29-867-Resolution Recorded 3/6/1979t
29W%`7
IN THE BOARD OF COUNTY COMMISSIONERS OF THE STATE OF OREGON
FOR DESCHUTES COUNTY
In the Matter of )
R E S O L U T I O N
CITY OF REDMOND, )
AIRPORT INDUSTRIAL PARK PROJECT )
WHEREAS, the Economic Development Administration (EDA) regulations require
that the City of Redmond must have legal title to all lands included within the
Airport Industrial Project during the construction period; and
WHEREAS, this includes legal title to the rights-of-way for the proposed
arterial road which extends East from.South Highway 97 and Wickiup Avenue to and
through the industrial park to connect with Sisters Avenue on the North;
NOW, THEREFORE, IT IS HEREBY RESOLVED that the Deschutes County Board of
Commissioners hereby conveys the rights-of-way, as described below, to the City
of Redmond for the duration of the construction period for the City of Redmond,
Airport Industrial Park Project:
An easement through a portion of the North Half of Section 28, the South-
east Quarter of Section 21, and the West Half of Section 22, Township
15 South, Range 13 East, Willamette Meridian, Deschutes County, Oregon,
lying 60 feet on each side of the following -described centerline:
Beginning at a 3" brass cap marking the Northeast corner of
said Section 21; thence South 680 07' 54" East a distance of
818.41 feet to the "True Point of Beginning" for this center-
line description; thence South 150 31' 01" East 1,222.26 feet;
thence following along the arc of a 1,100.00 foot radius curve
right through a central angle of 150 22' 18" an arc distance
of 295.11 feet; thence South 000 08' 43" East 1,088.62 feet;
thence along the arc of a 1,100.00 foot radius curve right
through a central angle of 540 12' 12" an arc distance of
1,040.63 feet; thence South 540 03' 28" West a distance of
826.37 feet to the East line of said Section 21; thence con-
tinuing South 540 03' 28" West 1,588.59 feet; thence along the
arc of a 1,100.00 foot radius curve right through a central
angle of 350 24' 32" an arc distance of 679.80 feet, crossing
the South line of said Section 21 at an arc distance of 314.81
feet; thence South 890 28' 00" West 1,107.16 feet; thence
along the arc of a 800.00 foot radius curve left through a
central angle of 310 05' 31" an arc distance of 434.13 feet;
thence South 580 22' 29" West 522.18 feet; thence along the
arc of a 453.81 foot radius curve right through a central
angle of 660 56' 05" an arc distance of 530.16 feet; thence
North 540 41' 26" West 821.21 feet to the terminus of this
centerline (from said point of terminus the Southwest corner
of said Section 21 bears North 880 48' 01" West a distance of
232.56 feet).
PAGE -1- RESOLUTION
` Zu
SUBJECT TO all easements, restrictions and rights-of-way of
record.
Implicit within this Resolution is an agreement on the part of the City of
Redmond to transfer all or part of the completed arterial road and the rights-of-way
therefor to Deschutes County, based upon a subsequent determination of the City
of Redmond and Deschutes County responsibilities for maintenance of the constructed
arterial road.
A hearing to hear objections to said exchange shall be held in the Deschutes
County Courthouse Annex, Conference Room "A," on Wednesday, March 21, 1979, at
10:00 a.m.
DATED this day of March, 1979.
BOARD OF COMMISSIONERS
00,
Ch firman
4�7-1
C:
Commissioner f
To be published
in The.Bulletin:
March 8, 1979
March 15, 1979
PAGE -2- RES'OLUTI'ON
va 29FAVE 869
Proposed Resolution
In the matter )
of ) RESOLUTION
City of Redmond, Airport )
Industrial Park Project )
The Economic Development Administration (EDA) regulations require
that the City of Redmond must have legal title to all lands included
within the Airport Industrial Project during the construction period.
This includes legal title to the rights of way for the proposed arterial
road which extends east from South Highway 97 and Wickiup Avenue to and
through the industrial park to connect with Sisters Avenue on the north.
THE DESCHUTES COUNTY BOARD OF COMMISSIONERS hereby conveys (intends
to convey) the rights of way as described below to the City of Redmond
for the duration of the construction period for the City of Redmond --
Airport Industrial Park Project.
Implicit within this resolution is an agreement on the part of the
City of Redmond to transfer all or part of the completed arterial road
and the rights of way therefor to Deschutes County based upon a subsequent
determination of the City of Redmond and Deschutes County responsibilities
for maintenance of the constructed arterial road.
VOL FACE8 ! 0
EASEMENT DESCRIPTION
An easement through a portion of the North Half of Section
28, the Southeast Quarter of Section 21, and the West Half
of Section 22, Township 15 South, Range 13 East, Willamette
Meridian, Deschutes County, Oregon, lying 60 feet on each
side of the following described centerline:
Beginning at a 3" brass cap marking the Northeast
corner of said Section 21.; thence South 68° 07'
54" East a distance of 818.41 feet to the "True
Point of Beginning" for this centerline descrip-
tion; thence South 150 31' 01" East 1,222.26 feet;
thence following along the arc of a 1,100.00 foot
radius curve right through a central angle of 15*
22' 18" an arc distance of 295.11 feet; thence
South 00° 08' 43" East 1,088.62 feet; thence along
the arc of a 1,100.00 foot radius curve right
through a central angle of 54° 12' 12" an arc
distance of 1,040.63 feet; thence South 54° 03' 28"
West a distance of 826.37 feet to the East line of
said Section 21; thence continuing South 541 03'
28" West 1,588.59 feet; thence along the arc of a
1,100.00 foot radius curve right through a central
angle of 35° 24' 32" an arc distance of 679.80
feet, crossing the South line of said Section 21
at an arc distance of 314.81 feet; thence South
890 28' 00" West 1,107.16 feet; thence along the
arc of a 800.00 foot radius curve left through a
central angle of 310 05' 31" an arc distance of
434.13 feet; thence South 58° 22' 29" West 522.18
feet; thence along the arc of a 453.81 foot radius
curve right through a central angle of 660 56' 05"
an arc distance of 530.16 feet; thence North 541
41' 26" West 821.21 feet to the terminus of this
centerline (from said point of terminus the South-
west corner of said Section 21 bears North 881 48'
01" West a distance of 232.56 feet).
SUBJECT TO: All easements, restrictions and
rights-of-way of record.