23-907-Resolution Recorded 1/19/19770
In the Matter
of
Cot) ME My
IN THE BOARD OF COUNTY COMMISSIONERS
OF THE STATE OF OREGON
FOR THE COUNTY OF DESCHUTES
RESOLUTION
PINEBROOK BOULEVARD
Be It Remembered, that at a term of the Board of County Commissioners,
begun and held at the County Courthouse in Bend, in said County on this 19th
day of January 1977 and continued from day to day thereafter to and including the
date of the Resolution the same being a term of said Board of County Commissioners
sitting for the transaction of County business, and at which time said Board of
County Commissioners may, by Resolution, propose any county road, the following
among other proceedings rotas had, to -wit:
WHEREAS, it is; herebyconsidered that a public necessity exists for the
establishment of the road hereinafter described, said Board of County Commissioners
does hereby declare its intention to establish a county road in Deschutes County,
Oregon, by Resolution, described as follows, to -wit:
A strip of land Sixty (60.00)`feet jn.wi'dth containing 3.45 acres, more
or less, located in the North One -Half of the Northwest One -Quartet (Nz NW''4) of
Section Seventeen (17) and in the Northeast One -Quarter of the Northeast One -
Quarter (NE's NEk) of Section Eighteen (18), all in Township Eighteen (18) South,
Range Twelve (12) East of the Willamette Meridian, Deschutes County, Oregon,; 'And
further being within Pinebrook Phase I and that portion in a Replat,in Pinebrook
Phase Il recorded in Deschutes County, Oregon, the aforesaid strip of land being
thirty (30.00) feet on each side of the following described centerline:
Commencing at the Northwest section corner of said Section 17 thence
South 89" 44' 37" East along the Northerly said Section line 1913.6 feet, more
or less, thence leaving said Northerly line South 00' 26' 2"6" West 412.00 feet,
more or less, to the true point of beginning, said point further being on,the
Westerly right-of-way line of the Dalles-California Highway (U.S.<97) as
described in Pinebrook Phase I; thence along the centerline of Pinebrook
Boulevard the following courses: North 89° 44' 37" West 674.8 feet, more or
less, to that portion replatted in Pinebrook Phase II;.thence along on an arc'
of a 6470.13 foot radius curve left 213.02 feet, (the long chord of which bears
South 891 18''47" West 213.0 feet); thence South 88' 22':12" West 22.61 feet;
thence along on an arc of a 3142.14 foot radius curve right 178.23 feet, (the
long chord of which bears South 890 59' 42" West 178.21 feet): thence North 88°
22' 48" West 21.91 feet; thence along on an arc of a 464.49 foot radius curve
left 141.67 feet, (the long chord,of which bears South 82° 52' 56" West 141.12
feet); thence South 740 08' 40" West 55.01 feet; thence along an an are of a
206.60 foot radius curve right 60.78 feet, (the long chord of 'which bears,South
820 34' 20" West 60.56 feet); thence along on an arc of a 100.00 foot radius
curve left 52.`37 feet, the long chord 'of which bears South 760 00' 00" West 51.77
VOL 23 phf 908
feet, thence along on an arc of a 200.00 foot radius curve left 76.57 feet, to that
portion platted in Pinebrook Phase I (the long chord of which bears South 500 02'
00" West 76.10 feet); thence South 39 03' 59" West.10.75 feet; thence along.on
an arc of a 100.00 foot radiuscurve right 87.59 feet, (the long chord of which
bears South 640 09' 35" West 84.82 feet); thence South 89" 15' lV' West 111.59
feet; thence along on an arc of a 800.00 foot radius curve left 134.91 feet, (the
long chord of which bears South 841 25' 19" West 134.75 feet); thence South 79c,
35' 26" West 95.42 feet; thence along on an arc of a 400.00 foot radius curve
right 64.78 feet, (the long chord of which bears South 840 13' 48" West 64.71 feet);
thence South 880 52' 11" West 110.36 feet; thencealongon an arc of a 100.00 foot
radius curve right 40.47 feet, (the long chord of which bears North 790 32' 11"
West 40.19 feet); thence North 670 56' 34" West 71.21 feet;, thence along on an
arc of a 1600.00 foot radius curve left 216.38 feet, (the long chord of which
bears North 710 49' 02" West 216.22 feet) to a point on the Westerly boundary
line platted in Pinebrook Phase I and terminus of this description.
NOW, THEREFORE, IT IS HEREBY ORDERED that the County Roadmaster or his
duly qualified deputy, shall give notice of this Resolution by posting true copies
thereof, properly certified to as such by the County Clerk, at, the place of holding
County Court and also at three public places in the vicinity of said proposed
road thirty days previous to the consideration of this Resolution by the Board of
County Commissioners, notifying all persons concerned that said Resolution will
be considered and passed upon by this Board of County Commissioners at a meeting
on the 2nd day of March, 1977 at which time the Board of County Commissioners
will consider any objections or -remonstrances which"may be filed on account of
said proposed road.
Dated at Bend, Deschutes County, Oregon this \ ` C/) N "AY day of � ,.1977.
.DESCHUTES COUNTY BOARD OF COMMISSIONERS:
1181, Al. 0 0'
COMM SSI ER