Loading...
24-166-Order Recorded 3/2/1977YM 4 I IN THE BOARD OF COUNTY COMMISSIONERS OF THE STATE OF OREGON FOR THE COUNTY OF DESCHUTES In the Matter of the Establishment of PINEBROOK BOULEVARD ORDER ESTABLISHING BE IT REMEMBERED, that at a term of the Board of County Commissioners of Deschutes County, Oregon, begun and held at the County Courthouse in Bend in said County on January 19, 1977, the same being a term of said Board of County Commissioners sitting for the transaction of County business, at which time the Board of County Commissioners legally, by resolution, proposed the establish- ment of PINEBROOK BOULEVARD. THAT on the said Wednesday, January 19, 1977, the Board of County Commissioners did consider that a public necessity existed for the establish- ment of said road hereinafter described, and did order that legal notice be given, and appointed March 2, 1977, as the day of hearing on the establishment of PINEBROOK BOULEVARD. And now at this time it appearing to the Board of County Commissioners that due notice of this intention and this proceeding has been given, as by law required, for more than thirty (30) days preceding the day named in said resolu- tion and said notice for a hearing hereon; and this being after the date for hearing objections to such establishment, if anytherebe, and there were none. IT IS THEREFORE ORDERED AND DECREED that PINEBROOK BOULEVARD shall be established as described in said resolution and by order herein as follows, to- wit: A strip of land sixty (60.00) feet in width containing 3.45 acres, more or less, located in the North one=half of the Northwest one-quarter (N1/2 NW1/4) of Section 17 and in the northeast one-quarter of the north- east one-quarter (NE1/4 NE1/4) of Section 18, all in Township 18 South, Range 12 East of the Willamette Meridian, Deschutes County, Oregon; and further being within Pinebrook Phase I and that portion in a Replat in Pinebrook Phase II recorded in Deschutes County, Oregon, the aforesaid strip of land being 30.00 feet on each side of the following described centerline: Commencing at the northwest section corner of said Section 17; thence South 89°44'37" East along the northerly said section line 1913.6 feet, more or less, thence leaving said northerly line South 00°26'26" West 412.00 feet, more or less, to the true point of beginning, said point further being on the westerly right-of-way line of the Dalles- California Highway (U.S. 97) as described in Pinebrook Phase 1; thence along the centerline of Pinebrook Boulevard the following courses: North 89°44'37" West 674.8 feet, more or less, to that portion replatted in Pinebrook Phase II; thence along on an arc of a 6470.13 foot radius curve left 213.02 feet, (the long chord of which bears South 89° 18'47" West 213.0 feet); thence South 88°22'12" West 22.61 feet; thence along on an arc of a 3142.14 foot radius curve right 178.23 feet, (the long chord of which bears South 89°59'42" West 178.21 feet); thence North 88°22'48" West 21.91 feet; thence along on an arc of a 464.49 foot radius curve left 141.67 feet, (the long chord of which bears South 82°52'56"West 141.12 feet); ORDER ESTABLISHING PINEBROOK BOULEVARD VOL 24 PW 1-s7 Page 2 thence South 74°08'40" West 55.01 feet; thence along on an arc of a 206.60 foot radius curve right 60.78 feet, (the long chord of which bears South 82°34'20" West 60.56 feet); thence along on an arc of a 100.00 foot radius curve left 52.37 feet, the long chord of which bears South 76°00'00" West 51.77 feet; thence along on an arc of a 200.00 foot radius curve left 76.57 feet, to that portion platted in Pinebrook Phase I (the long chord of which bears South 50°02'00" West 76.10 feet); thence South 39°03'59" West 10.75 feet; thence along on an arc of a 100.00 foot radius curve right 87.59 feet, (the long chord of which bears South 64°09'35" West 84.82 feet); thence South 89°15'11" West 111.59 feet; thence along on an arc of a 800.00 foot radius curve left 134.91 feet, (the long chord of which bears South 84°25'19" West 134.75 feet); thence South 790 35'26" West 95.42 feet; thence along on an arc of a 400.00 foot radius curve right 64.78 feet, (the long chord of which bears South 84013'48" West 64.71 feet); thence South 88°52'11" West 110.36 feet; thence along on an arc of a 100.00 foot radius curve right 40.47 feet, (the long chord of which bears North 79°32'11" West 40.19 feet); thence North 67°56'34" West 71.21 feet; thence along on an arc of a 1600.00 foot radius curve left 216.38 feet, (the long chord of which bears North 71°49'02" West 216.22 feet) to a point on the Westerly boundary line platted in Pinebrook Phase I and terminus of this description. NOW, THEREFORE, IT IS FURTHER ORDERED that the Deschutes County Surveyor shall file a plat of said road, as surveyed on the ground, with the road records of Deschutes County. Dated at Bend, Deschutes County, Oregon this J_~ay of March, 1977. DESCHUTES COUNTY BOARD OF COMMISSIONERS Chairman ommissioner 01 Co o er 17 - JOA:kc