Loading...
2004-1041-Resolution No. 2004-080 Recorded 7/27/2004REVIE �E� D� LEGAL COUNSEL DESCHUTES COUNTY CLERK CJ 7004'1441 NANCY COMMISSIONERS' JOURNAL 1111AAA 04'M It PM V11 , For Recording Stamp Only BEFORE THE BOARD OF COUNTY COMMISSIONERS OF DESCHUTES COUNTY, OREGON A Resolution Initiating Proceedings for the Newberry Estates LID to Improve Certain Dedicated Road(s) Known as Newberry Estates, Phases I and II, Deschutes County, Oregon, Describing the Road(s) to be Improved; Designating Where the Improvements Shall be Made; Defining the Nature of the Improvements; and Referring this Resolution to the Engineer for Completion of a Feasibility Study. RESOLUTION NO. 2004-080 WHEREAS, the owners of property abutting the proposed improvement of Newberry Estates, Phases I and II in Deschutes County, Oregon, have requested the Board of County Commissioners to improve this/these road(s); and WHEREAS, it appears that such road(s) should be improved; and WHEREAS, it appears that it is in the public interest that the Road Department of Deschutes County, Oregon, perform the required feasibility study for this improvement; now, therefore, BE IT RESOLVED BY THE BOARD OF COUNTY COMMISSIONERS OF DESCHUTES COUNTY, OREGON, as follows: Section 1. That proceedings be initiated to improve the roads described in Exhibit "A" to Deschutes County Rural Local Road Standards for the benefit of the area described in Exhibit "B", attached hereto and by this reference incorporated herein. Section 2. That the dedicated road(s) to be improved within the district described in Section 1 of this Resolution are shown on the map, Exhibit "C", attached hereto and by this reference incorporated herein. Section 3. The road(s) to be improved as a result of this Resolution shall be improved to County Rural Local Road Standards. Page 1 of 2 - Resolution No. 2004-080 Section 4. Improvements to be made to the roadway within the district include, but are not limited to, reconstruction of the roadway to a 20 or 24 foot wide paved road with 2 foot aggregate shoulders, and adequate drainage, as well as related engineering, administration, mobilization and traffic control work. Section 5. This Resolution shall hereby be referred to the Engineer for completion of a feasibility study in accordance with Chapter 12.48.150 of the Deschutes County Code. The Engineer may engage the services of any qualified engineer for all or part of the investigation required under Chapter 12.48.150 of the Deschutes County Code. 117 1� DATED this day of '2004. ATTEST: �� Recording Secretary Page 2 of 3 — Resolution No. 2004-080 BOARD OF COUNTY COMMISSIONERS OF DESCHUTES, COUNTY, OREGON IN DENNIS R. LUKE, COAMMISSIONER TOM DEWOLF, COMMISSIONER EXHIBIT "A" ROADS TO BE IMPROVED WITHIN NEWBERRY ESTATES L.I.D. 1. All of Kelvel Court in Newberry Estates Phase II 2. All of Henna Court in Newberry Estates Phase II 3. All of Juno Court in Newberry Estates Phase II 4. All of Cosset Loop in Newberry Estates Phase II 5. All of Holgate Road in Newberry Estates Phase II 6. All of Holgate Court in Newberry Estates Phase II 7. All of Golden Astor Road in Newberry Estates Phases I and 8. All of Manning Court in Newberry Estates Phases II 9. All of Mete Road in Newberry Estates Phases I and II 10. All of Sutter Court in Newberry Estates Phase I 11. All of Sutter Street in Newberry Estates Phase I 12.All of Mete Court in Newberry Estates Phase I 13.All of Penny Court in Newberry Estates Phase I 14.All of Randy Court in Newberry Estates Phase I 15.All of Westley Loop in Newberry Estates Phase I 16. All of Eden Street in Newberry Estates Phase I 17.All of Derby Court in Newberry Estates Phase I 18.All of Teil Court in Newberry Estates Phase I 19. That portion of Rosland Road in Newberry Estates Phase I 20. That portion of Newberry Road in Newberry Estates Phase I 21.All of Ammon Road in Newberry Estates Phases I and II 22.All of Suza Court in Newberry Estates Phase I 23.All of Natoma Road in Newberry Estates Phase I EXHIBIT "B" NEWBERRY ESTATES L.I.D. BENEFITED LOTS NEWBERRY ESTATES PHASE I Lots 1 through 50 Block 1 Lots 1 through 35 Block 2 Lots 1 and 2 Block 3 Lots 1 through 7 Block 4 Lots 1 through 18 Block 5 Lots 1 through 5 Block 6 Lots 1 through 3 Block 7 Lots 1 through 10 Block 8 NEWBERRY ESTATES PHASE II Lots 1 through 43 Block 9 Lots 1 through 5 Block 10 Lots 1 through 6 Block 11 Lots 1 through 32 Block 12 Lots 1 through 46 Block 13 Lot 1 Block 14 4-JU W Q L N N N > z2 0. cu E a m Ov 0- J SN�Co a CQ R C C 9 S. M E s= IDf3-N ta:L-1 �c0 t; cU.epC � D $ Ste{{ m 25 a 1 �GG 2o CL Mc7v�'°'m8tl JQ 1 0 � FoE�� 1's 1 0 Z7 0 � N J C 3 a L1J r _� 5 � � U V o m yr cu = M N c wa � ca o 1.1_ La U v c o Q U)O X Q U H � A Y m Z rn W SN�Co a CQ R C C 9 S. M E s= IDf3-N ta:L-1 �c0 t; cU.epC � D $ Ste{{ m 25 a 1 �GG 2o CL Mc7v�'°'m8tl JQ 1 0 � FoE�� 1's 1 0 Z7 0 � N C 3 a L1J r _� 5 � � U V H m N = M c wa � ca o 1.1_ La U v c o Q U)O X Q U H � A Y SN�Co a CQ R C C 9 S. M E s= IDf3-N ta:L-1 �c0 t; cU.epC � D $ Ste{{ m 25 a 1 �GG 2o CL Mc7v�'°'m8tl JQ 1 0 � FoE�� 1's 1 0 Z7