2002-827-Ordinance No. 2002-009 Recorded 4/30/2002REVIEWED
ku
LEGAL COUNSEL
REVIEWED
VL
CODE REVIEW COMMITTEE
COUNTY OFFICIAL
MARYHSUE SPENHOLLOW, COUNTYRCLERKS U MUD
COMMISSIONERS' JOURNAL 04/30/2002 08:19:38 AM
For Recording Stamp Only
BEFORE THE BOARD OF COUNTY COMMISSIONERS OF DESCHUTES COUNTY, OREGON
An Ordinance Amending Title 23, Deschutes
County Comprehensive Plan, of the Deschutes * ORDINANCE NO. 2002-009
County Code and Declaring an Emergency.
WHEREAS, strategy #2 in Chapter 23.44, Regional Problem Solving for South Deschutes County, of
the county's comprehensive plan states:
"The County shall continue to develop and analyze a Transferable Development Credit
program as a possible means to redirect potential growth away from residential lots in
subdivisions throughout the region into the new neighborhood."; and
WHEREAS, ORS 94.531 identifies transferable development credits (TDCs) as a severable
development interest in real property and authorizes the county to establish a system for the purchase and sale of
TDCs; and
WHEREAS, the County has developed a Transferable Development Credit (TDC) program that
identifies a "sending area" where TDCs are allocated to eligible lots and a "receiving area" where TDCs are
required to be redeemed based on a net developable acreage formula (file nos. PA -02-01 and TA -02-1); and
WHEREAS, the TDC program will operate in a voluntary manner in the sending area, wherein those
property owners who choose to sell their TDCs, while still retaining ownership of the land, will sign and record
a conservation easement prohibiting the construction of a dwelling, an on-site sewage disposal system, and other
utilities on said property while continuing to allow other uses as specified in the easement such as camping,
wood cutting, vegetation management, agricultural activities and construction of a small storage structure; and
WHEREAS, the TDC program is intended to provide a market-based incentive for an overall reduction
in growth in the sending area commensurate with new residential development in the receiving area, the
Residential General and Residential Center Districts of the Neighborhood Planning Area in the La Pine Urban
Unincorporated Community; and
WHEREAS, important resources such as water quality and wildlife migration corridors will be
protected and the rural character of South Deschutes County will be enhanced by transferring some of the future
growth in the region into the Neighborhood Planning Area; now, therefore,
THE BOARD OF COUNTY COMMISSIONERS OF DESCHUTES COUNTY, OREGON, ORDAINS
as follows:
Section 1. AMENDMENT, Chapter 23.44, Regional Problem Solving, of the Deschutes County
Code, is amended to read as described in Exhibit "A," attached hereto and by this reference incorporated herein,
with new language underlined and language to be deleted in str-ik g h
PAGE 1 OF 2 - ORDINANCE NO. 2002-009 (4/24/02)
Section 2. EMERGENCY. This Ordinance being necessary for the immediate preservation of the
public peace, health and safety, an emergency is declared to exist, and this Ordinance takes effect on its passage.
DATED this d y of , 2002.
Date of 1St Reading:
BOARD OF COUNTY COMMISSIONERS
4, , I W"* / A t�, - I/,
MICIAEL M. DALY, ommissioner
9q --day of , 2002.
Date of 2nd Reading: 2- ( day of .2002.
Record of Adoption Vote
Commissioner Yes No Abstained Excused
Tom DeWolf +/
Dennis R. Lukey
Michael M. Daly (%
Effective date:
ndq
a__( day of , 2002.
ATTEST:
INUU,C--� lw�
Recording Secretary
PAGE 2 OF 2 - ORDINANCE NO. 2002-009 (4/24/02)
Chapter 23.44
23.44.010.
23.44.020.
23.44.030
23.44.040.
23.44.010.
A. Overview.
EXHIBIT "A"
REGIONAL PROBLEM SOLVING FOR SOUTH DESCHUTES COUNTY
Regional problem solving for South Deschutes County.
Goals.
PolieiesStrategies.
Map.
Regional problem solving for south Deshutes County.
In the 1960's and early 1970's, before statewide planning occurred in Oregon, over 15,000 lots
were created in subdivisions platted south of Sunriver. Most of these parcels are less than two
acres in size and use on-site septic systems to dispose of sewage. Many of them are located in
areas where development is now restricted, such as floodplains, wetlands and areas with a high
groundwater table where septic approval is unlikely.
Since 1989, Deschutes County has been the fastest growing county in the state on a percentage
basis. The rural character, attractive location on or near the Deschutes and Little Deschutes
Rivers, and relatively inexpensive land prices in South Deschutes County have led to a
burgeoning population. The current estimated population of up to 16,000 residents (over 10,000
permanent) would make this area the second largest city in Oregon east of the Cascades were it
incorporated, exceeded only by the city of Bend. Impacts to groundwater, the source of
drinking water in this area, air quality, wetlands and mule deer migration and the risks to human
life and property from wildfires have increased significantly over time.
In 1996, Deschutes County and the Department of Land Conservation and Development
recognized that significant consequences could occur from the pattern of development and
began a collaborative project known as Regional Problem Solving Project for South Deschutes
County. The Regional Problem Solving (RPS) project area encompasses approximately 42
square miles between Sunriver to the north and La Pine to the south, and includes thousands of
small subdivided lots, and some larger parcels, throughout southern Deschutes County. The
attached map identifies Study Areas 1, 2 and 3 within the project area.
The RPS project area is a landscape with a geologic history that produced sediments of volcanic
origin that were deposited in a basin over past eons. These conditions are the result of lava
flows from the west (Cascades) and east (Newberry) that periodically dammed and shifted the
course of the Deschutes River, creating the La Pine Basin, where the deposition of sediments
has occurred, sometimes burying older forests. Volcanic eruptions such as the one at Mt.
Mazama (Crater Lake) approximately 6,800 years ago have contributed significantly to the
volume of sediment deposited in the basin. The Mt. Mazama eruption is the source of volcanic
material that has formed the predominant soil in the area.
At an elevation of 4200 feet, the climate in the region is one of cool nighttime temperatures
with a short frost -free summer that averages less than 100 days annually and a winter period bf
five or six months where snow can reside on the ground at any time. The rivers receive
significant input from cool spring fed waters. The groundwater is mostly derived from
snowmelt in the high Cascades to the west, and is also relatively cool.
The development of thousands of small lots in the RPS project area is therefore superimposed
upon highly permeable, rapidly draining soils and a high groundwater table with relatively cold
water temperatures. The overwhelming majority of the lots are served by on-site sewage
disposal systems (septic systems), including standard drain fields, cap and fill systems, and
Page 1 of 8 - EXHIBIT "A" TO ORDINANCE NO. 2002-009 (4/24/02)
EXHIBIT "A"
more recently sand -filter systems. Nitrates, a by-product of septic systems and an indicator of
human pathogens, are poorly retained in the fast draining soils and do not easily break down
due to the cool groundwater temperature. As a result, loading of nitrates occurs in the shallow
groundwater aquifer that underlies this region. The presence of a high level of nitrates is of
great concern because this same aquifer is the source of drinking water for the residents in the
area.
A recent US Geological Survey study of groundwater in Central Oregon concludes that
groundwater in the area is connected to nearby surface waters, including the Deschutes and
Little Deschutes Rivers. Through the sampling of numerous wells in the RPS project area the
Oregon Department of Environmental Quality (DEQ) is predicting that nitrate in the
groundwater will approach unsafe levels, principally as a result of the cumulative effect of
sewage disposal with on-site septic systems, in the near future. Levels of nitrate are elevated in
several localized areas within the RPS project area. However the majority of wells show very
low nitrate levels at this time and surface water contamination has not been documented.
Due to the existing pattern and density of development DEQ is predicting that nitrate levels will
continue to increase over time, even if measures were taken now to alter the development
pattern in the RPS project area. If measures are delayed much longer, the consequences could
become more serious, possibly resulting in unsafe levels of nitrates in groundwater and drinking
water.
More definitive information is expected to be available in the next few years, regarding the
timing of nitrate movement in groundwater and the overall impact of nitrate from septic
systems to groundwater and possible surface water pollution. The DEQ and Deschutes County
will complete additional groundwater investigations and testing of exper-i - ental innovative
sewage treatment and disposal teehnelegy-ssy tems to reduce the impact on groundwater from
nitrates fr-em en site sewage dis 3esalnitrogen in household sewage, with grants from the US
Environmental Protection Agency. The results from these studies will not be known for several
years. l imeiital-Studying different approaches to on-site sewage treatment and disposal
may lead to affordable technological advances that can be applied to new and possibly existing
systems. In the meantime, the region will continue to grow and nitrate loading from on-site
systems will continue to increase.
Some measures may need to be implemented in the future to address groundwater pollution and
other impacts that could result from the development of the thousands of small -size subdivided
lots in South Deschutes County. The creation of a new neighborhood between La Pine and
Wickiup Junction as an alternative to building fewer houses on the remaining vacant small lots
appears to hold much promise. A market-driven transferable development credits program
could assist in the redirection of growth from the existing subdivisions into this new
neighborhood.
A development standard or sewage disposal rule that requires an effective lot area of 1.5 acres
for new dwellings served by an on-site septic system may need to be considered. The acreage
requirement would need to be based on the long-term balance between nitrate loading from
septic systems and dilution from precipitation that infiltrates the land. An effective lot area
should include contiguous or non-contiguous vacant land within a specified distance from the
proposed building site.
For these reasons, Deschutes County has determined that it is appropriate to adopt
comprehensive plan goals and policies to recognize the importance in protecting groundwater
and other resources and the need to continue to work on the Regional Problem Solving project
for South Deschutes County.
Page 2 of 8 - EXHIBIT "A" TO ORDINANCE NO. 2002-009 (4/24/02)
EXHIBIT "A"
B. Nitrates - Health and groundwater impacts; septic system impacts and studies.
High levels of nitrates in drinking water are a cause of methemoglobinemia (blue baby
syndrome) in infants and have been linked to cancer and weakening of immune system in the
elderly. Recent epidemiologic studies indicate that chronic long term exposure to low levels
(2.5 mg/L) of nitrates can increase the risks for certain types of cancers Nitrate levels are often
used as an indicator for the transmission capabilities of other pathogenic agents. Surface waters
are very sensitive to eutrophication by the addition of nutrients; nitrate is an indicator of
nutrient loading.
A natural background level of nitrates would be less than 1 mg/L. The Environmental
Protection Agency (EPA) has set the safe water drinking standard (Maximum Contaminant
Level or MCL) for nitrate at 10 mg/L. The DEQ is required to declare a region a Groundwater
Management Area if nitrate concentration reaches 7 mg/L. This would require a plan to protect
and restore groundwater quality. Deschutes County Planning and Environmental Health are
only slightly ahead by starting and developing their plans proactively.
On-site septic systems are the only significant source of nitrates in the La Pine sub -basin. The
La Pine sub -basin has many conditions that allow for little denitrification of wastewater to
occur: rapidly draining soil, shallow, well oxygenated -groundwater, very short growing season,
cold temperature, not much hydraulic gradient. Most of the development has taken place in the
very bottom of the sub -basin over shallow groundwater and on small lots served by wells from
an unconfined aquifer.
In 1980-81 Ge of i at:oontamination of the aquifer from septic systems had already
occurred in the La Pine core area as of 1980-81 (La Pine Aquifer Management Plan, Century
West, 1982). A community sewer system was required to remedy the situation. A 1995 well
monitoring study by DEQ showed that after 11 years of sewer, the nitrate levels in the La Pine
core area had receded but were still at "unsafe levels." This is an indication that the recovery
time for the aquifer is lengthy.
The 1995 monitoring study also revealed the existence of five areas in the RPS project area, not
including the core area of La Pine, where nitrate levels are greater than usual background levels.
Nitrate levels are as high as 4.8 to 5.9 mg/L in three of these areas and as high as 3 mg/L in the
other two.
The 1995 monitoring study was part of a modeling effort by the DEQ to estimate the impact of
septic systems on the groundwater. The initial results of the model indicate that at existing
(1994).development the aquifer would reach nitrate levels of 7 mg/1 by 2005. Since the
collection of samples in 1994 there are approximately 700 additional residences in the RPS
project area using on-site septic systems. The model is limited because it is two-dimensional
and does not account for flow in or out of its boundaries.
A grant from the US Environmental Protection Agency will allow significant work to begin in
1999 to help with a solution to the problem of high nitrate levels. The primary purpose of the
grant is to exper-if �ent withsj dy new technologies in on-site septic systems. Part of the grant
will be used to continue increasing the groundwater monitoring network and complete
additional analysis of nitrate movement in the groundwater using a three dimensional model.
The experifneRW—innovative septic system program was started in 1998 through the RPS
project and DEQ grant funding and is expected to increase significantly with the new federal
grant. The purpose is try new technologies that appear to be capable of reducing nitrate levels.
Besides nitrate reduction there are many other aspects of new technology that need to be
examined before widespread applications for the general public can occur.
Page 3 of 8 - EXHIBIT "A" TO ORDINANCE NO. 2002-009 (4/24/02)
EXHIBIT "A"
Over the past five years the US Geological Survey (USGS) has developed a groundwater flow
model of the entire Upper Deschutes Basin. The model will be used to -&as the basis for an
analysis of the impacts of nitrates from on-site systems to help answer the following three
questions:
1. Where should additional monitoring wells be set up for continuous monitoring of nitrate
plumes from residential development?
2. What density does development need to be set at to minimize impact on groundwater
quality?
3. What variations of impact due to location are there in the La Pine sub -basin?
The DEQ rules require a minimum of an acre for standard system and a half -acre for pressure
or sand filters in rapidly draining soils. This is a statewide rule and the authors were probably
looking at rainfall amount from a typical Willamette Valley year to provide dilution.
Mixing wastewater from a typical single family residence with the recharge provided by yearly
precipitation in Southern Deschutes County, it requires 2.5 acres for a standard system and 1.5
acres for a sand filter to maintain a recharge concentration at or below 7 mg/l. This estimate is
on the conservative side because it does not account for inflow, outflow, or upflow from other
areas.
Areas such as Fall River Estates, Wild River and Ponderosa Pines do not require as much
acreage to achieve an adequate amount of mixing and dilution of nitrates because they are
located in areas of higher precipitation at the western edge of the aquifer. Also, the aquifer
gradient is steeper resulting in more dilution due to higher groundwater flow rates. La Pine and
portions of Oregon Water Wonderland and Stage Stop Meadows subdivisions served by sewer
systems are also not contributing to the overall nitrate loading problem in the region.
C. Legislation.
In October 1998, Congress passed legislation to assist Deschutes County in purchasing a 540 -
acre tract of land from the Bureau of Land Management. This tract is located between La Pine
and Wickiup Junction, west of Highway 97 and east of Huntington Road. A sewer line
between the communities of La Pine and Wickiup Junction runs through the property.
This property is intended to be the site of a new neighborhood that will be serviced by sewer
and water systems, and paved roads. Residential use will predominate, although community
needs such as a senior center, library, assisted living facility and limited neighborhood
commercial uses may be developed. A design process known as a "charette" occurred in
November 1998. This design workshop occurred over a three-day period with the participation
of over 80 people from the community.
The initial design encompasses a neighborhood primarily residential in character with sewer,
water and a road network of paved streets and access roads without curbs. A setback of 300
feet from Highway 97 has been incorporated into the eastern boundary of the design. A senior
center and assisted living facilities are included in the southern part of the property adjacent to
the community of La Pine. This preliminary design will be evaluated to determine lot sizes and
density, development costs, phasing of development and the ability to use transferable
development credits as a tool for the overall development of the new neighborhood.
D. Transferable development credits.
A TDC (Transferable Development Credit) Program has been developed to redirect some of the
future development of residential dwellings from lots served by on-site sewage disposal (septic)
systems to the residentially zoned districts in the Neighborhood Planning Area in the La Pine
UUC that will be connected to water and sewer systems.
Page 4 of 8 - EXHIBIT "A" TO ORDINANCE NO. 2002-009 (4/24/02)
EXHIBIT "A"
A TDC is a severable interest in real property that represents the right to construct a single-
family dwelling and an on-site sewage disposal system The TDC program code has been
adopted in compliance with the provisions of ORS 94.53 1
The essential elements of the TDC program are to be codified in Title 11, County Owned Land
and Property, of the Coun1y Code The TDC program is intended t^^r-eatien e f a He
neighbor -heed -redirect some of the future residential growth from existing subdivisions in South
Deschutes County, also identified as the "sending area" where TDCs are allocated to eli ig'ble
lots, into the Neighborhood Planning Area also referred to as the "receiving area" where TDCs
are required to be redeemed based on a net developable acreage formula.between La Pine d
will "" ""e o� o�=e�=eetien f successful the TDC program will reduce the overall
r
impact from development away fiem platted le4s in flood plains, wetlands, deer migration
corridors and areas susceptible to groundwater pollution from nitrates. Shifting fi,+ r -e
residential epaient away ffefarthese ar-easlt will also help to maintain open space and
preserve the rural character of the area by reducing the overall density of development that
would otherwise eeeor-exist in the future if a dwelling were built on every legal existing lots. In
the sending area the TDC program will operate in a voluntary market-driven manner. Those
property owners who choose to sell their TDCs will retain ownership of the underlying land on
which certain uses such as camping wood cutting vegetation management agricultural use
and construction of a small storage structure will be allowed A Conservation Easement will be
placed on the property that will prohibit the construction of a single-family dwelling and on-site
sewage disposal system on the propert. Property owners who sell their TDCs and enter into a
Conservation Easement restricting future uses on their property may elect to sell the deed for
the underlying property to a willing buyer.
fluetuating eemmedity, i4iere a prepe I ld keep his or- her- land, but sell the figh4 to
-a to build in the new neighbafheed eould the
diffeFeat lot s* the new neighber-heed mast still be detefmined. 14 appears the mes
equitable system is a fnethed based on valuation of pfepef:ty.
E. Public participation.
The RPS project has involved all aspects of the community, including property owners, interest
groups, public agencies and government at the local, state and federal levels. Over 20
stakeholder meetings and 5 public forums were held. T-vAe Eight newsletters and other mailings
have been sent out to an extensive mailing list of property owners and other interested
individuals, community organizations and local governments. The local press has covered this
topic with a number of articles and news reports on several occasions.
According to dwse-written
surveys the top three priorities for the residents of South Deschutes County mare: _lto retain
open space to maintain the rural character of the area,-• Lto not allow septic systems in areas of
high groundwater; and 3) to allow for experimentation with alternative methods of sewage
disposal. Among the least favored options was extending sewer throughout the region due to
the high cost associated with this expansion. However, several small sewer systems exist in the
region and people whe commented c< the . ity MEshep and testified befefe the
Planning Commission i n December- indi * a at public meetings and hearings that the option of
using sewer systems to dispose of sewage should continue to be explored.
Page 5 of 8 - EXHIBIT "A" TO ORDINANCE NO. 2002-009 (4/24/02)
EXHIBIT "A"
To ensure that public involvement was as great as possible regarding die -proposed amendments
in 1998 to the comprehensive plan and zoning ordinance, an additional newsletter was mailed
in 1998 This ne ile4efthat contained a notice of the -public hearings held- in
Deeember- the Deschutes County Planning Commission and the Board of County
Commissioners. regarding the pfepesed afnendments. The newsletter also described various
aspects of the RPS program, characterized design elements of the new neighborhood as a result
of the design charette and encouraged people to attend a community workshop held in early
December to learn more about the amendments. This newsletter was mailed to over 5,000
property owners, including the owners of all lots in the RPS project area which are zoned RR -
10 and less than 2 acres in size, and the stakeholders, interest groups, agencies, etc., who had
previously participated or expressed an interest in the RPS project.
G,,unt. , staff assembled c ....,.e -More detailed paeket of information about the RPS project in
oeee ern98This paeket ineludes including information on a v afioj'-ef topies=elat `. te
RPS primeet ineluding experimental on-site technology, alternative solutions,
transferable development credits and a bibliography of the studies and other sources of
information used to analyze the region's problems and to formulate solutions was made
available at the hearings.
F. LCDC Acknowledgement.
In September 2000 the Oregon Land Conservation and Development Commission (LCDC)
conducted a hearing and approved the County's request to expand the La Pine UUC to include
the area formerly recognized as the Wickiup Junction Rural Service Center and the New
Neighborhood area The Neighborhood area includes a tract of land the County purchased from
the Bureau of Land Management and a privately owned parcel.
LCDC also improved the County's comprehensive plan designation and rezoning of the area
added to the La Pine WC from resource lands zoned exclusive farm use to various planning
districts that allow for the creation of a residential subdivdivision served by municipal water
and sewer systems and paved roads.
(Ord. 2002-009 § 1, 2002; Ord. 2002-005 § 1, 2002; Ord. 2000-017 § 1; 2000; Ord. 98-085 § 1;
1998)
23.44.020. Goals.
1. To preserve water and air quality, reduce wildfire hazards and protect wildlife habitat.
2. To ensure that domestic water derived from groundwater meets safe drinking water
standards.
3. To develop an equitable, market-driven system, that reduces the potential development of
existing lots in floodplains, wetlands, mule deer migration corridors and areas susceptible
to groundwater pollution.
4. To create a new neighborhood, primarily residential in character, between La Pine and
Wickiup Junction, that provides services efficiently, sustains economic development and
reduces adverse impacts to groundwater quality in South Deschutes County.
5. To explore expal innovative sewage treatment and disposal methods.
(Ord. 2002-009 § 1, 2002; Ord. 2002-005 § 1, 2002; Ord. 2000-017 § 1; 2000; Ord. 98-085 § 1;
1998)
23.44.030. golieiesStrategies.
1. The County shall continue to work with landowners, citizens, community organizations and
governmental agencies at the local, state and federal level to:
a. Continue collaborative work on the Regional Problem Solving project.
Page 6 of 8 - EXHIBIT "A" TO ORDINANCE NO. 2002-009 (4/24/02)
EXHIBIT "A"
b. Develop, review and implement land use policies and development standards that will
ensure that agreed-upon solutions from the RPS project are enacted to the maximum
extent possible.
c. Analyze the feasibility of aequiring 1&quire land from the BLM between La Pine and
Wickiup Junction, west of Highway 97, to develop as a new neighborhood.
d. Conduct feasibility studies regarding development of a new neighborhood. Such
studies may include, but are not limited to: a master design plan, development costs and
funding options, water and sewer system feasibility, traffic impacts, and zoning codes
and governance issues.
e. Install and monitor innovative on-site sewage treatment and disposal (septic) systems
on privately owned parcels in the RPS project area as part of the La Pine National
Decentralized Wastewater Treatment Demonstration Project funded by the U.S.
Environmental Protection Agency and in cooperation with the Oregon Department of
Environmental Quality.
f. Work cooperatively with the U.S. Geological Survey and Oregon Water Resources
Department during well water sampling and analysis to advance three-dimensional
groundwater and nutrient fate and transport modeling in the south Deschutes County
area.
2. The County shall eentinue te develepimplement and analyzemonitor in accordance with
23.44.030(D), a Transferable Development Credit program as a pessible--means to redirect
potential growth away from residential lots in subdivisions throughout the region into the
new neigkberheedLa Pine Neighborhood Planning Area. The County shall establish a
TDC Review Committee to assist in analog and recommending any changes deemed
appropriate to the TDC program.
3. The County shall continue to evaluate means to reduce nitrate loading from on-site sewage
disposal systems by exploring ex o fneata' innovative on-site sewage treatment and
disposal technology, retrofitting of existing substandard or inappropriately located disposal
systems, expansion of sewer systems, development of standards such as an effective lot
area or variable lot area requirements, or other measures that will accomplish the goals.
4. New residential subdivisions and partitions in the
andAi,—La Pine Urban Unincorporated Community shall be connected to a community
water system and either the .La Pine Special Sewer District sewage dispesal-treatment
system or a community waste water treatment facility that meets Oregon Department of
Environmental Quality standards.
(Ord. 2002-009 § 1, 2002; Ord. 2002-005 § 1, 2002; Ord. 2000-017 § 1; 2000; Ord. 98-085 § 1;
1998)
Page 7 of 8 - EXHIBIT "A" TO ORDINANCE NO. 2002-009 (4/24/02)
EXHIBIT "A"
23.44.040. Map.
South Deschutes County
Regional Problem Solving
Project Area MapF,
STUDY
.'? :AREA...
F' ,�,
gR?
::Bend,
7UN1(,12 Mi.)
VEYR.�
4
km,
5
x a 1.5- . 2 Miles
Pill!'
STUD
AREJ
3
WICKIUP
/ JCT
I NEW I
I'NEIGHBORHOOD
Page 8 of 8 - EXHIBIT "A" TO ORDINANCE NO. 2002-009 (4/24/02)