47-974-Resolution No. 83-030 Recorded 6/30/1983974
BEFORE THE BOARD OF COUNTY COMMISSIONERS OF DESCHUTES COUNTY, OREGON
A Resolution Adopting and
Continuing Fees For the
Community Development
Department, Providing For the *
Doubling of Fees For Applica- *
tions Received After an
Activity For Which a Permit
and Fee Was Required Was
Initiated, and Providing an
Effective Date.
RESOLUTION NO. 83-030
GARY SUE PEN OLLOIVV, CO. 0
LER{f
WHEREAS, the Community Development Department charges fees
for services and permits; and
WHEREAS, it is necessary to amend the fee schedule to reflect
the cost of the permits or services provided; and
WHEREAS, the Community Development Department has studied the
fees currently charged and has recommended that certain fees be
amended; and
WHEREAS, the Board of County Commissioners has reviewed the
proposed fee schedule; now, therefore,
BE IT RESOLVED BY THE BOARD OF COUNTY COMMISSIONERS OF
DESCHUTES COUNTY, OREGON, as follows:
Section 1. That the fees set forth in Exhibit "A", attached
hereto and by this reference made a part hereof, are hereby
adopted as the fees for the Planning Division and Environmental
Health Division of the Community Development Department. Those
fees with dates are continued unchanged from the date said fees
were adopted.
Section 2. The fees for the Building Safety Division of the
Community Development Department shall remain unchanged at the
maximum level provided within the Building Codes.
Section 3. That any application for a required service or
permit received after an activity has commenced or been completed
for which a fee is required shall be charged at two times the fee
set forth in Sections 1 and 2 of this Resolution.
Section 4. This Resolution is effective July 1, 1983.
1 - RESOLUTION NO. 83-030
y
vol, 47 PAGE 975
DATED this J&day of 1983.
BOARD OF COUNTY COMMISSIONERS
OF DESCHUTF„S COUNTY, OREGON
ATTE/ST":,
Reco' ording Secretary
2 - RESOLUTION NO. 83-030
, Commissioner
A. TUTTLEJ, Commissioner
PLANNING DIVISION FEES
von 47 PAce 976
APPEALS . . . . . . . . . . . . . . . . .
. . . $ 405.00
APPEALS/ADM . . • • • • • • • • . • • . .
. • • 150.00
CONDITIONAL USE . . . . . . . . . . . . .
. . . . 245.00
CONDITIONAL USE/MOBILE HOME . . . . . . .
. . . . 120.00
EXTENSION - ADM . . . . . . . . . . . . .
. . . . .50.00
EXTENSION - H.0 . . . . . . . . . . . . . .
. . . . 170.00
FEASIBILITY LOOKUPS . . . . . . . . . . .
. . . . . 5.00
FOREST MANAGEMENT PLAN . . . . . . . . . .
. . . . 40.00*
12-7-82
LANDSCAPE MANAGEMENT PLAN . . . . . . . .
. . . . .25.00*
12-7-82
LOT LINE ADJUSTMENT . . . . . . . . . . .
. . . . .35.00*
12-7-82
MAJOR PARTITION . . . . . . . . . . . . .
. . . . 230.00
MASTER PLAN . . . . . . . . . . . . . . .
. . . . 500.00
MASTER PLAN WITH SUBDIVISION . . . . . . .
. . . .250.00
MINOR PARTITION . . . . . . . . . . . . .
. . . . 210.00
PLAN AMENDMENT . . . . . . . . . . . . . .
. . . .585.00
PLOT PLAN SIGN -OFF . . . . . . . . . . . .
. . . . 10.00
ROAD DEDICATION . . . . . . . . . . . . .
. . . . .40.00*
12-7-82
ROAD NAME CHANGE . . . . . . . . . . . . .
. . . 100.00
SIGN PERMIT . . . . . . . . . . . . . . ...
. . . 50.00
SIGN PERMIT VARIANCE . . . . . . . . . . .
. . . .100.00
SITE PLAN - MINOR ALTERATION . . . . . . .
. .185.00
- MAJOR ALTERATION . . . . . . .
. . . .250.00
- NEW DEVELOPMENT (SMALL) ... .
. . . . 300.00
- NEW DEVELOPMENT (LARGE) . . .
. . . . 300.00 +
$10/acre
- SURFACE MINING . . . . . . . .
. . . .435.00
SUBDIVISION NAME CHANGE . . . . . . . . .
. . . . 100.00
SUBDIVISION TYPE I . . . . . . . . . . . .
. . . .315.00 +
$10/lot
SUBDIVISION TYPE II . . . . . . . . . . .
. . . . 240.00 +
$10/lot
TAX LOT LOOKUPS . . . . . . . . . . . . .
. . . . 5.00
TEMPORARY USE . . . . . . . . . . . . . .
. . . . .95.00
TEMPORARY USE/MOBILE HOME . . . . . . . .
. . . . .70.00
VARIANCE . . . . . . . . . . . . . . . . .
. . . .280.00
ZONE CHANGE . . . . . . . . . . . . . . .
. . . . 465.00
EXHIBIT "A"
VOL 47 PACE 977
Activity
Surcharge
Site Evaluation: For each One Thousand (1,000) gallons
projected daily sewage flow or part thereof,
up to
a maximum surcharge of Seventy five ($75.00)
. . . . .15.00
Construction -Installation Permit . . . . . .
. . . . . 5.00
EXCEPTION: Repair permits are not subject to
a surcharge.
Alteration Permit . . . . . . . . . . . . . .
. . . . 5.00
Authorication Notice . . . . . . . . . . . .
. . . . . 5.00
Refunds, The Agent may refund a fee accompanying
an application
if the applicant withdraws the application before
the Agent
has done any field work or other substantial
review of the
application.
Licenses:
Food Service:
Full Service Restaurant . . . . . . . . .
. . . . 200.00
Commissary . . . . . . . . . . . . . . .
. . . . .140.00
Warehouse . . . . . . . . . . . . . . . .
. . . . .45.00
Limited Service . . . . . . . . . . . . .
. . . . .60.00
Temporary Restuarant . . . . . . . . . .
. . . . . 50.00
Mobile Units, each . . . . . . . . . . .
. . . . . 60.00
Vending Machines: . .
1-10 . . . . . . . . . . . . . . . . . .
. . . . . 50.00
11-20 . . . . . . . . . . . . . . . . . .
. . . . . 75.00
21-30 . . . . . . . . . . . . . . . . . .
. . . . 100.00
31-40 . . . . . . . . . . . . . . . . . .
. . . . 125.00
41-50+ . . . . . . . . . . . . . . . . .
. . . . 150.00
Certificates of Sanitation:
Tourist Accomodations & recreation parks
1-50 Units . . . . . . . . . . . . . . .
. . . . . 80.00
51-75 Units . . . . . . . . . . . . . . .
. . . . 120.00
76-100 Units . . . . . . . . . . . . .
. . . . .160.00
Organization camp or picnic park . . . . . .
. . . . . 60.00
Swimming Pools:
License (public pool, spa, bathhouse) . . . .
. . . . 160.00
Children's Services:
Foster home/day care inspections . . . . . .
. . . . .60.00
Loan Inspections:
Water . . . . . . . . . . . . . . . . . . . .
. . . . 25.00
Sewage . . . . . . . . . . . . . . . . . . .
. . . . 60.00
VOL 47 TA78,
Authorization Notice Denial Review . . . . . . . . . . 60.0
Annual Evaluation of Alternative System .(where required) . 60.00
Annual Evaluation of Large System (2501 to 5000 GPD) . . . .60.00
Annual Evaluation of Temporary or Hardship Mobile Home . . .60.00
Variance to On -Site System Rules . . . . . . . . . . . . . 225.00
NOTE: The variance application fee may be waived if
the applicant meets the requirements of OAR 340-71-415(5).
Rural Area Variance to Standard Subsurface Rules:
Site Evaluation . . . . . . . . . . . . . . . . . . . 150.00
NOTE: In the event there is on file a site evaluation
report for that parcel that is less than ninety (90) days
old, the site evaluation fee shall be waived.
Construction -Installation Permit...The appropriate fee
identified in subsection (1)(b) of this rule applies.
Sewage Disposal Service:
Annual Business License . . . . . . . . . . . . . . .150.00
EXCEPTION: The application fee for a license valid during
the period July 1, 1983 through June 30, 1984 shall be
$100.
Transfer of or Amendments to License . . . . . . . . .75.00
Reinstatement of Suspended License . . . . . . . . . 100.00
Pumper Truck Inspection . . . (Each vehicle). . . . . 25.00
Experimental Systems:
Permit . . . . . . . . . . . . . . . . . . . . . . . 100.00
Existing System Evaluation Report . . . . . . . . . . 60.00
NOTE: The fee shall not be charged for an evaluation
report on any proposed repair, alteration or extension
of an existing system.
Contract County Fee Schedules, General:
Each county having an agreement with ..Department under ORS
454.725 shall adopt a fee schedule for services rendered and
permits and licenses to be issued.
A copy of the fee schedule and any subsequent amendments to
the schedule shall be forwarded to the Department.
Fees shall not:
Exceed actual costs for efficiently conducted services; or
Exceed the maximum established in Section (1) of this rule,
unless approved by the Commission pursuant to ORS 454.745(4).
Surcharge. In order to offset a portion of the administrative costs
of the statewide on-site sewage disposal program, a surcharge for
each activity, as set forth in the following schedule, shall be
levied by the Department and by each Agreement County. Proceeds
from surcharges collected by the Department and Agreement Counties
shall be accounted for separately. Each Agreement County shall
forward the proceeds to the Department as negotiated in the
memorandum of agreement (contract) between the County and the Department
VOL 47 FAcE 979
The permit fee required for standard, cesspool, seepage pit,
steep slope and seepage trench systems may be reduced to
sixty ($60.00) dollars, providing per permit application is
submitted to the Agent within six (6) months of the site
evaluation report date, the system will serve a single family
dwelling, and a site visit is not required before issuance of
the permit.
For systems projected daily sewage flows greater than One
Thousand (1,000) gallons, the construction -installation permit
fee shall be equal to the fee required in OAR 340-71-140
(1)(b)(A) plus $10 for each Five Hundred (500) gallons or
part thereof above One Thousand (1,000) gallons.
NOTE: Fees for construction permits for systems with projected
daily sewage flows greater than Five Thousand (5,000) gallons
shall be in accordance with the fee schedule for WPCF permits.
Commercial Facility System, Plan Review:
For a system with a projected daily sewage flow of less than
Six Hundred (600) gallons, the cost of plan review is included
in the permit application fee.
For a system with a projected daily sewage flow of Six Hundred
(600) gallons, but not more than One Thousand (1,000) gallons
projected daily sewage flow . . . . . . . . . . . .60.00
Plus for each Five Hundred (500) gallons or part thereof
above One Thousand (1,000) gallons, to a maximum sewage flow
limit of Five Thousand (5,000) gallons per day . . . . . 15.00
Plan review for systems with projected sewage flows greater
than Five Thousand (5,000) gallons per day shall be pursuant
to OAR 340, Division 52.
Permit Denial Review . . . . . . . . . . . . . . . . . .50.00
Construction -Installation Permit Renewal:
If field visit required . . . . . . . . . . . . . . .60.00
No field visit required . . . . . . . . . . . . . . . . .10.00
NOTE: Renewal of a permit may be granted to the original
permittee if an application fpr permit renewal is filed
prior to the original permit expiration date. Refer to
OAR 340-71-160 (10).
Alteration Permit . . . . . . . . . . . . . . . . . . . . . . 95.00
Repair Permit:
Single Family Dwelling . . . . . . . . . . . . . . . . . 35.00
Commercial Facility... The appropriate fee identified in
paragraphs (1)(b) (A) and (B) of this rule applies.
Permit Denial Review . . . . . . . . . . . . . . . . 60.00
Authorization Notice:
If field visit required . . . . . . . . . . . . . . . . .25.00* 1-26-83
No field visit required . . . . . . . . . . . . . . . . .25.00* 1-26-83
f
VOL 47 FACCL 980
ENVIRONMENTAL HEALTH FEES
ON-SITE SEWAGE DISPOSAL SYSTEMS
New Site Evaluation:
Single Family Dwelling: First Lot . . . . . . . . .
150.00
Each Additional Lot Evaluated During Initial Visit .
.130.00
Commercial Facility System:
For First One Thousand (1,000) Gallons projected
daily sewage flow . . . . . . . . . . . . . . . . . .
150.00
Plus for each Five Hundred (500) Gallons or part
thereof above One Thousand (1,000) Gallons for
projected daily sewage flows up to Ten Thousand
(10,000) Gallons . . . . . . . . . . . . . . . . . .
. 50.00
Plus for each One Thousand (1,000) Gallons or part
thereof above Ten Thousand (10,000) Gallons . . . . .
20.00
Site Evaluation Denial Review . . . . . . . . . . . . . .
. 60.00
Fees for site evaluation applications made to an agreement
county shall be in accordance with that county's fee
schedule.
Each fee paid entitles the applicant to as many site
inspections on a single parcel or lot as are necessary
to determine site suitability for a single system. The
applicant may request additional site inspections within
ninety (90) days of the initial site evaluation, at no
extra cost.
Separate fees shall be required if site inspections are
to determine site suitability for more than one (1) system
on a single parcel of land.
Construction Installation Permit:
For first One Thousand (1,000) Gallons projected daily
sewage flow:
Standard On -Site System . . . . . . . . . . . . .
Alternative System:
Aerobic System . . . . . . . . . . . . . . . . .
Capping Fill . . . . . . . . . . . . . . . . . .
Cesspool . . . . . . . . . . . . . . . . . . . .
Evapotranspiration -Absorption . . . . . . . . .
Gray Water Waste Disposal Sump . . . . . . . . .
Holding Tank . .
Pressure Distribution . . . . . . . . . . . . .
Redundant . . . . . . . . . . . . . . . . . . .
Sand Filter . . . . . . . . . . . . . . . . . .
Seepage Pit . . . . . . . . . . . . . . . . . .
Seepage Trench . . . . . . . . . . . . . . . . .
Steep Slope . . . . . . . . . . . . . . . . .
Tile Dewatering . . . . . . . . . . . . . . . .
Split Waste
Non -Water Carried . . . . . . . . . . . . . . .
Gravel -less Ssytem . . . . . . . . . . . . . . .
Low -Flush Toilets . . . . . . . . . . . . . . .
50.00* 1-26-83
90.00
75.00
50.00
.90.00
50.00
50.00
.75.00
. 50.00
100.00
.50.00
50.00
.50.00
.75.00
.50.00
50.00*
50.00*
.50. 00*
1-26-83
1-26-83
1-26-83