2004-1041-Resolution No. 2004-080 Recorded 7/27/2004REVIE �E� D�
LEGAL COUNSEL
DESCHUTES
COUNTY CLERK
CJ 7004'1441
NANCY
COMMISSIONERS' JOURNAL 1111AAA 04'M It PM
V11 ,
For Recording Stamp Only
BEFORE THE BOARD OF COUNTY COMMISSIONERS OF DESCHUTES COUNTY, OREGON
A Resolution Initiating Proceedings for the
Newberry Estates LID to Improve Certain
Dedicated Road(s) Known as Newberry
Estates, Phases I and II, Deschutes County,
Oregon, Describing the Road(s) to be
Improved; Designating Where the
Improvements Shall be Made; Defining the
Nature of the Improvements; and Referring
this Resolution to the Engineer for
Completion of a Feasibility Study.
RESOLUTION NO. 2004-080
WHEREAS, the owners of property abutting the proposed improvement of Newberry Estates,
Phases I and II in Deschutes County, Oregon, have requested the Board of County Commissioners to
improve this/these road(s); and
WHEREAS, it appears that such road(s) should be improved; and
WHEREAS, it appears that it is in the public interest that the Road Department of Deschutes
County, Oregon, perform the required feasibility study for this improvement; now, therefore,
BE IT RESOLVED BY THE BOARD OF COUNTY COMMISSIONERS OF DESCHUTES COUNTY,
OREGON, as follows:
Section 1. That proceedings be initiated to improve the roads described in Exhibit "A" to Deschutes
County Rural Local Road Standards for the benefit of the area described in Exhibit "B", attached hereto
and by this reference incorporated herein.
Section 2. That the dedicated road(s) to be improved within the district described in Section 1 of
this Resolution are shown on the map, Exhibit "C", attached hereto and by this reference incorporated
herein.
Section 3. The road(s) to be improved as a result of this Resolution shall be improved to County
Rural Local Road Standards.
Page 1 of 2 - Resolution No. 2004-080
Section 4. Improvements to be made to the roadway within the district include, but are not limited
to, reconstruction of the roadway to a 20 or 24 foot wide paved road with 2 foot aggregate shoulders, and
adequate drainage, as well as related engineering, administration, mobilization and traffic control work.
Section 5. This Resolution shall hereby be referred to the Engineer for completion of a feasibility
study in accordance with Chapter 12.48.150 of the Deschutes County Code. The Engineer may engage
the services of any qualified engineer for all or part of the investigation required under Chapter 12.48.150
of the Deschutes County Code.
117 1�
DATED this day of '2004.
ATTEST:
��
Recording Secretary
Page 2 of 3 — Resolution No. 2004-080
BOARD OF COUNTY COMMISSIONERS
OF DESCHUTES, COUNTY, OREGON
IN
DENNIS R. LUKE, COAMMISSIONER
TOM DEWOLF, COMMISSIONER
EXHIBIT "A"
ROADS TO BE IMPROVED WITHIN
NEWBERRY ESTATES L.I.D.
1. All of Kelvel Court in Newberry Estates Phase II
2. All of Henna Court in Newberry Estates Phase II
3. All of Juno Court in Newberry Estates Phase II
4. All of Cosset Loop in Newberry Estates Phase II
5. All of Holgate Road in Newberry Estates Phase II
6. All of Holgate Court in Newberry Estates Phase II
7. All of Golden Astor Road in Newberry Estates Phases I and
8. All of Manning Court in Newberry Estates Phases II
9. All of Mete Road in Newberry Estates Phases I and II
10. All of Sutter Court in Newberry Estates Phase I
11. All of Sutter Street in Newberry Estates Phase I
12.All of Mete Court in Newberry Estates Phase I
13.All of Penny Court in Newberry Estates Phase I
14.All of Randy Court in Newberry Estates Phase I
15.All of Westley Loop in Newberry Estates Phase I
16. All of Eden Street in Newberry Estates Phase I
17.All of Derby Court in Newberry Estates Phase I
18.All of Teil Court in Newberry Estates Phase I
19. That portion of Rosland Road in Newberry Estates Phase I
20. That portion of Newberry Road in Newberry Estates Phase I
21.All of Ammon Road in Newberry Estates Phases I and II
22.All of Suza Court in Newberry Estates Phase I
23.All of Natoma Road in Newberry Estates Phase I
EXHIBIT "B"
NEWBERRY ESTATES L.I.D.
BENEFITED LOTS
NEWBERRY ESTATES PHASE I
Lots 1 through 50
Block 1
Lots 1 through 35
Block 2
Lots 1 and 2
Block 3
Lots 1 through 7
Block 4
Lots 1 through 18
Block 5
Lots 1 through 5
Block 6
Lots 1 through 3
Block 7
Lots 1 through 10
Block 8
NEWBERRY ESTATES PHASE II
Lots 1 through 43
Block 9
Lots 1 through 5
Block 10
Lots 1 through 6
Block 11
Lots 1 through 32
Block 12
Lots 1 through 46
Block 13
Lot 1
Block 14
4-JU
W Q
L
N
N
N >
z2
0.
cu E
a m
Ov
0- J
SN�Co
a CQ R C
C 9
S. M E s=
IDf3-N ta:L-1
�c0 t;
cU.epC
�
D $ Ste{{
m 25 a 1 �GG 2o
CL
Mc7v�'°'m8tl
JQ 1 0 �
FoE�� 1's
1 0
Z7
0
� N
J
C
3
a
L1J
r
_�
5
�
�
U
V
o
m
yr
cu
=
M
N
c
wa
�
ca
o
1.1_ La
U
v
c o Q
U)O
X Q
U H �
A
Y
m
Z
rn
W
SN�Co
a CQ R C
C 9
S. M E s=
IDf3-N ta:L-1
�c0 t;
cU.epC
�
D $ Ste{{
m 25 a 1 �GG 2o
CL
Mc7v�'°'m8tl
JQ 1 0 �
FoE�� 1's
1 0
Z7
0
� N
C
3
a
L1J
r
_�
5
�
�
U
V
H
m
N
=
M
c
wa
�
ca
o
1.1_ La
U
v
c o Q
U)O
X Q
U H �
A
Y
SN�Co
a CQ R C
C 9
S. M E s=
IDf3-N ta:L-1
�c0 t;
cU.epC
�
D $ Ste{{
m 25 a 1 �GG 2o
CL
Mc7v�'°'m8tl
JQ 1 0 �
FoE�� 1's
1 0
Z7