 0 F- 0 zo F- 0 m O LL m O LL m O LL m O LL m O LL Q m w Q 0 Z z C z z z K z Y ¢ O 0 O m m Q¢ m m Q N m W> W❑ ¢ m W m W tY Z W Z Y m Y m Y m x W S w 2 2 S 2 S 2 S 2 Z /- Z H Z H z H¢¢ j j Z Q Z Q Z Q Z Q Z Q w m NW LU N VO) Z w Z N z N Z N Z y Z 3 LL y W W W m W W C O Q Q Q W W W W Z Z Z Z W W O O O O O z Z z Z z Z x 0 S 0 x 0 S 0 x 0 x 0 Z Z Z C a g a g a N N m m C7 2 x x x x 2 2 S x x x x 2 U U Z Z Z Z Z Y Y Y5 i i 22 W W Cy} O N O N N N O N 01 O q f/a : t0 C2f7 �A YS N YS N f�7 l�f tD N m N c8 N tD N O O 0 O O 0 O t7 O V N fh� O O O O N O O N O_ y11yN O O O O O_ t7 O O M f7 l7 O N O� f7 O tV Of M O N W f7 O N Of M O <D Of N O m N N O m N N O N O O N V O N 0 O M v O N m1 N O_ y O O O NN y O O O f7 y O v Exhibit 130 Page Fl_ of F Z4 Ordinance48- Dq4 • 0 165 - 1305 mm m a O. m ma v °� v m�� v v v v v v v v v v v v v v v v v v v v x= >, m m r U. `m L `m L N m L N mm L N L m `m L N `m L N `m L N `m L W m` L . `m L N `m L N `m L N `m L N `m L N m` L N m L . m L N m L N `m L . m L H m L N m L N m L N m L h m L N m L . m L N m L N m L N m L N m L Y) m L M > O L Y! > O L M > O L N > O L b > O L Y) > O L h > O L tll > O L N 0 v ^ O O O f7 M M M l'7 M )O N N N N N M t0 N N O N N r 3 CA C L C 3 `Om C N N N N N N N N N N N N N N N N N N N N N N N N N Z r J 0 3 m jt0 o 0 0 0 0 0 w 0 w 0 w 0 m 0 f0 0 Co 0 WO 0 Co 0 �O 0 w 0 0 0 0 0 0 0 S 0 w 0 40 0 t0 0 w 0 0 0 w 0 w 0 w 0 w 0 0 0 w 0 w 0 w 0 0 0 w 0 w 0 t0 0 tD 0 ... 0 0 0 t0 0 t0 0 f0 C7 N Y O N N O) O < (7 N O Q) OR U) O 7 O m O O (7 O W O l0 0) N N N N O O W O Q7 Cm • E o o o 0 0 0 0 0 0 0 0 o c 0 o o o o o ri o o o J r J W w ❑ �` p o W p p > K > CL Q Qz J X m 0 0 z w Z Z W p w� w a Q m LU Y p Z m w W U U Z J w w O w Co w w m Q z r <n Z m z w > �... r h r r m a a o �'� w 3 a p z O¢ a m o p m r -� a O r W Ul r > r r z o r m 0 x W p W> r > 0 z o w Y U vri = Q v1 ti r p m x$ �1! m n U Q o U} Z 0 p r C7 i m a¢ z ¢ c7 W m _z O> w , O r O' W p¢ m CLI 0 U faq W Q p$¢ ��1 J11l W O w~ QQZ�Q+ •�- Q to u) C co r x Q r �' m Z 0} O- x W Z Z z Q} g y Z Z N O N W Z Z Z U' U' m z Z Z O O a p ° r N �I LL w U o w m z w U w z z v0i w z z ma LL ¢a z z -Wi E5 S m o' o O� m x O p O 2 w N a N ¢ > O x z to � O m m r p w LL 0 o fr p x < g m x W x X w aZ Cr a C Z z r w x W z O w Z J 0 Q r N r Y ma Q p o W r Z Q J W W Z O Z Lu a o p y a p Q X a• w r iW.i r '� p a• J m > Q 7 m z 7 W W U r m r r rn r ul a v> m n Q U X O p C 7 a' (n U¢ r Z m a J a Cr r w m Z W r U 0= O r J Z O w p �_ W r V d' p a Z J �u m Q m Z x r N r to x r O 2 r m n O Q E7 o 0 n 0 U j o N x U n 0 p J 0 p w z f K w Z o ¢ o Z m > w 0 Z F-3:(/) (7 O E Q U, Z 0¢ Q w w p p 0 2 z ai w z g Z O Z w W NO W O w a¢ z LL. 3 w W m U 0 m a m Y cm7 o w w z ,~ M 3 m z z x a W x 3 z - x Y m o- m o oo x N m > x m o 0 0 0 0 0 0 0 0 z m z m}} m m a m a m m m 000000 J Q W W W Y W Y w Y Q 3 Q 3 p C 0 2 p p O p p p r r r r r r r r • m m z x x x x x x Z Q a¢ ¢¢ Z>> g g g � o m z a m w a m 0 z 0 m m 0 w w w w Z w U Z w U Z w U Z w U 2 w U Z w U Z w U Z w U E 2 w w w r r rQ K rQ K r¢ C Q w o u3i ai 0 w 7- � a D a¢ i Q z Q¢ z x> Z W 5 W O a a m Q Q >> x r x r x r x r x r x x r x r r Q r Q r Z z 7 W W Q Q Q 0) N w g QQ U U U U U U>> w W o o o o o O O 0 c w 2 i a U U U 2 U U m U i w z z z m o m 0 a o a O a a a W a m m m K a m m m m m m m m m m N N m O y m N z iillg z z w z z z z o, O O O O O O O O O O o 0 0 0 0 0 0 N O 1� n O O O_ O O O O N O N N O N m N O N . N O N N O 9 a f�I )A uS N �O YS to tb N N N ) 1A V N fV N a a V M P7 M c7 to e7 c7 N N N N N N N V 0 0 V co M M O O V O Y :W,:; 0 0 V Exhibit D Page F i2- of fZG Ordinance af' DIq H X H l0 7 • C 7 O U N a • .f_A 169 - 1306 mm fi I i O C Q i i I W w w V T (L >> O LN O LN w L N w L N m C N w L N m L N w t N w L N W L N m C N w L N w L N w L N w L N w t N w L N w L N w L N w L N m L N w L N l0 L N w L N m L N w L N m L N m L m L w t L L L i I m I I 7 a M M N M M v N N N N O M N Cl) N N N M O N N N N I L 3 I I y I I I O O O O O O N O O O O O O O O I I I G m C 'I" C 2 F- N N N N N N N N N N N N N N N N N N N N N N N N N N N IN N N N N N ,10 m dj v m N m N N N m N n N r N m N m N 7 N N IN N N M N N N N N o N n N m N m N M N m N m N r N O N N N N N v N O N o N m N 03a 3 m mo m , m m o com m mmmm mm mmoom o n o0omm000 o o n o o o w o no o m mm I I fA N N O mm M Cl O r O r M O m m N � O O N O m N M N O O O O N In J 0 0 0 0 0 0 0 0 0 0 0 0 o v l I GI yI I ni LU c3i O IM Q ZQ p W C p a p J Z I r Z e �I h N w N Z p 0 K ?> p a 7 Z 7 p J w I m Q 0 Z p 0 m O O O o t^ O O m Q p It O H N m p F- y Z W U Q Z m y p K Q=q z Q F- y F.. y F- y V m W y W Z j •� p m p Z Q p 3 F- W W W J p F- V Y m m = y= Z N= Q p Z w Z w l++ p J p== J P F- p m Y >> p a chi g m O LL m> m Z p m J_ U W Z J M 7 N W g a Z n M O m a Cl p 0 o O m X J rn O (A N J O (D 7 w Q O 02 Y LL o U O N m O F- N _J m O w er Q w w z w Z 2 U Q LL F- (n Z W Z W N N W LL p Q LL W LL W O y Y m F- o ion vl$ p p w co m m Q ~ Z Z Q I dim l� ir (D m W U Y m O p YQ 3 H p Z moic U f a N w z p p m F w > p p m JO m p Z J W ml= ;J Z V p z 0 0 y K U O Q R Y Y W H p p m F- W Q� Z N p m p Q W z = y F- y = F- y p Y JO m J N � 1 N u m H W Z J Z O m U a p Q n~ O y w d' W J J m U 2 W Y w p = W H r m O N Q p Z w w Z W J d J W 2 N M d LL m p Q Q LL II a 9 11 m�;m 2 m 7 Z O Q H J U J m y QX d .- p LL w N m 0 INi lyi fq nNi 0 y 0 Y m FY- LL Z x m O N J m a y Z z 2 U u y W N N J I I i I m m m m m m p m 0 m 0 Cr 0 m 0 mbi 0 0 0 0 0 0 •x Os C W >_ K W >_ O C LL p O_' a Y W w Y W w Y W w p p p p W y w W y w W y w W y w W w w W y wCr w F- w p p p p O p W >>>> Q W Q W Q W Q Z p Er¢¢ p z Z z U w w w w w 0 Q 0 Q 0 0 Q 0 J 0 Q 0 Q 0 Q 0 Q 0>> Q C m p C O m p m p x p I p a Y x 0 x 0 x 0 m C m m IDI^ !�! a l W W (Qn Q Z Q Q Q Q Q Q U J J J J J J J m l y >> 3 3 3 3 3 3 m i y I U) (n y F- 1- z y w w w S z z z 1 O 0 r 0 N 0 r 0 N 0 N 0 M 0 yy O_ 0 N 0 M 0 0 0 N 0 M 0 v 0 N 0 m 0 N1 O_ O r h �- O N O M O O 011 O O N O (? O O NL O C o Q � Z N N r f� d d d ob (L ab n' n' r n 1 W N N N N N N r y 11 ab cp a4D V O N M N M M M M M N V N M N M N M N M N M N M N N N N I Exhibit ~ (3' Page of Ordinance 'S'64 ( x N V T 7 • W- • 7 o v v o o vo o 0 0 00 a ad m g o o 0 o0 o g 0 0 0 0 7 o C o a.v o l 7 A �C� jxxxx o o It IL N <7oo7( C UU U LL w N LL W W W W LLa 00F a _M co G E. O O O O � O O O � O N O Y7 O O N O m O 1n O O O O O In O � O m O O N O m O M O M O t7 S l7 O O 01 O N O N N O pp 1n O m O N pp N O 1A Q N N L7 N O N N N W. v a a v v m v a v v m v a a v a a v a a a a v a v a a a v a a v a v a a a o v v m N W N N A N N N N W N N N l0 l0 l0 l0 W N N N 10 N l0 N l0 N f0 l0 l0 10 L l0 L N L l0 L L f0 L l0 L l0 L l0 L N L L L 10 L N L L R L H LL N 1q N N d H f/1 N N tll H N N N N N N N N N N N h N N N 1I1 N H d H W N tll N N N tp N t M 0 f9 M N 0 N V O R PI 0 f7 f7 In M M M C7 In N Q N f7 O Cl) Y M N N A N N R M N V C'7 V O O O O N m .« C:� rn n m N o m n m m m m m r m n n r r n m r n m m m m o o W o o m o n r m V V v .�l 3 `o _ m C N N N N N N NN N N N N N N N N N N N N N N Cl. N N N N N N N N N N N N N N N N N N Z H J M t cmc >3 m CL m m O m O m O m O m o m o m O m O m O m O m O m O m O m O m O m O m O m O m O O O O O O O O O O O O L Vl rn m C.•E r 0 m 0 m 0 N 0 m 0 m 0 M 0 7 0 N 0 A 0 O 0 0 M 0 O1 0 v 0 N r 0 N 0 N 0 N 0 N 0 N 0 O m 0 O O 0 Y 0 n o 0 c D c m o r c g o M 0 O M 0 O r1 D M o 7 c J ❑ o � w w ❑ x z w U � z 0 ❑ m z C7 w � z v¢ LU LU o_ w } a O¢ J a O J }< ¢ 3 w > w > w > w w w Q w>> ¢ a w> > w > ❑ f w m F- z w j a w > w a z z x > X Q 3 Y m W Y J J 3 Y ¢ Q¢ > a > Q z X > ¢ } a Q a w ¢ J w W 2 > Q ❑ } Q C W J W J W J W J UJ w❑ z a' W a O U 0❑ a U O> a¢ W m m m m S U U 0 X 0 W U z W U} z w w❑ ti= 00 } w m] m g S t 1- O }O } w m> J¢a.> w S U W J cr m O z g m m m m m m m m as i¢ w❑ rm z ' o o c❑i m m m i J x z>> X o o o a z w❑ V o O w N U 0 2¢ z z a a aQ J w d 0 a m ❑❑❑❑ m m m i o ❑❑ z z z z z w z z w z w w w w F° w a z z z z z w z z w w ti z w vii w co vii vii u3i vii vii m m vii ❑ } o IJ 03 ❑ ug w} w ¢ }¢ Q 3 } 3 w O} ❑ a w w cr w } a}> 3 U w> > a L. > w w¢ > z w w w w> w a> w w w w w Q - S ¢ Q Y z O z J m> Q O Y Q a w ❑ m W> ❑ a W z> Q z a¢~>> a N W Q Q❑ s > ¢}¢ a¢ z a Z V O V z x 0 m o 0 of x Z mm�uu o} z> z o w g¢= U a Y 0° ❑❑ m y> w o m Z >¢ a> w m w CQ7 N> w w ¢ m w m O W m > r U J C7 r> m Z❑ N J y N 5 a c� F_ O a a Y 0 0 0 Q Q N w i O cYj z N a¢ 0 0 w 3 w 3 3 3 3 3 w z 3 X a w 3 3 3 3 v 3 3 3 3 3 3 3 w 3 y 3 Z 3 Z 3 0 3 m 3 Z 3 Z z z 3 Z N LL z z S m 0 Z Z Z Z Z Z z m w z z Z Z z m Z v) m y ti u) N m as ;C (D C '2 x (at S w n. O m RH Z v) mw v) Cl) H cn H v) F v) z J 1- m t- 0 0 0 f- m H m H v) F- N v) H m f- w 1- w v) f- w v) N 1- w v) m F- 0 N m W v1 �- m H w m v1 J a U F U U s x x x x x x r- m x x x F- x x x❑❑❑ fpp- a S f S r- S S S S❑ F a S S F S S r S H m F mf S S S S S F S❑ F a S S S m m 01 O O N N N N N N f") f'N1 M M O N 1m[I m m A n r r r r m m coo N w z 3 w w 3 3 3 z 3 w 3 z w w w 3 3 3 z 3 z 3 3 3 3 3 3 3 3 3 3 z 3 3 3 z z z z Q: Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z V) m m m co V) m v) m Z Z m y Z 7 pj O M O M O r1 O O � O v O n O N O_ � O N O N O 1 O_ O 1t] M � O � O t") dl O N d O fV O f0 O N N O � O N O q' O N N f7 v t[�1 t+7 N M. (V � N C? N l 1 � d y V � r N W m N 6 � m N m N N r m N N (� m N N v1 N N N 1'7 N C� of N N 11S m N d v1 N N df �t N N � N C7 N m N m N m N N N N N N N N N N N N N N 1� N f%/ N N N N N N c� 1n N N N N N O N O N N N N m N N N N N N N N N N N N 1n N N to N N QI N N N N • U) c o W U _ r mE 9'a`a`o o c o``'Ci ` c o0 0 o o 0 o m 0 0 m o 0 o 0 0 m v m v v a oo` 0o` o`o v a a m a a 0. aLL0o o 0 0 0 LL a a 0 0 0 o o` cm vo0 o 0 a o 0 0 0000oo 0 0 00 LLa 0 o � a O 4 'U 0 0o a .O o,X xx 'm 7 cx a LL m LL LL LL W LL LL W LL LL LL W LL W W LL LL LL LL W W v mE OO OO OON Omn O O O Ou 00 N O Ln N N C, N O NO O Clio, O O O O ON O ON O W ®a:, va v a m a a v a v v v v v v v v v v a v a m a v v v v a v v v a a v m m m v m v Y = m m m m m m m m m m m m m m m m m m m m m V N M M M M 0 0 /0 Mm M M M N M M M m` M M M M M M m m N M M M m m N W W m m m M M m m m. N N N W q N N N M N N N N h N N N H N N H N N N N N N tlLl N Lm W q N H N N N N H N N LL: V L �+ 7.. �. O V Cl) O N M V V V N l7 V V V N N V V V V f7 V C7 07 C7 0 '- V 0 V M V M M C, V tm N r3 N: C,' . � w nm m m m w m m n m am m m n m rn 1-IC2 d � m w m a) m m w� m CD m n� 3 > d (p. C{� N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Z F J G m E LO LO O, '0 V V V V V V v m O N e N v V N O V v N m V O v v N N N V v V v N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N > W a 3w 0 0 0 0 0 o O o 0 0 0 0 0 0 0 0 0 0 0 o 0000 0 0 0 o O o 0 0 0 0 0 0 0 0 0 0 0 O .° co m m m m m m m m m m m m m m m co m m m m m m m m m m m m m m m m m m m m m m m m 3 l I I r � Ol M M N u7 D1 n M M O V M N N f7 � N V N b N v O N N m m V M G •E. C C O O O 0 O O G G C O O O O O G C C G O O C C G O 0 0 0 0 0 0 0 0 0 0 a 0 J a > O Q < O Q a p> Q m W F Z cr Z Y w Z (a Z m J C w w wJ J G J J❑¢ O W W w W w W W ❑ S p p W w W p i W W W J J J J J m ¢ W J J J J 2 W m W m m m w w m m 0 0 2 m m W m w W m m S Z m W m 2 p m m Q z J F m m m J Z m m O m 2 m m > m LL > ❑ m m N ❑ m > m J ~ J m m ¢ O Z w m m m m¢ O m m 3 2 W m m a m w a m m m w¢ C m LL m Z U m m > U¢ H❑ Q❑ 2 i U❑❑ w Z S O p❑❑ 0 H❑ m❑ 0 0 w z Y w❑ p❑ p w O O❑ (Q7 a 0 2 Z w Z w w w, Z Z w w O Q Z w w w w w m w m w w w w Q m m w w w w- 2 w w W w w r i IP z w 2 z 0 ¢ o W W w Z N_J Z N J_ 2 S ❑ S m ~ ¢ w Q W¢ ? w❑❑> > U S H fA N p S Q❑ w H H O p z J m ❑ 2 H¢ F... Z W x J J W } D: ❑ S G m W Q: uj U (7 m w w > z❑ V (n m O Z❑ i J J m F 5 z mQw f- J m ¢ 0 0 W S Z mw a O U J¢¢ J]>❑ p p j❑ p p J Q H ❑ W LL O m LLj Q H¢ Z U S Z❑ O N W y Qwp N W W Z 0' m w ❑ 1- S O m w W Z C W W O c 3 3 3 z 3 a 3 w 3 m 3 w= = Z o> z a 0 s a a o a LL,. Z Z m w z O Z 2 m a 0 0 0 z O z -, (n O D U U� O w m m� J U> m❑❑ 0� m m m U O O R J 2 2 2 ❑ ❑ D W ?¢ J p p 2 p O O O J a Y �, 2 w W❑ 4 Z S m C d' (n E: J z¢ a `� p❑ z w a a¢ M O cJ7 m m m z¢ v R.. Z (n U W O G J m 0 ❑ U W W W W m¢ H N fn N W¢ F❑ Z,:. a m m m U J J t!1 m Z ¢ C R S m¢> w¢ w w w w t- H r❑ 2 z w w m LL 0 w r z O Q m Y ❑ w¢ N_ K �FS�pp- FS- N fn (A m v~i J Z /J- m K U Y Z m S U U W W U j m O O O 7 N a pa Q mQ ❑ 0= m O O W m 0 O O o O O m J z z x x ¢ ¢ ¢ ¢ w W W W g J O 0 0 0 0 0 K K K ¢¢¢¢¢¢ m m m m m m m m m m m m m m m m m m m m m m Mims Q-. z to Z Z Z Z z z Z z 3 Z O O O O O O O O O O O N O O O O O 0 In N N m m n n Yf m a, V n n M V QO m O, N v n m 0 .- O V O R m m n .0 N N N N N N N N N N N N N N N N ff"ll �m l`•) 1n N N N N N N N N N N N (7 N f7 N C7 f7 l7 A 00 M M C X c Lu n. 0 .7 • m O c O C E O C C C C C C O C O O O O a o a v 0 0 a a a o m 0 o a a o o m m d v d d m ao an d $ o o a v ao a c 8 E o 0 0 o c. 0 0 0 0 a 0 0 0 a `0 8 o o o o � O o 0 0 0 0 0 0 0 0 o d m o 0 0 g o 0 0 W g c�a00 x �o0(D(D � 3.�c�c�c�c�c�c�c� � x xm 5 � 5.� .�cDc�c�c�•�c�•�c� a U W LL W W u. W W W W W W LL W LL LL LL LL O O O O O O O o O o O O O O O O O O o O o O O O O O O O O O O O O O O O O O O m � � � � � � O O O O N O O N O N O A O ¢ N 7 M N m N m LL] m N N N N M M C C Z 1C N N N N N N m n m N N m m W Y d m m m m m d 01 N gl N m N N 7i N m N N N N m m N N N d N N N m m N N N `I N d N N N l0 N W N l0 m 0 N m m m 0 m 0 mm m w 0 0m m m m m m m w m m m m m m m m m m m 0 m m mm U.(Q t t L L L L L L L t L L L L L L L L t L L L L L L L L L L L L L L L L L L L L L N N tll N N N N tl1 N N Ol N N M tll N ... tll N N N % N H N N 41 N fb M M tll tll ... tll W N N V. 7 r M M M N V N M M M M m M M M V V V m V C v O V v m V N N r M V M M M V M M r 3 a, r C� y cV N O W m O m o rn rn w A m m m m m m e m A A A A a m m m m rn m a m a m m �3 C N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N 2 H J e a' E.;9 M m m V o V O m N V V V V M N V v v V O ON N N M O v V V V m e a a V v v e N N N N N N N N N N N N N N N N N N N N N - C N N N N N N N N N N N N N N N N N N N a 3 yo 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O m m m m m m m m m m m m m m m m m m m m m m m m m to CO I CO m m m m m m m to to m m m r � O) a1 m N V W m N A N O - m O W O O r V N O O O N N m M Cl O i0 T N C O O O O O O O O O O O O O O O O C O O O O O O O O O O G O J m 0 W ¢ m O U O D J Q z Y z Z p z m U ? O z w w a 3 W w w w w m m J m w X¢ W w m¢ w w m m w w J _W Z m J J J J Q Z Q J O w J q M J J W J m W 7 m m W m m m i m m Z H F- f" W m J p m m z Z U tL m f' w m> f- J 0. m m> m J m¢ Y Q C7 m 7 (7 to m �n > m W m m m m J 0 Y m O U> w w o to 7 O Q >> 7 LL Q Q Z O w m a a a¢ 7 li w 0 0 0 r W O p p m p¢ m QwQ a z 0 m m a m m m J QzQ m, ZWW�$1l a m m o m m¢ m m o p z 2 W W O z Z z z Z z z z z J¢ Y z p o Q J W W z z W O Z � N�iu! z z Q x z z W 0 w a v� LL U w w w w IWIWI w w w Q U O m w U a U 2 i 2 w w o m w S w g i z U w w a 0 J p m m Y Y d O Z p a a F- a O Jz W a , w S Q a N J S to x Q O W O O � OJ 0 C Y W Z U W m W QQ S z p g O O W O m J m W W S� J m m m U Z z Z C 0 0 0 Q �• Y m z O N y tq W O m w S z w m LL O O S Z w z Q o w x m o p o m m O c� i o m o Y w o 0 o U o m w o a z Y m m m 3~ 0 QQ w o m ppJ Q¢ x Z v oQ LL Q�Q N 2z J � Wuu ¢ N w ��$$uu J a a o. g m m Q�Q m> 0 w w LL m W O: C W W Q 2 W x p g O m m Y Y w Q O O Q w J J Q Q Q O O a U x x? O m> U Z U. a m LL 0 0 0 Z to � U m m 0 m x O m N c.0 x U a U��� 3 0>� z J O H J cr O ZU a r C C K Y } p O a a Q m w O H y OJ m m m Z Y Y Y Y Y Y Y H Z Q ¢ J m m m 3, p w Em m m m m H z} U W p 0 0 J w W W W W W W („) J 3 m E o o p p J o J z z_ u v z Y Y Y Y w z z w z z z z w w Q p 3 It w z z Q 2 z m Z W W w W W U U U 0 Y 0 0 m m m m m U U U U U U U} O 0 �"� m m Y Z Z mQ p F m m U O O O J z Z Y Y Y U U W (¢� (¢� (¢j (Q') a a a a a a a 0 0 0= w a m Y Y U o U 3. O O O O 0 J J J J z m m m m m m w w F z z Q W W W O O O D U U Z Z Z Q: Gr m m m 7 D 7>>>}} Q¢ Q Q Q Q Q Q Q Q Q Q¢ Q W W x x x x x x S m m m m m m m m m m m m m m m U U U U U U U U U U U U U U U U U U U U U U U U U U O_ OO_ O_ O_ 9 O O_ O_ O O O O O O O O_ O_ O O_ O O_ O_ O O O_ O_ O_ O_ O_ O 6 LA d, ab cS d N 6 6 d 6 d 6 6 6 6� 4 � 4 A A A A M V m m 0 A m m m m m M A m N M N m O A N M N S M N m Y7 V N M M M M N pp N O O O M O N pp V V V V M M M M th M mm M M M U) m V N 7 • • o y `o c `o `c `o `o `o c V g o v m v v o v m v v o v v v v o v g o m v v$$ v m o m m d v E o LL a o B o g a o v o o a o 0 0 o a o a a o o LL a o `d LL o 0 v 0 0 0 D o o m o o o 0 0 0 0 al o o 0 0 0 0 o x o U C7 � t C7 O x C7 O •� C9 0 m x C7 C7 •� O O O O •� O •� � x O O •� •� C7 U C7 C7 •W C7 C7 K C7 CL LL LL W LL W LL LL LL LL W LL LL W LL W W W 7 ❑ O O O O O O O O O O O OON ON O O O OV O N 1n m O O I O O O 8 O S O O O O O O -I-1- O O O N E Q N N N N V vl N Y N U1 N N O N C m N- N W ® g, 'O V V v V V V V V V v v V V V V V V V V V v V V V V V V V V V V v V V V V V Y- `m `m m` `m `m `m `m m` `m m m m m `m `m `m `m m `m `m m L L L L L L L tL L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L LL N N m tl1 m N M N m N N N N N N N m N m N m H m N N N N N N M N N N N fll N N N m L. Z M 7� N V N In (7 V C] C) N C7 N N V (7 t7 V V [7 t7 V C7 N V Ol In N V � (7 t7 V t7 V N V Pi N t7 t3 N am m m m m m m m n m m m m m n n m rn m m m r -m m m n m m m m(2 m �3 o > m to >6 2 C. N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Z f J C a/' L E p v 0 N O O V O n V vl v O m V O N v e v V O v M vV 0 0 e V V N r N N N N N N N N N N N N . N N N N N N N N N N N N N N N N N N N N N N N N N N N N N to 3 a 3 O�0 0 0 0 0 0 0 0 o 0 0 0 0 o 0 o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o o o O O o o m m m m m m m co m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m 01 a1 O N t7 m N O n N N N OR r O O O m m m m e M N m n17 n N til O f7 m O m C-1 O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O J ❑ Y Z !W- z z Y o Z tQ N W W cr Q w O W W w W ❑ W w Q O❑ W W w W W W W J J J W S J J H J J r2 O o J J 2 J J J O J p O= m m Z W U m m W to m 2 m O W J O m m❑ W m m m m p C m m Z c� > to m m > x m m x> c� 3 m m m > m m Co m S m z D m w z a o m m a m m q� m` a z Q x >> ¢>> > "' >> w z w w x> m m o a m m m cv m r x ❑❑❑❑ W C: 0 0 0 0 0❑ ❑❑❑ C7 O ❑ C J C O❑ O C O❑❑ D O D ❑❑❑ N C J F: W W W W U L7 W O W W W W !3 W W W W Z W C7 N Z W W W W W W W W W W W W W S N C ❑ ❑ o ❑ p ❑ Q} Q W � p ❑ ¢ Y C 3 Y W C Y C� 0 _J W a X w 2 O H C H H>❑ Y p w O Y U ❑ Q C O J p C=❑ F- O O F- Q O to ❑ a m d' H C F 6' Q C C F C U J C w 3 v) S 2 X O W C W p U w y¢ to 0 0❑ U m ❑ o m m Q w U W o � J x to C ❑ w m o C Z W C C O LL N C N ~ J J U W O F' to a Q d' D_' C❑ 2 C C w m x C7 } '¢ w C❑ w m S x J C7 U z m C N C 0 J m m w t7 m LL S C W r O m H ❑ E c o w¢? o> 9 0 3 3 3= w zQ w wp a o o w�� o m> 3:50<w 0 3 LL m m U Z z 0 0 0 0 Fr z z to U Z H o o i m a -� ❑ Z to x 0 0 0 0 Z m m x U O to cr Ix ig J ❑ IX Q C W J❑ Y O w U W> W> W 3> to ¢ o C Y Q a p 0 Zcr > mr p w C m> >>> O 3 p p J H Q E. U C x z }} Q a Q K o zS z a J U o o z 3 ac ❑ vUi w z o v0) ¢ a- C? C❑ U C C C f- C C W W W y❑ V O Z w_ y U C C J C p U❑ C¢ w O Z, w W C Z Q S F- H Z W W H Y Y m C W 1O- LL~ W m m? W z> Z J w w Fow zz r O> O E p ❑ O Z 7>>>>> O O O Z> w w w Y m m w z z O S C7 0 O to .. �� y 0 0 0 0 0 0 0 0 0 0 0 a: C C a a a Q Q W W W U o o o O O a: O Q u� ug W ll) Il) w Lou w U U U U U U U U U U U U U U U❑❑❑ o 0 0❑❑ o a o❑❑❑❑ w O z vii Z In co o_1 o_ 0 0 0 0_ 0 0 I -i.= 1iz" 0N 1z. 6 6 N N C� IA t� y d r L n Lh A N d rfi 'L A 6 ay a5 6 N 6 A O nm V �o n N m N N A f`7 t7 (7 t7 NC9 C7 t7 N N V V (7 t7 t7 C7 lel N t7 t7 C7 Q7 N Go M Cl) m x m m 0 c 0 0 U am U N 0 r o `o `o `o c `o c c c `o o` c c o` o` m a a v v m o v v v o v v$ v o m o v m d v m v o o v m o 8 m g v v v 8 8 v o v m E o 0 o a `a a o 0 o a o o a o o a o o $ a a o o a a o o o a g a o a V O O O ` O ` O O O O O O O O d O O O ` ` O O O ` O O IL V C7 C9 C7 ,� O ,� C7 C7 C9 •,� 0 C9 � C9 C9 ,� 0 x 0 x C7 �,� �,� U x C7 .W x E a a 0 Al: AW LL LL LL LL W LL w W W LL LL W LL W LL LL LL LL LL 0 O O t00 O 1 I O O O O ID 0 0 O O O O O N O O O O O A O S O O O O O O 0 0 0 0 0 0 E Q N C N 0 m m m m m m N N N 0 m N O G N N N n 0 m h m W m A ww w w w w w w w w w w w w w w w w w w w w w w w w w w m w m w w w m w w w w w w N N q N N N i i N N i i N N N N N N N H i N N N N N N N N N N N N N N N N N q N N LL -0 5 7. v V m N N V N - — M V N N— M N N t�f N N 07 N V V Cf V C7 N N c1 N V N f7 N N N N N M N N 0 m Coco W::WM<D � 3 c m. � m 0 2, C N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N a r m L E' v a V o co rt v m V m V V o V o u7 t� a� co e v a to V v e a v v a in w o w N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N �.3 IL 3 0 0 0 0 0 0 0 0 0 00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O t0 t0 w t0 w O w wt0 t0 w t0 t0 0101010 0 t0 t0 t0 w t0 t0 0 t0 t0 f0 tD t0 t0 tD t0 w Wiwi 0t0 O t0 w w O O tD N w N t d1 O 10 O O 10 7 N th 7 V N 7 N .- to CO O tD N t0 to r OR O) N N V CR N N 7 m t7 .- O N M O • E o o c o c o 0 0 0 o c o c 0 0 0 0 0 0 0 0 0 o c o 0 0 0 0 0 0 J rn x ¢ Z ❑ ZLLJ m LU cr FW O ❑ m O Z O m W p 0 m Z~ a W W W W W�❑ W LC W} Z Z W Z W❑ W Z J W W W W Q p p ❑ J ❑ O J J J J J W ❑ J w ❑ H O O J O J m > J W J J J J m W m w m m m m m m� J m rn w [C W z � m w m m m m m a Qm O m m m m m W m x m z>>❑ o m❑ m❑ Q❑ m m m m o p a r J? �1 J1s11' w m m m m m �_ Er m`� D d U K m j m Q _z O D m m m m Q W z 7 ❑ W ❑ ❑ ❑ ❑ ❑ ❑ Q W ❑ W ❑ ❑ ❑ z O ❑ Y ❑ ❑ f' U' J O ❑ ❑ ❑ ❑ ❑ ❑ J z S lo- w O z> z z Z z z z m w z 3> O z z J O z❑ z U z z N w O z z z z z z¢ s ¢ U V) a W m W W W w W w a❑ w z o w w o x w w w w w c� m w 3 W W W W W W U 7 U m z a a a o p zz v, a of It w J N m m CC o Z W N a w U as ❑ W ❑ ~ m ❑ F m Y z❑ Y W p >❑ 2 ¢❑ a' H O m U U MEM J¢ ¢ w m w a w p i m o to o ¢ N g¢ w m z> x w w m J❑ m a_ ❑ U m m F J t0 H❑ N m t0 ❑ J ¢ z ❑¢ Z z m} W x❑ O W („) m~ W N O f� z N W N m m a O J Z O W LL Q❑ p O a 2 7 w (D W m 0 w x W U N CR to aW, w J J W z N W a L7 m p W 5 m J m J �3>s$��mmwmuommu W ?v3iom.WE'CEmm �� amU20Q��a ❑ ❑ m a a m F m O O U H p m W rn Y ❑ y m 0 0 m W❑ o J m p¢> 3 0 3❑ ❑ z z WW> z>❑ w p U m m a ❑}❑ W 3} p y �d W❑ m m 0 0 Q Q? x¢ m Z C E, m m Z? W J U U m (� m Q m U > O❑ V F❑❑ O H H f W J} L7 ❑❑ J= J J J R' m a O m >_ U?¢~ z f V- ¢ w w 0 m O a m fY (7 (7 (� J¢ Z} m J J J Z' O m m U 0¢ O z z w 3 m C ULL z z z g o w w w w o w o w w o o " o w," w 9 o w o o 0�Q xa> w x¢❑ x CD x � w a x J Z m Q Q Q Q w J O O m w W W LL g J O O m m m¢ S S x x S x x x x x x S x W W W LL LL LL LL LL LL LL LL LL LL LL 3 U 0 O C9 a 0 0 a 0 0 0 a S Q Z y N �6 6 f� 6 A N LLS 6 6 P4.tv N N 6 to ^ 6 d A N 4 V d t0 O tD 1� V tD � 1� tD � t0 t7 (�pp OD � ^ t7 O V V f0 t0 OD OD � f7 N t0 I� V t0 f7 N N N • C mE aO C C C C o o � O o a. o 00000000000v0m 0 0 o 0 00 0 0 0 0 0 0 0 8 0 o�� 0 Fa (D x ,o0 ocDcDo0oomo7cD7(D Cx vvaavvva U. IL LL W W W W W W W Wa - m a W F- O O QOO ON 2 O O O O O�O O O O O O O O NOOOOOOO OONN OO OOOO.9OsOO N w N N NE Cl) N N W y ka v a v a a v v v v v v a m v a v v a v a a a a v v v a v a a a a v a a a a a a a m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m N N N N N N =I= N N W N N N N . N N h N N q q N N N L N N N N H N N H H N N N N N N LL M M N N O M N ? M O M M N 0 0 N M Q M M 0 0 O M M N 'T Y V M M M M N M N M L N' C $' s m m o 0 o m ao n m m m m m m m n m m ao m m m m n m m w m m rn m n m -+ 3 `0 m m C N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Z H J. c E w Y m N e v v n a M o O v v< m v v v N N<< Y d . Y a 3 O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O p O O O O 0 <0 N fD f0 f0 f0 t0 c0 <0 D f0 f0 W 010 t0 t0 f0 0 t0 c0 c0 w 010101010 Dt0fDtDt0 0 w 0 0 0 w w 0 $ t0 t0 0 '= N Oi m r f0 N m f7 M N O t0 g r O N 00 a M N9 N N O r N M O t0 m N c0 O N N N M N f0 n O C O O O O a o o O O O O O O C O O O O O O O O O O O O O O O O O Z z O O U U LY w Y Q j Z N p a W W W W Q Q W W W W x W p W W W O w w p W W W J J J J> J J J O J r J J J W w w w w ao m m m m Y w S U m m z m z 3 U p m m w z a m m m> >>>> p C7 m m m m m m J co O m x> p m m m m m m m M Z a m m m m w m w m m J¢ m LLJ W>�~ m n 6Q. m Q m m m �_ z z z z z o z w z i z z z z z z v w z z z z tli z z w >_ z n z' YY� z z z z qa z F w w w w S w to w 0 w m w w w w w w C7 w w w w m w w a N w w w w w w a w z 3 w a W p a 6 m c J Z Y S w p a 3 Z Z C7 F- ¢ a p F- > p U a p y W j N O LU z m w z x p 3 z p O a 0 W a w a �> a a Q O a> w W a, a W m p N 0 a F- p p Q p a z p w w p a w F' o w w z f O a a w a s v1 O O F- a a O W a p fn F- > W 3 m w S a OJ a> F- O O a S U 2 Z Z a Z> p a a 0-M."'. 7 LL p a W_ a Q w U a U~ O Z a 3 a w a z a °a a O w O W w W} Z Z W a J w U w a~o w Q w a z z W> Z a Q J O O a W W g g a p a a a U a m N F w v �[ o O p C7 w Y Y v) a a J N c w w= Z z �QQ' w w? QQ a p 5 U z o J w v>> Q >_ ago 3 o Q 3 0 Q U. m m F- LL W W p U to Y U 0 a W a m U z 2 F- N W U a m Ow Z a U U W J U a S z O a w W o p p y: O p p Z Z f�pq W F U p wU' F- ap a p W a0 O V z a a a Z a 0 0 p O p U p p a Q p p a¢ Z Q E J J J O O ~ Q a U 0 N K¢ K a a F- Z> O p ~ F- a 2 a a U z rp a a io J J J C7 U' Z p Q O a v7 v7 C7 O O J z a cx O a W w U O J z z O a a W z z Lu z~ H w o W m p a �wi. z t=.1 U z p a w x m c37 W w cx.) cx.) a ai ai Q Q xU' a G T p p U' z M LL 1 z m Cr w Cr z F- W w w M z o Y m a a a F- 0 0 0 0 0 x S x x x x?° Y Y Y Y Y Y 5 5 5 5 5 5 J J J J J O' vii z U) O O O O O OO OOOvV N0_ OO Tim—; NO N_O O w N _N_ N N __ PL O 1 � f N N N N d N 2 w m N O n n W V K fN wM M O V 0 A co) MM M M M ONN O_dON M M V M (L U cz :G N C X co '2 wa0 N x N N 7 0 w C7 r c c `c `o `o o v m o o o d$ v m v d v$ P o v$ D a o v d$ v _d m 8 o a v o v E o o o a a$ o o d a a o a a a 0 g g °o a 0 a s° 8 0 a' 0 0 a .0 o 0 0 0 o 0 0 0 0 0 a U C7 C7 U' U' C7 0 U' C7 C7 C7 U' U' C7 C7 C7 (7 U' (7 U' C7 $ ($7 x m x m x x m m m m m co x m x x m m W LL W LL W W LL LL LL LL LL LL W LL W W LL LL LL LL m i0 �" O O O o A O O O O O O O O O O p O O O O O O O O O O p p O 11101010 O O O O O O O O O O O sj O s O 2 O O0 0 0 0 0 M � �/1 N � Y7 N W m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m W m m m m m m m m ,W L L L L L LL L L L L L L L L L L L L L L L L L L L L L C L L L L L L L L L L L L LL N N N N W H tll N 1/1 tll N m N N m tll N N m tll !/! N N N N N H N W m N f/1 m W N tl1 tll W N tlJ N m L 9 M 7 M m N N O O V < Y M N C M O M M M O M M < M M M N M M N o M M M O M M N t3 y m � o m m n m m n m m m m m m m m m m m m m 0:0 r m m m m m m m m > m N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N 2 F co c m E. y o v o N v m v o v M M M u� a a o v v c v v a a M v v a e n u� m o v 10 v e m N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N cc 3 a 3r 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 m m 0 m m m m m ro m m m m m 0 m m m m m m m m 0 m m m m m m m m m m m m m m m m m z r O: m m t0 O N O N O N N MM m m m m a 0 m m N M O M m m m O C E o 0 0 0 0 o c o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o c o 0 0 0 0 0 0 0 0 0 o c o J z a O ° ¢ z x z vai z z S z 3 0 ° O m w ° w w w a U W Y O W W W W W W W W W W p w J U m J J J H H 1 J w J J J O J F- f- U S W° m U w m m m 0 W m m W m> W m m m o m m m Z 0 m Y m W 2 z m J m S U m m m Z> x F- > m a> m m° m J m p S W m U m Y 2 w z a L) m w g m m m~ aLL m a m z a m m x m° m w o U m m O w x a °z z z z z z z z a z °z z z 3 3 z z a z z z z g z z w a 0 z a z m= a Fn w w w w w w w w w w W w w to m W W a w w W z w w w z C9 w w 2 w U U 3 f ° ° p o a Y. z Cr a z z x x o O a o 3 2 p W p w s>_ i v~i ° z z J 3 s W �p 0°, o z y m z k G mIII U_ V1 U S m W Z m J O Z} C7 C m m N p N } p a W R i��tl H O Z Z m W z m m O H S} O H Q Z LL J W Z O H J O (q Q d' H O W R S 0 2 J z m Q S U W Z O W W W S S Q H W O ��1111 C QQ°' J M 3�3 ° Q m Z O U) Q SySN m a- w x-' J J U7 z ga z to U' fA N V% Q' W ° W w CpwS>z�z�7 LL m N m Z Z Z Z W U p U m m O U= N m N m a U w W dJ 2 OJ m 2° U U U 2 a ° w m�_ z a ° � F- U S H }} S m. O w >.} Q z W z V? w w w w z z z= H } ap w w°° U m _S p p p p E. z S > H Z Q Q F- O J Q y Y Y >>> J J J W U p a Q - Z 0 0 0 m z 00 C.) 33mmlgzt -W WUUyaaa333z_Q�33? oo�azZo3-o3ozz 'O H Q U U U U U "' w vl H H S W W J W W W O 9 O p U Z W}}} f' H H C z F F- Q Q y y m m 2° z Z Z Z Z Z a S m S >> a>>>� W w W W W° m 0 z z 0 0 w> a a Q w w JO J J J J J J J f �! f 2 m 2 2 2 2 2 2 f m 2 Z Z z Z z O ZZ Z 1,:13 N z O_ O O_ 1O N O_ O_ O_ O O_ O_ O_ O O O_ O_ 0" (on N N N ' q aD tb lA y d d <8 d d .h uS N N rb b tb d d d 'h 16 N m N M M M M N N Y Y t9 Q V N N N O V O O O N N O V M N N N N N M � M lrl M f7 fel N N N M O O M C7 �f f7 V f0 M N N f9 M l`) M f7 t7 l+f M M 6 dp ar �7 w �I .. as X f0 '2 w o. 0 m x ui 'O N Qr • u C lo__ I m y O O O C C C C C O C 0 C v v v v 0 v 0 o v v v d m v v o v v v v v d v v d v d v v d v v v v o m a- o a a o 0 0 0 0 0 0 0 0 0 0 0 0 o a g o 0 0 a E v oo oo oo o o o 0 0 0 0 0 0 0 0 0 0 0 o g o g o d 0 Q 0 0 0 C U' C7 U C7 U C7 •� C7 � •� 0 0 C9 U a C9 0 U C9 U C7 C7 U C7 U •� C7 C7 x U C7 C7 U C7 C7 •, X LL LL LL W W W W W LL w LL W v �N ❑ m O O O O O O O O O �j O O O O O O S O O O S A O O $ O 8 O O O N O O S O S S O E Q N N N N N N C M N p� N N N N C N N N N N N N 7 N N N N W m v o v v v v v v v v v v v v v v v v v v v v v p v v v v v v v o v v v v v v v v Y. 'Zi d d d d d d d d d d d d d d d d m A N W N E w W N {0 l0 N� l0 l0 l0 W A N {0 {0 A E W l0 W l0 l0 m W m N W w m m N tm w N� W 0 N N N L N b N N N N N N N N N « N N 0 N N « N N N N N N N H N N N M N N N N N N M N LL 9 7 v M V (O N N N 0 v 0 N M O V v 7 m V t7 O N N N O M v 0 M N N O N M N N N Y O 0 N m « my r m m o n n m m m m a w m o m m m m n m m m m n n m m m 1 m m m m J 3, a m > m C N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Z {= J c m L E v N N N N N N N N N N N N N N l`O') N N N N N N N N N N N N N N N N N N N N N N N N >3 CL CL 3« o 3 O O O O O O O O O O O O O O O Cl O O O O O O O O O O O O O O O O O O O O O O O O m m m ro m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m L ^tl! a m O M Ci N N Cl! n N m.7 17 t7 N N N 7 cl v N m o m N r r Cf r O m N O m n O N O cl W O 0 0 0 0 0 0 0 0 0 a a a O O O O O O O O O O O O O O O O O O O O O O O J ❑ O � O x x x x W LU o> W O Q D w D Z W H w ❑ W W O O x p O W W J W W W W W O m 5 -WE V1 x ❑ H J J N _❑ x J J J J 2 J J ❑ W m Q U p J (n m m w x m m ~ w m m W m m x x D W F m m} x 0 4J } m m m m Z m m W_ O O J J z x x LL H m 7 7 m 2 D D U D D 'i Q F 7>> O x x z 0 W ��guu p N Fw x Cmi {- m m Z Q U ap x m m J a m m w a U m m w N Y Z z Fp, p O W z w o z z z 0¢ z 0 00 z z z z X z z z z z z m z z z o f<>> z a c7 z U w❑ z w w w U U w❑ O w w w w U w w w w Y w w U w w w i¢ 3 r- x w X C: x z x z ❑ �_ j x w m ❑ W> x O w ❑ O x x Z Y O Y OW ❑ U > N ❑ n O W (~i) y W x 2 p W Z x (n ❑ m O ❑ x m x Q z x H O} Z a}' m❑ 2 2 2 0 x U Q 1Q- z (n w~ C7 O ❑ cr W? a p U x Z 1- D<< Z¢ O N a cm•� } Q m x W x W u~j x (.7 (7 ❑ F Y N Y W To Z o' Q 3 WQw z¢ 3 w o a¢ w o¢ a i z 3 w ¢ w v >> j ¢ z w H o � a w LL F3 a Z i m❑ Z m U} U U x U z } U x LL a x m m N m m U) Y C7 m Q o m x ❑ x wp D W 0 Cl)x x (A to m ❑ O x ¢ Ir w > J J J 7 Z F x x z ? W U D x x x x Q m. N J F F D y O} O O Q Z x x 2 O U D W x Z J H Z W > J ¢ E. x x x x o o Q o 0 0 r D❑ x w J O} J Y z m¢ o m= Z x O O x W W Z U m N h❑❑ U ❑ x ¢¢ x U JQ O x C z to x x x x x 7 x _ p w w 2 2 z>> z a¢ w W w w W x� w O J x x x U_ 0 Y> O O>>> Y w J O Z❑❑❑ x x a 2 x W x O p Y Y U .x U W x 2 x 2 x Q p Y Y Y to Q O ❑ ❑ ❑ ❑ U U W m J a' Q Q Q z w Q W W W W W W W W W x Z W W O O O O Q Q Q m YY J J J J J J x x> x¢ Q LLl 4J w w Z???????? O O �:. z z z z z z 0 0O o 0 0 0 0 0 0 0 0 0 0 0 o a a a a a a a a a a a a a a a a a a a O: z z z z z z _o 0 0 0 0 0 0 0 0 0 o N o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 oN o 0 C?� C4 N��� .L 6 66 ��� ������ �� C4 m m o N o 666 � m m co N N N n v o 0 0 0 o O n II' o N N N N N N (7 N N N N N N N N N N N O N �' Ol V N O O O N N N M l7 f9 C�1 f7 f"7 N l7 N N O f7 l7 N (7 N f7 07 V N C7 V O M N f7 �I C _ as x c 'a wa0 N X v m rc • w • m., O': E O v m v v v O m odmmdo m o vE o a o o O a a a dd a a a mo •00 ooo$ao voO aoO o voo o 7 O��� L L � � 7 �7 7 7 � 7 � O O A. W WLL LL LL LL W W LL LL LL V 0 0 0 0 0 0 0 0 0 0 0 p S 0 0 0 0 0 0 0 0 0 O O N O O p O O O O O p O O p p O O O O O O O O O O S O N C) C, O N N n N n n m 10 0 of K) n O N n A W ®... ' v v v v v v a v v v v v v v v v v v v v v v v v v v v v v v v v v v v v v v v v o mY,r mm mm Wm mm mm mm md mm mm mm mm mm mm mm mm mm mm md md mm md mm mm mm mm mm mm mm m mm md WN Wd mm mm mm 10m mm 1Em md m p.NNNNNtNNHNNNhNNNNNNqNqNNNNNNNNNNNNNN N . w . . N m uw V: o: �l 7 v: O M /7 10 (`� CI V O (7 r P) M f7 V f7 N N 10 O 10 C7 V N M Y Y C7 N f7 C7 Y O M V M N 117 V Y 03 W m' C mm m n m m m m 0 r m p n m m o m m m m m m r-0 m m m n m m m m m m m m m m m d l 3 w w o. m E N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N z° F J m L E;5 a a e v v v v N 0 e 0 < N N o o a mv v v N O 01 a v 0 1O v < o < r1 17 O m v v N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N W 03 O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O �,m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m r Orn at n Ci 0 1O o n O n 17 N q N o n N N cl n 1O o 0 0 c— o o c o 0 0 0 0 0 o c o 0 o c o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 E: ❑ z w F U) LY z ❑ w p a O m O ❑ m U sa� m Q 3 Q O W W r W w v) > W❑ W W W W w W w W W W W W W❑ O d W J w F- J Q J❑ F' J W J J J J J J J J J H J J R w m O N z m m m N m 3 m a❑ v) m N m 0 m m m m m o m m m m m m m m y❑ 3❑ M cn d 2 m m m m m 0 a S J H m H x m m m m m m m m m H m m y -� Q w F 7 F- m n w 7�} F- Q V) O Z U H 7 O 7 O 7 > n> n N O n w O F ❑❑ H m n a m Y m w m Z m O 2 m m m m Z❑❑❑❑ 0❑❑ N❑❑ 0 3 Z �T ❑ O ❑ -� ❑ C7 Q ❑ F' ❑ ❑ ❑ ❑ ❑ ❑ SS f d LL Z W W Z Z W 3 W w 2 w w N W W Z W W W W W W 7 W W W W W W W Z W W m W U Y ❑ Z W F - V1 a: O W ❑ Q LX U) w LY J ❑ > 0 v) .: :. Q ❑ a: W ❑ ❑ 2 W F LY ❑ ❑ f:1 ❑ W U ~ ~ F- F- ❑ J D: d OONm O m w 2❑ m y ❑ m W❑ g w a w ❑_ 3 m d L j m LY m w M 2 g 0 ❑❑ m m m J F U z S❑ m J❑ a w❑ a w p m 2 2 2 2 ww m m a m w ❑ ow ❑ N J O 2 Z O O w m z N m m W F 1n O 2❑ O W❑ r W¢ 1~ 1i 1n 1i W m W 0 Q U a m Lmi. Z mm Z m d m Z& 2 W W X O W Z 3 Y U 3 z x 3 Lz ? Z Z Z Z z w W m U Y r r o a: m m Q Q Q w ❑ m m❑ _a X r w z v o o a❑ O ❑ o 0 0 a/:,: V1 V1 v) F- F- R' W O W y W U30: oz wr >>> N 2 W w U❑ Q 2 J ❑ N t�f O W❑ 000 Q U U❑>Q❑ Q Q Q U❑ Q Q LL W 3 U W W W W O Y Y Y Y Y Q W 2 0 0 0 w000 lM1' Q W }}} U U LL W cr cr� w x w w w > d>>>> 3 0 0 0 U U z m a 3 3 3 z o o a g g g g w g 2 cxa J J m m U U V w W 3 W W W W W 0 0 0 0 O O m m m m Lz a a a a a (L a a a a a d d d d d d d d d G'. z Z z z Z vii u3i U) z z z z Z Z Z Z 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N g U7 N u 0 ch cb di 0 r r 6 d 1b 6 A Ar; b n n d, d> r 1b ab 0 a d, cb 0 1b r 0 0 d u5 1h 16 N n l7 of m m V m io � N � � � m m O pnp S m m V of N bl M M io N m N o Np N p N • • s C O' y.0 c O c c C7 o 0o c c c c cm cm cm 0o LLoao cm ao a 0 0 0 o va v o000oo$ o vo0 ao E o 00 wAjaLu�Cx f O , x 00 0 a Oxxxxxxx mx O w LL w w LL LL W w w w w w w w 0 m o� o N o 0 0 0 0 0 0 0 0 O o 0 o O O o 0 0 0 0 0 0 O-- 0 0 O o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0$ o o W E Q N N �..� O n N N N N N N N N N N 0 N N � � N m N N C W Y. = m m m m m m m m m m m m m d m m m m m m m m m m m m m m m m m m m m m m m m m 'm m m m m m m m m m m m m m w m m m m m w w m m m w m m m m m m m m m w w m m m m m L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L u. N N N N N m N m . N w m . N N N N N N m N M N m N N N w w N » w N N N N N 0 N m m' 7O - N N - - N N- O- O- N N- O N N Q N N M of . N N N N N N. L T Ha: W' V m m w w CO O O CO W 01 CO 0 O 0 0 0 CO 0 CO 0 n O n 0 CO CO n 0) 0 0) 0 J..3 o m' m Z � r m t E N v v eq N o v o s v N a a v O v N o Ol N O N v O N N N N v C7 N N N N N N N N N N N N N N N N N N N N N N N N N N N r N N N N N N N N N N N N N N N N N N a 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0:0 0,00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 �- O O O O O O O O O O O O O O co t0 10 CO CO O O O O O O '01,01,01,01,010 OOOOO O O O O O O O O O O L' N Ol 41 N N q 01 l7 N N < V9 f7 N N O O M O t7 n O N M 'C N O O O N 0 0 0 0 0 0 o N q q C C. O O O O o O O o O O O O O O O o O O O O O O O 0 O O O O O J., v F - z 0 � Z p z X F- W w Z} p U w z p z z z Z z Z �p } z W W 0 a W p W W Q W W W W} Z W W W W O W W .� C W a w tq W w J J i J J J J W J J ; 2 } m Q J O O K J F m m a w z m m m m m m z m w w w z w o 0 0 m m 0 p w �- �- "- m m m m J W Z J >>> Q > c0 �D Z m J > fn fn w m 0 m O m= J V) > m 00 °� O m m m m O w= m C O O O O O O w m m Z ¢U' a m m m Z m m m m L)Q o m Qa ¢a (L y m p p o m vm1 Z a a a a a a a p m a 0 z H a j 0 0= 0 0 0 0 0 LL a a a a U a o w w m p Z g 0 z a J J J p p F w w Z a w m w w- w w w w w z m w w w w m w w LLL LLL w w Y w U w m w z o_ w = r p z p � X m p O m Z p F- p m Z m 0 -� Z p� z p p p a a a w U O C z Ne0 o C p J o o a o m 0 L) v 0 c~i a W a w L) m} a Z a Z u! Q Q Q z} m m m> Z p Q¢ 0 0 0>> a U -' F- �-- F- H h H ow w w p O p m¢ 0 Z W m m O J O O W W m m tq y rn N 0 w O m m W n Q O v1 O p w w m m m= w m cr Q O a. cQ.> m W C z a v m O> O O O o 0 0 0 w v~i E m Q O O F U C 2 w a O Q m; OO W R$ U Y O H m a a U a 0) Q w w w N w w w 2: 3 J (� O O O ��1ul Q Q- 9 O i m? m w 0 0 0 O m w m 0 a z Q W J J J J J J > 3 Z U O m a m 0 5 w N U 4 a z m m w m m to m LL LL IL c7 a1 2 2 m z z p z CZ J W J J J J J J J a p p O 0 J m za p p p m p p p J C JJl �1 J1 �1 J1 �I JJ �t Jl �1 J1 �1 J1 O p p} m Y Y Y Y w C C D co m m a p 5 5 5 5 5 5 5 0 m <. U O m m Z W U U U U z Y Z~ Z a W W O f4 fn 4) H J F- m Q Q Q Q Q O K U U E m U p p U �' m m m m O p SS� J m z z p p m m m °d m m w m m m m m m m m w x m Za Z ¢ W W W W 0 FQQ- S z� N !A O O g m W W W U p p !n p W W W W W W W D W W 9 W W W 7 F p O p p W Y Z O' a 0 Z J f0 (n W m J J J m W Z Z z z z z z U>> m p 0 v� rn v, w 0 a a a 0 m w 0 m a a o 0 0>>}} } o g g W, O w w w w w w w m N N N N N m N N N N w w to (� y m N N N N N N N N N m N N tatl w W N z z z O O o O O O O O O O ON 0 t7 Or O co 0) N co 0) O N n f7 N N N N WV N N O N N N Rf7 N l0 m O V Cf P') l7 M M m 07 9 N '? 0 0 P') f") f") M (7 M Ci m M 1,4- Y Cn V G 0 N N N N G O N N • Ir • C y O C O C O O O O O C O O C m o v v m o o v a m v v o 0 0 0 v a v a a o 0 o O o m v v v o v v v m E LL o 0 8—� °0 4 °o o °0 8 g a a a LL g$ °o °o o °0 00 00 4 4 0 8 8 a o0 a o 00 8 a U m O O C7 x O � C7 C7 x C7 C7 U' � � •� •� U' C7 U' C7 U' U' C7 C7 C7 C7 � •W U' x U' C7 � C7 � ( C7 U' x U' LL w LL w LL LL LL LL LL LL W LL LL W V D OO O O O O p O O O p O O O p O O O ,Q O O 0 0 0 0 0 0 0 c-, 0 O O O O O E Q N N d N N N N N N N O N N N 0 d d N N N N N N N N N N N N N W icy m m d m m m m m m d m m m m m m m m d m m m m m m m m m m m m m m m m m m m m cj m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m LL L L L L L L L L L L L L L L L L L L t L L L L L L L L L L L L L L L L L L L L pl M N m m m N m N m W m N N m N N Vi m N N N N N m m m N tll m m N fA m N N m N m N M Z 7 d d N N d d d d d N N Cf d N N Ol N d d d d d C7 M P1 C'7 d d C7 N M d M N N N M N f7 N d t3 m L c 0 m m W ao n ao m m n n m n n n n n m m m m w co m ao m n w �3 > d O C N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Z F J C m L E 9 O N d N d d d N m O d N N O d d d N N d N N N d M t0 d m (O O N d d N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N r N N N N N a. a 3� O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O t0 t0 t0 !O t0 (D (O t0 tD tD f0 t0 0 W S 0 w t0 8 <0 0 f0 t0 WIT t0 t00c0 t0t0t0 WIT tD c0 w 0101010 0!00t0 r � Ol m N O d m O m f'1 O N N O 0D n OD N (O d N O N O tD m t0 O OR N d N f0 n N C E O o O o o 0 o o o o 0 0 0 0 0 0 0 0 0 o O O o o O o 0 0 0 0 0 0 0 J ❑ w w = (7 o z � m U r Z 2Q f ❑ Lij Z a 0 Z Z w w w 0) O —❑Q, w p w m w m w W N W 0 m ❑ 0 0 w n w❑ U' J J J J m m J J C7 ❑ ❑ W fn m r d m J J O Z m m 1- !- m m W W W y W m❑ W m m m m W❑} m m❑ m QZ m O O S❑ Z U o❑ U w m Z m > O m Z o m> m m m m> F w m m¢ m w 0 C7 m H o 7 mQ co m m m a a Y C9 N J O a m m m m a y Ja m m m , Q O J m w_ a❑ co O U W o 1- u7 g m O m O z 5 Z Q¢ z z z z z z z m z z Z Q YO- m 0 ¢Q V z 3 z w 0 w z w D z p z F w m 0 x 3 w w w w w w w O O w w U 0 w w o Y i 3 w z z W Z LL m W Z W W w o z i m m o > U) 7 K z M z w w p w o W m v❑i Z W o w o w m Cr Y F W m W w Z O> w m ❑ O J N Z> 0) ❑ w Z>O ❑cDz mm mO m❑Jc� z`�m ❑m ❑ Z N w m m N} _❑ y❑ O O ❑ ❑ m m❑ 0 0 0 S m❑ m j N 0 o wo Z co m m a Fn O O U O m = J m ~ ❑ ~ W o H m Q m w m Z H Q~Q ❑ Sr W m z p w Q p N O O Z LL �_.. Z fn n J y m W y m m m W Q 2 Z U1 O W m W F W Z N❑ U' ❑ N J Q m E m z w O O N J a m m z r z❑ r z z a SS O m O Q�Q O c� O O m❑ y J 4� {L 7 fU) fp Y N U O F- m Z U) O V O o v U !n F y S W 41 2 Y Y m m Z Y S LLL m O S U F F U 0 m a m c m z o o cr o F❑ F- m v ti m m a a cr 000 m a m m❑ m cw7 U g ❑❑❑ o m m m p p Q O w w z W w N Z W f O❑❑ m o❑ Z ap U m Z J m m m m p 0 O >> p A m m m tp m m N O m J 3 ❑ J a} r r r J J w 3 a a w m m m m 2 ❑ O W W Z r a U O 0) N w w W J J J J~ H H�1 H!! Q Q a Z J W W W W Q�Q a W m 2 w 0 0 0 J O. O H F H H H O O r>>> 7>> >i S Y} Q Q W W W W S O O 7 (A tq !A w N N N fn w fA fn N N 0) N V) N h N V) N O) N fn V) V) O) F H H !- H H F- H H F- C, 0 0 Ol N 1 N y11 1Ny1 ay�I y y r y y 1 l7 y � 1 N} n �y p W tb �_ O V �l df N (b tb N N W v 05 tt5 r Y7 N IL t7 of � O� Ol ON} O N m N N t7 N O O 000 O O O V d N N n n O O f0 fC N O N N l7 Pf 01 {7 d C7 M d l7 N N N N co (7 N v— `(v� • • C C 01 y C C C C C C O v ao v v m d C LLO O C O $ o pCp aO aO $ $ °° O o $ �o oO o Cx x _W W �777 7 d W W W W W LL W•LL W LL LL LL LL LL d O0vv E °$$ ° m Lu ro O 1,31 O O O O O O O O O O O O O O O O O O O O O O O O O O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o Q O O E Q m N N N O m m �i N m M M N N N O HI pOj 007 10 10 M "• O co N N W ® v a a a v v v 9 a v a a v a v a p a v v v a a 9 a av v a a v v v v a a v v a a m LN 4i al N a) N N N U7 N Q+ N N m N N G1 al N m a> N m al m Am mm m m N m m m m m A m c0 t0 m W A m m m N m m N N N` W 0 m m m m m N` m w m L L L L L L L L L L L L L t L L L L L L L L L L L L L L L L L L L L L L L t t t m m M tll N N N tll Nl W N m N N N N N N N N N . m N N m N N m N N m 2 a) N N N tp N tl! m U. 9 L oV M V M r .- V N O M V V N N N N V N V M V V N N M M V M N N M V V V M V 10 M M M V .0 mr �a m m Ad d I m m m m m m m m m 01 m CD m m m m m m A m m m m m r m r m �3 > m c m 0- 'p V N N u1 O N V M m V V O N N M V M O O m V O O m m O N V V N V m O O O 03 3 N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N a 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03 0 0 0 0 0 0 m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m w N Cm M O O M m .- M 10 V N O O N M N m 7 m m r N O m O N O/ N M C7 �- V m r r O O r V �O m E o o 0 0 0 0 00 — 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0- 0 0 0 J w o CL w O Q Z a 1„ fn Y a 5 W Y Q p YQ (X 3 0 LU w Q Q a W> w w w Q 3 w N v Gn w N w o w o > J ¢ Q' tY J F -� Y J J W J Q Q W Q' W Q J J W J J H J Q m Z g> Z Z m a m m Q J j m C i O Q w J m¢¢> m F m W F U N m W ¢ p S Q m m (r J w m N ¢ Z J C S ¢ m J J ¢ m m m y Q x J m o w j¢= i o o GOD w o 0 0 �_ m? Q y v w a W m i i- m W m W K z Q F z O 3 5 p z z 3 z z O z z z o °z w z w o a z 3 3 3 z z Qz z z z 3$ a W i U v> Y W W Z fn w W Q g w a w U W¢ z w c.� O x o w z z z W w w a w a !A rn rn U Q o x w a a0 O> w w UUi z > ¢ Q ix 0 o W Y>(X Cr Y Q v i 3 z Q m Q x Q W J Y N Q ¢¢ Q w Q O O¢ U> . Q a Q m Q > O w Q' W (Y Q Z C i N J x p J C J W¢¢ N > Z N m Q to W Yj W ¢ X Z p¢ U Q~ O Y cr O J Q ¢ > F- C d' ¢ cr w Z J ¢ W Q W Q F E a¢ N w= w w w¢ Q g rn w¢ W `" z Q a z wp vQ-iigP O v o o w LL v �xvc¢>z�c�US ��¢a0z20. 0 o�Zzm�Z�3x3a�aiv�i0v�i x X a a a Q N J 9w O O O Oa Y x Cr pp J Q Q ow w Z 2 Y Q J 4 Y Y Y O¢ w Q J m w C ww O 5 z z Q Q Q> z a w Q z u~i 3 w 3 z z a 0 0 o z U) u3i ¢ a o 0 0 0 o a LU a¢ Z �QQmixIx 0 wm m m xUz � 33� c�c�oc� 0 W W W W p 0 2 2 U 0 N y y U y V m W W Z w W U U (.7 F- O¢ Y Y Y Y H m C� C� Y Y y J J d d 0 0 0 0 0 0 2 Z 2 2 O. O Y J¢¢¢ w U 2 6¢ ¢ ¢¢ N m U J J Z 0 0 0 0 0 0 o o 0 >>>>>> 3 3 3 3 3 3 3 3 3 3 3 3 3 3 Y Y Y Y G Z Z 2 W W W W 0 o a o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 p 0 0 0 cm 1M N 10 WM1 N vO G Qom, � � N V V fN7 M C7 V O � t� f+7 C7 O fN7 N N N N � PM') l7 l`7 ON7 tN'1 N N fV N N x .0 m L H w ow c � oIt cc m E c a° a° o a > cD cD 'm CL U a a ti V Q �" W Y cj m t0 m l0 m l0 ccm t0 t0 m m m R LL L N L N L N L N L N t N i �m w • I G0'O .3 t7 v M M Cl) mt 9 3 r m m 0 r 01 I o m N N N N N I I _Z .. ~ J • C m .t+ mN N N N N M > � N ' a, �3 t W n im m Co N o- E 0 0 0 0 0 J N N C � I 0 J ., � o •o !o o o i a) CI aO�lh fV IT O G 1n IN 1� 1 z W y m H m H d m LU m m > °° N °° a O V p w z z z f.. z w z w w a I I • N Q Q J CC Q 'fl Mu TO E z o a a wa U) a o w Q z Z U Z U to I of c F- c o w � O ol ;U .m >- LA? ILn _ U Q Z o c%j Olr-i�IN iVI NZQ CI.wOlwO w; U U O a IC OOw =P7 OKZGU w z > > > > N a i a.! a. a is �i II III II III II p Lu z 3 z o�ol�l oidlolopp U a N — ('% a �O0000 � Q O N MIX! !Ml IWALL! qui ; O II- l'N7 N N V l7 O t7 ._m.. F� 1 I 1 I Z 169 a 1319 co O CA x v N 0 Appendix G • • 169 - 1320 TERREBONNE AND TUMALO STREET STANDARDS Page 6 1 of GS - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) • • 6-9 1321 y m m mm m m m m m m m c o cc 0 0 0 0 c c c 0 c 0 c 0 c 0 0 0 c c c � m m m m m m m m m m m m m m m QN N N N .N.. N v .N.. v v N E :� E o 0 0 o Go o o c 0 0 n 0 � IQ m cm o w Go co ao co ao � La gow\ t"' `m a d m $a o 0 o co co ao co $o m iQ v >Q Z � m o A/ o c 'N > li. Q M N m T- Q Q Q Q Q Q Q Q O Q Q Q d M Pf Z r N .cr 7 .0 ... .c `1 �' 7 m` 7 m m ! %n � O m Ix O O d Z Z Q: z O 0 Z o Z� " V Z z z z " 1 v o W , Qao V V� O �d mm mm CL m A 0 aa m c m a ! mc :ca wQcl)(0 c 0 o o o o - o E a0 ZZ Z Z 0 wZZ JW E n c e m QEm m m m N U r `m v v v 0 3 m 3 3 _c a/ m v v > m c= Q o > a > > n a > > N a `o of `o 0 N> 0l 0) v a N T z Q y ip iA in "v m mm _o O v Q � `— � ' ui Q CL a a � m c c o m O y� 3 3 'O 3 3 O w y m 0. m m ami m m m m ? m2 mao ~to ` R o Q Q Q Q Q Q Q > N TL 3 Oct v y W o CL z 0 z 0 o z z ai Z mfm8e=° cvM E c m c >>a 52 E � ZCMO d m E m N M Q m cao` yva a W W cv m> c== m Tm > N N N NN N N N N N a O c -.m « E c0 c 3 c o O 0 O 8 &Cap cc co maE QcPE aE moW 8 g .0 Q A13C 0mdO m 3 0 W 10 0 to f0 0 co to N m c c mcS OB Q.—I cm =a ma c mr=a m N N N m a7 � = m m 7 c F-UOD:US� a m m m m0 Eo _m Q EE UQC i o m om 0; m $. <m -65c 00 0a U m m m > a U v � c p m m o. m c � m c Q ca a m m m N (7 L d /0 d 0 c c Ua c c m O O N � t C � y C O. N O U m m c U m 0 F- 02.1 C m N 7 i. is v " 0 nm NyU iCL LA t d N = c CALL N j m Ln y N > Co {D Q O m N N m 7 6,0 C O Cm 0 0 mU NQo� CL c m Um mocm`.? 0 0 tic '00m�'2 —a QLm. � Um C c aL c mQ ( N NLI"tD c p t m 0 c Co c.0 (M'o °D v c 0 o c d o ,° m wm o� .N.. MR m WmL N t Q A m m N 0 =0N33L.�E 0 N 3 0 m o m m ca � c M � $ � m.�a� N'S l0� O mv`v oUp(�tsa mct33310y� m O Y Y Y c Of _Nm �_ o. �o M 7 p N N N lBID 0 y iU_a_a of o. m N N N N L O/Go Y C 1.1.000-0.0 r-MOOo0 2 L c c m y U V U 0'2 m m ..0. 3.0-0-0 C t 46,SL666LLCL � Ov� vvvvvv %% ^ 14 Exhibit 1= — Page &- of Gs Ordinance 16 -0-4d- 169 yd 165 - 1322 • • • 69 M 1323 c O w OpdjI q m v U o �� C cd c d U .0 m o = 'a E as c WCLO CL �c E a m coo O• m $ o C 0-0 �_ w O C _m C m M Q NC m G v ,v_ O M m N NCL L 7 C r O O r � C L l0 N w > N O C i >.� G O O = N 3 NC` C O N N m m � m�rm>>�a ccm yVco cmo O 0 a t = OO C m NN w3,o m= mrn '0 m 0 O m L C c�'o`*L NS cw� m m m um,v` co C p L C f0 m L m V C 3 O 7E -90 UU 8 E aa5 t,V�.. U U L ) ; U O O a O m m OC_ c mQ w ma CLI­0 w m m L'0 O N CLL y p M l0 N W> m •NmmLocm� (D N N N •m l0 7 C C m N N V NCf of 0 'p N L O m N N Q� '0p L m m m 7 `� f-OOix0 C�� 4tC*4 C14 4 civ mm a. c c c c m c c ! 0 U) m m m m m m U) ) N E^ W— E m o o e xE 'o a cO co co co cp a co co co co "rawo 0 " co ♦A O m # m V♦ \/Q♦ c c N E c. ¢ Q < 0 CV)co d cr) iV CL Z ^ Q Y C p 3 p zc zc zUa zC zcrc V/ U) C C It w rm Z 13m d W Q N O O m m = c .-. O Q Q _ SO ami i" m (t m � a c= cr z z � z z z 0o G LU O LU J J m W m d N O d m N �- y > > 1°. a > c0a � c 0 = a H Q 06 °' W `o Q cm V m O m O O O O O O oa z z a a a a O > C-0 04 r <V r O r O r O r O r S J Q w mai m won v E O � � N N N > � a= t0 O > CL 3 CO co 3 3 O c cO co to co co •- Go In A S °' off. 2W E 'a m cc c o` +. m m d O U ca N CY o o m .► d ial, co o of Q U C 0 -1 0 Q d 69 M 1323 c O w OpdjI q m v U o �� C cd c d U .0 m o = 'a E as c WCLO CL �c E a m coo O• m $ o C 0-0 �_ w O C _m C m M Q NC m G v ,v_ O M m N NCL L 7 C r O O r � C L l0 N w > N O C i >.� G O O = N 3 NC` C O N N m m � m�rm>>�a ccm yVco cmo O 0 a t = OO C m NN w3,o m= mrn '0 m 0 O m L C c�'o`*L NS cw� m m m um,v` co C p L C f0 m L m V C 3 O 7E -90 UU 8 E aa5 t,V�.. U U L ) ; U O O a O m m OC_ c mQ w ma CLI­0 w m m L'0 O N CLL y p M l0 N W> m •NmmLocm� (D N N N •m l0 7 C C m N N V NCf of 0 'p N L O m N N Q� '0p L m m m 7 `� f-OOix0 C�� 169 -1324 N 0 a m C m a m .y C O L O a E 0 U 0 .m o m U rn >. y C 3 aU y y c0 :2 w H � N m m N 0 m Go m coi v .r l0 O1 w y O O y 0 C is r 01 L EU 2 o CL y WA = — a mU� co = c m c y m 0 d = Q m~cco C co o 0 c`O� gaDy L .0 y C M' U L 0 C m m H (0 C N F- c0 C 3 w g E m i0 CL CU �C.S Oma o o m C U V L y <O C E Y y 47 0 Of m 2.0 O C 3 m=m -Y H ti co d N L to cm y ya 0 W c 1°v3 0 0 0 a c cm c� « E • U- a z° Exhibit Page G'5 Of > QVV�l c)r,+inance O N C7 v v v v v 0 Appendix H • n U 169 - 1 325 BEND-REDMOND COMMUTER SHUTTLE SERVICE FEASIBILITY STUDY Page 1+1 of 14iq - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 0 • Bend -Redmond Commuter Shuttle Service Feasibility Study August 1997 Prepared for the Oregon Department of Transportation by Commute Options for Centrai Oregon A project of the Central Oregon Environmental Center 16 NW Kansas, Bend, Oregon 97701 ote Q 0 0 0 U C) . /'1 C 1pfral O t'g 169 - 1326 4 d Exhibit Page Hz— of ON_ Ordinance Gs'Pq`i Bend -Redmond Commuter Shuttle Service Feasibility Study Summary There are thousands of commuters traveling be- tween Bend and Redmond, about two-thirds of which travel into Bend to work. Preliminary surveys indicate interest in a commuter -oriented. intercity shuttle. Daily ridership could probably average about 100 with a fare not exceeding $3.00. Operation would normally be restricted to week- days. To provide timely service, a shuttle would need to 169 ~ 1327 Contents Summary..................................................... 2 1. Purpose ............................................... 2 2. Factors ................................................. 2 3. Potential Riders .................................... 3 4. Commuter Survey ................................ 7 5. Costs....................................................9 6. Analysis..............................................11 7. Conclusions & Recommendations ..... 12 Survey Form .............................................. 13 Frgures 1. Time Workers Leave for Job ................ 3 Z Pickup Tmes from Survey ................... 9 Tables 1. Origins & Destinations—Survey........... 7 Z Origins & Destinations—Rideshare ..... 7 Maps 1. Bend Major Employers ......................... 5 Z Redmond Pickup Locations ................. 8 travel a fairly direct route with few stops. This would most easily be achieved with half-hour service from specific pickup locations to large employers or concentrated employment areas. Maximum flexibility with minimum investment would be offered by 12 to 15 -passenger vans. Start-up costs for a 3 -van system would be at least $150.000. Annual operational costs would be about $165,000 for the vehicles and $30,000 miscellaneous (marketing, management. etc.). With careful planning, a fleet of 3 to 5 vans could probably cover a substantial portion (perhaps 45%) of its operating and administration costs through fares. The remainder would need to be subsi- dized. Although a schedule and some likely shuttle stops have been identified. further study is needed to determine operational details. 1. Purpose This study examines the feasibility of a commuter shuttle service between Bend and Redmond through existing data and a simple survey. 2. Factors Many factors influence an individual's choice of travel mode. Various studies have identified over a hundred critical factors. Among those that may be most important to potential shuttle riders are distance to the pickup point, timely service, cost, and comfort. Addressing these needs will be a challenge: riders tend to live and work in widely dispersed areas, they need to be picked up...at different times, they are willing to pay only a fraction of transport costs, and there is poor infrastructure (such as bus stops and sidewalks) to support transit. The success of a shuttle service will depend on how these factors are addressed. Exhibit Page 143 of N_4 Page 2 August �ss7 Ordinance 0-o44 17_,� • • • 169 1328 3. Potential Riders Commute trips make up only one in five trips, although they typically represent 30% to 40% of transit trips (reference Bend Urban Area Transit Feasibilitv Study, NelsonlNygaard Consulting Associates, 1996). A commuter shuttle between Bend and Redmond (about 16 miles between city centers) focuses on a subset of commuters who currently have no other option than private automobile. Commuting patterns and the location of employment centers will give an indication of how many people might use a commuter shuttle at least some of the time. Central Oregon Commuting Patterns The 1990 Census journey -to -work data provide the most complete look at commuting patterns. Although Central Oregon has grown significantly since 1990, the overall relationships should be similar, with Bend attracting the majority of intercity commuters because it contains by far the most jobs. Some of the commuting data are listed below, with the estimated number of workers in 1994 (extrapolated from Bureau of Labor Statistics data which showed that Deschutes County had a civilian labor force of 49,508): Deschutes County 1994 Est. Workers living in a census place ................. 45% ..... 22,300 Workers with 20+ minute commute ............ 30% ..... 14,850 Bend 1994 Est. Workers living in Bend ................................ 30% ..... 14,850 Workers commuting outside Bend .............. 23% ....... 3,415 Workers with 20+ minute commute ............ 17% ....... 2,500 Redmond 1994 Est. Workers living in Redmond ...........................9% ....... 4,455 Workers commuting outside Redmond .......40% ....... 1,780 Workers with 20+ minute commute ............ 35% ....... 1,550 About twice as many workers who lived in Redmond commuted to jobs outside the city than did workers who lived in Bend. So, even though Bend had 3.3 times the total workers of Redmond, Redmond had half as many who commuted outside their city and even a higher proportion who traveled 20 or more minutes to their job. Also, nearly 20% of Redmond and Bend commuters left for work between 7:30 and 8:00 a.m. (see Figure 1). In Redmond, about half left between 6:00 and 8:00 a.m. In Bend, over half left between 6:30 and 8:30 a.m., reflecting the shorter overall commuting time in Bend, presumably because jobs are closer. The number of workers with a 20 or more minute commute, especially those who live in Bend or Redmond (4,050), give a rough idea of the total number of potential shuttle users between these cities. Of course, some of these workers travel to other cities or county areas, but they might be willing to take the shuttle for part of their trip, as may some commuters who live in county areas (for example, a resident of Terrebonne could drive to Redmond and take the shuttle to Bend). Exhibit august 1997 Page 14.4 Of t4 Of Page 3 Ordinance "° 169 M 1329 Figure 1. Time Workers Leave for Job (1990 Census) Bend ■_■ I I I I I I I ■= 11 12:00 05:00 05:30 06:00 06:30 07:00 07:30 08:00 08:30 09:00 10:00 11:00 12:00 16:00 Redmond ■_ 1 ■ 12:00 05:00 05:30 06:00 06:30 07:00 07:30 08:00 08:30 09:00 10:00 11:00 12:00 16:00 In Oregon, transit captured 3.4% of commute trips in 1990. Applying this percentage to the potential users between Bend and Redmond yields a ridership of 138. If this group used transit an average of 3.5 out of 5 weekdays. that would be a daily ridership of nearly 100. Major Employers Concentrated employment areas and large employers provide the best opportunity for convenient shuttle bus service. Although some of the employers are seasonal (such as Mt. Bachelor) or decentralized (school districts), there are still opportunities to serve a substantial number of employees. In Redmond, most of the employment in on the east side of the city, with several large employers near Highway 97. In Bend, the major employers are widely scattered (see also Map 1): Bend St. Charles Medical Center .................. 1,200 Bend-LaPine School District ............... 1,200 State of Oregon .................................... 1,000 Deschutes National Forest ...................... 900 Ekhibit " Page__ of N!y Ra e a August -1997 - Ordinance _ 4e-0-44 g • • 0 0 0 Map 1. Bend Major Employers /N 4- 169 - 1330 August 1997 Page 14 (*, _ of if (q Prop 5 Ordinance qb- 044 169 - 1331 Mt. Bachelor Inc ..................................... 800 Deschutes County .......................•........... 680 Central Oregon Community College ...... 400 Pozzi Window Co ................................... 370 Redmond Redmond School District ....................... 546 Central Oregon District Hospital ............ 230 Wal-Mart ................................................. 180 Opportunity Foundation ......................... 170 Safeway.................................................. 125 Tektronix................................................. 120 Beyond Bend and Redmond, there are major employers in Deschutes. Crook and Jefferson Counties that attract some workers from Bend and Redmond: Deschutes County Sunriver Resort ....................................... 600 Eagle Crest Resort .................................. 350 Crook County Les Schwab Tire Center .......................... 675 Clear Pine Moulding ............................... 600 American Pine Products ......................... 425 Crook County School District ................ 385 Jefferson County Bright Wood Corp........ ......................... 1,200 Warm Springs ......................................... 790 Jefferson County School District............ 337 Ka -Nee -Ta Resort ................................... 270 Community Support Transit is a frequently requested service in Central Oregon and appears to have widespread support. The Bend Urban Area Transit Feasibility Study conducted a survey in which over 75% of the respondents supported a fixed -route transit system, 69% said they would use it, and 74% of the potential users said they would ride at least twice a week. Similar results were obtained in a 1993 Gallup Poll in which 68% of those in ODOT's Region 4 (including Bend and Redmond) said they would be willing to use transit instead of a car for an average of 18 trips per month (49% of reported trips), public transit investments were the top priority for 45%. and intercity bus service rated 3.7 on a scale of I (not important) to 5 (ex- tremely important). 0 Exhibit - v� August 1997 Page ��— of {.�, y _ Ordinance -oy Pages 6 169 - 1332 4. Commuter Survey A brief questionnaire (see Appendix) was distributed to area employers before Commute Options Week (an annual event centered in Bend). The questions were directed at people commuting between Bend and Redmond. Thirty-two responses were received; half of these were from St. Charles Medical Center and nearby medical offices. Origin/Destination Table I summarizes where people travel from and to; "county" refers to unincorporated areas in Deschutes County including Terrebonne and Tumalo. About 9 out of 10 respondents travel from (or through) Redmond with Bend as their destina- tion. Requested pickup locations in Redmond are shown in Map 2. Destinations in Bend are widely scattered, although half the respondents worked at St. Charles Medical Center. For comparison, Table 2 summarizes origin/ destination data from the Rideshare program for Central Oregon which covers a larger area than the survey. A search of the database for Rideshare • participants who might travel through Bend or Redmond yielded 78 commuters. About 7 out of 10 rideshare participants travel from (or through) Redmond with Bend as their destination. Many of the factors that motivate people to rideshare (re- duced cost, limited car availability, environmental concerns) also apply to potential shuttle customers. rime of Travel Table 1. Survey Results—Origins and Destinations Origin Destination Bend 3 29 Redmond 24 3 Prineville 1 0 North County 4 0 Table 2. Rideshare Data—Origins and Destinations Over half of the respondents wanted to be picked up between 6:30 and 7:30 a.m.. with 85/0 between 5:00 and 8:15 a.m. (see Figure 2). After work, about half wanted to be picked up be- tween 5:00 and 5:30 p.m.. with the remainder scattered from 2:00 p.m. on into the evening. Participation The respondents to the survey indicated that they would be willing to use a shuttle van an aver- age of 3.6 days in a 5 -day work week. Price The respondents to the survey indicated that they would be willing to pay an average of $2.85 for a round trip between Redmond and Bend. That is less than $0.09 per mile for the roughly 32 - mile round trip from city center to city center. Exhibit 130 August 1997 ...--page _8- Ofd_ Page 7 Ordinance 48- OT4 . Destination Bend 20 57 Redmond 34 13 Madras 4 3 Prineville 18 5 Terrebonne 1 0 LaPine 1 0 Over half of the respondents wanted to be picked up between 6:30 and 7:30 a.m.. with 85/0 between 5:00 and 8:15 a.m. (see Figure 2). After work, about half wanted to be picked up be- tween 5:00 and 5:30 p.m.. with the remainder scattered from 2:00 p.m. on into the evening. Participation The respondents to the survey indicated that they would be willing to use a shuttle van an aver- age of 3.6 days in a 5 -day work week. Price The respondents to the survey indicated that they would be willing to pay an average of $2.85 for a round trip between Redmond and Bend. That is less than $0.09 per mile for the roughly 32 - mile round trip from city center to city center. Exhibit 130 August 1997 ...--page _8- Ofd_ Page 7 Ordinance 48- OT4 169 - 1333 Man 2 Redmond PIckuD Locations from Survey Exhibit b" Page of Ni4 Page 8 August 1997 Ordinance qb' 014 • • • • • 169 1334 5. Costs It is difficult to compare a potential intercity commuter shuttle service with urban transit and specialized transit (van pools, dial -a -ride, airport shuttles, etc.) operations in Oregon because each has its own unique attributes and funding sources. Costs vary widely, and systems are often part of larger fixed -route systems or are subsidized by large employers. A simple commuter shuttle service between Bend and Redmond will probably require two or more vehicles, a driver for each vehicle, a storage area, and a program for seeking customers and coordinating operations. Figure 2. Pickup Times from Survey 5 4 3 Riders 2 1 0 AM August 1997 5 AM 6 AM 7 AM 8 AM 9 AM Pickup Time 5 4 3 Riders 2- I 1 0 PM 10 AM 11 AM 3 PM 4 PM 5 PM >6 PM Pickup Time Page 9 169 Start -Up Costs The primary start-up cost is that of the vehicles. A gasoline powered van that carries 12 or 15 passengers would cost about $30,000 to $35,000 (at least $10,000 more if a wheelchair lift is needed). Leasing is also possible at rates that typically run about $400 per month with a $4,000 lease fee if mileage is not excessive. A 30 -passenger diesel bus would cost over $200.000 but it would last longer and fewer would be needed compared to a smaller, light-duty van. Whatever vehicle is chosen, a backup would be necessary in case of a breakdown. Some type of communications system and office would also be needed. Depending on the size of vehicle, an investment of about $150,000 to $600,000 could be expected. It is assumed that no special transit facilities (benches, shelters, signs, etc.) would be needed. Operating Costs The operating costs include fuel, maintenance, insur- ance, registration, driver compensation, and deprecia- tion. Cost may be expressed in terms of dollars per Costs for minimum 3 -van system: Start -Up Costs .......... $150.000 Operating Costs ........ $165.000/year Marketing, etc............ $30.000/year service hour or by dollars per vehicle -mile. The examples below are not directly comparable because they involve different vehicle types carrying different numbers of passengers, but they give an indication of the range of options from small vans to large buses. There would also be miscellaneous expenses (marketing, management, etc., totaling perhaps $30,000 per year) that would be similar whatever the type and number of vehicles. At a $3.00 fare, nearly 40 passengers per day would be needed to cover miscellaneous expenses. Hourly costs for primarily fixed -route systems in cities comparable to Bend is about 537 exclud- ing administration for 30 -passenger buses (reference Bend Urban Area Transit Feasibilin, Study). Assuming that the commuter system would operate during weekdays with 22 round trips (most occurring during a.m. and p.m. peak hours), at one hour per round trip, there would be 5.720 annual service hours (22 hours x 5 days x 52 weeks). At $37 per hour, the annual operating cost would be about $210,000. At 32 miles per round-trip, the annual mileage would be 185,000 miles (22 trips x 5 days x 52 weeks x 32 miles) which would result in a cost per mile of S 1.14. Calculated another way using average dollars per vehicle mile in North America ( reference Transportation Cost Analyzer, Victoria Transport Policy Institute, March 1996), 40 -foot diesel buses (capable of carrying 53 passengers) would have an operating cost of $4.89 per mile or Ow x about $900,000 for 185,000 annual miles. A 12 -passenger van would cost $0.54 per mile or 3 C about $0.90 per mile including the driver's wages for an annual total of about $165.000 for 185,000 miles. Note that parking is assumed to be free (probably provided by a local government m = or by a business served by the shuttle). For comparison, the Opportunity Foundation in Redmond reports an operating cost of $0.74 per mile for their van. By comparison, an average automobile would cost about $0.33 per mile to operate but would normally carry only 1.2 people (about 15% of automobile commuters carpooled in 1990), mak- ing the cost per passenger -mile much higher than a van or bus. August 1997 Pago 10 • • • • 169 - 1336 Other costs associated with vehicle use not analyzed here but relevant to owners, users and the general public who help subsidize travel are travel time, accidents, parking, congestion, roadway provision, municipal services, land use impacts. pollution, resource consumption, waste disposal, travel equity, and the barrier effect. 6. Analysis Schedule A shuttle system that appeals to commuters will need to have frequent service during weekday a.m. and p.m. peak hours (6:30 to 8:00 a.m. and 4:30 to 6:00 p.m.). A headway of 30 -minutes is probably the minimum. This can be extended to much longer periods (perhaps 120 minutes) midday. A possible schedule would have 13 round trips between Bend and Redmond at (in 24- hour time) 6:00, 6:30, 7:00, 7:30, 8:00, 10:00, 12:00, 14:00, 16:00, 16:30, 17:00, 17:30, and 18:00. The midday trips would probably attract some shoppers to the commercial centers. Week- end service would not be provided unless a particular employer could support it. Because the one-way distance is about 16 miles, 10 on rural highway, each round-trip could be made in an hour even with a couple of stops in each city. Two vehicles could cover the peak -hour times, while one vehicle could cover the midday period. For Flexibility and route choices (per- haps one to west Bend and one to east Bend), four vehicles and a spare would be preferred, although the cost might be prohibitive. Locations The choice of pickup and drop-off locations involves trade-offs. Ideally, shuttle stops should be kept to a minimum to reduce delay and simplify the user's understanding of the service. On the other hand, limited locations will discourage potential customers who do not want to travel far to the shuttle stop. The best locations will be areas near dense residential or business uses. Because of the low-density, segregated zoning in Bend and Redmond, few locations are ideal. The most promising shuttle stop locations in Redmond are probably the downtown and the Safeway on U.S. 97: other potential stops are Airport Way, the hospital, the high school. and O'Neil Highway. Promising stops in Bend are the downtown. St. Charles Medical Center. Shevlin Industrial Park, COCC, and any employers who have substantial ridership; the Grey- hound station on Highway 20 is also a possibility. Modal Connections To achieve anywhere near its potential, a commuter shuttle service needs to connect well to sidewalks, bikeways, fixed -route transit systems, and park-and-ride lots. There is no fixed -route transit in Bend or Redmond, the pedestrian and bicycle networks are generally fragmented, and there are few park-and-ride lots. Because of these limitations, shuttle service should attempt point-to-point travel as much as possible which means working with large employers to encour- age the service. August 1997 Exhibit Page il (Z of _R Iq Ordinance 4 $' °,ty piage 11 169 1337 Fares Transit fares average $1.00 per 8 -mile trip nationally ($4.00 for 32 miles) and provide about l0% to 25% of the operating costs (Transit Fact Book, American Public Transit Association). Grants, city general funds, special taxes, and employer contributions are other typical funding sources. The survey showed that potential users may be willing to pay close to $3.00 for a 32 -mile round trip which, if the service operated 12 -passenger vans at an average capacity of 6 (not counting the driver), would generate $0.56 per mile which would just cover the operating expense of the vehicle but not wages. Larger, more expensive diesel buses would need proportionally greater ridership to cover operat- ing costs, although wages and administrative costs would remain fairly constant. Shuttle services usually offer discounted monthly rates to encourage long-term use. The feasibility of achieving the ridership necessary to cover a reasonable portion of the operating costs cannot be stated with any certainty. Under present conditions, realistic ridership may be around 100 which, if spread out over 22 round trips (2 vehicles during peak hours only), would provide an average occupancy of 4.5 and peak occupancy of around 10. This points to 12 or 15 - passenger vans as the logical vehicle choice. A daily average of 100 riders at $3.00 per fare would raise about $75,000 annually or 45% of a $165,000 operating budget. 7. Conclusions and Recommendations Feasibility is a function of priorities. If an intercity commuter shuttle service is a priority to the state, cities, employers, and public, then it can be provided. Certainly. there is a good argument for making this a priority: there are thousands of intercity commuters, the Highway 97 corridor is under increasing traffic pressure, the public has a high interest in transit, and a limited survey attracted scores of potential riders. The most promising scenario might be a 3 -van fleet to 2 or 3 locations in each city, later ex- panded to 5 vans or mid-sized buses when the concept is proven. Further contact with govern- ment agencies, employers and potential riders is needed to identify exact locations and funding sources. H U Exhibit Page ..i - of -014 Ordinance -- a`+y August 1997 Page 12 • • �Py�� vA 169 1338 0 �o Special survey on potential U N Bend -Redmond shuttle serviceik� �°"`"C61d °tr41 Olt `'g We are studying the feasibility of a shuttle service between Bend and Redmond. if you or others in your company commute between these cities, please fill out this questionnaire. Fiii out one questionnaire for each person responding. Company How many days a week would you be willing to take a shuttle van from a pickup point near your home to a point near your place of work (circle your choice)? 1 2 3 4 5 How much would you be willing to pay for a round-trip between Bend and Red- mond by shuttle (circle your choice)? $1 S2 53 54 $5 S6 S7 S8 S9 $10 S_ What is your point of origin (city and nearest cross streets)? What is your destination (city and nearest cross streets)? What would be the best pickup times for you? A.M. P.M. Thanks for your help! if you have any comments, write them below. Exhibit Page Hl'y_ of 9 14 Ordinance _19'041 --- 16 NW Kansas Ave. - Bend, OR 97701 - (541( 330-2647 • FAX: (541) 385-3370 - E-mail: commuteopOempnet.com Commute Options Is o project of the Central Oregon Environmental Center • Appendix I • • 169 1339 1996 AND 2016 TRAFFIC VOLUMES AND LEVEL OF SERVICE ESTIMATES FOR DESCHUTES COUNTY AND STATE HIGHWAYS Page I I of _Ili - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) • O 0 O O w EZ.n o uwi m . rn m0 0N0vO LO OONO PrYL9IMNOO O'N-OOrO` �O-nR �O O 0ONOMCOoOIrt'9—9 —9Yt7991 10 T —9 t0co N ttr- N t0 a0 ab - CD N N 00 00 N aD N CD co — (00 —O Cl__C—-7 _ a0 to T- v M v O Ct) t _ _ to tt) tD ►� O Of N N N N N N N N N N M M M M Cl) Cl) Cl) t^7 f07 M 7 N O E 0 0 0 0 0 0 0 0 E a —a m !9 i a 0 0 0 E 0 0 0 �p 0 'U 'a 'a 'U 169 r 1340 ct) C Z c0 m 0 0 0 � 0� 0 0 "S 'I ::T Oc to m ri � i) a 5 i -a c - .` .` .` .` u s is -a U •a d v a- iO g ii %) C 10. N N m N N N d m N C) N N N N N to N N N 0 d 2 N 0 N C <<< r< r r C7 0 0 0 N 0 0 N N 0 m m N 01 (0 c.V o 00000000<<<<<< o 0 0 o 0 0 o U¢ U U U U U U U U Q U U U¢ U U U Q U o o 0 0 0 o o o Q U¢¢ Q U U U U¢ U¢ U U fn �? O .. m W O o00 U0ru C.) 000UUUUUUUUUUUmmmmaommmmmmmmm rn S W rn Y A t0 m O. t0t.9t0Rtoat10Qa(7)IV(0NOtbt M000)`tV04NrOCID Nccto—Otg O O) N NP. N a0 0? CD N Nr- N � h O) r. to N O v er v m m r. tO tp 2vNR V QMR Q'Nv Q'Mm V)mC-) `) cl m M N r - U) VtoCMm N C4 to f7 0) N N M— .- � 0 Q m Of Of X (") N m t7 M tv M m M t`9 N N N N a Q W C O a A 0 O O w pl O t0 N r` P. O CD V p) tti t0 7 O tt9 V.V O tb t0 aD N tr t0 t0 •r tt9 N q) N C � Q N N? Ol N N M N N W) I. 7 N N N N N� tr to r` t0 tq er �r 7 V N N N V ct t,K tp«jw w --iNtti tti v; ef N N N r; m N t') t+f N N N� .- X 0 0 to Of Ol O) M of rf tti N ri ef Ntti Ne (Ni NNN tOnsOOWlnwOwZQOwSp ❑ p p W U Z � O w Q00 F- w S T O S OSS z w w S O S w p W to S Y W O m O J m Z Z W 0 0 S os»sssu~iw�m¢s��v�izUmm�vOims❑ OOOLU LUZw aQ O0YD0 00 F-m�OSO a: It a: a0zcr �mz 0a0Uw jLLLLLC) 0Z�zF~Q-Omw❑p0s�0z��3ow��Hzda zO=NS W tns W SJ ❑r` W SC%l F-c—Stn W �- v�Osg�aSmwU Qm�•' Y QJ w zw N�2 JF- Y VJ0W d j= W a a0Q�Dz�20U' m0 Q QU3 W OU' Y=�OSQOS 0 FW--� 0 10(1)wtns(nm}�SOaDF-SaztnODmz=U) 2CnDwOg�tAwWtL o uwi m . rn m0 0N0vO LO OONO PrYL9IMNOO O'N-OOrO` �O-nR �O O 0ONOMCOoOIrt'9—9 —9Yt7991 10 T —9 t0co N ttr- N t0 a0 ab - CD N N 00 00 N aD N CD co — (00 —O Cl__C—-7 _ a0 to T- v M v O Ct) t _ _ to tt) tD ►� O Of N N N N N N N N N N M M M M Cl) Cl) Cl) t^7 f07 M 7 N 0 S O 3 U_ S W ❑ S W w z Q W Q O S O 0E- S ❑ a a. O 0 S S❑ 3S }� w J S z OpSSODDO W W p S S O z p p 'Lou ,e 0 Q� OS❑SS¢ S p p p m y- QF-OOSS F -Z¢ ❑ tOnsOOWlnwOwZQOwSp (02 p> 0Z=' (n¢ W Z2itStoSZU�toZ °1 C=7 W zFa-Q� W ¢�� W wmZ W °)~o°)°'ZQw�cW7�°)mLuw��C7waHw�o S T O W z W su.ac7�uwimg�or���n to S Y W O m O J m Z Z W 0 0 S os»sssu~iw�m¢s��v�izUmm�vOims❑ m J S Z S Y J❑ F- W H7- LL 0 O as SSSSSss F- F- F- F- F- F- F -Ix w Q YYYYYYY } S S S S S S S IX ' OO S s S}-_ S O It p } -;:} Q Q Q Q 5 S S p S S C S ❑❑❑F S W W 222mmm Op S -Z OtntntntnNtntntnF-❑ pF-❑yr- W W W S W W (13 ❑YF S ��SF-N �_ �F-SF-p UZF- WF- N m SSSZO O w0wwI. S Lu LuJZS —ZIX W tnF-F-F-F-F- F-F-JWfnw W lnJC1 U) - DZQD JO D>m �'p oow2in JF-mmRmJ 00 mUNQJ W J�-% Jm ¢O J J¢ �.%C� W� O Z SwW W Y�SSS❑2YoMWIWNNNW WSZSQWSSSSS22WSWS=W -i UJ W M,x ��z -J W _j LLZW WCD ZW WS J-�Z>-ZZZ�S3z} N m vmmmvOiimOm0000000ivOimgcOnmcJaoavOimavovi�aaiOactio }�❑F �° o uwi m . rn m0 0N0vO LO OONO PrYL9IMNOO O'N-OOrO` �O-nR �O O 0ONOMCOoOIrt'9—9 —9Yt7991 10 T —9 t0co N ttr- N t0 a0 ab - CD N N 00 00 N aD N CD co — (00 —O Cl__C—-7 _ a0 to T- v M v O Ct) t _ _ to tt) tD ►� O Of N N N N N N N N N N M M M M Cl) Cl) Cl) t^7 f07 M 7 N 169 1341 y c 19 `` ` u ` ` u ` 000coo 0uouo uo uo uo m mo o m moc c°.2 .2 oc° 0 vu u uC c ii ti c"5 f0 c W N N Gl 07 al al a) N� al a) .2-R.22.2 0 CD ? N N N N a`1 4'.2 a) a) a) a) (DN al 2 a) 0 a1 a) a/ a) (D (� "QaUUUUUa000QUUUaQUQUUaaaUaUUQaUUUQaUUUUa Om m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m Ul rn rn Y � m t0 to CDP M M O N t0 0 V• M N N M tO LO N O O W O o M t0 t0 t040 V• M t0 N V � O t0 ^ �• 0 ;: al a. aD a* N !� ^ N � t0 t0 t0 t0 90 t0 40 to to to to to to N V• a0 M M M M M M M N N - O O O O CO CDN N N N N N N N N N N N N N N N N N N N N N N a- N N N N N N N N N N N N N N N •O CL aD• 00000000 to 000000 to0to000000000a0ato000aaaa 0 40 to co M M M^ O t0 t0 t0 V• M N N m <0 N O O N O CD M t0 tO 40 t0 V• M to N V• � 00 t0 � r O r � 00 co n►�►�►� N n t0 t0 t0 t0 t0 t0 tO tq to to U)tole V'P'!' M M M M M M M N N V OOOOO N N N N N N N N N N N N N N N CV N N N N N N N !V N N N N N N N N N N N N N N N N •vim ecu p IL It z LL z W O OJ z tow J �Ww� W N > p n N N O a Y Y 0 H Q a' to N m Z V N � Ix a' =� M W m J tO z❑ ~YNR=-~nQtw-~�O f-�WQ<Q ~~~ 00�=�- ~ HpQIx a m ~cr❑ O=aOpOwv�O=Na.NOJ=��wO OW O�QO>O�OOtaL�O�NO�O J} vi a a Na cL LL%wa aN aim0. Qi J�aDHWOmWWLLZJ00z 0 wzw�0 V)=xz ��� za J���m JQ� F ��v�iw���� iso �Ov=iQ¢vaimv=iRv�zW>u3i2o2vz2mv�iQMv3iI O ❑ O CL z z W 0 p to 2 ❑ = Z Z Z i Zai a wk > ❑ J = am N W W an 2 O =tn ❑ W W a:O �y CC W IL H W>=F-0H f' F-ZW (AIX w�wNY Q F-F_M0m0 �� `n >O❑ CO (aCO O�v,Clxo00wp❑❑ ❑wOo:OwN9ZOOa O=OJ VNO pmtOv~i❑�❑w 0. Jrnv�aaa�c�irn�vv=i�Y_Z�a�awa°n'a�n �OwQC'4m W -azix zxm O� E LU2O t Ja J�v aDZOOVC9mW W JM Jp0C7m w� ��a:pm r L 2x wRf-2zz WLLWiYwmm202xzx�v3i20vit a �<0Ua. )00 m ❑ 0 0 z W V Don W Y4:4:0: W LU CO wD:OwY�p W OY Q �• �N❑00❑O�� m N �a��pNmF-YI-❑N �Z Nix F- O Q J O O O Y❑ p❑ J " p 2 Y p x J a W U Z> J p 0 J Q J z 0 • m�J ��Jm❑ a'J ❑ COZ.JMW -J W OW JJ m�a'❑J� JJ Wa' ■ J��zZZa JaOO�❑mom JOaJ W LLa�aUmu-pJ W }.ILILou VO❑ 2 W JWOOOa WmO<w D:w Za U' W JF_=F_QWD:�tJ mQm WQ�WmFJW O 3►-z�3M?�?}Y�=�� ZF_��❑ZZ}Sp22Zw JZ}pzu. _ am iL)�OicOiL)a.xu�vom�aovamimzv�iv0icQ��oao►=-ii¢s iovOi5z O � � Z N 3:Z � O 1 000OOOOtoOOOp000to0O00NO000O�00000WOOW09oO(D N NN M I� N N (? Vj M1� N n l'7 lD N M In M t0 r M— N f? f0 - 0 M r C. dDN aD l+f f7M aO to lh aD ap .-f0 t00o � mtO aD Nao Npao Sao tO Oo to oo �tO ao�NOo t`7 r 'Q raOQ<��t0 OO V'�.-On OtO O�00n V') V'�R�MMNM Onto r-�•-0'T r- r- U � V'MMMM�-M�-MNN��y�7MNCM H o vNMRtotOnvOO NM<tOt0ntD0/O W NM to0 r-W(D W O•-NM�tntO r- OfO at- vvvvvvvvvtnti�tntntr�tc�tnt�tntn<ctototot�toto<ototonnnnnnnnn.naD m X ca W a. 0 169 1312 io C oto o` `oo `o �o o o` `o o` o o` o`o `o o o` Y w i'i 5 ii 25 ZU '6 v a 'U c ii u 0 u L) v 'U u IS v •c i) U C of N N N N N N G) N N N N N N N N a1 N 0 a1 N al N N N N ? N N a1 N N N a1 N N N (p c V o o Q o o Q o Q o Q o Q o 0 oQQ oQQ o Q Q o Q o 0 o Q o Q o 0 o Q Q o Q o a U. UU UU U U U UUU U U U UUU U UUU U U fn .s to O WOmmmmmmmmmmmmmm¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢-cc ¢¢ rn Y � R N tCD 0 m,. to M N O w to to M w M O t\ N to Of to tq tf'f N w t\ tp tp t0 A N df O n V' CD M M w O O N V. n7 tD X IOL o/ of Ol of l0 tb t4 CII to l0 1� N N N to to to to to to to to to to M to v V• v w r v R V' v v M t7 t+7 N CD a a a o ~ �?N00tCOO o1Oji-0a00�tMpW)MttntCtCNOwOti(ootOottj V Nmr.-Nvt+lt`O'1t`O'f�OOtnfCwDaN.O- C7 m a Of of of o) at Olt Olt at ap CC t\ t\ A t\ to to to to to to tq to to to to of qt V V• V• V V V V li ot t"1 t"f P9 Y tQ W Z O Q ❑ ❑ w W W Q W_ Y } W > z ~ > m z J W W z W W> 5 3 p❑ W p Q QQ o ❑ w moa❑o❑Qo0 �QmQQZQ N�- v¢, �� Qo3t-YQ�a❑=�Z it ��}Ww��m¢zi===LU=CL ❑ommo-imowc�=O?z2>>�cYiw gQ)��awSWa2P0ZJZ�2 U�W�UQ�zSr�Z >Z1WZUO J �zo3om3�Qo�533o0�w3ao�oM 3:3w?0E-�0-JD mzot-=zaoz=3c�mgv�zcn❑=❑v)mawv�Jgrnzz2❑v�Mao=az O °CZ z 0 m o o wI❑ r Y W y W ❑> cr Y-❑ W 3 ¢ w Q W > z Q ~ W W p W mIx> t- ? a aQ Qo z� �z❑> tno?o Q Q ❑tn W F- f- ort- C/3 Q❑❑o c7 co 2� m ❑ W❑ z ❑❑ w m= m= Z z U❑ O W= 3 r Z 0 w m t" OJ 0 a !n } Y S N O O1 ix = U Of .�- t- CA O I'� O O U w Y. tv�j Of Z> J Q OJ UI w J O p� 8z3=Zziz> �zW CDQ �Q }Uz�wJ�rn Xw 0:) = 2 r LL. ¢zzrn�azuJi z m2�iai3 t❑ -3 u3imaixgv3i3voiv3i ��u3io�PfcoU)az a ❑ c b oIX � � = p z = Z °� ciz co o zzo W F- ❑ } ,� >' H LU pU)3Q ❑ p W � Y-22 -L Q❑ Q J Q❑ �' Q w Y p� Q _ =zw= t•-�Q� W❑nt�0N(n❑?o❑ 3�z❑3Y� Qozpz� ,�_ co `O m =JW=J2Q� WF -2 J❑M>�W}J~->j w JJO J Jom=p22W =W L �� r too Irk_ a W W =wLLLL }m=W J==mY W =aZm=� O IQiw m W �. O zz�Qa0zJzmzaZmJz-izm-iwzomw-imzzwto2Utiomzo� t0 V= 0 m Q ❑J O m Q O a J J Q Z Q W Q m w w Q x m W w Q p Q W 2?= Q J J o Q U o � =Uzt-UOUm3z5<UMLL �=>O=❑ummz=U=c�acnUt-3QOtnU2Z y o z `"z U) m Z� ca 3: m. a, O 000000000000000 M000000000000 to 0000 Lc) O O to 00:0 N N N � N N to N t'7 � � M r N to M r v � � � .- �" to er OD.� to � �- tC) •- N N '7 � M � � tp fi�'� �"' Lo W arM' w w Q N N m v W to 0 w w N t0 w tl M w M w 0 1- w N co N v' to N O to .� •Q f� _R n _� t0 IA tD co co, n M to of O) M n O O M T O_ !- to O_ M t0 a0 N O tCl to r' M n .. M Cl) N M^ N M M N V• M �•- M 'tf < f7 C7 O O N `"' N N N N N M� M N � V• N N N M M M M N V' N M N G — N M V• to W t- O O O — N M V' to W i -- W Of O N M � t[f to 1� a0 O) �_ OapapOapm00000000000000000000000^--.-•------- N 0 00 00 ts QaUaUUaUUaQ Q Q Q Q Q Q Q Q Q¢ Q Y N. IL6 N N N N 0 0 0 66 JtiW�UmQ (C to M O QcA 00CD v CD A O O Ch �- N 0 U 3 0 a) .N N .0 N ui N t0 E > N � O C 7 U o N E N L N 0.0 N o _U N m O p L C Y U d c0 OOi O co m C � 3 0 coo ami m N p, cc co L U Jm cc O N s CO CD rn c E _ CD m t L .� E C Z O co w 0 Z 169 ~ 1343 X • rl- C) N r� N A2 W p. Q► Raaf N�oto 40mN V- to c'10 t`7Cl! NNNIli ll X11: 0 Y C p � Y Wg O C 2 z WW O J m D W Q 3 W o z a Z��: U O t0 a. p 0 0 0 0 C N p o W O N �o:��o:Owao � _Z Z} O m 0= J X 0 0 co _j -i wU' V Zm gUOUZF=-t3ZamOp W `O V cc D: li _ }W W C O U W Q O U (p 0 Q � IL O p �N0<xa-j z=- ,a.� W>wuiL-UJ U)i0mIW E J Y N 0 W W01J-ZZCVaZI r LL i i0a.U)0))mw00wm C _ v O Y Q Y Ix cc w Y> H> W OY < d 0 >- >- JJ J J=m= Ix 0W a =-p 0 ix _=LQLZ - -W Z WQ 0_= Qg tL� > a°OmQQWOWOQJS 3t00=0=0Z0=<0 ~o o NU)zZ 0 tAm o000U.)o0o000d I I N p < N tq0 th t'7 V A l7 tf M ty N N tf w C"n t+f C S: m C N l'7 V to CO h O W O N N--.N-.N-.N------ �- � X co �. wao 66 JtiW�UmQ (C to M O QcA 00CD v CD A O O Ch �- N 0 U 3 0 a) .N N .0 N ui N t0 E > N � O C 7 U o N E N L N 0.0 N o _U N m O p L C Y U d c0 OOi O co m C � 3 0 coo ami m N p, cc co L U Jm cc O N s CO CD rn c E _ CD m t L .� E C Z O co w 0 Z 169 ~ 1343 X • rl- C) N r� N A2 C7 w SJ a.:CEIR OIC Off O On n N z n n w to cc O C M t(IL N Q ' c O O O O o C � wV N O V .- Ck o to n r, p ❑ O W W p p p p❑ C W N m ❑. a� & �. O O O O O O C N p N d N m d d 4 m j m p p W W 0 U' H SJ a.:CEIR OIC Off O On n N z n n w to cc O C M t(IL N Q ' c O O O O o C � wV N O V .- Ck o to n r, 0 0 0 0 :v M r> of0 q N Q t0O') h IT to W n =14 169 — 1344 110 U U U U U U U U U U U U U U U U U U U U U U 0 d N N N N N N o d O O NO do d O o 0 NN i9 N N N N d O O O O O O O O O O O U U Q U Q Q Q Q Q Q U Q) U U U Q U Q Q U U Q to to O N O to W to O O to M w v R M N 0 W M n 0 Ln tOA ttn tN iA tLn iOo t� tLn tOA V v v v v qT IV V R Ir R v Q O to to 0 0 0 0 0 o 0 0 0 0 0 0 0 0 0 0 0 0 0 O_ to � O O n n t0 O O M M (D 7 � N N Of f0 lD n to tD to N n 0 0 0 0 0 c to actt0 <O to t0 tp to M M M M ❑ ❑ m m H z z W QO W p ❑ a F- 0 UJ W LL Y m 0z O W p Y m w m l� m O- z m Q O OF -()(a W ~ 40 _5w020Wma LU >-Ozto N W N ►- W Q 2 z m W Z m Q m F- W Q� cc u~i �m�wgia�v0)ozm0zmaxU)o� ❑ m LL W W Z m m a p F- } m O p p a. 0: m Y H z m O� z O u F- ❑ m m z m 0 OLLJ LL n F=- Q= FQ- m W= n W S z W n LL m n Z Q m °' W N W F- rn ❑ W F= C7 01 J to W W U' W QmQ ❑ U' Q O O Q aw> j U J C7 ttttFLLLLLLJ F- ❑ 2 m )- S = p a to = > W = m = Q D = co to Q Y Y Y Y Y Y YLU ❑ ❑ m❑ a� I I§ '2 i i m � D_� W W Y E _❑ (A (j) U) U) U) fn W� Z J Z p m p Q Z m❑ L CO m J F H H F- FW" H m H W J W m N m W m J U m Q p p m p p p =0<0 J U) J U U) m � W U W m W 0 0 0 U U z U F- F=- W a W J a 4 Q W- 3 z w 0 w w to to m co = Z U}3: mF- p m z p Q J W W W W W W 0. W O J O Q O m O p O= Q m J U❑❑❑❑❑❑ W W U to ❑ a m a m W m U y o 0 0 0 0 00 0 0 0 0 0 0 0 0 to 0 0 0 to 0 0 to ao n 9 9 Y NC? .- Nn M � q � 9 m o m 4 tD tD N N tD N t7D t0 m N N t0 O _O n O tq tD ao O O m O M_ r r to to O N M 7 to t0 n O to O N M a u w n Moo O N N N N N N N M M CA C Y a N t0 O N y X 2 - CL CL M H 0 � U CU Z O C X c wa0 p ❑ m Q O N m ❑. a� W m m O ZLLI m p p m O N ❑ m j m p p W W 0 U' H W m w 0m Z p m LU O = = IL Oz c!) Q mO 0 m to= W(A W m W O ❑ OJ m aa. O C7 U) W ❑ u 0 0 0 0 :v M r> of0 q N Q t0O') h IT to W n =14 169 — 1344 110 U U U U U U U U U U U U U U U U U U U U U U 0 d N N N N N N o d O O NO do d O o 0 NN i9 N N N N d O O O O O O O O O O O U U Q U Q Q Q Q Q Q U Q) U U U Q U Q Q U U Q to to O N O to W to O O to M w v R M N 0 W M n 0 Ln tOA ttn tN iA tLn iOo t� tLn tOA V v v v v qT IV V R Ir R v Q O to to 0 0 0 0 0 o 0 0 0 0 0 0 0 0 0 0 0 0 0 O_ to � O O n n t0 O O M M (D 7 � N N Of f0 lD n to tD to N n 0 0 0 0 0 c to actt0 <O to t0 tp to M M M M ❑ ❑ m m H z z W QO W p ❑ a F- 0 UJ W LL Y m 0z O W p Y m w m l� m O- z m Q O OF -()(a W ~ 40 _5w020Wma LU >-Ozto N W N ►- W Q 2 z m W Z m Q m F- W Q� cc u~i �m�wgia�v0)ozm0zmaxU)o� ❑ m LL W W Z m m a p F- } m O p p a. 0: m Y H z m O� z O u F- ❑ m m z m 0 OLLJ LL n F=- Q= FQ- m W= n W S z W n LL m n Z Q m °' W N W F- rn ❑ W F= C7 01 J to W W U' W QmQ ❑ U' Q O O Q aw> j U J C7 ttttFLLLLLLJ F- ❑ 2 m )- S = p a to = > W = m = Q D = co to Q Y Y Y Y Y Y YLU ❑ ❑ m❑ a� I I§ '2 i i m � D_� W W Y E _❑ (A (j) U) U) U) fn W� Z J Z p m p Q Z m❑ L CO m J F H H F- FW" H m H W J W m N m W m J U m Q p p m p p p =0<0 J U) J U U) m � W U W m W 0 0 0 U U z U F- F=- W a W J a 4 Q W- 3 z w 0 w w to to m co = Z U}3: mF- p m z p Q J W W W W W W 0. W O J O Q O m O p O= Q m J U❑❑❑❑❑❑ W W U to ❑ a m a m W m U y o 0 0 0 0 00 0 0 0 0 0 0 0 0 to 0 0 0 to 0 0 to ao n 9 9 Y NC? .- Nn M � q � 9 m o m 4 tD tD N N tD N t7D t0 m N N t0 O _O n O tq tD ao O O m O M_ r r to to O N M 7 to t0 n O to O N M a u w n Moo O N N N N N N N M M CA C Y a N t0 O N y X 2 - CL CL M H 0 � U CU Z O C X c wa0 ❑ m ❑ O m m a� m m O U m f/) fA � O N ❑ m m m W W Z 0 U' H W m w = m Z p m Y = = = 2 U) Q mO 0 m m Q m ❑ � m p O 0 U) F- Lu. p � W cW7 00 W m Y z J p OJ a (9 m u) g 0 0 0 0 :v M r> of0 q N Q t0O') h IT to W n =14 169 — 1344 110 U U U U U U U U U U U U U U U U U U U U U U 0 d N N N N N N o d O O NO do d O o 0 NN i9 N N N N d O O O O O O O O O O O U U Q U Q Q Q Q Q Q U Q) U U U Q U Q Q U U Q to to O N O to W to O O to M w v R M N 0 W M n 0 Ln tOA ttn tN iA tLn iOo t� tLn tOA V v v v v qT IV V R Ir R v Q O to to 0 0 0 0 0 o 0 0 0 0 0 0 0 0 0 0 0 0 0 O_ to � O O n n t0 O O M M (D 7 � N N Of f0 lD n to tD to N n 0 0 0 0 0 c to actt0 <O to t0 tp to M M M M ❑ ❑ m m H z z W QO W p ❑ a F- 0 UJ W LL Y m 0z O W p Y m w m l� m O- z m Q O OF -()(a W ~ 40 _5w020Wma LU >-Ozto N W N ►- W Q 2 z m W Z m Q m F- W Q� cc u~i �m�wgia�v0)ozm0zmaxU)o� ❑ m LL W W Z m m a p F- } m O p p a. 0: m Y H z m O� z O u F- ❑ m m z m 0 OLLJ LL n F=- Q= FQ- m W= n W S z W n LL m n Z Q m °' W N W F- rn ❑ W F= C7 01 J to W W U' W QmQ ❑ U' Q O O Q aw> j U J C7 ttttFLLLLLLJ F- ❑ 2 m )- S = p a to = > W = m = Q D = co to Q Y Y Y Y Y Y YLU ❑ ❑ m❑ a� I I§ '2 i i m � D_� W W Y E _❑ (A (j) U) U) U) fn W� Z J Z p m p Q Z m❑ L CO m J F H H F- FW" H m H W J W m N m W m J U m Q p p m p p p =0<0 J U) J U U) m � W U W m W 0 0 0 U U z U F- F=- W a W J a 4 Q W- 3 z w 0 w w to to m co = Z U}3: mF- p m z p Q J W W W W W W 0. W O J O Q O m O p O= Q m J U❑❑❑❑❑❑ W W U to ❑ a m a m W m U y o 0 0 0 0 00 0 0 0 0 0 0 0 0 to 0 0 0 to 0 0 to ao n 9 9 Y NC? .- Nn M � q � 9 m o m 4 tD tD N N tD N t7D t0 m N N t0 O _O n O tq tD ao O O m O M_ r r to to O N M 7 to t0 n O to O N M a u w n Moo O N N N N N N N M M CA C Y a N t0 O N y X 2 - CL CL M H 0 � U CU Z O C X c wa0 m p ❑ } m m m m O Z m f/) fA � W N ❑ U m m W W Z 0 U' H F=- 0 w = m Z p m Y = = = O Q m m= 0 m m 0 0 0 0 :v M r> of0 q N Q t0O') h IT to W n =14 169 — 1344 110 U U U U U U U U U U U U U U U U U U U U U U 0 d N N N N N N o d O O NO do d O o 0 NN i9 N N N N d O O O O O O O O O O O U U Q U Q Q Q Q Q Q U Q) U U U Q U Q Q U U Q to to O N O to W to O O to M w v R M N 0 W M n 0 Ln tOA ttn tN iA tLn iOo t� tLn tOA V v v v v qT IV V R Ir R v Q O to to 0 0 0 0 0 o 0 0 0 0 0 0 0 0 0 0 0 0 0 O_ to � O O n n t0 O O M M (D 7 � N N Of f0 lD n to tD to N n 0 0 0 0 0 c to actt0 <O to t0 tp to M M M M ❑ ❑ m m H z z W QO W p ❑ a F- 0 UJ W LL Y m 0z O W p Y m w m l� m O- z m Q O OF -()(a W ~ 40 _5w020Wma LU >-Ozto N W N ►- W Q 2 z m W Z m Q m F- W Q� cc u~i �m�wgia�v0)ozm0zmaxU)o� ❑ m LL W W Z m m a p F- } m O p p a. 0: m Y H z m O� z O u F- ❑ m m z m 0 OLLJ LL n F=- Q= FQ- m W= n W S z W n LL m n Z Q m °' W N W F- rn ❑ W F= C7 01 J to W W U' W QmQ ❑ U' Q O O Q aw> j U J C7 ttttFLLLLLLJ F- ❑ 2 m )- S = p a to = > W = m = Q D = co to Q Y Y Y Y Y Y YLU ❑ ❑ m❑ a� I I§ '2 i i m � D_� W W Y E _❑ (A (j) U) U) U) fn W� Z J Z p m p Q Z m❑ L CO m J F H H F- FW" H m H W J W m N m W m J U m Q p p m p p p =0<0 J U) J U U) m � W U W m W 0 0 0 U U z U F- F=- W a W J a 4 Q W- 3 z w 0 w w to to m co = Z U}3: mF- p m z p Q J W W W W W W 0. W O J O Q O m O p O= Q m J U❑❑❑❑❑❑ W W U to ❑ a m a m W m U y o 0 0 0 0 00 0 0 0 0 0 0 0 0 to 0 0 0 to 0 0 to ao n 9 9 Y NC? .- Nn M � q � 9 m o m 4 tD tD N N tD N t7D t0 m N N t0 O _O n O tq tD ao O O m O M_ r r to to O N M 7 to t0 n O to O N M a u w n Moo O N N N N N N N M M CA C Y a N t0 O N y X 2 - CL CL M H 0 � U CU Z O C X c wa0 y d .E W E O .� � Y r O 0 J �O = r � N Q O 169 135 o�UUUUUUUUUUUUUUUUUU�UUUUUU�UU� O O Oo o O o O O O C u o m t'i u u •m m m 2i u r, v �i v t'i fO ii u u m m �o io m m � 0<<< vL)00�cia���a0()�aaaaaaL Y t0 m m• CO In N_� O O O M m •f ID n n n n /D n O O N O O O O n n Q 4 N N N O0 O a1 of 1- (O <O la (O 10 to (O 41 O LO W) W) u') V A V M M M M m M M Cl) M M M M M M M Cl) M M f' O 0 0 Ln O O O O O_ 0 0 0 0 0 0 0 O_ O O O O o 0 0 0 0 0 0 C w in N O_ O O O M v h n n I-- n < w I- IA O N O O0 O n of t\ p, O N N N O O O of I't t0 (O 10 <O <O ( t0 Lq to In Iq 10 In In In In 't v y O w a Y U. W ui W }zZ F- 2 O a I Z to LU 0 LU O p 0 f- U ani N p cn 0 Y O Y p it W cn -� Z N it Y O p Z m x w Z I- Z=¢ w W J O¢ Y F- I -- -;;t - H a U a d z= z= co v' o z a z ; o w N c °o z z z a m 0 0 m o w Q W> a Y J z 0 LL� w vOi a> m NW 0; N V a 0 W a a a J 0 N Lu 0W O C7 Y J U OQ W~ J i Z 0= J N J � Q J J J J¢ O w p g w W LL m u) m w m m LL rn R O¢ S g ¢ y O Y W cr. w a p I N� wp = z cr F- Q U H z O w n > 0.0 O z v~i w a' ¢ O a Z w p y ir O�� H H¢ O W F >= I- a W ~ J N ►- F- h p w O z cn p z z g � c O z H w z N O a Z Z Z O Z a~i ¢w�0000w:'OWan0Oww=anav�>-aaa� W� M rn cn a c7 a M m Y z E w Z a Y w w FJ- W( v H w O a 0 tLLL co Z O 2 W W W U_ O m O O O O¢ J J O W¢ X =� = W z¢ J J_ J W C7 Iz U m m m= O W z W m H cn Z S to LL Y= W m O O a' O a aooo� Y. w coz��G�v=) wYa N p�KKG�Qa, O O O m' J m m m m J J Y ?� 3 a J p 0 � m m m m z J E• ¢ c� J J J¢ ¢ Z Z Z Z O m X O¢ O J J J J 0 O R' O LL Z w J J J LL p LL O a } J LL p J J .J J C- Z. a' W p W W W W W� w O O O O; a w m g W a Q J w w w w Z a I a>- z Z p 3 3 z >- Z Z�: 1O ¢ J? O O O J¢ J= 0 0 0=¢¢¢ J¢ V 0 0 0 0 0¢ U a a a U O D U U U U to U m= h U O m m a a a a n U I o z m 0 0 0 o In o 0 0 o O o 0 0 0 0 0 0 0 0 0 0 0 0 o In o In 0 0 1 M In c? N r' N M f0 M N 7 M .- Ir N N dl r 00 N CO /n aD OD a0 M M M N M W to W W ILf N w M M W i Q' R .- _ Y. C N M w of O N M < N n v of O N M O CO ID to of O m m m m M M M M M M M M w v v Q v ? � IV7 vIn 10 to 4i LL� 0 U') In tn IA t0 V �mm 0 Y C e U ¢ N N t0 t0 X CO)n C14 M Q fl. C� O O co q N CO) Cl) p N � Y N O O O CL = W W J_ _ O CY J ¢ J S` L IX W u J � m i � co - M CM 1 co • 169 1346 1.o m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m ` 0 - ````` ` ` Y0 0 0 0 0 0 0 0 0 0 o 'a v -C 0 v 0 u ' v 5 Ti 2i a is u ii c io. d m d m d dm m m m m a� d a� m d d d m d m d d d m m a� an d a► a> N r r r r r r r �v QQciQc�ciQcici�c°�aQcic6iciQcicicici00 CiQQciQcic0 N Y � N m m• aD a0 aD h tl9 O M Of M a0 f� M O a0 O O O O t0 O O O1 M N �O t0 x O aD a0 1� 1� 1� c0 <D t0 w O O M V• N M M M M M M M M M M N N N N N N N N N N N N N N N N N N N N N Q CL M M 0 ' O O O o O O o O O O o O o O O O of o O O O o O 40 O O 0 O O Ot0 <o�.G_a0 0 W t- Mb M O M M P M M M O M VO O W M M N p: O fh C a0 a0 f'I h P' t0 cO t0 t0 Iq I wN W (� W z Z m W 3 w mz } > O W F' _� Q 0 0 0 z IN- W 2 Y (7 H H J~ O Q. 0 QQ� �- O O a 0 O O Q O w ixix _� C7 Ow a. O F- Q> 0 0 N 2 Zi Z w W p C7 o w cn m z¢ z Ix O '� x= W W Z N Z Z U. W a 0 U m Q W Z z Lu a W= W W 6 2 z J J J (9 Y fn Z •� vii o ai x d> z m vii z Q vii m z mm o P ow z m m o z c0> m Y � O � J c0 w 0 0 zo z O Ix 0 = m F- 0 } c w Q W w it Q 0 LU N O z M m ,� z cr z w 3 o Q z H� W 0 (� f- 0 O O Q � O !n } J i oz�o0o0 a:aWLU m 2 F-���Qc raw °f 0' O a m w a N a w a �z J v Z rn to } Y= V m N O= U m -' O O j � � J Q o c07 Ix w a cz10:y 0 0 0 0 d Q J '0 LL.v� O 0 o a mw a= 0 0 0 Q z w= rn J a z m W= z U, I- z z o o a W U W J 0 3 w0 7 Y Q z 0 W 0 0 o W cc .Q V; J m 0 0 Z J N J O J Z Q O Y O> O? ~� Q J m J N a' W O J J J I J W F- IX J Q> z w J 0 x M >0°J°O��Ww J0=�wm=�-OOzJXU. W W Y00=�} WaO Z= Q W LLl (� f. m W J LU ix W H Z Q a� Z 0 W 0 F.. W m oH Z >- z w 0 0 Z � Z} twi Z 0 a 0} O H w m Z QQ� u�i U 0 a V m o H v0i i U¢= U H z i v0i H O o U m m z o S 0 z z oLn o o v o 0 0 o O 0 0 0 0 O o (D 0 o w 0 0 0 0 0 0 0 0 0 0 0 � tN/f r' �•- Pr M K) N .- M 7 N M 9 M C? N v 7 .- N to N M v CA 7 M 'T p ap a0 w 6 a0 N iii a0 4 w w — w M 'n W N aD Lh �. 9' M _ V' O_ _M _� Of V' �A r V' _ V' f� 1� V' �_ G:' N N V M V N l7 V M c� N r V M M M V V M N N M M NM N M p N H C M V U') t0 P 0 O O N M V M W f- W 0 0 N M V• M 0 t.- M M O N M N m t0 t0 O t0 f0 (0 1� n n n n � A n � N aD a0 a0 a0 a0 aD aD aD a0 ao O Of CA O VI .E W E O V m O fr R L Y C CD O J R 169 1347 p m m m in m m m m m m m m m m m m m m m m m m m Q'Q Q Q Q Q Q Q W.J c a `o `0 `o `o0 0` o` o �o o` o` o` `o 0` `0 g` o` 00 ti u ti ti ti v t5 v ti v v 5 'd u C C N N o N m N N d C t: 3 U U Q Q U Q Q U Q U U U°U U Q U U U Q Q U Q Q Q U Q Y m m n N N N _W h N O? O (O M M M N Of OD C> Of (O M W a0 O N Lo N 0 O Gd. N N N N O O O O 0) 0) W O 0) 00 00 1� I� ti n h O (O (p iA (q (Cf 1n O N N N N N N N N N N N r- — — — — e- — .- r- .- — r .- — — .- a CO 0 0 0 0 0 0 0 0 0 0 0 0 0 0 u) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 r P N N N w ti O v O (O M M N N O 1- 0 O 0 (n V N— 0 N; Q N N N N .- O O O 01 O T W Of Of w GO P. -ti n n (O (O (l7 to N N N N N N N N N N w W O Q z O Y cr W} z H m W J} W} LU Q QQ Q Z > w Q w } Q z 0 Q N 3 F- Y Q S O? S p 0 0 w Z w W Q W W Z m p F- Q y Z � 0 U)Y F- L -w cr O W m W U) W W� a U N O JQ W w U S z YQ 0 Q O W W m O N J� S W F - Z rn z FS- r V U Q z O k Z ao > S C� D O U G Z W m f°- LU mv�izvoi�=owcUn�gazz 0tiCaCLozS0QI-- cozza. W Z Z 0 m Ix z m cr C3a It O LU > FW- a w w W m} LU LUQ Q O Q z Cm7 z z 0 0 0 C07 a p Q �p o Z m m mw Do WO p 3 >- z x m O P - m p S Z J w ori F- o> W F- o J S S W o z> p j O O W W M O Q g fA Y S E co Q p Q W J j z X Y Q cn z O W 0 FJ °> Z O� U W U) 3 o i vii 3 UO) vi vii o Fp- a (1)z vii cQi m U)v x a w o LL Ix a z yz p O Q } p w } } Qo cr Q O Q J a O z Q 3 w O O a 3 ui � N w z N W N Y O x U z 0= W W S O W 1 Q Q U • p J J W} J f- J o C7 N J O m O p U O} O m w O m O Z m m O> w 0 0 p o CL z Q X(X 0 W- W 3 S W S J U S U) Z } J S W J S S S a W= S W J O S F- O J W Q S g O Z LL Q. J Z Z -i W lL c) LL -1 i Z S S~ O z S p C) z Q J 0} LL. Ix R Z Q W Q m W W W W Q>> W z Q -� U Q o Q m Q Q W w W O W O 0 izUx>OSOZSUSmaUUF-30U)z3oSUmIz0zo a mz cin uj z `nuwiU)i fizz 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 (A 0 �A F � CO �- N N •- (O M N °d r- (p (D v N N of CO N (O Cl) (O (O N O N (p N GD N N (+Oj O_ O P 1� (D O_ O fD dD N R O M r `� ^ N O N M N^ O N P. _O R N N M N M en N 7< N N c M cN7 N M '? N M M M (y M N N N M v C t0 MO O O O O O O O O O .•- O q o a a a a a a a a us 1 C'. N O o 0 0 O 0N Z1 V 5 U A 0 01 0 0 0) N N N V U U U U a a a U W N as r00 h to t0 L f7 icn n f� CL w~00 0 ( 0 LC)00Y 0 00f O O V-, 0 0 R R '"i Q Q M c7 Na — .- — — — .- — .- y J L W O 0 m< N O U O O O O O M CO rO I O f� CO O O M O co D O 6 0 A (OD 00 CD 0O V a to cr) e - 169 - 1348 w O z o) N r r it e W E > U) S y W 0 W = M 0 O N 0 a. U) W O z O i C' j a LU o � W a W o n z} ��W z U W a H Y OagWm3cn O !- CO) � O 3 CD F- W N it o z W U Ix w -j O z w Uj ow 0 a E' W z a U o (D c o Da z V �° a LL m o m 3 CL m m m O 1'� O O O O 0 c O a a a)- 0: W W D F- S S z m �• W U z W U z W U z W U z W U a a O 0 S a c cc 0 0 0 0 O 0 < -1 < Z K 0 0 0 0 v) a a S C v M N 7 v N M N 4 W 0 0 T 0 C11 0 O 2� o SC'. N r N N N N n y J L W O 0 m< N O U O O O O O M CO rO I O f� CO O O M O co D O 6 0 A (OD 00 CD 0O V a to cr) e - 169 - 1348 w O z o) N r r it 0000 1996 Hignway Volumes anq 6 9 - 13 4 9 LOS Ranking ................... HlghsNe 1896 198H £st. Rask HtivY# ...Name Ra 16 # Lc alwtt MI[e Point ADT fAiT Peak 1 4 DALLES-CALIF. HWY. US 97 SOUTH CENTURY DR. 153.09 8,100 810 E 2 4 DALLES-CALIF. HWY. US 97 "A- AVENUE (TERREBONNE) 115.87 11,200 1,120 D 3 4 DALLES-CALIF. HWY. US 97 COTTONWOOD DR. 151.10 10,750 1,075 D 4 15 MCKENZIE HWY OR 126 HWY 20 92.32 10,100 1,010 D 5 15 MCKENZIE HWY OR 126 ELM ST. 92.51 9,800 980 D 6 15 MCKENZIE HWY OR 126 LOCUST ST. 9295 8,950 895 D 7 16 SANTIAM HWY. US 20/126 MCKENZIE HWY 100.03 8,900 890 D 8 16 SANTIAM HWY. US 20/126 SANTIAM PASS RD. 99.53 8,375 838 D 9 16 SANTIAM HWY. US 20/126 TOLLGATE RD. 98.33 7,850 785 D 10 17 MCKENZIE-BEND US 20 CLINE FALLS HWY. 14.77 7,400 740 D 11 4 DALLES-CALIF. HWY. US 97 LAPINE STATE REC. RD. 160.60 7,400 740 D 12 16 SANTIAM HWY. US 20/126 INDIAN FORD RD. 94.91 7,325 733 D 13 4 DALLES-CALIF. HWY. US 97 PAULINA LAKE RD. 161.76 7,300 730 D 14 4 DALLES-CALIF. HWY. US 97 1 ST STREET (LAPINE) 167.49 7,300 730 O 15 16 SANTIAM HWY. US 20/126 BLACK BUTTE RANCH (09-014) 93.19 6,800 1,156 D 16 17 MCKENZIE-BEND US 20 INNES MARKET RD. 9.71 6,700 670 D 17 4 DALLES-CALIF. HWY. US 97 JEFFERSON COUNTY LINE 11286 8,800 880 C 18 4 DALLES-CALIF. HWY. US 97 VANDERVERT RD. 155.51 7,500 750 C 19 4 DALLES-CALIF. HWY. US 97 BURGESS RD. 165.20 7,300 730 C 20 17 MCKENZIE-BEND US 20 COUCH MARKET RD. 12.28 7,050 705 C 21 7 MILLICAN-BURNS US 20 ERICKSON RD. 4.55 7,000 700 C 22 17 MCKENZIE-BEND US 20 TWEED RD. 10.07 6,875 688 C 23 4 DALLES-CALIF. HWY. US 97 OR 31 (FREMONT HWY.) 169.67 6,700 670 C 24 17 MCKENZIE-BEND US 20 FRYREAR RD. 7.87 6,600 660 C 25 17 MCKENZIE-BEND US 20 CLOVERDALE RD. 4.77 6,400 640 C 26 17 MCKENZIE-BEND US 20 HARRINGTON LOOP 3.21 6,300 630 C 27 17 MCKENZIE-BEND US 20 OR 126 0.11 6,200 620 C 28 15 MCKENZIE HWY OR 126 HELMHOLTZ WAY 109.64 6,000 600 C 29 41 OCHOCO HWY OR 126 REDMOND CITY LIMITS 2.32 5,700 570 C 30 41 OCHOCO HWY OR 126 CROOK COUNTY LINE 3.58 4,700 470 C 31 16 SANTIAM HWY. US 20/126 CAMP SHERMAN RD. 90.91 4,500 450 C 32 16 SANTIAM HWY. US 20/126 JEFFERSON COUNTY LINE 80.77 4,100 410 C 33: 7 MILLICAN-BURNS US 20 POWELL BUTTE HIGHWAY 4.83 3,700 370 C 34 372 CENTURY DR. OR 372 INN OF THE 7TH MTN. 7.14 3,600 360 C 35 372 CENTURY DR. OR 372 DILLON FALLS RD. 7.60 3,600 360 C 36 15 MCKENZIE HWY OR 126 HWY 20 93.08 3,500 350 C 37 370 O'NEIL HWY OR 370 NE 33RD ST. 257 1,600 160 C 38 4 DALLES-CALIF. HWY. US 97 KLAMATH COUNTY LINE 17219 5,200 520 B 39 15 MCKENZIE HWY OR 126 CLINE FALLS HWY 107.56 3,600 360 B 40 15 MCKENZIE HWY OR 126 GOODRICH RD. 97.47 2,900 290 B 41 15 MCKENZIE HWY OR 126 BUCKHORN RD. 103.72 2,800 280 B 42 7 MILLICAN-BURNS US 20 BEAR CREEK RD. (09-005) 6.27 2,400 281 B 43 370 O'NEIL HWY OR 370 N. CANAL BLVD. 0.19 2,200 220 B 44 370 O'NEIL HWY OR 370 NE 17TH ST. 1.62 1,700 170 B 45 370 O'NEIL HWY OR 370 NE STH ST. 0.87 1,600 160 B 46 370 O'NEIL HWY OR 370 CROOK COUNTY LINE 3.84 1,200 120 B • 47 15 MCKENZIE HWY OR 242 LINN COUNTY LINE 77.14 310 31 B Exhibit Revised: 11/12/97 page sem_ Of :r14 signinis.xls/1996 highways Ordinance qT'Oq • • ODOT 1996 Highway Volumes and 16 9 13 0 LOS Ranking 60 372 CENTURY DR. OR 372 MT. BACHELOR 21.96 2,400 240 A 61 372 CENTURY DR. OR 372 ROAD TO SUNRIVER (09-011) 19.25 2,300 943 A 62 7 MILLICAN-BURNS US 20 TEN BARR RD. 8.17 2,150 215 A 63 15 MCKENZIE HWY OR 242 SISTERS CITY LIMITS 92.20 2,100 210 A 64 370 O'NEIL HWY OR 370 HWY. 97 0.01 2,000 200 A 65 372 CENTURY DR. OR 372 KIWA BUTTE RD. 11.96 2,000 200 A 66 7 MILLICAN-BURNS US 20 DODDS RD. 9.16 1,900 190 A 67 7 MILLICAN-BURNS US 20 RICKARD RD. 10.94 1,650 165 A 68 19 FREMONT HWY OR 31 US 97 0.15 1,500 150 A 69 7 MILLICAN-BURNS US 20 BROTHERS 43.18 1,500 150 A 70 19 FREMONT HWY OR 31 KLAMATH COUNTY LINE Z31 1,400 140 A 71 7 MILLICAN-BURNS US 20 MILLICAN 25.80 1,400 140 A 72 7 MILLICAN-BURNS US 20 OR 27 (CROOKED RIVER HWY) 35.80 1,400 140 A 73 7 MILLICAN-BURNS US 20 LAKE COUNTY LINE 69.25 1,200 120 A 74 15 MCKENZIE HWY OR 242 BAILEY DITCH RD. 91.28 1,200 120 A 75 14 CROOKED RIVER HWY OR27 US 20 42.41 30 3 A Code: Generalized ADT: LOS: > 22,900 F 13,500 - 22,900 E 7,900 - 13,500 D 4,800 - 7,900 C 2,400 - 4,800 B < 2,400 A �T M �- 0 Note: Locations in BOLD denote permanent recorder stations. o Numbers in BOLD are actual 1995 counts, ITALICS are County estimates, and others are ODOT estimates. CD LOS estimates furnished by ODOT. c0 Multilane highways: ` '` "'' '' ``' ` `" i2 m wa0 Revised: 11/12/97 signirds.xls/1996 highways l69 ODOT 2016 Highway Volume EstimaW89 and LOS Ranking H�9h�!►4Y: .......... 2:116 E t, Ras�tc }{wy�i�Farrra R64", i.ccaticra I+fitePo�ai RF3T FMpeak L.flS:> 1 4 DALLES-CALIF. HWY. US 97 COTTONWOOD DR. 107.70 1a,14u 1,914 r 2 4 DALLES-CALIF. HWY. US 97 "A" AVENUE (TERREBONNE) 115.87 16,350 1,635 E 3 15 MCKENZIE HWY OR 126 LOCUST ST. 92.95 14,860 1,486 E 4 4 DALLES-CALIF. HWY. US 97 SOUTH CENTURY DR. 153.09 14,420 1,442 E 5 17 MCKENZIE-BEND US 20 CLINE FALLS HWY. 14.77 13,760 1,376 E 6 16 SANTIAM HWY. US 20/126 MCKENZIE HWY 100.03 13,710 1,371 E 7 4 DALLES-CALIF. HWY. US 97 LAPINE STATE REC. RD. 160.60 13,170 1,317 E 8 4 DALLES-CALIF. HWY. US 97 PAULINA LAKE RD. 161.76 12,990 1,299 E 9 4 DALLES-CALIF. HWY. US 97 1 ST STREET (LAPINE) 167.49 12,990 1,299 E 10 41 OCHOCO HWY OR 126 REDMOND CITY LIMITS 2.32 10,830 1,083 E 11 16 SANTIAM HWY. US 20/126 BLACK BUTTE RANCH (09-014) 93.19 9,660 966 E 12 16 SANTIAM HWY. US 20/126 CAMP SHERMAN RD. 90.91 9,360 936 E 13 372 CENTURY DR. OR 372 DILLON FALLS RD. 7.60 5,330 533 E • 14 15 MCKENZIE HWY OR 126 HWY 20 92.32 16,360 1,636 D 15 15 MCKENZIE HWY OR 126 ELM ST. 92.51 15,880 1,588 D 16 4 DALLES-CALIF. HWY. US 97 VANDERVERT RD. 155.51 13,350 1,335 D 17 4 DALLES-CALIF. HWY. US 97 BURGESS RD. 165.20 12,990 1,299 D 18 4 DALLES-CALIF. HWY. US 97 JEFFERSON COUNTY LINE 112.86 12,900 1,290 D 19 17 MCKENZIE-BEND US 20 COUCH MARKET RD. 12.28 12,270 1,227 D 20 17 MCKENZIE-BEND US 20 TWEED RD. 10.07 11,960 1,196 D 21 16 SANTIAM HWY. US 20/126 SANTIAM PASS RD. 99.53 11,890 1,189 D 22 17 MCKENZIE-BEND US 20 INNES MARKET RD. 9.71 11,660 1,166 D 23 16 SANTIAM HWY. US 20/126 TOLLGATE RD. 98.33 11,150 1,115 D 24 7 MILLICAN-BURNS US 20 ERICKSON RD. 4.55 11,060 1,106 D 25 16 SANTIAM HWY. US 20/126 INDIAN FORD RD. 94.91 10,400 1,040 D 26 17 MCKENZIE-BEND US 20 FRYREAR RD. 7.87 10,300 1,030 D 27 4 DALLES-CALIF. HWY. US 97 OR 31 (FREMONT HWY.) 169.67 10,180 1,018 D 28 17 MCKENZIE-BEND US 20 CLOVERDALE RD. 4.77 9,980 998 D 29 17 MCKENZIE-BEND US 20 HARRINGTON LOOP 3.21 9,830 983 D 30 17 MCKENZIE-BEND US 20 OR 126 0.11 9,670 967 D 31 41 OCHOCO HWY OR 126 CROOK COUNTY LINE 3.58 8,930 893 D 32 15 MCKENZIE HWY OR 126 HELMHOLTZ WAY 109.64 8,880 888 D 33 16 SANTIAM HWY. US 20/126 JEFFERSON COUNTY LINE 80.77 8,530 853 D 34 372 CENTURY DR. OR 372 KIWA BUTTE RD. 11.96 3,480 348 D 35 15 MCKENZIE HWY OR 126 HWY 20 93.08 5,810 581 C -D 36 :4 ii/til»I.IwS-1r11t3Stw . 0$.... 1�Qik'�i�FiilkE. a;48-0#........ 1t1Q . 3b,9►........3:5$4':>..... ......:,........ 37 4 DALLES-CALIF. HWY. US 97 KLAMATH COUNTY LINE 172.19 7,590 759 C 38 15 MCKENZIE HWY OR 126 CLINE FALLS HWY 107.56 6,190 619 C 39 7 MILLICAN-BURNS US 20 POWELL BUTTE HIGHWAY 4.83 6,070 607 C 40 15 MCKENZIE HWY OR 126 BUCKHORN RD. 103.72 4.650 465 C 41 370 O'NEIL HWY OR 370 N. CANAL BLVD. 0.19 3,920 392 C 42 7 MILLICAN-BURNS US 20 BEAR CREEK RD. (09-006) 6.27 3,840 384 C 43 370 O'NEIL HWY OR 370 NE 17TH ST. 1.62 3,030 303 C 44 370 O'NEIL HWY OR 370 NE STH ST. 0.87 2,850 285 C 45 370 O'NEIL HWY OR 370 NE 33RD ST. 2.57 2,850 285 C N u Exhibit Revised: 11/12/97 Page .11-- Of 3%proj.x)s/2016 highways Ordinance 0414 is • .7 ODOT 2016 Highway Volume Estimates 169 1352 and LOS Ranking 54 15 MCKENZIE HWY OR 126 GOODRICH RD. 97.47 4,810 481 B 55 372 CENTURY DR. OR 372 ROAD TO SUNRNER (09-011) 19.25 4,000 400 B 56 7 MILLICAN-BURNS US 20 TEN BARR RD. 8.17 3,440 344 8 57 15 MCKENZIE HWY OR 242 SISTERS CITY LIMITS 92.20 3,400 340 8 58 19 FREMONT HWY OR 31 US 97 0.15 3,210 321 B 59 19 FREMONT HWY OR 31 KLAMATH COUNTY LINE 2.31 3,110 311 B 60 370 O'NEIL HWY OR 370 HWY. 97 0.01 2,800 280 B 61 15 MCKENZIE HWY OR 242 LINN COUNTY LINE 77.14 350 35 B 66 372 CENTURY DR. OR 372 INN OF THE 7TH MTN. 7.14 4,400 440 A 67 372 CENTURY DR. OR 372 MT. BACHELOR 21.96 3,360 336 A 68 7 MILLICAN-BURNS US 20 DODDS RD. 9.16 3,040 304 A 69 7 MILLICAN-BURNS US 20 RICKARD RD. 10.94 2,640 264 A 70 7 MILLICAN-BURNS US 20 BROTHERS 43.18 2,400 240 A 71 7 MILLICAN-BURNS US 20 MILLICAN 25.80 2,240 224 A 72 7 MILLICAN-BURNS US 20 OR 27 (CROOKED RIVER HWY) 35.80 2,240 224 A 73 7 MILLICAN-BURNS US 20 LAKE COUNTY LINE 69.25 1,920 192 A 74 15 MCKENZIE HWY OR 242 BAILEY DITCH RD. 91.28 1,700 170 A 75 14 CROOKED RIVER HWY OR27 US 20 42.41 30 3 A Color Generalized ADT: LOS: Code: > 22,900 F 13,500 - 22,900 E 7,900 - 13,500 D 4,800 - 7,900 C 2,400 - 4,800 B _ o < 2,400 A o 'g Note: Locations in BOLD denote permanent recorder stations. Numbers reflect ODOT estimates as of 7/97. LOS estimates furnished by ODOT. Revised: 11/12/97 Multilane highways: '•`:> 3%proj.xls/2016 highways Is Appendix J 0 • 169 - 133 TRANSPORTATION SYSTEM PLAN PROJECT SELECTION MATRIX Page ?l of -T5 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) Ln :S) s L� M W r---1 m M m CL m E co rn _=2) MM N x M x 'Q x V x Yf x to x 10 i w x N x M x V x Q x (0 x 10 x fr x aD i x i g a a w c a N c€ a a N g a N g a N g a N g M M g a V a V g a V a N g a 10 Oc a ID a h c a 00 a 01 c a O g a g a w g a g a g a. M r M r M H a r r r r r r r M M r r r N r i0 r PN r r N r v r V r v r a. r N r t0 r t0 r w r 1. r a r w r M r O --AA N N N AA N N Uf N f0 N t0 N G. w• b O O O O O O w b O O O O O O O O O O O O O O O O O O O O O O O O O O O 7 m � S Y pppa 0 0 0 0 0 0 0 0 w N w w w (y w y Q w N w M M N w w h Q w w M w w w h w Q w w Q w 0 G N N N N M (/1 to w 1A N N M N N M N 1A l0 Y C a 3 ' lA 1A N N N 1A 1A 1A 1A 1A M 1A iA lA to lA 1A Y q M N N N N N M N N LCC m _. N M Q Q w h Q M M N In Q in w N w w w w N M Q w N h m h h aD Ol 00 c'^ c4 V M 0 0 N M O m m 0 M r M m 7 N N N N M V (A N M m m m 0 N N N N N m N w N M N MM O M M 7 N Y O Q V h N mien m (n < (n h M m N m M N O (n N NN M I� m y N N N m aD N N N N N ty M 1- N N o 1A R moo mpp V Npp M h m N M N N 1- M 1n V V m V GO O) V IT Tp N V N N 01 N OND p� N aMD N N CN, O N N l+1 t0 Of p V m n Q N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N p O p S pp O pp O O N p (A pp N pp O OO O N N p O 7 p O T 1l f` t0 O R N p O N (O R N O m O OD g V f�I O a0 O V 1f! N 8 O Op O A ti 8 V V 8 < N N O N h M O 01 �p t7 to O N O N V h N M �p (O OI p t0 N N I� N M OD M pN OD aaDD Np to m N 1� m h N to M 1� O? 1. lM v r o m 8N O0 8N 0p N N NN 189 8N 8N 0 8N 8N O 8N O 8N 8N 8N O N nNp (pNp 8H O 8N N ppNp N p N p 8M 8N O 8N O gpNp C 8N O pNp 8N O ppN N ppNp O) SN f0 N 1mN 189 O �Ny Ol {Vpp/ N 8N OpD� (pN� 1pp9 8N 8N N N �pNp OVpp! 8N ppNp M tlppf� ppNp N g O O p0 O p0 O p0 (� p0 (0 p0 N 8 p0 N 8 8 AO 1� 1(�D (0 {� O ppp (� yO V O w yO� N 8 8 yw (N� OD N N ( N� LA o O�0 w N (lph�Np V 10 O (`•/ O IM O r M N N n O N N N N N N N N N - N "1" N N N N N N N W (A N N N w N N N N N N N N N N N N N N N t9 N N N N N N N N N N T T W m T W m T W T W W T W T W C Q T O T T T T T T T T T li2 T T LO A WT> LW igCS > 0000000 o 00000 Eo m > > > > >T oWT > �+ aE ea c ed aE aE g atl 07 c nd c ad > O > O M ad d ae 0�0i ad 00 00 c a0 00 wr ad 00 00 m > O 00 Y M N m M N N (N`I N tOV M N (h M M N N N M N M N N M (7 N N tOV N NN m N N N b N (`] N O N (O N t[I N h N t7 N N N N (� N N h N N N N N N N (7 N N N <'f N N N N O M (7 N 10 N N h N lN'1 ei N N z. IN U m U m m U m U m m U m m U a U¢ m m m¢ U¢¢ m m¢o ¢¢¢ a¢ w Jp N Silo, Ci Ol � N ID I� N I� O�l. ON1_ �?l N � 1� b N O OD O1 O � 10 (Q < OD � (O, 2 a vI A . W to V w m V N M N 7 N O N (A R N 7 C) 7 (V (V vi O N (Y m N m m^ W m V M N N (N N N it) O n N O ftpp N 1A O m (Np P pQ G R Q (p m < a- N N O N Q N In FO N N Q h O CI N N M 7 N N m m m a m m U a ooS ¢ m¢ m m¢ m¢ m a m a m¢¢ m m a¢ a¢¢¢ Q N n M N 1� 1` f� 8 O (p OI s� V (mp OD N (O m ((pp lh � C1 N A ^ M (N� N 8 O ((t�) (D 8 N OD m (ppp N � N OD O (m� th OD O 8 (D app O O OD N pM ((1 00,1 N ((per (t) m N 8 a S R S- 8 g V 1.9 S NL - S 8 LL r yyyLpy H N N Y3LJp a N N YI C N Yl 1l1 N N N N N N N O c W o � - U) o c m M M h V1 O �+ o U o OI m 0 m m 0 of R N N o m y (A N N (O (n N N N? V fV (V M O n O O M M N O M 0 0 T - mg ME 81 B 8 A C C Y 6 m M O C N C Z Y 3 w mzo m(�mm C i3 o?°> s s s s s w w `�_ iii o o z o O rmO> 5t w m z z m �o${ C Z ti W m c .4 w p ¢ a o Kj r C m Z W z O o = O z J m m p K O p O m I� m N m 1' F' C :• $ (�Q Q�1 o W z 0 m O O N m y y= m O N m m W m a w m J J O Y 0 O Z_ J H av ¢ v ¢¢ U v a v m _� d (9 o m w m C7 O > �RQ pp 0 U w c �' W a Os c O w z w Q o¢ z o z 0 x= i -n C7 C7 O O z O m J O -- f (i m O S -. m C7 U oo >> w m O o m a a m U U x o w o. w o U o r x o w w w o m x z L A 0 � y « 3 m J m o m .. o m o O 0 w 2 Q co Y (� m O^ O n 9a C 10 N N yy y � � � � � O � Qs r` p p � o w z p m _ _ J dj dCLd� O {�� N w C7 (ii Y m w a 9a i N z i N •C w C7 tau' ru C c� z O E 2 w K a• c� z 2 w o ) a Z o z a' o J F� U z y w U Z m w w o J LL ° C w w m w § m m m K .; � 'O S a m m O= o S S x h H >> o U p U a '= z a> O zd a m « ; o J O f a m m o z m 2 a w w o m m w a z p 0� o N m o D 0 U>> m C7 m C7 o w O m w w o m C7 0 o J? 0 `L m C; 7 x M m 0 0 0 � C m m a y v B YCD o (Q c c a a= a F- >. A E o m A c m o .w°.. is x z —` w OC F O y a~ o W~W U Q Y m m O Z' ; o O o C i co ocr Q Y O> $ a P o m F- o¢ o> m m Z m ,: m $ Y K o o 3 Y m O Y �' y >. N E �O M E 7 L o m o z �„ a o �F z W o Y o m d z o W o o m 3 Y m w (n w z p r m a D a or a o o w d a z a m U o m J �+ o 9 v = " y w p $ s w m a o z a y� o m o }w � m « N a Y p a' z O �[ y ¢ ¢ Z "z a m mp' « C a 8 i FF 2 O m C7 K a a 5 x y C O 1�7 a J T m W o cc w C ° p U J �uJ 5 z m w J w m K W Y w J 0>. W O y J J 2 y J V- m 2 io- O m w o LL J C H w o m z x o > a o U O m m rn m o > c� x F� m a m c� w 0 3 L 0 pl s 8U U. m o (n m (� C a o o (n o a x (n 1d o 0 m O J O � O a a (3 � ¢ o m w z f° O rn � vii � M LL z h z m Y a1 (0a C 4 W «4: Lo L m W d w E 1 . �a: i� � z1 _zu�ix'ocoU0L) 0 m M m CL m E co rn t.� a� CSI CD co W S m 00 O) a s saaaaaaaa s s a s acaa a a a a s a m m m M a a a CL a a a a a 0. a CL a- 0- as as 0- as q a� e� N M a N M V H N t0 A 00 01 0 e- N M V H H H V H H W W n A A W N M V N .7 F 0 M O N r MV r r N r O r r N r 17 r O O r r N r N r M r M r H r t0 r O) r O N N r N N N M N aaN N r N C* V w N N co r M r V r w r w r w r 10 r 11 r r r A r Ib r r - O H O O O H H O O H O H O O O O O O O O O H O O O O O O O O 19 H O O O O E H N N � H m -- • i� g w H N Y1 H H H Y 8 m O Y 7 Y Om L m LL 19 O N r r r r N M VN H H ro n Nit ap N M V H— _ V V — � Y m N V w M N n M m H w 01 N M Q 10 1A N M {O n N 7< V H m n n N N M V 1A 77 N o p. to lV R C Q N f7 N M N V 0 n O O N 0) m m n H M m H m Of O^ � r � � � � N M V H H H m M Omi N M OMi � {app t0 m m n 17 V N m (�l O) � �O (mV � v1 N M V N �p ma p� OI O C 0 NO NO NO NO N0 N0 N0 N0 N0 Np N0 QH NOON'n0 O N NN g p O`' oN0 p0 p0 0 w OHHO m n m n m 0 m y N C N ri r,: 1, M 1 N O O of O H N m N O O H O C f0 (V m N ID O N 10 O O m N 0N w N N O O O O O N O N O N o ry M y n �y y� p^ N 0 !09O 0 vi 0 fop vi ,7yy' IQI Y vi CJ N N q q q p N p p q q p q q q q N q p p p q q N q q q q q q q N N N N N N N N N N N N N N N N N N N N N N N gAm $nm 8 0 88c o$< 8 R8 $ h O N !f n M O M NNO C O V m 1 m m N 1 In O N N g N H?N gpj Nn O S M N MIV q p ppp N N p qq p p NNq N N N N NNO N m -- m m m m m m v v v v O �j �j y m$a O 0 0 0 0 0 m 0 m 0 0 0 m 0 m 0 C K K K m' ^d m N ro ro of m ad =e .6 0 0 0 0 m�� H ro m d m d d 0 m m m m z z z z z M 17 1D 17 K N M M M N O M O N O M O N O N N O N N N O N O N D] N O. N N b M lb N (1 N N N N •i7 N N N N N N Iy N N N r} f/V! '40N N N N N oo yy yy Q`1 H GQ1 QS Q}, j� p�j �p5 gyp$ jpj LL v, Q Q Q Q Q U U U U U C3 U R CS C J Q (j m m U m m m a a m a a 5Q� c� sg 5� QQ gg (ppV N O �fppV N (V T N fD • a _- m m a m m a a a a aIn p 8 0 OnD �p1 '� o cq m fn0 �ppp O �Mp fD 8 n m V pppp c•1 8 oD �o o t+] �n O M Nj Q fpV fV O lV fV C) pOp�i �Qp �p p {� 0 co �EyEE _ s N m O t O1 a L O Y C O C 0 { O m S C S C .� S y m V m{ m wl m y y Z` J 1/: a. m O O U y$ m N O S E y m H y H N SV1 y _ 9 C m C (Cp y m m U M M Lm O > mm m O ul O i sy 3 C L C m ADO O O) O O m N DD O GD N n N N M t0 7 O E n m 0 m T m C O �. H C Z y C V ,K O y C Y01 m y UI F C S O .- Ol N - M 1� 0 0 0 0 aaX� y Y .21 C m Y m N H y m¢ J m A -, ] 0$ m Y C J o m 3 m 3 A m g� a N K a N a s U cm -6 co _w z N m (n m C O G) m (0 rl: g V) �Sjy K ch 0¢¢ UJ o 3 } O m a n m c m O H D U O 5Q2 Y yy Z d m U O ap B U O m�m 7 m 7 m£ J .0. N O m= s o O O > !V m i m 3 /L1 Q m Q' O z Z CO 3 Y rJO U L C O O a Q a J m 7 'm N LL Q UC O D m O V m LL O O O O O p_' W Z;7) m U 2 H w w U U 0= Z Z a w W 0 H �_ 0 .f O 0: D J a J (0 a G m c w e v o 01 ¢' i0 v N vi $ g V) O N `� ¢' m vi a' vi = m m m N L� ' " m W o c `—' O r LL w O 3 M, 0' J " } U 0 O �z U W�` Q w mE 1- a a a m a v� U 3 U U 7 U U z$ w w z m m c N m m h mN O o m B x « « V 0 i s w � o ZO y y y y y yy y yy y y y y y yy E w Ui �EE m m —L° Q1 'FHFFN y 'iiiiW C` [j cr w WJ2 OJ 8 NO ' Ka EI H HFFQ1 E t EEFE 'F E��C 2 Ssn ' .SS gFF x N a3 Q Ir C a` -e @ 2 2 v o r C a M C E CL a m m } 3 } 3 }} 3$ ? o `n N w Y map 0 a` D Y 1> m1>uu 3 cr z m Y o 1�� iZ 1m� :7 O 2 W Y 2 m 2 2 m Np1 Y H H w Q !. y m m O 000 CCC O: 8 Q y Sj N V N $j b'j b'j �1 y W m C 61 !_ ¢ 07 N x C 0 a C a z S U s 7 W¢ 2 z z J U m 5� W 2 K W a M= V s 7 W O z W U y O m U .f n T F N a J Os 2 C Cf bN £ � °i co fn --6 V) � ¢ co « � ¢ V) N ;s¢ cn E u$i ¢ Y g11:1 N m ; �o a Q: Z m m U m 2 ro n m m U v H¢ N .- 1 0 U U m w v O O z N 2 S m 00 O) C 1° x h aS ea M mnmum� C $ 4 o.o E. ¢" Y N C V U, J O C Jjjt f N cl A ci O 8 G a U) o °C �Cq m � �g C � a € C C 1° x aS ea M mnmum� Y $ 4 Y N C V C 1° x aS ea q7 N C V fj 0 $ 4 N C V Jjjt f N ci O 8 G a U) o °C C � a € co� W W 11) o a o n c cn is 3i o;o�p M N r i 0 fV d N aCq C6 Cq�� C .0 W W 5 I E c m g m E C? o W B c EE -3 o a ,poi V l J V N 0(" fn fn 1 0 it Ihl gl 111I 1I 1I 111ILI 11il1I I I? J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J r N M V N 10 1� CO OI O N M V N t0 1� a0 OI O N M V H" N A OD OI O N M N 10 10 P pp OI p co N N N N M M M M M M M M M M M V w NTMI VINI10'nIaDI a,I �!j ;:jVI�I;!IrI!9I�:ImI9!I NINI NI NI NI NI NI NI NI NI MIMI MI MIc'II MI�I MI MI MI MI< NM M M On Onn n n Wn OaD Nnm OMaD 0 n 8 Of nmmON8?pNNN MNO N, N N O18 0 N c0 a0 OI W O O O A N N VI M< O Q Npp {Npp N {Npp N N �pNp N N N pN Np Np N N 8N �pNp Np N pNp� �pN} N 8N N N N N Np {�Npp N pN N pN N N 8N {pNp� N N N �pNp� N W fM0 t'1 O�1 OI M fD (O tD n O O O t7 fD O (MV O N f7 t+l fD m N O m O m m N O 0 N lllll� mnl0 (DiD NN QN N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N �:j Y) EC r lC r Of l'7 O O Cl r N t� N n f0 M Vl N N N N N N n 0 N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N 111.110160101601 0 00>0>0-0 0 0000>006.000 g 00060000 b ,rororororororo�e�erororo�erorororo�n�e�eromro�rowmroro� �e°��ero�nro�eroro N N N N N N N I N N N N N N N N N N N N N N N N N N N N I N I N I N I N I N N I N I N I N N N N I N N a <1<1<1<W<W<W a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a iiiiiilliii ilii'u'•••••iiiiiiiiu"aiiiii�iiiiisiii ©©o©oo©0000©noo©o©oo©o©©oo©oo©n�000©eoeoe 'I '�. I I OI OI OI OI OI NI OI OI OI OI OI OI �I OI .-I aI NI Ol Ol OI NI OI NI NI Nl NI OI .-I OI OI OPill MI �I MI MI MI OI OI NI MI O 0 O o U W S z a K W J a d' O a ~ } CD Q a U Z � S CD 0 w O � 0 2 0 3 ri 3 Q DW L i C i Z U a S 2 K y n Os O n K N FS- N Z O a O iE N N S S O N O} n 0 m Q J>? U3 3 N3 O 33 u~f OI 3 N Z a W S a O1 W fM0 O VOI U H 3 Cl) 3 Y a � g� ? 3 U C O Of Z uj j j Z j S 2 z Z z Z N Z W z Q m y y 2 W S Z Z Z Z W y O y U i/7 CJ G O ix 3 $ a 3 i o 3 m 3 z Ir z C3 o yy i 3Q y o o v~i z o o Jo !P, o 61 U ~ N K M O tq O O y} (oY� � H S cr } p p ~ Or' Z 2 W N z Y ztJ k 4 W a' CLU 7 1 J z 0 Fr� Z N N N z N W m p �Np Of pp N Ol n �N(yy � N{pp M (m� 3 O $ W C7 Yz W W O m W UZ JS V OZ v C� 7 W C� O f0 (� fn'1 Y 1A N fD fD ID n 3 to o S m Z Z O `l m Z Z m Y S N Y UJ O 0o O O� y mm O LL 1 S m O O O O Cl W o } C LL S 0} a O O> 02 f W Y 3 C LU fn w CL d' Q' Y J N U fn a H LL U t�� J a u�� S �[ �' Y a U J (� N N RO' N W a N W C? W W N m Q Q a p}p N j �D =� m ID V O W t�f l�D O z U S US a}, N R' OJ O IiO Z N K VO-! W U a LL �. a � Z W U U O LL W - d' O O S O U O `� S LL O W U U U d S U m W y "' o o y z y� 3 3 3 3 3 3 3 C W W O S 3 Q o W a 3 � Z Z Z Z Z Z N Z Z N h N Z Z Z z N.3.: Z 0000000000000000000000000000000000 J J J 1J�Jp JJp J Jo J J JM Ja yJ�Jp J pJp J J J J JJ} J J J J J J J J J J J WW V V V V V O V Yf N N N N Yl Yf N N b 400 440 1ND IND 10 b 440 40 100 100 n n n ^ ^ n l) 'O pppp,.aayy yy H Y/ N N W) N H 400 40 440 t b b D 4^0 to 40 A n A n A n coN !�. OBD 0�0 OND 00 00 040 -. Q U m C r� C e co r3 m Y C Wm Y Y L m W LL 'r V y h h N y h N A A ^ ^ ^ ^ V N M N 0 n 0 m 0 N M N 0 n 0 m O N M N 0 n 0 m O N M v In v v v v v v v v In lig N W� w w N N W m m m 4 4� m m m 4 m n n n n n n NM In m n OD m 0 N M V N 10 n co m O N M N m n a0 01 O N M N a v v v v v v v N in N 013 In 1n 1n v) w 1D to <0 <0 m m m 1D 1D n h n n n n pp M {pp l0 ppp to In aA 1D n h m O O M v N N cnV t�1 W,G� M In In VI f0 f� O 0 t'7 v N 0 N fV N N 1h (6 l"1 4'7 v v v fO 0 m Oi m G 1V N d n n fU O . V H (p.Go y� H 8H QQH N N N N .I N N. H I. . H H..cli H H H H H Wa H H 0 H H off N p pop 8 am 1D O1 Q tN0_ n N m Cl a !7 q(NO f7 In_ r a IU t? -N -V vmi_ Cl! r 7 — t. V IN O m {Inn vi v OJ Di , N n v 0 (mp app app UpI (mp O Imn Mp m mN (Qp 14rp� OI �n f� Oi 8 h M v n v 10 n m In N N 10 CD 7 O Q Ov O N m GD v l7 n O v O a In {O m f"1 m 0 0� N n I+mI+�� Cf l`7 4V 16 IN M N 14 i OD C O V N VVV O N N H N N N N N N N N N N N H N N N N N N N H N N N N N N N N N N N N M v N N N N N N „. Sap �p 1� ppp ppb {e�� Ip�p p(pp {pp 8 11�y I� �7 app Ian ppp� �In� (p� pp Y n A O N l� � O Im�l P 19 N O O 1- 9 O 9 N� GD_ 0 In � l� f0 ED 1D � 1� N O 1� O 061 � 1p �y �y �p pp � �p mpp O �pQi Qi N 1� �ppp g O N Yf N IA n O N V 9 N In 9 $4 D1 10 N g 9 In n 10 m N � O1 v 9 9 N 0 (O ff77 N N n lel GD O M OI ffDD N v IIIDDD l0 n O_ v In_ O N v IV 1V N M N 17 10 T T T T T T T T T T T T T T T T T T TT T T N �p m W W Ip W W m m W m m m C m C m W W m t t L O o W m f t 'C t t t o 0 4� 0 0 0 0 o O o o o O o o O b o o o O o 0 0 0 0 0(5 o o M C . 6 w 1+6 m 0 0 m 0 0 ro ro ro w W ro w w �I �1 ro "tl H M 10 .tl �+ a0 ro �tl �0 10 10 10 M � a a J cpJ) p4 g V w C V m N w a0 N m m N N N m m m co N N m 4O "NO m mN N N I* m m w m m m ao w m m ro m m m m m 11 m ro m t- Q7 O N N N N N N d J ani --------/~ma diva--- -- Er W LL ¢ U U C5 CS h U U Cg Q Q N m mCL ff CL p LL W O a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a n o w m 1° CO o c-4 a <1< a a a a a a a a a a a a a a a a a a a a a a a a a a <l< <M 4 o gg�tgg 8 5? ��° � NB40 �ss28PSiS Ogg ' ^ O O n p O In It) p ^ M v v OD CO In HI VI 0 \i! .0! N fD M fD N l'� t7 In v N n N N N N N N N 4 v N M M O M N O O O M N v M N M M M O v O ti -I 0 0 v O m m O n 0 n 0 N n .- p n M O N 0 N O �',•E 0 N (V 4V 4`J C N v 1V m 1V O m IN m N N 0 1V O 6 a OC Or a a 0 my 0 W 0 K 0 >} Lx Z >Z- Z t m W W p Ii .LL[ LL W 7 y Z ix 5 l In H W- uW1 N rS� w RQ= [4u p>> yy~ p w qg m m m m y K J C p m W Z y O Z O O Z U a N Z w J OU O w }xQQc QX m co Z= O Z LL 2 m W W J _= 0 0= Z O O x of U' p J 0 0 W LL J p '� 0- E N N s_ Z W p 0 U LL Z Z U Q U O {- U U m W m W O f.7 a J = J Z !.. O and O W a w O - -- -- — - -- — - — w 0 h M N N O It) O u3wirjm nm j 3 Z Z W S = U SC O = dw 3 O "" _" co w m o n o m wU o qg Ap 0 Z m L $ 0 o p 0 O > $ C C t0 m p Ir Fu-� z a' a C W m c m W m z m m Y V p w O m m E ii a W o ii 0 0 0 4E? W p Y qg C O C7 4: p m m 0 m 0 m H a 1Z- K < w �" w w lam. K Q p i p p .i' >§ Im Orn 58p1 C, N QO W 0 0 W w 0 Z a= y C> X p Q�Q S WW O O Z 0 O 0 W C O= J2 y C H } _ w W Lys Z O U Z O K F p 0 zg C Cq 7 St �T m 0 Z U aQ Z W W= O ly W 2 Z O sJ s1 U=$ 0 O O Op U SJ 2O ¢ LL M i J t0 ^ 0 m 1� ? U C� LLLLw ( S S i U OJ C ? m C m S= w ���>jjj m O 0 lwl I I I Z Z 9) Z r g gUll m m m m g �mmmm Elil SIB = 00 co 0 00 0) 0 Appendix K • • 169 - 1362 DESCHUTES COUNTY POTENTIAL FUNDING SOURCE CALCULATIONS Page Kl of KZ - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) • • • 169 1363 Table 6.4.T2 Deschutes County Estimated Gas Tax Revenues Deschutes County Bend Current Statewide Gas Tax $ 0.24 County 1995 Population 30,630 10,585 775 Unincorporated 94,100 Bend 33% Redmond Sisters Area County 1995 Population 30,630 10,585 775 52,110 94,100 Percentage 33% 11% 1% 55% 100% Potential Motorcycles 2,464 1,232 $9 $11,088 Revenue @ 2,546 1,273 $30 $38,190 Total 0.5 cent $89,277 $30,852 $2,259 $151,884 $274,272 1.0 cent $178,554 $61,704 $4,518 $303,769 $548,544 1.5 cents $267,831 $92,556 $6,777 $455,653 $822,816 2.0 cents $357,108 $123,408 $9,036 $607,538 $1,097,089 3.0 cents $535,661 $185,112 $13,553 $911,306 $1,645,633 4.0 cents $714,215 $246,816 $18,071 $1,215,075 $2,194,177 5.0 cents $892,769 $308,520 $22,589 $1,518,844 $2,742,721 1995 Registered Vehicles Statewide 2,662,754 100% County 94,906 4% 1995 Estimated gallons of fuel sold Statewide 1,539,037,004 100% County 54,854,427 4% Table 6.433 Deschutes County Estimated Vehicle Registration Fee Revenues Deschutes County Potential revenue assuming 2 -year renewal cycle Total per year 785,223 $255,594 $88,327 $6,467 $434,835 Page KZ of KZ - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) Bend Redmond Sisters Unincorporated Area County 1995 Population 30,630 10,585 775 52,110 94,100 Percentage 33% 11 % 1% 55% 100% New Fee 1996 Deschutes County Registered Vehicles Renewals per year @ Autos 98,126 49,063 $15 $735,945 Motorcycles 2,464 1,232 $9 $11,088 Non -PUC Trucks 2,546 1,273 $30 $38,190 Total 103,136 51,568 $785,223 Potential revenue assuming 2 -year renewal cycle Total per year 785,223 $255,594 $88,327 $6,467 $434,835 Page KZ of KZ - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 0 Appendix L 0 • 169 r 1 364 GLOSSARY OF TERMS & ABBREVIATIONS USED IN THIS PLAN Page L I of L4 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 1365 AASHTO: American Association of State Highway and Transportation Officials. ACCESS MANAGEMENT: The principles, laws and techniques used to control access to a highway. ADA: The Americans with Disabilities Act civil rights legislation passed in 1990, effective July 1992. ADT: Average Daily Traffic. The measurement of the average number of vehicles passing a certain point each day on a highway, road or street. ARTERIAL (STREET): A street designated to carry traffic, mostly uninterrupted, through an urban area, or to different neighborhoods within an urban area. BICYCLE: A vehicle having two tandem wheels, a minimum of 14" (35 cm) in diameter, propelled solely by human power, upon which any person or persons may ride. A three -wheeled adult tricycle is considered a bicycle. BICYCLE FACILITY: Any facility provided for the benefit of bicycle travel, including bikeways and parking facilities as well as all other roadways not specifically designated for bicycle use. BIKE LANE: A portion of a roadway which has been designated by striping and pavement markings for the preferential or exclusive use of bicyclists. BIKEWAY: A bikeway is created when a road has the appropriate design treatment for bicyclists, based on motor vehicle traffic volumes and speeds: shared roadway, shoulder bikeway, bike lane or bicycle boulevard. Another type of facility is separated from the roadway: multi -use path. CLEARANCE, LATERAL: The width required for safe passage as measured in a horizontal plane. CLEARANCE, VERTICAL: The height required forsafe passage as measured in a vertical plane. COG: Council of Governments COLLECTOR (STREET): A street designated to carry traffic between local streets andarterials, or from local street to local street. CROSS SECTION, or TYPICAL CROSS-SECTION or TYPICAL: Diagrammatic presentation of a highway profile at right angles to the centerline at a given location. CROSSWALK: Portion of a roadway designated for pedestrian crossing, marked or unmarked. Unmarked crosswalks are the natural extension of the shoulder, curb line or sidewalk. DLCD: Department of Land Conservation and Development. FRONTAGE ROAD: A road designated and designed to serve local traffic parallel and adjacent to a highway or arterial street. GRADE: A measure of the steepness of a roadway, bikeway or walkway, expressed in a ratio of vertical rise per horizontal distance, usually in percent; e.g. a 5% grade equals 5 m of rise over a 100 m horizontal distance. GRADE SEPARATION: The vertical separation of conflicting travelways with a structure. HIGHWAY: A general term denoting a public way for purposes of travel, including the entire area within the right-of-way. Page Z of - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 - 1366 • ISTEA: The Intermodal Surface Transportation Efficiency Act. LCDC: Land Conservation and Development Commission. LEGEND: Words, phrases or numbers appearing on all or part of a traffic control device; also the symbols that appear on maps. LOCAL STREET: A street designated to provide access to and from residences or businesses. MOTOR VEHICLE: A vehicle that is self-propelled or designed for self -propulsion. MPO - Metropolitan Planning Organization: An agency that combines the governing bodies of neighboring cities whose combined population exceeds 50,000. MULTI -USE PATH: A path physically separated from motor vehicle traffic by an open space or barrier and either within a highway right-of-way or within an independent right-of-way, used by bicyclists, pedestrians, joggers, skaters and other non -motorized travelers. MUTCD: The "Manual on Uniform Traffic Control Devices," approved by the Federal Highway Administration as a national standard for placement and selection of all traffic control devices on or adjacent to all highways open to public travel. OAR: Oregon Administrative Rule - A rule written by an affected government agency, intended to clarify the intent of an ORS. . ODOT: Oregon Department of Transportation. ORS - Oregon Revised Statute: The laws that govern the state of Oregon, as proposed by the legislature and signed by the Governor. • OTC- Oregon Transportation Commission: a five -member, Governor -appointed commission, whose primary duty is to develop and maintain a state transportation policy and a comprehensive, long- term plan for a multimodal transportation system. OTP: Oregon Transportation Plan. PAVEMENT MARKINGS: Painted or applied lines or legends placed on a roadway surface for regulating, guiding or warning traffic. PEDESTRIAN: A person on foot, in a wheelchair or walking a bicycle. PEDESTRIAN FACILITY: A facility provided for the benefit of pedestrian travel, including walkways, crosswalks, signs, signals, illumination and benches. RIGHT-OF-WAY: A general term denoting publicly -owned land, property, or interest therein, usually in a strip, acquired for or devoted to transportation purposes. RIGHT OF WAY: The right of one vehicle or pedestrian to proceed in a lawful manner in preference to another vehicle or pedestrian. ROADWAY: The paved portion of the highway. Page L3 of Ly - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 - 1367 • RULES OF THE ROAD: The portion of a motor vehicle law that contains regulations governing the operation of vehicular and pedestrian traffic. SHARED ROADWAY: A type of bikeway where bicyclists and motor vehicles share a travel lane. SHOULDER: The portion of a highway that is contiguous to the travel lanes provided for pedestrians, bicyclists, emergency use by vehicles and for lateral support of base and surface courses. SHOULDER BIKEWAY: A type of bikeway where bicyclists travel on a paved shoulder. SHY DISTANCE: The distance between the edge of a travelway and a fixed object. SIDEWALK: A walkway separated from the roadway with a curb, constructed of a durable, hard and smooth surface, designed for preferential or exclusive use by pedestrians. SIGHT DISTANCE: The distance a person can see along an unobstructed line of sight. SKEW ANGLE: The angle formed between a roadway, bikeway or walkway and an intersecting roadway, bikeway, walkway or railway, measured away from the perpendicular. STRUCTURE: A bridge, retaining wall or tunnel. TPR: Transportation Planning Rule 12 (OAR 660-12). TRAFFIC CONTROL DEVICES: Signs, signals or other fixtures, whether permanent or temporary, placed on or adjacent to a travelway by authority of a public body having jurisdiction to regulate, warn or guide traffic. • TRAFFIC VOLUME: The given number of vehicles that pass a given point for a given amount of time (hour, day, year). See ADT. TSP: Transportation System Plan: the overall plan for all transportation modes for a given area (usually city, county or MPO). UGB: Urban Growth Boundary: the area surrounding an incorporated city in which the city may legally expand its city limits. URBAN AREA: The area immediately surrounding an incorporated city or rural community that is urban in character, regardless of size. VEHICLE: Any device in, upon or by which any person or property is or may be transported or drawn upon a highway, including vehicles that are self-propelled or powered by any means. WALKWAY: A transportation facility built for use by pedestrians, including persons in wheelchairs. Walkways include sidewalks, paths and paved shoulders. WIDE OUTSIDE LANE: A wider than normal curbside travel lane that is provided for ease of bicycle operation where there is insufficient room for a bike lane or shoulder bikeway. Page Ly of 0 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 0 Appendix M LJ 169 - 1368 TOOLBOX OF TDM STRATEGIES FOR CENTRAL OREGON Page IN ! of A3 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) • • 169 ?- 1369 The Central Oregon Transportation Demand Management (TDM) Tool Box of Strategies Prepared by Commute Options for Central Oregon STRATEGY LOCAL EXAMPLE COMMENTS Park and Ride LaPine, Redmond -Wal Mart, Dedicated and shared use sites. Sisters, Mt. Bachelor Reduces Single Occupant Vehicle (SOV) miles traveled. Most successful when linked with transit. Vanpool Future employers; SCMC and Each vanpool removes 10-12 Tektronix SOV from peak period travel, Reduces Vehicle Miles Traveled (VMT) and Emissions. Carpool Throughout area Informal or through Central Oregon RideShare; most effective where parking is managed with incentives and/or disincentives Local bus In Study phase The most common form of public transportation. Flexible and responsive to changing market. Group Transit passes Future Provides blanket coverage for employment sites. Shuttle bus Future plans; Bend to 3 to 5 vans, limited stops at major trip Redmond, other intercity generator sites. routes. Transportation ? Private employers provide monthly Allowances allowances for transportation; may be used for parking, vanpool, transit, bicycling etc. Transportation St. Charles Medical Center Gift certificate and other Incentives Incentives to encourage Bicycling, walking, carpooling Bicycle Supportive Area wide Relatively low cost, reduces SOV travel. Policies Bike lanes, trails, parking, education and enforcement Walking Supportive Area wide Relatively low cost, reduces SOV; Policies investment in sidewalk construction and maintenance; intersection safety and roadway design. Event Promotions Commute Options Week TDM promotions and awareness campaign; Media, employers, individuals. Schools Area wide Students, parents, staff encouraged to walk, bicycle, carpool. Add incentives, disincentives Page 02. of M3 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 0 I� C7 169 - 1370 Parking Management Limited in Central Oregon Can control SOV use more effectively than any other strategy; revenues generated from parking can be used by private employers or public jurisdictions to offer incentives for alternative mode transportation; very effective in Portland Trip Reduction Not used in Central Oregon May encourage or mandate reductions Ordinances in trips made to major employer sites, most effective when legally required and linked to financial incentives. Compressed Work Various businesses Removes commuters from daily peak Week (4-10hr. days, traffic periods and from roads altogether etc.) 2-4 days per month; minimal cost for some employers. Staggered Work Hours Various businesses Removes commuters from daily peaks; minimal cost for some employers. Flex -Time Various businesses Removes commuters from daily peaks; minimal cost for some employers. Telework Various businesses Removes commuters from road, (telecommute) requires proper work, home and management environment Page M3 of (43 - EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) • Appendix N • • COMMENT LETTERS Page N) of 065- EXHIBIT "B" to ORDINANCE No. 98-044 (8/26/98) 169 1311 169 - 1372 Steve, I applaud Nils for his exhaustive review, but truthfully I don't see much in his comments that you need to address. I do like the idea of an index, if that can be done easily. Regarding the automobile dominance of the document, I see that as simply a function of the dominant mode of travel in Deschutes Co. Further, the VMT reduction only applies to MPOs, which Deschutes Co. and Bend currently are not. The TSP is for a rural county and many of the bike/ped issues raised in Nils's letter are simply not applicable. Bike/ped projects are worthy and they do offer travel alternatives, particularly for short -distance trips. With the county turning planning jurisdiction for lands within the UGB over to Bend by July, I think Nils's concerns would be better addressed within the Bend TSP, not the county's. Similary, transit and Transportation Demand Management (TDM) are almost exclusively urban issues and issues for larger urban communities at that. Dial -a -Ride, vanpools, park and ride lots do hold promise for some rural applications. Regarding the needs far outstripping the funds available, this often an issue with facilities plans. It is tempting to assume current funding levels will persist into the future. However, if funding exceeds current levels, either by SDC's, exactions, local taxes, increase in state gas tax, etc., it is vital to have a plan in place that would accommodate heady economic times. Just as important, it is necessary for the TSP to rank projects so the most critical will be built in times of strained funding. I think the TSP has done an admirable job of doing so. It would be nice to see more upfront text about costs -sharing between ODOT and the county on road projects on state facilities, rather than having it in the tables containing the project lists with the phrase (ODOT projects with county participation.) Peter Russell ODOT 5/27/98 9:36 AM • u �r Exhibit Page`L- of N65 Ordinancegit"aYy From Nils Eddy, 0 Steve, 169 May 27, 1998 Thanks for the opportunity to review the TSP. I haven't had time to read all 9,000 pages ;-) but I've read enough of these kinds of documents to know what to look for. Please take the comments in the spirit of providing the best possible direction for what has been widely acknowledged as a very unbalanced transportation system... 1. Approach There are much interesting data in the Plan and a long project list, but very little analysis to tie things together. It is not clear how or if the projects will accomplish the goals. What analysis exists is far more oriented towards capacity improvements, which will result in those types of projects receiving more attention and support. Conversely, projects that don't improve capacity will be seen as expendable. There should be a clear line of reasoning that leads through the goals, the inventory, the needs analysis, the projects, and finally the implementation. Without that thread, the plan will flounder from lack of understanding and support. Transportation plans work best when they have measurable goals. Benchmarks or specific goals will help monitor progress and demonstrate if the Plan is working. To be effective, these measures must deal with system performance, such as how accessible destinations are, rather than mobility measures like level of service. Note that the Transportation Planning Rule (TPR) requires some specific increases in mode splits and reduced vehicle miles traveled, which the TSP claims are unmeasurable (p. 133) without explanation. There are several ways to measure these goals, and an unwillingness to comply with the requirements should not be an excuse for not trying. Recommendations: -Explain methodology (not just project ranking) clearly. - Relate projects to goals. - Quantify the goals, including TPR requirements. Z Organization • The important parts of the Plan—the goals and policies—should be up front where they can be seen, not buried after a hundred pages of 1373 Exhibit � 3" Page N3 of N65 Ordinance QS'6YY 169 1374 background information. They should be concise and easy to follow. The Plan, with about 26 goals and 52 policies, several of which are more than a page long, is very difficult to understand much less comment on. The numbering scheme for the goals and policies is so similar to the text numbering that it is confusing. In some cases, the numbers are identical which is a no -no in publications. A document this large and complicated must have an index. it will take no more than a day to compile and will make things much easier to find. Recommendations. - Simplify goals and policies. - Number the goals in a distinctive style. - Create an index. 3. Feasibility Implementation plans should be somewhat in sync with funding projections. It makes little sense to propose $142,000,000 in projects when "the cost of the needs far exceeds the projected funding" (p. 190) and when even alternative sources can't make up the difference (p. 193). Clearly, the transportation system as proposed is not achievable. We need to aggressively look at ways of providing access that don't involve expensive road operations, and we need to simply accept congestion. What is the alternative? One approach the Plan should take is a least -cost analysis of transport options. The Oregon Transportation Plan requires that the full costs and benefits of transportation projects be evaluated. It describes an efficient system as one where: - It is fast and economic for the user, - Users face prices that reflect the full costs of their transportation choices, and - Transportation investment decisions maximize the net full benefits of the system. It explains that full benefits and costs include social and environmental impacts, as well as the benefits of mobility to users, • and construction,, operations and maintenance costs." Exhibit = Page . W4 of N 65 Ordinance 169 - 1375 The County TSP considers only construction costs and mentions efficiency only in the context of automobile movement, not system is function. The results are predictable: the Plan focuses on capacity increases and automobile dependence. To meet this requirement of the Oregon Transportation Plan, the TSP must expand its evaluation to include all aspects of efficiency and pricing. The methodology of least -cost analysis was pioneered in the power industry where it radically changed development strategy. It has subsequently been applied to transport decisions where it helps policy makers pursue effective solutions. Recommendations. - Bring goals in line with realistic funding options. - Perform a least -cost analysis. - Seek more cost-effective solutions. 4. Inconsistent Treatment of Modes Automobiles dominate the Plan in terms of inventory, analysis and projects. Bicycling, transit and especially walking are barely covered. Transportation demand management appears to be an afterthought. By its narrow focus, the Plan almost guarantees that we will continue promoting increased automobile dependence. As an example, Policy 2.1.5 requires that streets "be located, designed and constructed to meet their planned function and provide space for motor vehicle travel and bike and pedestrian facilities where required." This makes it sound like bicycling and walking are optional. Why not just say "...their planned function?" The inventory of bike facilities (p. 63) doesn't describe the facilities, it merely summarizes the policies in the obsolete County Bicycle Master Plan. Current bikeway design should follow the State Plan, and we should not be referencing the old County Plan. To be consistent with the level of detail given to automobile facilities, the bikeway inventory should include not just a map of arterials and collectors, but a listing of traffic volume, traffic speed, shoulder width, surface condition, sight distance, difficult crossings, and connectivity gaps. This could be compiled using existing data. (Note: What is a "parallel bikeway" on Figure 2.2.F16 through 18? This makes it sound as if there is a separated path. The roads shown are shared roadways with minimal shoulders and relatively high traffic volumes.) Exhibit Page NS 1 of u= Ordinance 98.' 044 169 - 1376 The pedestrian facility inventory (p. 68) mentions only sidewalks, overlooking shoulders, crosswalks, warning devices, and ADA compliance. The position (p. 8) that pedestrians are generally well served by County roads is inaccurate, there are many deficiencies that routinely inconvenience pedestrians or put them at risk, including inadequate shoulders, high speeds and dangerous crossings. Although walkways and shoulder widening seem to be well represented in the project list (assuming they are funded), there is nothing allocated to transit and only a tiny amount (less than 0.04% of all projects over 20 years) to transportation demand management. We have to make a much greater commitment if we are to have any hope of meeting our goals. Recommendations. - Inventory bikeways and walkways - Increase funding to transit and transportation demand management to at least 5% each of total project funding. 5. Deferred Planning The Bikeway and Pedestrian Plan component (pp. 172-6), which scarcely mentions walking, puts off creating a plan to some future date. This approach won't work. The TSP will be the plan, and any inadequacies it has will be with us for the foreseeable future. The State Bicycle and Pedestrian Program as well as those of us who write multi -modal plans will tell you that independent plans are rarely effective, and bicycle and pedestrian planning needs to be integrated with overall transportation and land use plans. (Note: We don't refer to designated routes anymore as is done on p. 175. "Route" should be replaced with "bikeway.") Recommendations. - Complete the bicycle and pedestrian component of the TSP. - Add pedestrian goals and policies. S. No land Use Connection I could find very little on land use in the Plan. Current rural land use patterns and recent policies adopted for rural communities have important and sometimes negative impacts on transportation planning that should be discussed. Conversely, improvements to highways and other roads affect rural development and should be considered in road projects. There are local examples, good and bad, of how land use and transportation interact. We need good models. Exhibit ' lb Page N to of N 65 Ordinance RE -044 169 - 13*17 The Plan should reference some of the extensive literature on this • subject and follow up with appropriate policies. Graphics would help, especially when it comes time for planners to interpret the policies. Recommendations: - Make the connection between transportation and land use. 7. Scant Public Involvement There was inadequate public involvement in the Plan which will affect public buyoff. Few people responded to questionnaires and fewer came to meetings. The "public hearing" model of involvement didn't work well. We know that hearings are a poor planning tool even when people show up. Perhaps committees should have been tried. The Bicycle and Pedestrian Advisory Committee was willing to help, but we were hampered by your lack of attendance at meetings (one in 12 months?). Well, good luck with the hearing. There's many good things in the Plan, but I believe that it could be greatly improved with additional work. Thanks for listening. Sincerely, Nils Eddy 1199 NW Quincy Avenue Bend, OR 97701 bigeddy(fbendcable.com �J ►(Bn Exhibit Page N7 of N65 Ordinance 48' 04q • 169 - 13'18 Steve Jorgensen From: Steve Jorgensen <stevej@deschutes.org> To: MYSELF <stevej@deschutes.org> Subject: Fw: Test message Date: Wednesday, May 20, 1998 9:32 AM > From: Thomas.E.HIGHLAND@odot.state.or.us > To: stevej@deschutes.org > Subject: RE: Test message > Date: Tuesday, May 19, 1998 3:07 PM > Steve, I have attached Transportation Syst Plan aviation language > changes to this document. > <<Airport Exerpts.doc>> Thanks for forwarding the test program --1 > still haven't figured out how to save your address automatically from > this test. Seems I already have your address correct but it is not > responding. Keep trying I guess! 2.1.17 OREGON AVIATION SYSTEM PLAN The Aviation System Plan is due to be adopted incrementally by the Oregon Transportation Commission. This plan will identify a base airport system, system funding needs and gaps, and recommend various strategies to pay for the system. It will also recommend policies to guide the state in protecting, maintaining and developing the airport system. It will provide an inventory and forecasts for airports statewide. Some key issues that affect the Plan include: Local governments own most public use airports The federal government owns most of the navigational system The FAA determines funding levels and prioritization of expenditures for nationally recognized NPIAS airports U.S. Congress proposes to severely limit or eliminate general aviation airport funding altogether. 2.2.19 AIR TRANSPORTATION With the passage of SB 1113 in 1995, ODOT is proposing that the County establish an "airport zone" for each of the public use airports in the County to assure the continuation of airport and airport -related uses there. State Rule OAR 660-13, was adopted in December 1996 by the Land Conservation and Development Commission. In July 1997, the state passed HB 2605 which modified Oregon Statutes regarding airport planning and will have an as yet undetermined effect on OAR 660-13. Currently, County airport -specific zoning exists at the Bend Airport (AD Zone) and the Sunriver Airport (Airport District within the Planned Community Zone). There are seven existing public use airports in the County. Four of these airports have improved (paved) runways, and offer a range of services, from the availability of commercial passenger flights arriving and departing daily at Redmond Municipal Airport, to the Sisters (Eagle Air) Airport which offers no services or runway navigational aids. Figure 2.2.F22 shows the location of the four public -use airports in Deschutes County, while Table 2.2.T14 identifies the current level of development for the improved airports. Figure 2.2.F23 identifies the locations of the private or "personal -use" airports in the County. W .5u Page 1 Exhibit Page N 8 of N65 Ordinance Q6-,044 • • May 20, 1998 To: Steve Jorgensen FAX 385-1764 mom; Frank 6 Marie ConYlilr�"r �'�. Conklin's Gest Hduse FAX 541-4481 169 1 3 7 9 SUBJECT: Camp Polk Road Realignment Proposal We first read of your proposal in this past weeks Sisters Nugget weekly newspaper.. we own and operate the conklin's guest douse, Bed s Breakfast rnn bordered by Caarp Polk Road an the east and on the remaining three sides by the new road aligrsment proposed. we strongly endorse and -support the concept of your proposal and encourage its Inception at an early date. The effect of the road alignment would provide several major advantages or benefits over the existing situation. 1. Traffic on Camp Polk road is very high and will likely double over the next 5-10 years. Flom the and of the town of Sisters to the first curve past the runway, Camp Polk road .is a speedway and.passing area. it is dangerous with several accidents having occurred along .it Including at the intersection with Barclay Drtve. The- suggested alignment would eliminate this hazard. 2. Access to Sisters and its primary and middle -schools from the north is limited essentially to Camp Polk road creating a mjor bottleneck at school .arrival and .departure hours with the same result an weekends from visitor traffic. The proposed road alignment would provide a new access to H19rhway 20 without going through town and 2 new accesses to town via Larch Street and Barclay Drive thereby diverting much of the current traffic. Frank & Marie Conklin (503) 549-0123 69013 Camp Polk Road Sisters, Oregon 97759 u u Exhibit Page . N9--- , .of N� Ordinance 2g - Dqq 169 ~ 1380 I� 3. Traffic noise an Camp Polk Road is an issue for our business and other resideaoes. Diversion of much of the traffic would diffuse the noise for us and eliminate the hot rudders who now use the ;s mile in front of our bs ness toyaccelerate and/or pass other vehicles after departing 4. CemPPalk traffic to downtown, the -.industrial park, and the high school would be diverted completely away from the Locust street congestion area. S. Highway 20 traffic would have a by pass of the downtown area. 6. There is a strong need. for .a walking/bike Path from the Barclay drive and airport areato town. Traffic diversion fs�amr Came Palk road com1d .maks develapmient .of such a path a feasible objective with minimal safety hazard - 7. Thi, Sfstrrs, Planning Director, 7. The suggestion by to simply widen existing Camp Polk road by cutting off 100 feet of tis#_ existing- ray is- both inappropriate and dangerous. it is inappropriate in that it would aggravate rather than alleviate future, tra€rieaadesrg sisters Sist ong dangerous in that aircraft arrivid epartin ng with a runway uns st .Eagle Air airport' are already' dealfng marginal len This is especially so for inexperienced g pilots unfamiliar with crosswind and Jwunt,aln flying effects in summer. And the airport gets a lot of such pilots in summer because- of tier afrpoX-t`s Pt°X:i=t-Y' to Sisters whereby pilots can walk to town. Shortening the runway by 200 feet Is not an option for us'Pilots' Fnstearg, with the proposed road realignment, potential exists to lengthen the west end of the ZUMMp by Silk feet in the future. cc: Neil Thompson • Exhibit - Page N 1-0_ . of N b S Ordinance SI-OVi • • • Deschutes County 169 Phone �. • • Date: May 21, 1998 and May 22, 1998 Time: 2:00 pm and 1:30 pm From: Steve Jorgensen, Senior Transportation Planner Contact: Mr. and Mrs. Fitzjarrel, Sisters Area Residents Subject: (TSP) Proposed Camp Polk Road Realignment Discussion: 1331 I cleared up their misconception about all Camp Polk traffic being directed further west into Sisters. They were not necessarily happy about any out -of -direction travel on southbound Camp Polk Road, but understood that this was a planning document and that implementation could be many years away. I pointed out that the proposal would offer more travel direction choices for Camp Polk residents in the future than currently are planned. They think that the volume of traffic on Camp Polk Road far outweighs the air traffic to the airport and that the road should not be diverted. They thought that it makes sense to provide for a new connection further east for Camp Polk Road to connect with Highway 20/126, or force drivers into Central Sisters to access Highway 20. A new connection east or a diversion to the west, would diminish the traffic volumes that are now forced to go past the elementary school to access Highway 20 eastbound. They also asked about the possible shift of the runway 200 feet to the northeast. I explained the increased impact to residential areas in that direction and the . added safety problems associated with that proposal. SLJ:sij Phone log1 Exhibit 13.— Page —. of N6S Ordinance 36 -24 169 1332 Steve Jorgensen From: Sam Goodwin & Associates <sgoodwin@sistersnet.com> To: stevej@deschutes.org Subject: Camp Polk Road/Airport Date: Monday, May 18, 1998 5:41 PM Dear Mr.. Jorgensen. It is interesting that the county would consider the expense of a road alteration because of a small privately owned airport that most of the year has only 6-8 airplanes hangered or tied down on the property. The summer population only brings planes and accompanying pilots who find it difficult to take off and land in prescribed patternsand during designated times.have accidents and even have the audacity to kill and be killed. I am all in favor of having an emergency helicopter pad, but fmd pandering to a small minority of airplane owners quite ridiculous. The best thing the County could do is close the airport. The Redmond airport is only 30 minutes away. Think carefully, plan carefully and spend the tax payers money carefully. Respectfully, Lynne K. Goodwin 06 ►� Exhibit FJ Page N 12 of P65 Page 1 Ordinance- a$' oyy • • Steve Jorgensen From: JKCERINO <JKCERINO aol.com> To: stevej@deschutes.org @ Subject: CAMP POLK ROAD RE -ALIGNMENT Date: Thursday, May 14, 1998 2:31 PM Dear Mr. Jorgenson, I read with interest about the County's potential plan to relocate Camp Polk Rd. away from the Sisters Airport runway. I appreciate and commend your concern for safety, but in this case your logic escapes me. I live in Sage Meadow and travel Camp Polk often. I am a former private pilot, so I understand something about aircraft/airport safety concerns, and in particular I spent several months last year under the flight path of Sisters airport, so I have an idea about the air traffic density and patterns there. In my experience, the traffic density on Camp Polk is not very heavy and the road handles it easily. Because of the lightness of air traffic and the prevailing landing and takeoff direction, the probability of a plane -auto collision is vanishingly small. Certainly not a justification for moving the road. Furthermore, rerouting traffic through the busy industrial park, through several intersections, and into the intersection of Pine St. and Rte 20 does not improve either traffic flow or safety. In fact that intersection would be worse than Camp Polk -Rte 20 because the •fast moving Rte 20 traffic would be on the right of a car entering from Pine, hence more difficult to see. I would like to suggest two possible improvements for safety and usability: 1. Add a bicycle lane. Like my wife and I, many Indian Ford area residents can and would ride bikes to town, reducing fossil fuel consumption and pollution; but it is quite worrisome to bike on that road now. 2. Install a traffic signal at the Camp Polk -Rte 20 intersection. On weekends in particular, crossing the highway is treacherous. These changes, which arc independent of airport proximity, would make me feel a great deal safer when driving or biking around town. Sincerely, John Cerino 69836 W. Meadow Pky Sisters tel 549-1742 • 169 - 1333 K Exhibit 1311 Page 1 Page N 13 . ' ofN 6!� Ordinance 9 s' o4 q FROM : Ronnie Frigulti FHUNE NU. • jell J47 luJU Mr. Steve Jorgensen, senior transportation planner, Deschutes, County: 169 - 1334 As a home owner in the Indian Ford area, my home rests near the end of the airport runway in Sisters, on airplane departures and landings. That end of runway is some 850feet end Y home. We have two other neighbors that also reside near the runway The shifting d it by Neil Thompson, City of Sisters planning director, runway 200 feet northeast, as I understan would place the runaway even closer to my home. and departing at near tree top levels over our Property and that of At this time, aircraft are landing P 8 our neighbors. The Sheriffs Office has confirmed at least runway would creato fatal accidents e a further safety shiftingdeparting the airport. I sincerely believe that shifting hazard for my home and my neighbors. landing over CSP Polk Road, it While I agree that there is a safety issue in aircraft taking off or lanother safety hazard at the other does not make sense to attempt to correct that issue by creating end of the runway. The proposal of the new road alignrnent would address the safety issue and not create another safety problem. I feel that this road alignment solution is sound while shifting the runway could be fatally Sawed. This response is not about the airport. My wife and I appreciate the need for a small airport in Sisters and we actually enjoy observing the small aircraft landing and departing. I appreciate the notification of this proposal as reported in the Nugget and your call for comments by interested parties. Thank You -a.;67- Ron and Debbie Frigulti 69311 Big vew Drive Sisters, Or. 97759 541.549.1089 Fax 549.1090 Exhibit 1�N Page .. 14 ' of 065 Ordinanbe Rb -0%4 • • 169 - 1365 Steve Jorgensen From: Kearney,P Y@ Pat < akeame ucdavis.edu> To: 'Steve Jorgensen' <stevej@deschutes.org> Subject: Camp Polk Road Changes Date: Wednesday, May 13, 1998 7:53 AM Good Morning Mr. Jorgensen: I am a soon to be property owner on Trapper Point Road near Camp Polk Road. I read with interest the article in the most recent issue of the Sisters paper. I was not able to fully understand your proposal as it relates to Trapper Point Road. Would it be possible for you to fax me the map that was referred to in the article? I am interested in where the cut-offs would be to Barclay way for travel in each direction. Also of interest is where Camp Polk Road would be widened, if that option should be chosen. If you can further clarify that for me via e-mail I would also appreciate that. I have a map of Sisters from the Chamber of Commerce but that does not give me the detail to understand the information in the article. Thank you. If you are able to fax a map please send it to 530-795-5854. Patricia A. Kearney Executive Director of Student Housing and Financial Aid pakearney@ucdavis.edu Student Housing Financial Aid 530-752-2034 530-752-2396 Fax 752-4345 Fax 752-7399 Page 1 Exhibit Page X11 S of N 1� 5 Ordinance q8,044 • • L` Form 734-2249B (2-97) Jan. 30, 1998 Steve Jorgensen, Deschutes County Community Development Department 117 NW Lafayette Bend, OR 97701 69 DEPARTMENT OF TRANSPORTATION Region 4 Program And Planning Unit Steve, / At the Jan. 22 public hearing on the draft Deschutes County Transportation System Plan (TSP), the E CODE: D� Deschutes County Planning Commission asked for information relating to the transport of hazardous materials through the county. I have reviewed Part 397, Subpart C of the Federal Motor Carrier Safety Regulations, which deals with non -radioactive hazardous materials (NRHM) in Sections 397.61 through 397.77. I also spoke to Mike Sullivan, who is a hazardous materials specialist with ODOT's Motor Carrier Transportation Branch. As I stated at the hearing, hazardous materials are a legal cargo. The U.S. Secretary of Transportation defines what is a hazardous material and these materials have a high degree of regulation regarding the containers in which they are shipped. This includes labeling, packaging, storage, what hazardous materials can and cannot be transported together, placards displayed on the vehicle, list of mitigation measures for the cargo in case of accident, telephone numbers of who to contact, etc. ODOT designates the NRHM routes, which must comply with federal standards. The federal DOT publishes a "Guidelines for Applying Criteria to Designate Routes for Transporting Hazardous Materials" which is available from Safety Technology and Information Management Division, HHS -10, Federal Highway Administration, U.S. Department of Transportation, 400 7h Street SW, Washington, D.C. 20590- 0001. The publication's number is DOT/RSPA/OHMT-89-02, July 1989. I do not know if there is a more recent version. As the state DOTS are the routing agencies for NRHM, the county would have to work through ODOT to alter or modify a designated NRHM route. Routing designation is defined as "Any regulation, limitation, restriction, curfew, time of travel restriction, lane restriction, routing ban, port -of - entry designation, or route weight restriction applicable to the highway transportation of NRHM over a specific highway route or portion of a route." The federal standards to designate or modify an NRHM route must be addressed in findings. The findings will consider the following: enhancement of public safety; public participation, which includes at least a 30 -day period for public comment; if a public hearing is held there must be 30 days advance notice; consultation with other political subdivisions, including a written notice to them at least 60 days prior to establishing an NRHM route; include a risk analysis of the route; no undue burden placed on intrastate or interstate commerce; continuity and timeliness of route; reasonable routes to terminals and other facilities; responsibility for local compliance. Part of the process to modify an NRHM route is examining a series of variables. The federal regulations mandate the route shall consider population density as based on U.S. Census tracts; proximity to special populated areas such as schools, hospitals, prisons, and senior centers; the type of highway and its physical characteristics, including number of lanes, access control, weight and height restrictions, roadway geometrics; the type and quantity of the NRHM cargo that would be transported over the route; emergency response capabilities; public input; exposure and risk factors; terrain and climatic variables along the route; continuity of the route; congestion and accident rates; and the effect on intrastate and interstate commerce. To modify an NRHM route, the risk analysis of the designated route needs to consider three situations. First, the current route presents at least 50% more risk to the public than the proposed alternate does. Second, the current route presents a greater risk but less than 50% more risk to the public than the propos deviation and the proposed alternate does not force a deviation of more than 25 miles or an increased trip ' length of more than 25%, whichever is shorter. The 25 miles or 25% apply only to the portion of the trip .t U 63034 O. B. Riley Rd. Exhibit Bend, OR 97701 Page N 116 of 1365' FAx) 388-6385-0476 Ordinance 4x-044 169 - 1387 affected by the alternate route, not the entire route. Third, if the current route has the same or less risk to the public than the proposed deviation, then the alternate will not be allowed. 0 In a nutshell, the alternate route must be demonstrably safer and not foist an undue burden on either commerce or another community. If the county decides to pursue this further, the staff would need to work with ODOT's Hazardous Material Office, which is where Mike is based. His telephone number is (503) 283-5852. Let me know if I can be of any further assistance. On another TSP matter, Mark DeVoney and myself would like to see a collector designated in the document linking Tollage to OR 242. This would offer a parallel and alternate route to U.S. 20; by having such a route, drivers returning to Tollgate from Sisters and Bend would no longer have to make the left turn across U.S. 20. Instead, they could use OR 242 and then this proposed linkage. Peter Russell Senior Development and Review Planner 63034 O.B. Riley Road Bend, OR 97701 • • Exhibit 13 Page31 �� of N65 Ordinance Q%-044 T( 169 - 1 388 CITY OF REDMOND P.O. BOX 725 DESCHUTES COUNTY, OREGON REDMOND, OR 97756.0100 (541) 923-7710 County Planning Commission FROM: Bob Quitmeier, City of Redmond Community Development Director Alan Unger, Urban Area Planning Commission Chair DATE: January 29, 1998 RE: Deschutes County Transportation Plan AIRPORT 548.8059 PLANNING 91.5-7721 BUILDING 923.7715 PUBLIC WORKS 548.6068 The Redmond Planning Commission and the Redmond City Council recommend that the Deschutes County Transportation Plan be amended as follows: 1. Classify Quarry Road as a collector from Helmholtz east to Highway 97. 2. Identify road connections from Canal Blvd. south on 4311 Street then 461 Street to Quarry Road. 3. Identify road connections from Helmholtz Road and Canal Blvd. intersection southeast to Quarry Road. Background for Request. —tie Planning Commission has expressed concern about traffic from the west side of Forked Horn Butte ,aching Highway 97. The Planning Commission put a proposed road access to Highway 97 in the UGB south of Yew Avenue interchange. ODOT requested that this access be removed from our TSP_ ODOT felt that Yew Avenue would eventually be the northern anchor to a no -access Highway between Bend and Redmond. ODOT said they would not grant access to Highway 97 in this area. The City Council agreed with ODOT's concerns and removed this access from the TSP, but still had concerns that this does not solve the problem of traffic connecting from the West of Forked Ham Butte to Highway 97. As the butte continues to develop Reservoir Drive and the Yew Avenue interchange will experience capacity problems without a southbound altemative access to Highway 97. We feel a better option would be to take this traffic moving south from Helmholtz and Canal Blvd. To 43i4 and 46'" Street to Quarry Road. Classify Quarry Road as a collector that has access to Highway 97. Quarry would be a move logical connection to Highway 97 for the following reasons: 1. Quarry is closer to the midpoint between Deschutes Junction and Yew Avenue interchange. 2. Quant' would facilitate the use of frontage roads along Highway 97. 3. Quarry is the closest point that Helmholtz and Canal Blvd. come to Highway 97. 4. Quarry will help service the non -conforming commercial uses on both sides of Highway 97 which are concentrated north of Redmond. • thank you for your consideration on this matter. If you need more information, please contact Bob uitmeier, City of Redmond Community Development Director at 923-7716. FAX NUMBERS: AIRPORT (541) 548-0591 • CITY HALL 548-0706 • FIRE DEPT. 923.5512 • POLICE 923-775EkhIC WORKS 548-0253 Page N18 of 1`4 6-1 Ordinance 48.ogq 169 - 1 339 To: Steve Jorgenson Deschutes County Planning From: Theodore L. Eady RE: Proposed Airport TSP language Steve Please find the changes I feel are necessary in the TSP language. My proposed changes are underlined in italics. 923-2116 Policies 5.1 Deschutes County is committed to protecting the viability of the public -use airports located within the County. Protecting public use airports will be accomplished through the development of airport land use regulations. When an airport protected under these airport land use regulations is changed to a private use facility these regulations shall terminated and new regulations shall be adopted based upon the change in use. Efforts will be made to regulate the land uses in designated areas surrounding the Redmond, Bend, Sunriver and Sisters ( Eagle Air) airports based upon factual evidence ofeach airports specific level ofrisk and usage. The purpose of these regulations shall be to prevent the installation of airspace obstructions, additional airport hazards and to insure the safety of the public Regulations for compatible land use shall be based upon each airports locally determined needs and values in achieving compatible land uses based upon factual evidence speck to the regulated areas and airports risk. For the safety of those on the ground and after speck noise impacted and crash hazard areas have been identified for each airport, only limited uses will be allowed. Protecting the privately owned, private use airports, with three of more based aircraft, will be accommplished by development of specific land use regulations for these types of airports. The function and economic vitality of privately owned, private use airports with two or fewer based aircraft will also be accomplished through land use planning based upon each airports specific level of risk and usage to provide for continued safe aeronautical access to and from these airports considering the type of aircraft approved to use the airfield. In addition, Deschutes County will: Exhibit Page _N iq _ . of 045 Ordinance Q8' o4q 169 r 1 390 Cooperate with the cities of Bend, Redmond and Sisters in establishing uniform zoning standards, based upon factual evidence ofeach airRorts specific level of risk and usage which will • prevent the development of hazardous structures and incompatible land uses as established by each airports specific level ofrisk and usage and the local communities determined needs and values in achieving compatible land use around airports to insure the safety of those on the ground and the users of the airport; Adopt regulations to ensure that developments in the airport approach areas will not be visually distracting, create electrical interference or cause other safety problems for aircraft or persons on the ground. In addition, effort will be made, after the establishment ofeach airports specific level of risk and usage, to minimize population densities and places of public assembly in the approach areas based on each communities specific determined needs and values in achieving compatible land use in the approach areas; Participate in and require the County adoption of airRort master plans for all public use airports and at least an airport layout lan for the remaining ODOT- recognized airfield in Deschutes County Each airport proposed to be protected by land use regulations shall be required to provide to the governing body a study determining the FAR PART 77 SURFACES and any - obstructions to those surfaces If after this study it is found that there are existing hazards to aviation or public safety on the ground which are located off the airports property the airport master plan shall consider the effects of mitigation measures or condition which could reduce the potential safety risk or incompatibility If after this study it is found that the primary surface, the object free area or the FAA determined Runway Safety Area are located on property not owned by the airport operator a plan shall be required to plan for the containment within airport property Each airport master plan and aiport layout plan shall be required to plan for the safety of those on the ground and the users of the airport As a part of the airport master plan and to insure both the safety of those on the ground and in the air each airport adopting a Airport Master Plan with the county shall be required to review it's NTSB accident briefs and devise a airport safety plan to address the safety issues raised in each accident that the NTSB has a BriefofAccident. Support appropriate federal, state and local funding for airport improvements at public -use airports; and Thanks Theodore L Eady �� t1 Exhibit Page N 20 ofd Ordinance 4s" Oq4 E.F5,11IR's 9-0, Fill . r. cn- Re: Deschutes County TSP Dear Mr. Jorgenson: 169 1391 I O: � U 3AN 1998 CIO RL IVED DEBCs ES COLKTY CDO �`Ni7i ctZ� January 28,1998 I have reviewed the Draft TSP and have comments which I would like you to consider. Generally the comments relate to bike paths/ bike lanes, and traffic around the Bend UGB. Bike Paths/Lanes/Paved shoulders - There are many roads under County jurisdiction that have minimal to no paved shoulder to allow for safe bicycle travel. A good example of this is Deschutes Mkt. Rd., a designated road for bike travel. There is almost no way that you can ride that heavily travelled road and stay within the fog line. This causes motorists to have to slow down or move out into the oncoming lane of travel to pass. The TSP identifies the southern portion of the road as having a shoulder, however the large majority of the shoulder is not paved. I agree that on lightly travelled rural roads bikes and autos could co -exist with a minimal safety risk, however Deshutes Mkt. Rd. is one of the busier arterials in the County. Another example is the Old Bend -Redmond Highway. If the shoulders were upgraded on these two roads (there may be others) you would create a much safer route for motorists and bikers on these roads, and you would encourage travel between the two largest cities in the County. Bike commuters and fitness enthusiasts would be much more likely to use these convenient roads if they felt safer with some kind of paved shoulder. If these two busy roads are not upgraded for bicycle travel, they should not be identified as preferred routes for travel. Under the bike path/ sidewalk heading for high priorities, only sidewalks are listed. Surely there must be at least a few bicycle projects that are a high priority. Eastside Bypass - In section 4 of the TSP there is a brief discussion of the previous Eastside Bypass proposals. Now that the Parkway is being constructed the TSP suggests that existing road links and upgrades will be used instead of a bypass to handle the traffic around Bend. I feel strongly that in less than twenty years Bend will need a real bypass. It is misguided in my opinion not plan for an inevitable consequence of growth. A few points: 1) The Parkway will not serve as a bypass and it certainly will not improve east -west traffic. 2) With a. interchange at Deshutes Mkt. And at Baker/Knott Rd. a defacto bypass has been created and will be fostered (note the sign for MV HS and St. Charles on N -bound 97 south of_. Knott Rd.), however Knott, 27th, and Deschutes Mkt. are not designed for or identified as Exhibit 13 Page N21- Of N 6 s orrlin;ince q9-0 144 169 ~ 1 392 January 28, 1998 such. Therefore, some citizens along that route are upset about it. I believe it too late for that • series of streets to be part of a plan for a real bypass. 3) The argument that it's too expensive and disruptive neglects the reality that in twenty years it will only be even more expensive, and even more needed assuming that Bend continues to grow. If an alignment is identified in a plan, at least affected property owners have some indication of the future. If the TSP perpetuates that a designated bypass is not needed, the defacto bypasses will continue to create controversy. Therefore, the TSP should at the very least plan to consider a bypass and begin the long process to identify the alignment and how it can be integrated into the existing road network. East-West Access - It is hard for me to believe that ODOT, the County and the City can really believe that east -west traffic just does need to be considered because it is a lower volume than Hwy. 97 corridor traffic. Examples include travel on Hwy. 20: there is no way for trucks to bypass Bend when heading from Western OR to ID and beyond. Trucks must turn at Greenwood and 3rd, one of the busiest intersections in the City and County. Similarly trucks coming from the south, must turn right at that intersection. The Parkway will definitely not deal with this problem, and the TSP fails to address it. I think people fear that what has happened on Knott Rd. will happen to Empire when it is extended to 27th. These roads are all part of an effective network of arterials, but I don't see how they can be substituted for a state highway bypass around Bend. The problems will only get worse as Bend grows and it will affect the livability of the Bend area. I believe state, county, and city planners need to work on these areas to have a comprehensive plan, • even if there is not a current way to fund it. I hope these comments are useful and appreciate your work on this much needed planning effort. Sincerely, Y44"__ N. Toby Scott 63390 Overtree Rd. Bend, OR 97701 Exhibit Page of N bS Ordinance 0 -'01 M _. 0 Page 2 o- 16 9 1 3 9 36ap IUEp David M. Ghormley P.O. Box 3534 Sunriver, Oregon 97707 January 23, 1998 Mr. Steve Jorgensen, Senior Planner, Deschutes County Community Development Dept. 117 NW Lafayette Ave Bend, Or, 97701 Re: Comments on Proposed Transportation System Plan Dear Steve: Last night I was in the audience when you presented your draft traffic plan to the Planning Commission. I made some comments during the public portion of the evening. This letter is sent to document those comments. First, we are concerned overall that you stated that you felt that the main growth within the county in the next 20 years will be in the South end of the county and yet most of the detailed planning presented in the plan dealt with other areas. There is no • conceptual discussion of how you will handle the increase in traffic occasioned by this growth in the South other than improving the existing system, and there is no specific detail of how you would spend money on this existing system and when it will be spent. Are we to assume that non -visualized but desirable additions to the existing system and/or specific details of how to improve the existing system will be added to this basic document when, as, and if the need develops? Is there an orderly plan visualized to update this document as such needs emerge? If so, on what schedule? You stated that the figure presented for an interchange at the intersection of Century Dr. and Hiway 97 of $1,181,954 was the County's share of total costs. Is this correct. You also indicated that all costs presented elsewhere in the report are also the portion to be paid for by the county. Is this correct? You did not include any budget for the conversion of the road system from the beginnings of Spring River Road to Mount Bachelor (a portion of which is known as USFS Road #45) to county standards for county acceptance and maintenance. There was a discussion of this by Mrs. Swearingen, and you indicated that this project and its cost should be included in the plan. We concur. I commented that the County Commissioners had modified the Urban Unincorporated Community plan recently adopted for Sunriver to include some changes in the allowed use of property in the Business Park. It is anticipated that this will require a substantial short-term expenditure on Century Dr. and elsewhere in .the "t Exhibit Page. N23 of Ordinance 0-00 169 ~ 1394 area to accommodate a big increase in traffic and in dealing with egress and ingress from the area onto Century Dr. before if can be considered safe to expand the use of . the Business Park. There has not yet been any specific planning for such improvements but we will be requesting such a study in the near future and your budget should include some figure for short-term modifications and improvements. Please feel free to call on our Association for any assistance and/or clarification. incerely David M. Ghormley Chairman, SROA Public Affairs Com. cc: Commissioner Linda Swearingen Tom Gunn, President, SROA Board Exhibit Q Page N 2-4_ of IIJ5 Ordinance U- oK4 • • 169 a 1395 Robert G Shaw & Ginger Durdan-Shaw PO Boz 2147 Indian Ford Ranch Sisters, OR 97759 549-1318 fax 549-4284 To: Deschutes County Planning Commissioners cc: Steve Jorgensen Delivered to Fax # 541-385-1764 on January 22, 1998 RE: Draft TSP /Airports Dear Commissioners, Attached, please find my letter dated April 27, 1997 to Clifton Clemens, operator of Sisters Eagle Air. Also attached, please review the five letters written by locals who reside in or near the northeast flight path of the Sisters runway. Numerous discussions and meetings have taken place with high level Oregon Dept. of Transportation, Aeronautics members in an attempt to reclassify the current status of the runway from "Privately owned, Public use" to the more appropriate classification of "Privately owned, Private use". The Sisters runway was originally developed as a low-key facility designed to serve the recre- ational needs of a few local pilots. Today its primary use continues as a recreational airstrip for an expanded group of local pilots and as a tourist "lunch port" for pilots on sightseeing outings. Over the past few years numerous accidents have occurred in close proximity to the runway and others resulting in loss of life have taken place amongst homes in residential neighborhoods di- rectly surrounding the facility. Increased conflicts with a growing residential and commercial population surrounding the runway are the result of near -misses with homes and excessive noise from low level take -offs usually perpetuated by non -local or "transient pilots" who are unfamiliar with safety issues peculiar to our topography and climatic conditions. Many residents and pilots alike agree that the airstrip should be utilized only by local pilots and their invited guests, by lifellight and other emergency aircraft whose pilots understand the chal- lenges of density altitude and serious crosswinds affecting the safe and prudent use of this facil- ity. It is essentially an unregulated, unlit and unsafe airstrip which has never been and should not be construed as an essential air link or important transportation element such as the Redmond, Bend or Sunriver improved airports. The draft TSP as it applies to Airports may in fact make sense for the larger, improved Bend, Redmond, Sunriver airports however, it has no relevancy to the Sisters runway. More restrictive land use regulations now being promoted by the state aero- nautics officials are essentially designed to "clock -up" lands surrounding the runway in an effort to guarantee the continuance and public access to this private facility. Il u Exhibit Page N 257 .. of 0657 Ordinance 4 i3- o `l 169 M 1 396 Table 5.5.T1 should be deleted from the TSP as it differs substantially from the adopted Sisters Comp. Plan and may require amendments for any further development within the proposed ex- panded overlay zones. Is it fair to limit the economic viability of our last remaining residential and commercial property in order to unnecessarily expand overlay zones already sufficient to ac- commodate the clear air space needs of our runway? There is a limited supply of residential and commercial property available for development in our growing community. The guidelines as proposed will effectively down -zone much of our essential development land needed to accommodate our businesses, parks, churches and residences. We urge you not to lump the Sisters runway in with this transportation plan which is designed to protect and embellish the use of commercial airports. Sincerely, ^ �� Robert Shaw & Ginger Dur -Shaw Exhibit Page N Z6. of N 6 S Ordinance 91-n-44. • • High Meadow Ranch 169 69445 Deer Ridge Road P.O.Box 2147 Sisters, OR 97759 (541) 549-1318 Clifton Clemens David Clemens Sisters Eagle Air P.O. Box Sisters, OR 97759 April 29, 1997 Dear Gentlemen, 13 9`? Ginger and I wish to thank you for spending time with us yesterday at our office. Naturally we were disappointed that Betsy Johnson of the Aeronautics Division. could not join us, although she and Gerald Eames have both been most helpful and are always available by telephone. As we progress from here, I have the sense that everyone is pretty much on the same wavelength, hopefully paving the way for a quick resolution which not only addresses the safety concerns of the neighbourhood but also helps insure the future of the airfield for the benefit of our local pilots. To recap the reason for our meeting and its possible outcome, I offer the following notes for your consideration and comments. Please don't hesitate to correct any statements with which you do not agree or feel are materially incorrect. My sincere hope is to promote a continuing dialogue which is open, honest, and useful in building agreement between us. I suppose we could begin at the origins of the airport though this would seem repetitive. I believe however, that it would be safe to say that the runway came into existence for purely recreational and / or agricultural reasons. Over the years it would seem as though this has been the primary reason for its presence and improvement, not withstanding the more recent employment in support of fire fighting efforts and other emergency needs. You stated to me yesterday that approximately 15 local pilots base their aircraft adjacent to the runway although that number varies at any given time. We also discussed the efforts by the state in 1994 to rezone the runway environment and surrounding properties in an effort to solidify, perpetuate and perhaps even expand the airport from its original design as a personal use / recreational facility. It;was obvious to all involved at that time that significant opposition from neighbouring property owners was gathering steam to thwart any efforts to rezone or expand the runway's future beyond its historic, somewhat "low-key" use by local pilots and occasional visitors. It is crystal clear to me that among my neighbours, this very pervasive attitude continues to exist today - that is to say many of us are adamantly opposed to any state legislation or local zoning efforts which would in any way restrict or jeopardise the use of our properties surrounding the runway or which would increase the utilization of the runway for recreational or any other related aircraft uses. I have a rather large file containing numerous letters, documents and articles from individuals in the community who at that time, and now, are willing to tale any and all steps necessary to stop the Aeronautics Division, local government or any individual or group from rezoning the airport, approach zones and surrounding properties to facilitate a greater intensity or frequency of aircraft activity. w Exhibit � Page NZ7 of N65' Ordinance qg-DO 169 ~ 1398 With that said, I again wish to restate why I, and others in our neighbourhood, are deeply concerned over the current patterns of use of the airport environment. I gave to you yesterday • numerous letters from surrounding property owners at the North end of the airfield who, like myself, have observed potentially dangerous `hear misses" between aircraft and real property, expressed concerns over aircraft noise and even a few who were on the scene of an accident about one hundred yards from my kitchen that claimed the lives of three people and narrowly missed destroying a home and killing its occupants. Many of our concerned neighbours are pilots who have had the opportunity to utilize your runway and facilities and who believe the combination of altitude, topography to the North, and cross winds makes the Sisters airport a challenge for even experienced pilots and especially challenging for transient pilots unfamiliar with our local conditions. It is that group of "non -local" pilots who concern us the most. They have been responsible -for at least three accidents in about as many years, two of which involved instructors who either exhibited poor judgement or simply didn't understand the demands of our airport. As we discussed yesterday, I have personally observed pilots struggling to clear the hill and trees at the runway's north end. Too many choose between banking to the northwest and skirting the tops of three or four homes to avoid the very real possibility of not being able to clear the hill. You are now aware that one of those endangered homes is mine and that I am deeply concerned about the safety of my family and property. It is for these reasons that I implore you to consider changing the status of the runway fiom its current designation of "privately operated/ open to the public" to a "private / personal use" classification which will effectively minimize uninvited, unknowledgeable and potentially dangerous pilots from using your facilities. In the process we hope that you can, as well, is disseminate information to local and "invited" pilots concerning airport safety and protocol issues, ie., not flying low over homes, no night usc, cross winds, density altitude, etc. I realize that this step in itself will not insure ultimate safety for nearby property owners, but it should go a long way towards mitigating many of our concerns. While we met in my office yesterday, we also had an opportunity to place an open conference call to Gerald Eames, Manager, Air Operations for the State Aeronautics Division. Mr. Eames expertly answered all of our questions and I think belayed many of your concerns over "public" vs "personal" use issues. I have had the opportunity to speak with Mr. Eames before and have found him to be extremely down-to-earth, sensitive to the needs of the airport operator as well as those people such as myself who'express concerns over operational safety. Let me recap my understanding of the public vs personal use conversation with Mr. Eames yesterday - please correct any errors or omissions. rl Q: Why change the status / designation of the Sisters Airport from "private / open to the public' to "private / personal use"'? A: To limit the number of uninvited and perhaps `unfamiliar" pilots who currently use the airport - with an eye to lessoning peak summer season use and its impact on nearby residential neighbourhoods while at the same time improving airport safely through dissemination of information. • Exhibit Page of ,V.6 S Ordinance_ _ fl -OM .1 69 - 1399 #2 Q: How would Sisters Eagle Air go about changing the current `open to the pulbic" • status to a "personal use" status? A: Make a written request to the Aeronautics Division. 03 Q: How long would it take to "get the word out" to transient pilots that the airport was now restricted requiring an invitation to land? A: Maybe 6 months to a year, however notice can be sent immediately to the FAA and other flight service groups. #4 Q: Who would be able to use the Sisters airport if this change were made? A: Locally based aircraft and their invited guests. #S Q: Would this status change affect emergency uses such as fire, life flight or emergency landing? A: No, all current emergency uses could continue. #6 Q: Would the proposed status change affect the airport operators liability in any way? A: Most likely it would. Corporate and personal liability for accidents should be reduced (except in cases involving gross negligence) with the distinct possibility of a reduction in liability insurance premiums. I think it would be advisable for Sisters Eagle Air to seek counsel on these issues. #7 Q: Could the recently proposed legislation SB 1131 and its proposed revision affect the Sisters Airport and surrounding properties? A: Yes, although due to numerous changes in the works it is unclear how. Betsy Johnson has promised to send me a copy of the bill and revisions for review and comment. So what happens next? It is my sincere hope that you will agree to take the steps necessary to increase the safety of airport operations by changing the designation to personal use before the summer season is upon us. I will offer my time, if desired, to assist in the creation and dissemination of safety / protocol literature to pilots, local as well as invited. Additionally, I could work with the Aeronautics Division and FAA to expedite the flow of information to General Aviation resource groups concerning the proposed changes and modified procedures. In short i want to be your ally, not your adversary. Please let me know your thoughts as soon as possible. Sincerely, Robert C. Shaw cc: Betsy Johnson, Aeronautics Division Gerald Eames, Aeronautics Division Thomas Highland, Aeronautics Division Brian Harrington, Deschutes County • Exhibit Page N z 9 of N 6 S Ordinance g8 -a44 169 M 1400 Keith Crimin, FAA James Goodwin Alfred Goodwin Robert and Karlene Dickey Martin French Lawrence Meek Pat and Bob Hoberg Bob Burke . Gustav Wendland Exhibit Page N 3a of Vis_,_ Ordinance Is • • Betsey Johnson. _ Oregon Depc of.Transportation,Aeronautics Dear Betsey, My family and I have just moved to the Indian Ford Meadows neighborhood in the last few months. My wife, my two young children and I have found the area tube a wonderful mix of quiet surroundings and a concerned & thoughtful community Before making.the final decision to buy our home, l investigated the•concems of the local airstrip, specifically the accident that occurred a year or so ago. The general body of information•I received was that the airstrip.. _ if used.respvnsibly was nota reason to -avoid this neighborhood. Since we have.moved in.I have experiehced numerous inadents of pilots flying.just above -the tree tops around mry home and generally showing Bede or no respect for the families who five in this commuhity. , The need;for the'local airstrip. is 'indeed an important part of the Sisters area, for both safety and recreational ' reasons. However, if the airstrip is not used responsibly, icwill ruin a very strong'an`d• established area 6 - families aid Individuals who are committed - to this unique and beautiful part of Oregon. I would urge you to consider the Sisters airstrip be.zoned for private -use only. This approach seems to be • a fair and responsible balance to the issues that must be addressed.. It seems to me that the accidents that have already occurred should be reason enough to take action, and if nothing changes, more accidents ars , bound to' h en• ' The members of the Indian Ford Meadows neighborhood. are committed to making this situation work for. all those concerned, but I hope you would agree with the thought that the safety of the people_ living in this. community Is most important, and your support of that is greatly appreciated_ Thank you for your -time- Sincerely, -------------------- Martin French 6942S D&GR 0.iOCF RD. SISTERS. CREGON 97759 P S41 549.9969 f W $410680 MrRENCI4@0UTLAWNCT.COM Exhibit Page N 31 of IV b S Ordinance QQ -044 CASCADE MICROWAVE COMMUNICATIONS P.O. Box 972 102 E. Main St., Ste. A Sisters, OR 97759 (541) 549-1459 April 15, 1997 Betsey Johnson, Director Oregon Depawnent of Aeronautics Salem, OR Dear Ms. johnsom 169 - 1402- My 402 My wife and 1 have resided on Deer Ridge Road in S6w=. Oregon wWc6 is located across from and just north of the Sisters Aatporr, for eight years new. In the past three or four years we have noticed a definite increase in air traffic during the steamer wad fall months and have also witnessed two asshea - one of which rrsulted in the death of three people (the plane crashed ;a the 6=kyard of home located 2 lots away from us). We have also wx .jxd as pLrmr have bunny Weed above the trees during take -off. This anatase in air traffic is not curly potentially dangerous to home ovaria. but noisy as weA. IL is our undenstand int that Robert Shaw, one of our neighbors, will be meeting with you later this nzonrh to discuss the possibility of changing the status of she Sisters airport from the utrratr public use designation to a *,private use facility_ We support this change wholeheartedly and appreciaw your considemtion in this matter Thank you. dgwu-,kg I-awtence D. Mwk API; -16-97 TIED 9:10 AM Exhibit - B Page N3Z Of NG5 Ordinance 98-&iq 4�� 541 549 1420 P. 1 • • • April 22, 1997 Ms. Betsy Johnson, Director O gbri'Department 6f Aetcnauttcs Salem, flr Dear Ms. Johnson, Vire, live at'69293 Big View Drive in Sisters, Or. Our property is located near the 'North end afthe Sisters -airport runway. In the past seven years since we have lived at that location we have witnessed many interesting and dangerous incidents. We often see airplanes land at night, wait after it is dark an the ground. One genius -even-had his wife park a car an the runway so he could see to land by the car's lights. You know about the accidents, -but you just have to see the near misses before • You would believe them all. Many plots don't seem to pay any attention to the landing and take -off patterns as shown an the maps. When an airplane tapes off to the North and makes -a right turn at or before the end of the runway they really have it struggle. Sometimes that is true even if they seemingly -have plenty of power. But as you know, a lot of those airplanes have power problems with the air density an warm days I see a lot -of lawsuits waiting to happen -because there don't seem to be nay rules for use of the airport Sincerely, 1. Samuel J. Goodwin P.O. Box 1451 Sisters, Or. 97759 541-549-4606 Exhibit J Page 3'_ of Nos Ordinance q8- D 4 215 Cedar t P.O. Box 1451 • Sisters. OR 97159 . _ . (5411 549-4606 1 Fax - [5411549.4426 1 1-800-916-0002 169 1404 Robert R. and Karlone N. Dickey 62028 Fall Creek Loop • Bend, Oregon 97702 Tel: S41 -317-S 16 S Electronic Mail: Kdickey@empnet.com Ms. Betsey Johnson Director of the Oregon Department of Aeronautics Salem, Oregon Dear Ms. Johnson: We have recently purchased a home at 69311 Big View Drive in Sisters, Oregon and will be moving in shortly. The home is on the slope at the end of the Sisters airport runway. We had some concern about airport noise at the time we purchased, but felt it would 'probably be minimal and mostly in the summer day time. Since then we have learned that in the summer there is considerable traffic, much of which is generated by "sightseers," which leads not only to much increased noise; but also, we understand. has led to several of the recent accidents, due to the special conditions of the Sisters airport. We have discussed this with our neighbor, Robert Shaw, as well as another Sisters resident, Joel Premselaar, who keeps a plane at the airport. They both strongly support the classifying of the airport as a private use facility, which would meet the needs of local resident pilots, invited guests of Sisters residents, and emergency (fire and medical) use. We concur stronly in this view and wish to add our support to this solution to a presently • dangerous situation. We appreciate your interest and concern in this matter. Sincerely yours, 0 - Exhibit D page N34_ of L5.' Ordinance —4L -e-44 169 -'1405 a 9Z90 9ZZ HS WY cZ:L il�GM LS-7I—Hy < a►�i�T� 1 , 0 , . 11 N Exhibit � Page 3 S of 6 s Ordinance Qa' l,yy %nnQ� HINV XnO3 ?1Fi lTU AZ90 9Z7 Y09.9 29:90 Lb!vflt0 • • • Form 734-2249B (2-97) 169 - 1406 Jan. 22, 1998 Deschutes County Planning Commission 1130 NW Harriman DEPARTMENT OF TRANSPORTATION Bend, OR 97701 Region 4 Program And Planning Unit RE: Comments on draft Deschutes County Transportation System Plan (12/22/97 version) FILE CODE: The Oregon Department of Transportation (ODOT) has reviewed the draft document and compliments the county for a very thorough document. This plan is extremely critical to both the state and the county to ensure a balanced transportation system capable of handling the mobility needs of Central Oregon for the next 20 years. We submit the following comments and recommendations for inclusion into the final edition. On page 21, Table 2. LT3 lists several projects in the Statewide Transportation Improvement Plan for program year 2002. No funding has been identified for these projects and we would suggest modifying the table to indicate that and revising the total cost figure accordingly. On page 130, revise Policy 1.2 to read Deschutes County will notify ODOT "when a land use would add 100 ADT or more to a highway or intersection." We would also like to work with the county on the distance component of notification. Further, we would encourage the addition of language either in the TSP or its implementing ordinances to say a land use application must include a Traffic Impact Analysis (TIA) study to be determined to be complete. For Policy 1.4, expand it to include "state transportation plans, including the Oregon Transportation Plan, modal plans, and corridor plans." On Page 131, questions remain about what types of transportation projects would require a conditional use permit (CUP) from the county. We would be willing to work with county staff to identify those and to identify transportation projects that could be an outright permitted use. Do projects identified in TSP's require CUP's or comprehensive plan amendments or will they be outright permitted uses? We suggest the latter. On Page 135, under 5.2.2, add final sentence "No signals are appropriate on state highways outside of Urban Growth Boundaries, Terrebonne, or La Pine. Instead, as interchanges develop safety or operational problems, they either will be grade -separated, restricted, or closed where there is reasonable alternate access." We would also like to integrate the projects labeled "ODOT projects" on Page 174 into the county's priority list. There also needs to be a treatment of cost -shares between ODOT and the county. We are encouraged by the document's proposal for rural system development charges, which will assist in private development paying a fair share of the costs, reducing the taxpayers' burden for warranted improvements. I'd also like the public record to be held open for a week so we may submit any additional comments we feel are necessary. Overall, we are impressed with the quality and comprehensiveness of this effort. Thank i M, Peter Russell Senior Development and Review Planner 63034 O.B. Riley Road Bend, OR 97701 Y, �l Exhibit — 13 Paged of Nbs Ord+nanne 41- 00 63034 O. B. Riley Rd. Bend, OR 97701 (541)388-6032 FAX (541) 385-0476 0 L? O. Box 1508 • Sisters, Oregon 97759 January 22, 1998 169 - 1407 Affiliate of 1000 Friends of Oregon (541) 549-1117/548-6544 - Deschutes County Planning Commission Public Hearing - Draft Deschutes County Transportation System Plan I'm Howard Paine representing the Alliance for Responsible Land Use in Deschutes County. We endorse the Transportation Finance Plan proposal for countywide System Development Charges (SDCs) as described on pages 180 & 181 of the Draft TSP. This should be given high priority and implemented ASAP. Much of the increased traffic on county roads is the direct result of growth. SDCs are an equitable way for new developments to pay for capital improvements needed to accommodate growth. In the past county residents have been subsidizing the cost of growth. • As a related matter, again we emphasize our objection to Bend's UGB expansion for -an industrial park on the north side. This unneeded industrial park would generate heavy truck traffic causing additional expense to the county to maintain Cooley Road and Deschutes Market Road. Thank you for this opportunity to comment. .Howard. Paine Board Members Chairman Bill Borer Bruce Bishop '-arrie Caramella .ancy Hall Howard Paine Ernie Poole Suzanne Smither M Exhibit Page N37 of N65 Ordinance q8 -W The Alliance for Responsible Land Use in Deschutes County _ 169 - 1408 Is 1/22/97 Theodore L. Eady 18208 Hwy 126 Sisters, Or 97759 Please accepted the following document into the record for the public meeting on the Deschutes County draft TSP. I am a resident of Deschutes County and own real property that is impacted by the proposed Airport zones on my land. The TSP as proposed will not promote public safety only create the allusion which will enable an unsafe situation.to get worse. There will be more loss of life at the Sisters airport unless the county corrects the defects of the runway and forces the private owner of the airport to operate the airport to FAA guidelines for the 1:20 departure slope to the North East and the arrival and departure slope to the South west through Camp Polk Road. This airport the last thirty years has been used a an affluent few that have had the State Aeronautics place there interest above the interest of the community as a whole. The Dolan Vs. Tigard supreme court decision has mandated that a governmental authority compensate individual property owners when there development rights are taken. State law requires that local jurisdiction attempt to mitigate before regulation in the approach areas and neither has been done. Below you will find a history of the Sisters airport, language from the 11/94 Oregon Land Use Compatibility Guidelines, analysis of the TSP as it relates to Sisters Airport and my findings of fact. Regards Theodore L EAdy Sister Airport History In 1967 Harold Barclay deeded to the State Aeronautics a portion of the land for Barclay Field. The deed was recorded in book 154 page 14. At the same time Harold Barclay recorded an option to purchase back from the state the lands he deeded (154-237). When the state agreed to receive the airport it was a patch of two barren dirt runways. One runway was listed as the East West runway and was owned by Harold Barclay. The other runway was laid out in a Northeast - Southwest pattern. The deeded land for this runway, the NE -SW runway, terminated at the section line between section 4 and 33. The land in section 33 was owned by the developers of the Indian Ford Exhibit Wednesday, January 21, 1998 page N 38 of N65 Page 1 Ordinance 4g' 044 169 _ 1 409 Meadows recreation homes. The owners of the land in section 33 operated a guest ranch and where in the process of subdividing the vast area north of the town of Sisters for recreation home sites. The Indian Ford land company gave the state of Oregon Aeronautics a ten year lease on that portion of the runway. At the ends of the runways the state retained easements for clear zones ( RPZ ). These clear zones were documented in the lease agreement in Book 152 Page 179-182. Both the clear zones located on the western side of the runways were located over Camp Polk Road. In the engineering document prepared by Boatright Engineering of Salem the ends of the runway, the beginning of the clear zone and the 1:20 slopes required for departure and arrival, were documented to be 588 feet east of Camp Polk Road for the NE -SW runway. The Boatright engineering document stated that the clear zones would provide for 16 feet of height through Camp Polk Road. Prior to the state acquiring the airport they had decided to pave the runway. It was to be done with rock from Indian Ford Ranch and the help of some of Harold Barclays equipment. In May of 1967 the asphalt was applied to the NE -SW runway. In the files reviewed at the State Aeronautics Division there was no documentation of how the airport was laid out our sited. It appears that the airport was originally laid out in the late forty's. A document in the file stated the airport runway was built to state standards which did not require a 7 : 1 transitional surface on either side of the runway. In the files it was noted in July of 1972 " Sisters State Airport, Highway and Fence obstruct approach from west." In these files were also a number of letters which advised the state that the prevailing cross winds created an unsafe situation for the usage of the NE -SW runway and that the state needed to pave the east west runway to offer pilots a safe alternative for landing and take off during the windy times. In October 1971 Harold Barclay sold the majority of his land holdings known as the Barclay Ranch to Brooks Resources. The land sold to Brooks included the land around the current airport on both sides of Camp Polk Road towards the city of Sisters and include the lands of Trapper Point Subdivision and the airport lots at and above Barclay Meadows. This transaction was documented in Volume 180 Page 97. Brooks Resources exercised the option for the airport 2/21/78 and purchased the airport form the state for $100.00. In that deed, Volume 271, page 814, the state stated that" The property herein conveyed is no longer useful by Grantor for state airport purpose." At this point the lease had expired on the other portion o f the runway located in section 33. In July of 1978 Brooks resources sold a portion of the EW runway to Cliff Clemons after the plat of Barclay Meadows subdivision. In 1979 Sisters and Deschutes County adopted the Sisters Urban Area Comprehensive Plan (SUACP). In that plan it showed the existing land use for the airport terminating at the end of section 4. At that time the owners of the land in section 33 were preparing plans for a site plan for what was proposed to be a condominium and 150 seat restaurant Lake Village Condominium project. During this time period the Indian Ford Home owner association announced it would close the section of the airport in section 33. For this reason it was not shown in the adopted maps of the SUACP. Some time in 1980 Indian Ford Home Owners Association applied for a site plan for the Lake Village Condominium project. In July of 1.981 , Volume 344 Page 211, Wednesday, January 21, 1998 Exhibit ' 3 Page 2 Page_ of ubS Ordinance �� 169 - 1410 Deschutes county and the Developers recorded a Development Plan Agreement - Site Plans for the project which was to remove the northern 1100 feet of the runway. In May of 1982 Brooks sold to Sisters Eagle Air the NE- SE Runway located in section 4. In the deed for that portion of the runway it listed a number of conditions . Condition two prohibited the airport from being used for gliders, glider tow planes, parachute jumping or recreational vehicles and for the airport to be used only for general aviation use by power aircraft ( V 357-b552 ) . In may of 1985 the remaining partners of Indian Ford Meadow gave the rest of the airport runway to Sisters Eagle Air after the condominium project had be given up due to the high interest rates and poor economy of the early eighties. In that deed Book 96 page 1003, the same restrictions of the Brook's deed were found as it related to gliders. In this deed air shows or acrobatic flying was prohibited. Condition three mandated that " The property and the Sisters Airport use shall conform to all applicable laws and regulation of all governmental authorities. In the recent past there have been two accidents at the Sisters Airport and a number of fatalities. In September,of - 1991 three people died in an accident during takeoff. In August of 1996 two people were injured taking off In interviews with pilots that do not have a vested interest in the airport it is reported that the airport is extremely unsafe in the summer with dangerous cross winds and the obstructions in the air space to the east of the airport. I have been told that there have been quite a few accidents at this airport for as few flights that it has. The cause for the last two is altitude density in the summer heat which reduces the effect of the airplane's lift [� capabilities. In discussions with the Redmond Airport which is reporting 48,000 occurrence a year they report no fatalities. Finding: The Sisters Airport never underwent a process of being properly sited. It appears that it was laid out with no surveying for obstructions or with regard to the safety of the community. This was further aggravated by the state when they took over the airport and permitted it to be used even though it's own engineering firm document the ridge which creates an obstruction to the airspace. When the state paved the runway they showed the runway stopping 588 feet east of Camp Polk Road which would have been a 3000 foot runway instead of the 3550 feet at indicated by state Aeronautics. The airport is not safe now and has never been safe. It is the responsibility of the local government which controls land use decisions to mandate measures which will protect the users of the airport and those on the ground. Camp Polk Road has been in its present location for over a hundred years, well before general aviation was expanded to include the Sisters Airport. The primary cause of the last two accidents, which killed three people, is the pilots not having an unobstructed 1:20 departure slope to the east due to the ridge and trees. If the airports runway length was pulled back to meet the federal guidelines this safety problem would be corrected and visiting pilots would not be planning on using a 3,550 foot runway which acts like a 3,000 foot runway once on the ground. The pervious owner, Brooks Resources, dismantled the east west runway when they • began developing home sites in the Barclay Meadows subdivision. The other owner of the remainder of the runway, Indian Ford Meadow developed home sites in the 3600 acres of Wednesday, January 21, 1998 Exhibit V Page 3 Page ..M qb of N I S Ordinance 9A -- boy 169 - 1 411 the former Indian Ford Ranch and applied and received approval to remove the runway. In I979 when the current comprehensive plan was passed the airport was shown to be less than 2500 feet. The deeds giving the airport to the current operator even restrict the type of use at the airport. This was done by the developers of the home sites to make sure the airport did not cause conflicts and hazards with- the subdivision they had created. The previous owners of the airport saw it as a tool to bring in wealthy people to purchase their vacation properties. If the county had built an unsafe bridge in thirty years ago would they continue to let the public use it because it was there. No ! For public safety they would either fix the bridge or close it. The county needs to make sure the airport is safe. The previous owners have required the airport operator to by the deed; "The property and the Sisters Airport use shall conform to all applicable laws and regulation of all governmental authorities." The county has been given authority by this deed to make the airport safe. November 1994 Page 2 Oregon Land Use Compatibility Guidelines The Promotion of compatible land uses around an airport must be accomplished at the local level since local governments have the authority to direct land use development. Finding: The local government have the authority to direct land use development not the FAA or State Of Oregon Aeronautics Division. The Oregon Department of Transpiration, Aeronautics Section strongly recommends that each community with a public use airport consider implementing actions described in these Guidelines to preserve their aviation facility and to protect their community. Finding: The airport compatibility guidelines are only recommendations not O '0 m requirements. The ODOTAD strongly recommends only that the communities a cc =. consider implementing actions described in the guidelines. Each airport is CD a different. Each community- is different. Because of this the state does not mandate 0 the implementation of these guidelines but recommends that each community m consider implementing them based on their situation. These guidelines are suppose to be designed to protect the community not take away a property owners property 2. rights. OAR- 660 -div 13 only mandates that local government prohibit residential s development and public assembly uses within the RPZ. a - The Oregon Transportation Plan is Part of an ongoing transportation planning process that is overseen by the Oregon Department of Transportation. Page 3 Wednesday, January 21, 1998 Page 4 169 1412 The State Agency Coordination Agreement between ODOT and the Land Conservation and Development Commission LCDC requires that State Transportation facility plans be compatible with acknowledged comprehensive plans. Finding: State Transportation facility plans must be compatible with acknowledged comprehensive plans. The Sisters Urban Area Comprehensive plan is an acknowledged comprehensive plan. Aeronautics reviewed the plan during the last periodic review ending in 1994 which resulted in the adoption of an airport overlay zone. Any changes that the TSP or Aeronautics wishes to impose on the Sisters Urban Area must be compatible with that plan. The plan was passed in 1979. In that pian it listed this portion of the Barclay Ranch to have a park. Page 45 of that plan states " The area north of the city has ceased to operate as a viable economic unit and is somewhat fragmented by the- airport and lesser private holdings. Taking into account gravity sewer service and a general land slope to the northeast, this area provided an opportunity for orderly community expansion in this area in the future." Page 74 said that a Airport master plan should be developed for Barclay Field which will govern airport related activities and prescribed development standards for surrounding development compatible with air approach criteria. To date the airport sponsor has not brought forward a airport master plan to govern the airport related activities. The City of Sisters has implemented an airport overlay zone. Page 84 List the Non-buidable lands list the lands not buildable in the Sisters Urban Growth Boundary and non of the lands under the approach surface are listed as non buildable. The implementing of restriction will be a takings of property rights. Page 92 list the irrigated grazing land as urban reserve areas which would be retained for limited agricultural use until at least 75% of the city is developed first. Page 93. Policy 3 & 4. " In order to assure the economic provisions and utilization of future public facilities and services, the present city shall develop to 75 % capacity before expanding into the " urban reserve" areas." The city has reached 75 % capacity and these urban reserve lands are now given- developmental priority. Any restriction placed on these- lands by the county or city to limit development will be a takings of private property rights. Policy 4. Marginal agricultural landswithin the urban growth boundary shall be classified as urban reserve, to be used for limited agricultural purposes until such time as other non-agricutural land develop first or until a demonstrated public need, consistent with these polices, can be shown to exist. These land zoned UAR-10 • are urbanizable and meet to be developed at urban densities. Any restriction to it Wednesday, January 21, 1998 Exhibit Page 5 Page N 4 Z of 96 5 Ordinance —Rt' -1644 169 - 1413 limit the development of these lands will not be in compliance with the SUACP and a violation of the state agency coordination agreement. 0 Page 123 Urban Reserve: Those rural open lands lying immediately adjacent to the city limits that are needed for eventual urban expansion before the year 2000 but not until at least 75% of the present (1979r city limits has developed. By definitions the UAR lands in the approach surface are needed for eventual urban expansion. To limit the level of urbanization of these lands is a violation of the SUACP and a violation of the state agency coordination agreement and a takings under the U.S. Constitution. Urbanizable Lands: Are those lands within the urban growth boundaries and which can be served by urban services and facilities and which are necessary and suitable for future expansion of an urban area. These land are served by urban services and facilities and are necessary and suitable for urbanization. Any restriction placed on the use of these land will is not compatible with the SUACP. Page 82 of the Deschutes county plan list as goal 1 of transportation. To provide a balanced, safe, efficient and integrated transportation system which reflect environmental, economic and social considerations. Finding: The draft TSP does not provide a safe transportation system as it relates to , the Sisters Airport and Camp Polk Road. The Aeronautics Section first developed and issued guidelines for planning for compatible land use in the airport environs in 1978. An airport Land Use Compatibility Guidelines document was prepared in 1978 and updated in 1981. This document serves as an update to those earlier land use compatibility guidelines. The OTP calls for the development of a Transportation Safety/ Action Plan which addresses land use in the aviation environs with the goal being to reduce fatalities, injury and property damage. p -v m Q. cQ � The purpose stated above is for the development of a TSP which address land use in CD a the aviation environs with the goal being to reduce fatalities, injury and property 0 r damage. The paved airport runway as we know it today was the result of the funds allocated by the State Board of Aeronautics. When the state took over the airport in IV6 1967 they Established clear zones torreduce fatalities, injury and property damage. coo h When they did this they established the beginning of the clear zone, now known as the RPZ, as being 588' north east of camp Polk road. They did that to insure that L a 1 : 20 slope was maintained from the end of the runway through Camp Polk Road. This is illustrated in the attachment coped from the Official Records of Deschutes county book 152 page 182. After review of a copy of this document Wednesday, January 21, 1998 Page 6 Page 4 169 r 1414 prepared by Boatright engineering in 1967 for Aeronautics it was determined that this distance was to provide for the unobstructed passage of a 16' high vehicle in Camp Polk Road. This was to reduce fatalities, injury and property damage. The owner of the private airport and the state supplied the city and county with information which has resulted in the airport primary surface leaving the airport land and crossing into Camp Polk Road. This new RPZ does not provide for safety on the ground because it promotes the use of more runway than is clearly safe to use. The state knew in 1967 that the clear zone should end 588' away from Camp Polk Road. There is no justification for the RPZto be listed as beginning on the west side of Camp Polk Road. To insure public safety -a new threshold needs to be established and a new RPZ located east of Camp Polk Road that will insure an unobstructed 1 : 20 slope for arriving and departing aircraft above Camp Polk Road. The current RPZ violates FAA guidelines and does not serve to protect the safety of the public only, take away property- rights of adjacent property owners to the exclusive benefit of another private individual, the airport owner. The purpose of this report is to provide information to increase compatibility land use in the airport environs. This document is intended to be an informational resource for planners and local officials regarding airport land use compatibility. Finding: The Oregon Airport Land Use Compatibility Guidelines, 1.1/94, are Designed to provide information and are not regulations or administrative rules. They are intended to be a informational resources for local and regional officials. If we read the document in its entirety it tells us on page 21 " The responsibility for determining the acceptable and permissible land uses and relationship between specific properties and FAA Safety Zone and Part 77 surfaces rest with the local authorities. These determinations under are not intended to substitute state, locally, or federally determined land uses for those determined to be appropriate by local authorities in response to locally determined needs and values in achieving compatible land uses." Federal Aviation Regulation ( Far) Part 77 and Federal Aviation (FAA) airport design specify airport airspace requirements to maintain safety in the airport environs. Land use controls and height zoning measures that can be used to promote safety around an airport are identifies in this report. Finding: The 1 : 20 slope from the end of a runway is described in FAR Part 77 and must be maintained to maintain safety in the airport environs. The including by the State Aeronautics of Camp Polk Road in the Primary Surface violates the regulation in FAR Part 77 and thus does not maintain safety in the airport environs. Wednesday, January 21, 1998 Exhibit Page 7 PageNU of N6 S Ordinance 'D Page 6 169 - 1415 A primary concern in achieving airport land use compatibility involves safety at and around an airport. It is important to identify those safety risks that are associated with air transportation in order to minimize the consequences of accident potential. Specific areas near airports are exposed to various levels of accident potential. Identifying and protecting these specific areas around an airport through effective land use controls is essential to ensuring the safe and efficient operation of an airport and in protecting the public from the impacts of a potential aircraft accident. Finding: A primary concern in achieving land use compatibility involves safety at and around an airport. The current draft TSP and Airport Overlay Zone do not achieve safety at the airport because of the inclusion of a major public road in the primarysurface. Both the airport overlay and the draft TSP have failed to identify the safety risk at the Sisters airport of having the aviation community use the North East to Southwest runway with out a clear zone that permits the safe travel of pedestrians and vehicles on a major public road. It is the responsibility of the local government to protect the safety of the public through the identification of the hazard that the airport places on the public with its use of Camp Polk Road. The local government has the responsibility through land use controls to protect the public road from the hazards to vehicles because of the invasion of the airplanes into the road and to ensure the safe and efficient operation of an airport. The NTSB maintains extensive data on air carrier and general aviation accidents and their causes. The most current data available are from 1990. The statistics presented in Table 1 show that, in 1990, 60 percent of all commercial aircraft accidents and 64.1 percent ( 40.00 landing and 24.10 takeoff) of all general aviation aircraft accidents occurred during the landing or takeoff portions of flight. The critical areas at an airport that need to be secured and protected from land use 0-0 cQ 3 compatibility standpoint include the approach paths and departure paths to the runways. a To enhance airport safety it is important to maintain obstruction -free airport i rt airspace and a reasonable amount of vacant land at both ends of each runway. m co o, Finding: The FAA guidelines state that the airspace must be obstruction free. It Z is not possible for the primary surface to be through a road because the road is X meant to have objects on it and this results in the penetrating of the 1 : 20 slope. More importantly 64.10% of accidents happen during the take off or landing which implies that there is a significant risk to the public that an accident will occur involving Camp Polk Road. Page 7 Wednesday, January 21, 1998 Page 8 n C7 169 - 1416 Data presented in table 2 indicate that commercial aviation accidents are most often. attributed to pilot error. Table 2 list the number one cause of General aviation as pilot, 1800 or 45.3%. Second was propulsion system \ controls with 486 or 12.20%. Next was weather at 485 12.20% and fourth was terrain at 454 or 11.40%. Fifth was object at 187 or 4.7% General aviation aircraft accident, however are often related to the terrain and obstructions surround an airport. in 1990, terrain ranked as the fourth leading factor associated with general aviation aircraft accidents. Conflicts with objects, such as trees and wires, ranked as the fifth leading factor associated with general aviation accidents. A pilots preoccupation with the terrain and structures immediately surrounding an airport can contribute to accidents. Structures in the approach path of a runway also contribute to aircraft accidents. Clearly for the safety of both air travelers and the general public, it is best to maintain obstruction -free airspace as part of compatible land use planning for the area around each airport. Finding: The risk of an accident at the Sisters Airport is increased by the potential distraction caused to the pilot by cars, school buses and other vehicles in the primary surface as described by the airport overlay zone and the TSP and the take off and landing thresholds must be returned to the 1967 level to protect the safety of both air travelers and the general public. Page 8 Page 9 Data compiled by the NTSB indicate that the largest number of aircraft accidents occur on airport property. With regard to general aviation aircraft accidents, data from the NTSB indicate that roughly 45 percent of all aircraft accidents occurred on airport property, while 15 percent occurred within one mile ofthe airport and 40 percent occurred beyond one mile of the airport. Considering the general aviation aircraft accidents. that occurred within one mile of the airport, 33 percent of these occurred within one-quarter mile of the airport, 29 percent occurred in the airport traffic pattern; the remaining 38 percent occurred within one mile of an airport. These data suggest that land use under the airport traffic pattern and within one-quarter mile of an airport should be considered, in addition to the land use off the approach ens to runways. Specific areas to be secured at and around an airport are defined by two major Federal Aviation Administration criteria: Federal Aviation Regulation ( Far) part 77- objects affecting Navigable Airspace and Safety zones; Safety Zones are defined by FAA airport design standards. While Far Part 778 Surfaces are designed to protect specific airspace areas, Safety Zones are designed to protect specific ground areas. In general, the term " surface" refers to an airspace area; the term "zone" refers to the land underlying the airspace area. Safety Wednesday, January 21, 1998 Exhibit Page 9 Page 0% of N65 Ordinance 58'n4y 169 ~ 1417 Zones are required by the FAA to be free of all object s except objects whose location are fixed by function. Accident data presented earlier reveals that most aircraft accidents occur during the landing or takeoff portion of flight. It is, therefore, important to protect the approach and departure ends of each runway. The RPZ is designed to protect the approach and departure ends of a runway. Finding: The purpose of the RPZ is to protect the approach and departure ends of a runway and the current RPZ in Sisters fails to do this because of the objects on the road. The road was established in the 1880's and was there before the airport. The TSP must acknowledge the road and restore the former clear zone (RPZ) to protect the public from the potential of an air accident. Page 13 Although the FAA can determine which structures are obstruction to air navigation, the FAA is not authorized to regulate tall structures. Under FAR Part 77, an aeronautical study can be undertaken by FAA to determine.whether the structure in question would be a hazard to air navigation. However, there is no specific authorization in any statues that permits FAA to limit structure heights or determine which structure should be lighted or marked. In fact, every aeronautical study determination, the FAA acknowledges that state or local authorities have control over the appropriate use of property beneath an airport's airspace. The State of Oregon exercises its authority to control obstruction to air navigation. Oregon Administrative Rule Chapter 738, Division 70 Physical Hazards to Air navigation ( OAR -738-70) authorizes the Aeronautics Section to adopt rules defining physical hazards to air navigation within the State of Oregon. These hazards include existing and proposed manmade objects, objects of natural growth, mobile objects and terrain. OAR 738-70 permits the Aeronautics section to make an independent judgment as to whether specific objects or structures constitutes a hazard to air navigation in Oregon, and determine whether specific objects or structures shall be marked and lighted; and determine the responsibility of such marking and lighting. While FAR Part 77 recommends mitigation measures for objects that deviate from Part 77 Imaginary surface, OAR 738-70 requires marking and lighting for objects that are obstructions. aX Finding: Neither state Aeronautics or the FAA can prohibit local land uses or CD structures in the airport environs. Only local governments have that authority. M ^' Page 14 CD FAA SAFETY ZONES o _ Runway Protection Zones, formerly clear zones, where originally established to define land areas underneath aircraft approach paths in which control by the airport operator was highly desirable to prevent the creation of airport hazards or the development of incompatible land use. A 1952 report by the President's Airport Commission, entitled " The Airport and its Neighbors, " recommend the establishment of clear areas beyond Wednesday, January 21, 1998 Page 10 169 + 1418 . runway ends. Provision of these clear areas was intended not only to preclude obstructions potentially hazardous to aircraft, but also to control building construction as protection to people on the ground. The Department of Commerce concurred with the recommendation on the basis that this area was "primary for the purpose of safety for people on the ground". The FAA adopted -clear zones with dimensional standards to implement the Commission's recommendation. Guidelines were developed recommending that clear zones be kept free of structures and any development which would create a place of public assembly. Today, clear zones are. referred to as Runway Protection Zones, whose function remains to protect people and property on the ground. Finding: The primary purpose of the safety zones was to protect people and property on the ground. The current safety zones fail to protect people on Camp Polk Road and they must be changed. Page 16 Runway Object Free Area: The runway OFA is a two-dimensional ground area surrounding the runway. FAA standards prohibit parked aircraft and objects from locating within the OFA. The runway OFA extends beyond the runway end at lengths that vary from 300 feet to 1,000 feet, depending on the runway design category and the approach type. These safety zones ( RSA and OFAs almost always are contained within airport property. The RPZs, however can extend beyond airport property. Therefore, from an ofd airport land use compatibility perspective, the critical safety zone for land use compatibility planning is the RPZ. The FAA recommends that the entire RPZ should be owned by the airport whenever possible. Finding: The Object Free Area at the Sisters Airport extends through Camp Polk Road and onto a other property owners property. The OFA at Sisters Airport must be recreated to remove the private property and Camp Polk Road from with in its reach for the safety of both people on the ground and in the air. The FAA recommends that the Sisters Airport own the RPZ. The FAA states that the runway and OFA almost always are contained within the airport property. IF the aviation community wishes the existing RPZ they should realign Camp Polk Road and purchase the property for the rest of the primary surface and OFA A primary means of limiting the risks of damage or injury to persons or property on the ground due to near -airport aircraft accidents is to limit the density of land use development in these areas. The question of where to set these limits is dependent upon both the probability of an accident and the degree of risk that the community finds acceptable. Finding: No information has been presented as to the probability of an accident at this airport. Before the TSP. and overlay zone can place restrictions on other rt�.t Wednesday, January 21, 1998 Exhibit Page H Page N48 of NbS Ordinance - °y 169 M 1419 property owners the governing body must asses the risk based on this specific airport and it's traffic. It is up to the community to asses the probability of an accident and the level of risk that it finds acceptable. The Planning templates found in the 11/94 Compatibility Guidelines are general. and must be evaluated in relationship to the use of each airport individually. Sister Eagle Air is estimated to have 1,400 annual operations on it's 3,550 listed runway. Creswell Municipal has the same classification for its 3,100 foot runway but estimated annual operations of 41,600. A airport with 41}000 operations will have much more occurrence a year that Sisters at 1404 or Silver Lake at 25. These compatibility guidelines are for information and are designed for illustrating what would apply to a busy airport. The more annual operation at an airport the higher the probability of an accident and the closer to the template the restrictive zones should be. Of the 68 air ports listed in the 11/94 guide 30 have Sisters level of usage, 1400 flights or below, and 38 have higher. 12 airport of the 38 have over 9404 annus} operations. It is not reasonable to place the same restrictions on property owners in the Sisters Airport area as it is in these busy areas. As a note the Redmond airport had occurrences of 35,000 occurrence and has less restrictions than is proposed in the TSP on the Sisters area. The community of Sisters has already evaluated the level of controls and have an airport overlay which was approved by LCDC and it is not appropriate to impose more restrictions on other peoples private property without compensation. Some airports and local communities have set development density ranging from 25 to 100 people for various parts of a runway approach corridor. Shopping Centers are likely to average about 75 people per acre and restaurants are often over 100. Finding: There is no information which would indicate that the Sisters Airport warrants restrictions of 25 people per acre in the approach corridor past the RPZ. The current airport overlay approved by LCDC set a density limit in the first 1500 feet of the Approach Safety Zone to 50 people if the land was zoned UAR-10. To a? imply a more restrictive requirement would be a takings under the U.S. 5' m Cr — Constitution. � Z 0 r (D .A Page 3 5 o. _ -C jr- Land purchase in fee simple by the airport is the most positive of all forms of land use controls, but it is usually the most expensive. It is recommended by the FAA, however, that airport proprietors own the property under the runway approach and departure areas, at least to the limits of the RPZ. Page 45 Wednesday, January 21, 1998 Page 12 .7 • • 169 - 1420 Fee simple acquisition should be considered to protect safety zones ( RPZ) and areas subject to high levels of noise impact. Most effective method for resolving existing problems: may be eligible for FAA grant. Finding: The FAA recommends that the airport own the RPZ and land under the primary surface. The Sister's airport does not own the land shown by the state for the primary surface. The airport does not own the land under the RPZ and should seek to purchase the land and relocate Camp Polk Road if the current runway length of 3,550 feet needs to be maintained. Page 55 Many airports in Oregon have already adopted overlay zoning. These planning templates are not intended to replace such zoning, but rather they are provided for those airports who have not yet taken steps to promote compatible land use in the airport environs. Finding: Sisters and Deschutes County have adopted an airport overlay zone for the Sisters Airport and the planning templates should not be used in the TSP. Page 65 . Airport Development area ( No developmenty. . No development should occur in this area other than airport specific development whose needs are airfield related; this . .. property, according to Federal guidelines should be under the airports control to prevent incompatible land use development. Finding: This no development area of the TSP list is 220 acres in size and not under the control of the airport operator. The airport is 20.37 in size. This no development zone will be a take away property owners rights on this 200 acres of land to the exclusive benefit of a another private individual in violation of the U.S. Federal Constitution. If the county wishes to create this no development zone it or the airport operator should purchase the land from the property owners. Page 74 These guidelines provide a significant amount of information related to land use planning in the airport environs. These guidelines, however, cannot be implemented by the State. Implementation of the Guidelines must be accomplished at the local level. The variety of strategies discussed in these guidelines are presented with the intent to help achieve the highest level of compatible land use in airport environs that is determined to be realistic for each community. Wednesday, January 21, 1998 Page 13 Exhibit Page N56 of N 65 Ordinance g8 -6'('f 169 - 1421 Finding: The local jurisdiction must evaluate the airport and make findings of fact to implement these guidelines. The local jurisdiction has the power to effected land use planning at the airport and in the surrounding areas. State land use planning laws require all. land use decisions to be made based upon findings of facts and supported with substantial evidence in the record. One shoe does not fit all. Each airport has a different levet of activity and impact on a community and for this reason these are guidelines and not administrative rules. These must be weighed with all interest of the community not just the airport in a vacuum. It is not realistic. for the TSP or airport overlay zone in Sisters to, limit the land uses of private land for the sole benefit of another private property owner, the airport owner. Specific TSP Findings Goal 5.1 Protect the function and economic viability of the existing public -use airports, while ensuring public safety and compatibility between the airport uses and surrounding land used for public use airports and for airports with three or more based aircraft. Finding: The TSP does not ensure the safety of the public as it relates to the Sisters airport because of the location of Camp Polk Road and the geological formation know as deer ridge which are preexisting obstructions to the navigable air space of both the approaches to the Sisters Airport. • Policies 5.1 Deschutes county is committed to protecting the viability of the public use airports located within the County. Protecting public use airports will be accomplished through the development of an Airport Overly Zone ( Table 5.1.t 1). Efforts will be made to regulate the land uses in the designated areas surrounding the Redmond, Bend, Sunriver and Sisters ( Eagle Air) airports to prevent the installation of airspace obstruction, additional airport hazards and for compatible land use. For the safety of those on the ground, only limited use will be allowed in noise impacted and crash hazard areas. Wednesday, January 21, 1998 Page 14 Finding: Deschutes County has made no study of the importance of the Sisters Airport and the impacts of the community it impacts. The airport is privately owned and in current violation of the FAA Part 77 standards and is known to be q 0) X unsafe during the summer months with numerous fatalities. If the county adopts L 3 the TSP with the current table 5.11tl it wilt be taking private property owners A= rights without compensation in violation of the U.S. Constitution to the sole benefit m N of a limit number of private users of the Sisters. airport. County staff has errored in _ the use o€the- planning -templates as it relates to the Sisters Airport and is in o tM violation of standards listed in Oar 660 Division 13 airport planning. Specifically L L the RPZ which is listed by the TSP at 1200 feet and as 1000 feet in exhibit 1 & 4 as page 11. County staff has errored in its creation of a proposed LDZ . Page 57 of the State 11194 Compatibility guidelines list the width for the limited development . area as 2600 feet not the 3100 feet listed in the TSP. The adoption of these zones _ Wednesday, January 21, 1998 Page 14 169 - 1422 will not be in the interest of public safety only in the interest of stripping development rights of non resource lands that are either urbanizable or already listed for residential use by the acknowledge comprehensive plans of Deschutes County and Sisters. The town was created over fifty years before the creation of the airport which has never been evaluated for safety. The continuation of the stripping of private property rights will only serve to make the County liable for the loss of life on the ground by expanding the use of an unsafe airport. Cooperate with the cities of Bend, Redmond and Sisters in establishing zoning standards, which will prevent the development of hazardous structures around airports; Finding: The city of Sisters has an adopted Airport overlay zone that that has been reviewed by LCDC and additional restrictions are not appropriate. ORS DIV 13 660-013-0080 (3) states that: If a local government receives information, supported by evidence, alleging that public safety requires a higher level of protection than the minimum standards in these rules, the governing body shall consider the information and adopt findings, supported by substantial evidence, explaining the basis for its decision regarding the need for more stringent regulations. 4 Land use regulation and standards for land use decisions regarding land use compatibility and other requirement of this rule shall consider the effect of mitigation measures or conditions which could reduce the potential for safety risk or incompatibility. The county has not attempted to consider the effect of mitigation measure or conditions which could reduce the potential for safety risk or incompatibility. No evidence has been included in the TSP to warrant stiffer regulation of the Sisters area than what is listed in OAR 660-013-0080 1 a,b,c,d,e,f.. It is not legal to enact the policies of the TSP without substantial evidence in the record and findings of fact. The current draft TSP is in violation of OAR 660-013-0080. Participate in and/or encourage the adoption of airport master plans for all public use airports and at least an airport layout plan for the remaining ODOT recognized airfields in Deschutes County; Finding: This is in violation of policy 30 of the Deschutes County Compressive plan which states:. "The county shall participate in and encourage adopted master plans and appropriate federal, state and local funding for airport improvements at publicly -owned airports". The Sisters airport is not public owned and the promotion of the adoption of master plans and expansions at non public owned facilities in Deschutes county is in violation of the Deschutes County Compressive Plan. Adopt regulation to ensure the developments in the airport approach areas will not be visually distracting, create interference or cause other safety problems for aircraft or persons on the ground. In addition, efforts will be made to minimize population densities and prohibit placesof public assembly in the approach areas. 0 h �i Wednesday, January 21, 1998 Exhibit Pae 15 Page N522 of G$ Page Ordinance QS a&l 169 1423 Finding : No mitigation or other measures have been considered before the adoption of these standards in the approach areas. No detailed study as required by Dolan Vs. Tigard had been done by the county indicated the validity of taking the development rights of the lands in these approach areas. No data specific to the Sisters Airport and the community has been listed in the TSP as required by state law. The approach areas are not clearly defined in the TSP. No data has been entered to indicate the restrictions of public assembly in the approach areas as required by state law. Finding: Oar 660-013-0140 offers a safe harder that satisfies certain requirements of division 13. Mainly the portions of existing acknowledged comprehensive plans, land use regulation, and other adopted airport plans approved by the local government as mandatory standards. Deschutes County and the City of Sisters has approved an airport overlay zone for the Sisters airport and the adoption of the standards in the TSP would be a violation of the Sister Urban Growth Management Agreement which requires mutual adoption by the city and the county. 11 Exhibit �13 Page N 53 of Nts Ordinance - EyA_ 0 Wednesday, January 21, 1998 Page 16 Steve Jorgensen Is From: RUSSELL Peter L <Peter.L.RUSSELL@odot.state.or.us> To: 'Jorgensen, Steve' <stevej@deschutes.org> Cc: DEVONEY Mark A <Mark.A.DEVONEY@odot.state.or.us> Subject: La Pine TAG Date: Tuesday, January 06, 1998 8:48 AM Steve, I have been asked to attend the La Pine TAG mtgs whenever my schedule permits. They are on the 3rd Wednesday of every month, as you doubtless know. Do you go to these, and if so, do you want to carpool to them? I am reviewing the draft Des. Co. TSP, which looks pretty good so far. The section on state hwys was nicely done, especially since I didn't get you the promised language. When do you need any suggestions or revised language by? For the bulleted list for 97, I would suggest shifting the wording to read "Limiting and/or reducing local road and direct access to the highway." Do you think it would be worthwhile in the 97 section to add language about the need to develop/improve a parallel route, such as Huntington Road, Forest Service Road 41 (Conklin Rd)? For U.S. 20, I'd parrot the suggested language for 97 and local road/driveway connections to the state hwy. For the 126 section, we might want to discuss the Highland Extension. On the list of potential interchanges (Fig. 5.2.F1), another one on U.S. 97 is around 61st/Gift, which would be the interchange south of Yew Ave. and north of Deschutes Market. For ODOT, the site seems to be floating, but the need for one is there, and the TSP should indicate the potential location. That's it for now; rll talk to you later and sorry again about not getting the language to you. I owe you a beverage of your choice. Peter 169 - 1424 Exhibit. Page N-51 of N45' Pa< Ordinance 48- Old JHN-10-00 rKi 1L.01 f17 UCzUnUlCJ uv FUD wuaho E5 • C nA nus 169 - 1425 Department of Public Works 81150 S.E 27th St.. Send OR 97702 (5411388-6581 • FAX (5411388-2719 MEMORANDUM DATE: January 16, 1998 TO: Steve Jorgensen FROM: Tom $lust, Road Department Director RE: TSP Suggested wording for the finance section (6.2 Implementation Costs, last paragraph): Under current funding levels, only those projects identified as previously committed projects can be funded. An average of $550,000 per year over the next three years, for a total of $1,650,000, will be available for preservation projects. These projects could be a portion of the identified short-term, high priority road widening and overly projects. The short-term, high priority projects identified amount to So. The difference of $o, or $<> per year will need to be covered by new funding sources, or projects will need to be removed from the list to balance the budget. Quality Services Performed with Pride �1 Exhibit Bu page .1j55' of N6S 169 1426 Steve Jorgensen 0 From: MS CAROLYN S NOVICK <LSQU2IA@prodigy.com> To: stevej@deschutes.org Subject: Date: Sunday, January 18, 1998 1:19 PM • steve suggest a change on page two that refers to airports..... redmond is a commerical service airport not general aviation airport, that would show that we have air service in and out of the region and i suggest you show sunriver as privately owned and public use ..... and since you show the RR and Greyhound you also might state that the region also has service by FedEx, Airbourne and UPS Air ..... carrie novick 4 u Exhibit B Page 1 Page N56 of N 6.5' Ordinance 98 - a `1 y 169 1427 Steve Jorgensen 0 From: RUSSELL Peter L <Peter.L.RUSSELL@odot.state.or.us> To: 'Jorgensen, Steve' <stevej@deschutes.org> Subject: FW: Updated version of Aero's comments Date: Tuesday, December 09, 1997 11:59 AM • FYI > -----Original Message---- > From: HIGHLAND Thomas E > Sent: Tuesday, December 09, 1997 11:44 AM > To: RUSSELL Peter L > Subject: > **** Please Note*** this file has been changed*** there were errors > in the first transmission. Peter, this file contains Aero's suggested > comments on the Deschutes County 5.5 Airport Plan. The comments are > included to begin the process of integrating the Airport Protection > Bill, HB 2605, into the planning process. ODOT still has to adopt > which airports are to be included for protection. These airports have > been fairly narrowly defined in the bill. LCDC will need to review the > rules they adopted during December of 1996, OAR 660 Division 13, and > revise them to reflect the HB 2605 language, which revised SB 1113. 91 I! Exhibit B Page 1 Page NS7 of P65 Ordinance f 8' DIN 169 - 1428 Dec. 8, 1997 TO: Peter Russell, Region 4 FROM: Tom Highland, Aviation Planner SUBJECT: Aeronautics Comments Draft Deschutes Co. TSP ODOT Aeronautics personnel have reviewed the Deschutes County AIRPORT Plan and have the following comments. 5.5.1 AIRPORT PLAN DELETE THE FIRST SENTENCE AND ADD SOMETHING SIMILAR TO THE FOLLOWING: The continued operation and vitality of airports registered, licensed or otherwise recognized by the Department of Transportation is a matter of State and County concern. There are currently 18 registered airports in Deschutes County. Four of these are public use airports; two of which, Bend Municipal and Redmond Municipal - Roberts Field are publicly owned and Sisters Eagle Air and Sunriver airports are privately owned. Cline Falls Airport, Juniper Airpark and Pilot Butte Airport are privately owned private use airports with more than three based aircraft. There are three heliports; St. Charles Medical Center, Lapine and Cinder Butte all with fewer than three based aircraft. The eight remaining airfields; Don Stevenson Ranch, Fall River Fish Hatchery, Gopher Gulch, Pine Ridge Ranch, The Citadel, Whippet Field, Freight Wagon and Sage Ranch Airports are all privately owned private use airfields with 2 or fewer based aircraft. ADD THE REMAINING PORTION OF THE ORIGINAL PARAGRAPH. Goal 5.1 Protect the function and economic vitality of existing airports while ensuring public safety and compatibility between airport uses and surrounding land uses for public use airports and for airports with three or more based aircraft. It is the policy of Deschutes County that: 5.2 Deschutes County is committed to protecting the viability of airports located within the County. Protecting public use airports will be accomplished through the development of an Airport Overlay Zone, efforts will be made to regulate the land uses in the designated areas surrounding the ........to prevent the installation of airspace obstructions, additional airports hazards and for compatible land use to limit uses in noise impacted and crash hazard areas for the safety of those Exhibit — Page Nom— of N 65 Ordinance 18" ° • 169 1429 on the ground. Protecting Privately Owned Private Use Airports, with three or more based aircraft, will be accomplished by development of Airport Overlay Zones for these airports. The function and economic vitality of privately owned private use airports with two or fewer based aircraft will be accomplished through land use planning to provide for continued, safe aeronautical access to and from these airports considering the type of aircraft approved to use the airfield. The fourth bullet: Should be changed to read: Steps shall be taken to ensure that proposed uses will not impact... aircraft. Sixth Bullet: The County shall... other safety problems for aircraft or persons on the ground. Population densities will be minimized and places of public assembly shall be prohibited. Seventh Bullet: Deschutes County.... Encroachments within critical noise contours or safety areas... consent. Eighth bullet: Any proposed... on an airport master plan or airport layout plan map ... growth with surrounding rural or urban development. Eleventh bullet: The County shall participate in and/or encourage the adoption of airport master plans for all public use airports and at least an airport layout plan for the remaining airfields in Deschutes County. Aeronautics appreciates having the opportunity to review these projects for potential aviation impacts. u u Exhibit - Page .M5 of N b S Ordinance q8 - v4 169 - 1430 STATE OF OREGON INTEROFFICE MEMO FROM: Linda Willnow Planning Section SUBJECT: Deschutes County TSP Thank you for forwarding the Transit portion of the draft Deschutes County Transportation System Plan. The plan identifies an extensive inventory of local public transportation providers and that is an important step in developing the county's TSP. In reviewing the requirements of the Transportation Planning Rule, there appears to be some additional work that the county should conduct to address the future needs of public transportation in the area. Some basic guidelines can be found in the Transportation Planning Rule, 660-12-020, Elements of Transportation System Plans. Deschutes County is one of the fastest growing areas of the state and a careful analysis of future needs is especially important. The plan should discuss the demographics of the county and identify whether there are current public transportation inadequacies or if they are expected to develop during the course of the plan. The TSP needs to show how Deschutes County intends to address those inadequacies. Below, I have tried to summarize some of the basic elements needed in the public transportation portion of a TSP: • A description of public transportation services for the transportation disadvantaged that identifies service inadequacies. These inadequacies can vary, with hours of service, age, type and condition of vehicles, or area served being only examples. • The TPR requires identification of the location of intercity bus and passenger rail terminals and their connectivity with other modes. Identify gaps in connectivity. For example, can a person make reasonable connections between the current elderly and disabled services to the intercity bus services? Does the intercity bus provide connections to the Chemult Exhibit "R Page N6° of N457 Ordinance q!R64� 169 1431 passenger rail station discussed under section 2.2.16.1? Do the hours and days of intercity service meet the current or projected needs of the county? • An inventory and general assessment of existing and committed public transportation facilities and their capacities. This inventory should include information on vehicles (capacity, ADA accessible, etc.) depots, or other facilities that may be required to operate the services. • A condition analysis that describes the general physical and operational condition of each public transportation facility. The condition analysis could be used to help establish fleet and facility replacement schedules. • Opportunities for better coordination of existing services in order to meet projected needs. Do some services overlap? Are there opportunities to use the elderly and disabled services for the general public? Can greater coverage be provided by coordinating existing services, thereby eliminating the need to add service? • A description of planned public transportation facilities, services and major improvements, including the type of facility or service and the associated capacities and levels of service. • A location description of planned public transportation improvements, including a map showing their general location. Are there areas of the county that are currently under -served that will be getting facilities or services during the life of this plan? The locations of existing and planned rideshare lots that are apparently shown in Figure 2.2120 are a good example. • Provider of each facility or service Robin , the Phillips, intercitycoordinator will be providing additional comments that focus specifically in intercity public transportation issues. As you are aware, the county's TSP needs to be consistent with state and local plans for the area. Deschutes County needs to coordinate planning for its future public transportation services with the needs identified in corridor plans for the area as well as the TSPs of its incorporated cities. I would like to emphasize that as the competition for funding increases it will be very important to have public transportation needs identified in local and regional TSPs. I appreciate the opportunity to comment on this document while it is in draft form and would be happy to answer any questions you might have about my comments. Please feel free to call me at (503) 986-4168. y Exhibit�iLJ� Page M 61 of N65' Ordinance 18 - 6111 Nov. 6, 1997 Deschutes County Planning Commission 1130 NW Harriman I il(o/ 7 1 DEPARTMENT OF TRANSPORTATION Bend, OR 97701 Region 4 Resource Center RE: Preliminary ODOT comments on the draft Deschutes County Transportation System Plan ran ODE: he Oregon Department of Transportation appreciates the opportunity to participate in theprep000 this document. Planning and district staff have reviewed the draft plan and would like to see language inserted regarding state facilities. ODOT would be happy to draft the language and submit it to the commission and Deschutes County planning staff. Additionally, various modal planners in ODOT's Statewide Mobility Unit in Salem will be providing comment by Nov. 20. Generally, the plan should indicate the following access management classifications for the state facilities outside the urban growth boundaries. These categories are taken from ODOT's 1991 Highway Plan. The plan should contain a brief narrative about the various highways' current function and their longterm roles. The agency's "four -phased approach" to highway improvements should be added. (Briefly, the phases are passing lanes, widening to four lanes, interchanges and raised medians, full-blown interchanges and frontage roads.) ODOT will be providing text in the near future for this purpose. 1. U.S. 97: Category 2 for its entire length outside the urban growth boundaries of Bend, Redmond, and Sisters, except for the areas discussed below. 2. U.S. 97 in Terrebonne and La Pine: Category 4 with specific termini identified 3. U.S. 20: Category 3 from Jefferson County to the western UGB of Sisters; Category 2 from the eastern Sisters UGB to the western Bend UGB; Category 4 from eastern Bend UGB to Lake County. 4. OR 126: Category 3 or 4, ODOT staff is still discussing the matter internally. 5. OR 27, OR 31, OR 370, OR 372: Either keep existing language or Category 4 as ODOT staff is still considering the appropriate designation For the three major highways, U.S. 97, U.S. 20, and OR 126, the plan should discuss potential interchange locations, key issues, and troublespots. The plan should discuss how changing traffic volumes and congestion levels affect the highways' longterm function. This would be comparable to the way the City of Bend discusses state facilities in their draft general plan on pages 7-25 to 7-28. ODOT will be submitting recommended text for the commission to consider. Thank you for your attention to these matters. If you have any questions, please feel free to contact me at (541)388-6046. Peter Russell Senior Development and Review Planner Program and Planning Unit 63034 O.B. Riley Road Bend, OR 97701 cc: Steve Jorgensen, Deschutes County Planning • Form 734-2249A (2-97) Exhibit Page ? of N65 Ordinance 4B -o44 * 63034 63034 O: B. Riley Rd. Bend, OR 97701 (541)388-6032 FAX (541) 385-0476 169 -1433 M 1991 OREGON HIGHWAY PLAN M TABLE 1 HIGHWAY ACCESS MANAGEMENT CATEGORIES Category 1: These highway segments provide for efficient and safe high speed and high volume traffic movements, on interstate, interregional, intercity, and some intracity routes in the largest urbanized areas. The segments do not provide direct land access. Access control and other methods will be used on nearby cross streets in the area of interchanges to protect the operation of those interchanges. This category will apply to all interstate highways and other highways that function like freeways. Category 2: These highway segments provide for efficient and safe high speed and high volume traffic movements, on interstate, interregional, intercity and longer distance intracity routes. They should not provide direct land access. This category is distinguished by highly controlled connections, and medians. Traffic signals should be avoided and where they must be installed, their effect on mainline traffic flow should be minimized. Grade separations should be considered for high volume cross streets or other cases where signals are not appropriate. Some category 2 facilities may be developed into category 1 facilities over time. This category includes many of the statewide facilities. Category 3: These highway segments provide for efficient and safe medium to high speed and medium to high volume traffic movements, on interregional, intercity and longer distance intracity routes. The segments are appropriate for areas which have some dependence on the highway to serve land access and Exhibit �� Page NU of L, K B- 4 Ordinance 9-6 where financial and social costs of attaining full access control would substantially exceed benefits. This category includes some of the statewide facilities. Category 4: These highway segments provide for efficient and safe medium to high speed and medium to high volume traffic movements, on higher function interregional and intercity highway segments. They also may carry significant volumes of longer distance intracity trips. They are appropriate for routes passing through areas which have moderate dependence on the highway to serve land access and where the financial and social costs of attaining full access control would substantially exceed benefits. This category includes a small part of the state- wide facilities and most regional facilities. Category 5: These highway segments provide for efficient and safe medium speed and medium to high-volume traffic movements, on intercity, intracity and inter - community routes. There is a reasonable balance between direct access and mobility needs within this category. Category 6: These highway segments provide for efficient and safe slower to medium speed and low to high- volume traffic movements, on intracity and inter - community routes. This category will be assigned only where there is little value in providing for high speed travel. Providing for reasonable and safe access to abutting property is a major purpose of this access category. r r ® 19'91 OREGON HIGHWAY PLAN H 1 4 ACCESS MANAGEMENT CLASSIFICATION SYSTEM Notes: 1) The Level of Importance (LOI) to which the Access Category will gener- ally correspond. In cases where the access category is higher than the Level of Importance calls for, existing levels of access control will not be reduced. 2) The basic intersection design options are as listed. Special treatments may be considered in other than category 1. These include partial interchanges, jughandles, etc. The decision on design should be based on function of the highway, traffic engineering, cost- effectiveness and need to protect the highway. Interchanges must conform to the interchange policy. 3) Generally, no signals will be allowed at private access points on statewide and regional highways. If warrants are met, alternatives to signals should be investigated, including median closing. Spacing between private access points is to be determined by acceleration needs to achieve 70 percent of facility operating speed. Allowed moves and spacing requir- ments may be more restrictive than B-5 those shown to optimize capacity and safety. 4) Generally, signals should be spaced to minimize delay and disruptions to through traffic. Signals may be spaced at intervals closer than those shown to optimize capacity and safety. 5) In some instances, signals may need to be installed. Prior to deciding on a signal, other alternatives should be examined. The design should minimize the effect of the signal on through traffic by establishing spacing to optimize progression. Long-range plans for the facility should be directed at ways to eliminate the need for the signal in the future. 6) Partial median control will allow some well-defined and channelized breaks in the physical median barrier. These can be allowed between intersections if no dete- rioration of highway operation will result. 7) Use of physical median barrier can be interspersed with segments of continuous left -rum lane or, if demand is light, no median at all. Exhibit Page N6 of NQS Ordinance fS-044 Intersection Access Urban/ Public Road Private Drive (3) Signal Median Category Treatment LOI (1) Rural T (2) Spacing T Spacing Spacing 4 Control Full Control Interstate/ U Interchange 2-3 Mi. None NA None Full 1 (Freeway) Statewide R Interchange 3-8 Mi. None NA None Full 2 Full Control Statewide U At grade4ntch 1/2-2 Mi. None NA 1/2-2 Mi. Full (Expressway) R At grade/Intch 1-SMi. None NA None Full 3 Limited Control Statewide U At grade4ntch 1/2-1 Mi. Rt. Tums 800' 1/2-1 Mi. Partial (Expressway) R At grade/Intch 1-3Mi. Rt. Tums 1200' None Partial (6) 4 Limited Control Statewide/ U At cradeAntch 1/4 Mi. Lt/RL Tums 500' 1/2 Mi. Partial/None R At grade etch 1 Mi. Lt/Rt. Tums 1200' None (5) Partial/None (7) Regional Regional/ U At rade 1/4 Mi. Lt/Rt. Tums 3 00' 1/4 Mi. None 5 Partial Control District R At grade 1/2 Mi. I Lt/RL Tums 500' 1/2 Mi. None U I At grade 500' I Lt/Rt. Tums 150' 1/4 Mi. None 6 Partial Control District R EAt grade 1/4 Mi. I Lt./Rt. Tums 300' 1/2 Mi. None Notes: 1) The Level of Importance (LOI) to which the Access Category will gener- ally correspond. In cases where the access category is higher than the Level of Importance calls for, existing levels of access control will not be reduced. 2) The basic intersection design options are as listed. Special treatments may be considered in other than category 1. These include partial interchanges, jughandles, etc. The decision on design should be based on function of the highway, traffic engineering, cost- effectiveness and need to protect the highway. Interchanges must conform to the interchange policy. 3) Generally, no signals will be allowed at private access points on statewide and regional highways. If warrants are met, alternatives to signals should be investigated, including median closing. Spacing between private access points is to be determined by acceleration needs to achieve 70 percent of facility operating speed. Allowed moves and spacing requir- ments may be more restrictive than B-5 those shown to optimize capacity and safety. 4) Generally, signals should be spaced to minimize delay and disruptions to through traffic. Signals may be spaced at intervals closer than those shown to optimize capacity and safety. 5) In some instances, signals may need to be installed. Prior to deciding on a signal, other alternatives should be examined. The design should minimize the effect of the signal on through traffic by establishing spacing to optimize progression. Long-range plans for the facility should be directed at ways to eliminate the need for the signal in the future. 6) Partial median control will allow some well-defined and channelized breaks in the physical median barrier. These can be allowed between intersections if no dete- rioration of highway operation will result. 7) Use of physical median barrier can be interspersed with segments of continuous left -rum lane or, if demand is light, no median at all. Exhibit Page N6 of NQS Ordinance fS-044 4 - 169 - 1435 /d�28/g7 Date: Oct 28, 1997 To: Dick Johnson, County Rd Dept From: Vernon Frost Subject: Comments on county TSP Page 4 [1.2.4 Multi -Modal Planning] Rewrite last sentence as: The Rule encourages transportation solutions that " support a pattern of travel and land use in urban areas which will avoid air pollution, traffic and liviaility problems. Page 11 [1.3.5 Determine Transportation Needs (Pedestrian Needs)] Most of the county roads I have been on biking or walling the shoulder width is usually not adaquat for a safe feeling as you go. Ibis is one reason why county roads are not used for biking and walling more. Page 26 [2.1.16 close to the bottom ofpage.] Rewrite: o Rural highways will have shoulders widened in the course of modernization projecst, as well as on many preservation overiays. Donot put in'where wamited'.I I1! Ibis is an easy out!! I have noticed bike lanes eliminated when the road was "modemized". Ex -> 27th dt Reed mrkt rd. Page 78 [Top of per] o The existing system of improved County rds ----- other caiagories should be listed here: bike commuters and recreational bikers. Pages 181-185 [5.4 BIKEWAY AND PEDESTRIAN PLAN] This section reads good I can not think of any corrections. Note: sec. 4.3 states policy is for the Bike & Pedestrian Advisory committee is given some good oversee and review responsibilities. The following is my comments to the TSP: People, who drive cans, have come to expect that the Road Dept should provide enough roads to give them unrestricted access to any place they wish to go at any time. As our population grows this becomes harder and more expensive to do. Ibis mental attitude must change. How is this done? We simply decide that the Road Dept will provide the basic roads as they exist now and will not cont nue to try to keep ahead of the traffic growth by building new roads. Maint fining wasting roads willbe its main prioraty. Phu a new emphasis will be placed on transportation other than cars. The following ideas relate to that. We need to start d*ddng about a light rail system to connect six cities. It would rim from Lapin through Bend and Redmond to Madras. The other leg would be from Sisters through Redmond to Prineville. Redmond would be the iliteisectian or connector point The Dight Rail will not work if each city does not have a local bus system in place. So my other thought is to remind us all that we already have a bas system in place. However it is a very select and discdminating system. It only operates periodically twice a day and only for 9 months and it only carnes young people. Even&ough every property pays for this system only a few use it. I am speaking of course about the Public . School bus system. I blink we need to nworporate the school buses into a city transit system (all cities) and with a ligiht rail system to connect central Oregon we would have a wodmble transit plan The only way people will accept this concept to to not continually try to fix the cangested roads as our population increases and to just let it get bad. lbmks for allowing me to present these ideas to you. My wm pro== does not have a spell checker so sorry about the spelling. N u Exhibit Page N65 of NbS Ordinance 8'°y —