Loading...
18-901-Order Recorded 7/17/1974U q , % IN THE BOARD OF COUNTY COr4MISSIONERS OF THE STATE OF OREGON FOR THE COUNTY OF DESCHUTES In the Matter ) of ) Establishing Relative ) Codes including policies, ) O R D E R interpretations, definitions ) and fees pursuant to Senate ) Bill 73, Oregon State Building ) Code compliance. ) This matter coming before the County Commission for the purpose of compliance with Senate Bill 73, State-wide Building Code, and, The Commission deeming this action to be in the public .interest to establish provisions to implement Senate Bill. 73, State-wide Building Code; IT IS HEREBY ORDERED That the following provisions be adopted with respect to the Building Code of the State of Oregon and Deschutes County for the construction, enlargement, alteration, repair, moving, removal, conversion, demolition, occupancy, equipment, use, height, area and maintenance of buildings or structures within the unincorporated areas of Deschutes County, along with the collection of fees to defray administrative costs: BE! IT ORDAINED BY THE BOARD OF COMMISSIONERS FOR DESCHUTES COUNTY, OREGON, that: Certain books or publications and laws, copies of which are on file in the Office of the Deschutes County Clerk, marked and entitled "Oregon State Structural and Fire and Life Safety Code," "Oregon State Mechanical Specialty Code," "Uniform Code for the Abatement of Dangerous Buildings," 1973 Edition, the Oregon State Plumbing Laws as contained in 0. R. S. CHAPTERS 447, 670 and 693 and the Administrative Rules adopted thereunder, are adopted as the Building Code for the unincorporated areas of Deschutes County, Oregon except Table 3A and Appendix Chapter 13, of the Oregon State Structural and Fire and Life Safety Code, and the fees(see attached schedule) prescribed by Section 304 of the Oregon State Mechanical Specialty Code, Figures 23B10 and 23B14 (see attached map), are not adopted. It shall be the duty of the Deschutes County Building Administrator to enforce the provisions of the aforementioned code. INTERPRETATIONS AND DEFINITIONS: In applying the provisions of the Oregon State Structural and Fire and Life Safety Code, to construction on the County, the following interpretations will be used: APPOINTING AUTHORITY - shall apply to the Board of Commissioners for Deschutes County, Oregon. CITY - shall apply to unincorporated areas of. Deschutes County, Oregon, as hereinafter defined. CITY TREASURY - shall apply to COUNTY TREASURY. CITY RECORDER - shall apply to COUNTY CLERK. BUILDING DEPARTMENT - shall apply to DESCHUTES COUNTY BUILDING DEPARTMENT. BUILDING OFFICIAL - shall apply to the official designated by the County Commission as the BUILDING ADMINISTRATOR. MAYOR - shall apply to the COUNTY COMMISSIONERS. FIRE CHIEF - shall apply to the CHIEF OF VOLUNTEER FIRE DEPARTMENTS, Or Fire Departments of Rural Fire Prevention Districts, or whichever department shall have jurisdiction over the area involved, or to his regularly appointed deputy. STREET - shall apply to streets as defined in the Building Code, and to public roads of Deschutes County, Oregon. FARM LABOR CAMP - shall, apply to a shelter or temporary housing for farm migrant or seasonal workers, that is furnished without charge to the occupants and is identifiable and subject to control as a. faun labor camp within the meaning of ORS 446.S1.0 (2). s r R. � � is 'VOL ,.,.. r p'tiuu MOBILE HOME- shall apply to a vehicular portable structure built to the specifications and standards of the United States of America Standards for Mobile Homes (USASA 119.1, 1969 and as amended 1/6/74) on a chassis and designed to be used without a permanent foundation as a dwelling when connected to indicated utility facilities. Each mobile home shall bear the State plate certifying compliance with the above standards. MODULAR OR FACTORY -BUILT HOME - shall apply to a factory - built dwelling unit designed to be transported to a site and affixed to proper foundations and the construction meets the standards of the Oregon State Prefabricated Structures Code. GENERAL PROVISIONS AND REQUIREMENTS. The Fire Marshall Laws, as contained in O.R.S. Chapters 278, 407, 443, 478,479 and 480; O.R.S. 448.205 to 448.325 and regulations of the State Board of Health, governing water supply; O.R.S. Chapter 835 and regulations of the Department of Environmental Quality, governing subsurface disposal of sewage; the laws pertaining to electrical wiring and equipment as contained in ORS Chapters 479, 651 and 694 are incorporated in and made a part of this Ordinance. Flans for waste disposal facilities must have the approval of the County Health Department before a hermit is issued and the installed facilities must be inspected and. approved before back filling. No structure shall be occupied until the facilities for water supply and sewage disposal equal to the minimum standards of the State Board of Health and the Department of Environmental Quality have been installed and are approved by the County Health Department. Building Permits or Mobile Home .Location Permits shall not be issued if the parcel of land on which the building is to be erected, or the use of the building or land would. be in violation of the Deschutes County Subdivision or Zoning Codes. Mobile homes are not to be located on a site until a permit to locate a mobile home is obtained. TEMPORARY STRUCTURE; Buildings of a temporary nature may be permitted if conditions of business warrant such construction. A special permit shall be granted, which permit shall be limited to ninety(90) days with renewal of ninety(90) days. The fee for the permit shall be five dollars.($5.00). BUILDING PERMIT AND PLANS REVIEW SCHEDULE 1. BUILDING PERMIT fees will be based on a fourteen (14) dollar per square foot cost factor on residential building. Exceptions: (a) Where a building has a contract price the contract price will be the factor. (b) Accessory Building permits will be assessed on the basis of a four (4) dollar cost per square foot factor. Exception: Where the size of the accessory building exceeds the area allowed for a "J" occupancy, the charge will be based on the Oregon State plans review schedule. (c) Where the complexity of design or amenities indicate a higher cost per foot should apply, an appropriate cost factor will be established at the time of application. (d) Commercial Building permit fees will be based on the architect's estimate or the bid price, whichever is final. (e) Where a basement is incorporated with a residence a four (4) dollar per square foot valuation factor shall be added to the permit fee for that portion of the structure. 2. PLANS REVIEW fees will be based on thirty (30) percent of the building permit fee. 3. SWIMMING POOLS fees shall be based on the schedule of fees as set forth for residential building permits. 4. PUBLIC SCHOOLS fees for schools supported by taxes upon the general public shall e 50% of the above rates. 5. APPROVED MODULAR HOMES fees for approved modular homes shall be 50% of the above fees. 6. MOBILE HOME LOCATION PERMITS Individual mobile home spaces $10.00 Mobile Home Parks lst space 15.00 Each succeeding space 4.00 7. BUILDING DEMOLITION Type 1 - 2 - 3 -- 1 story 5.00 2 story 10.00 3 ty 15.00 4 it or more 20.00 Type 4 - 5 1 story 5.00 (each additional story + $2.00) Buildings under 500 sq. ft. No fee VOL 8. SEPTIC TANK INSPECTIONS (Fees set by Department of Environmental Quality) New Installation $50.00 (With previous site evaluation -$25.00) Repair or alteration $15.00 9. MECHANICAL PERMITS The permit fees for the installation(in existing buildings) of equipment or apparatus governed by the Mechanical Code shall be based on actual value and be charged at the following fee schedule: $25.00 to $1,000 $5.00 for the first $500 plus $1.00 per additional $100 to and including $1,000. $1,001 to $2,000 $10.00 for the first $1,000 plus $.50 per additional $100 to and including $2,000. Over $2,000 $15.00 plus the same fee rate prescribed for buildings of over $2,000 valuation. 10. PLUMBING PERMITS Base Price $5.00 Kitchen unit 4.00 Bath unit (full) 5.00 Bath unit (half) 3.00 Laundry unit 3.00 Miscellaneous fixtures 2.00 Commercial Buildings 1 to 50 fixtures (each) 2.00 Over 50 fixtures (each) 1.00 Alterations and Additions Shall.be charged at the commercial rates Lawn Sprinkling System To and including each protective device(each) 2.00 DONE by order of the Board of Commissioners this 17th day of July, 1974, to become effective immediately. 14 VOL DESCHUTES COUNTY BUILDING PERMIT & PLANS REVIEW FEE SCHEDULE COMMERCIAL Permit Plan Permit Plan Fee Check Fee Check Less than $100.00 none none $101 - $500 5.00 1.60 501 - 600 6.00 2.00 601 - 700 7.00 2.30 701 - 800 8.00 2.60 801 - 900 9.00 3.00 901 - 1000 10.00 3.30 1001 - 1100 11.00 3.60 1101 - 1200 12.00 4.00 1201 - 1300 13.00 4.30 1301 - 1400 14.00 4.60 1401 - 1500 15.00 5.00 1501 - 1600 16.00 5.30 1601 - 1700 17.00 5.60 1701 - 1800 18.00 6.00 1901 - 2000 19.00 6.50 2001 - 3000 24.00 8.00 3001 - 4000 28.00 9.50 4001 - 5000 32.00 10.50 5001 - 6000 36.00 12.00 6001 - 7000 40.00 13.50 7001 - 8000 44..00 14.50 8001 - 9000 48.00 16.00 9001 - 10,000 52.00 •17.50 10,001 - 11,000 56.00 18.50 11,001 - 12,000 60.00 20.00 12,001 - 13,000 64.00 21.50 13,001 - 14,000 68.00 22.50 14,001 - 15,000 72.00 24.00 15,001 - 16,000 76.00 25.50 16,001 - 1.7,0A0 • 80.00 26.50 17,001 - 18,000 84.00 28.00 "'18;001 - 19,000 MOD 29.50"' ** PLUS 1% STATE OF OREGON SURCHARG 19,001 - 20,000 92.00 31.00 20,001 - 21,000 96.00 32.50 21,001 - 22,000 100.00 33.50 22,001 - 23,000 104.00 34.50 23,001 - 24,000 108.00 35.50 24,001 - 25,000 112.00 36.50 25,001 - 26,000 115.00 37.50 26,001 - 27,000 118.00 38.50 27,001 - 28,000 121.00 39.50 28,001 - 29.000 124.00 40.50 29,001 - 30,000 127.00 41.50 30,001 - 31,000 130.00 42.50 31,001 - 32,000 133.00 43.50 32,001 - 33,000 136.00 44.50 33,001 - 34,000 139.00 45.50 34,001 - 35,000 142.00 46.50 35,001 - 36,000 145.00 47.50 36,001 - 37,000 148.00 48.50 37,001 - 38,000 151.00 49.50 38,001.- 39,000 154.00 50.50 39,001 - 40,000 157.00 51.50 40,001 - 41,000 160.00 52.50 41,001 - 42,000 163.00 53.50 42,001 - 43,000 166.00 54.50 43,001 - 44,000 169.00 55.50 44,001 - 45,000 172.00 56.50 45,001 - 46,000 175.00 57.50 46,001 - 47,000 178.00 58.50 47,001 - 48,000 181.00 59.50 48,001 - 49,000 184.00 60.50 49,001 - 50,000 187.00 61.50 Basements: A8.00 per sq. ft. Garages (finished or unfinished) and Carports: _$4.00 per sq. ft. $14,00 per sq, ft. VOL 18 PAGE 9 1 h --- o r - rq Nay n r