Loading...
16-24-Order Recorded 9/14/1972VOL 16 PAGE 24 IN THE BOARD OF COUNTY COMMISSIONERS OF THE STATE OF OREGON FOR THE COUNTY OF DESCHUTES ,In the Matter ) of ) ORDER Moving a Building) A permit is granted by Deschutes County to John Hastings to move a building on or across Deschutes County right-of-way. A detailed description and map of this operation must be provided on the reverse side of this sheet. This permit is subject to the following general specifica- tions and is revocable at any time upon written notice by the Deschutes County Board of Commissioners. GENERAL SPECIFICATIONS FOR MOVING'BUILDINGS: The permittee shall be required to observe the following rules and regulations pertaining to the moving of buildings. Thepermitteeshall be required to move the buildings on pneumatic dollies evenly spaced, so as to insure an even weight distribution, and properly shored, so as to prevent collapse while in the process of moving. The permittee shall be responsible for all traffic warnings to the traveling public, as may be necessary to insure safety while in the process of moving the building. The permittee shall be required to have at least two (2) pilot cars equipped with signs depicting "Wide Load", and all the necessary signs and flagmen at all intersections, so as to insure an even flow of the traffic and -prevent congestion. The permittee will be held directly responsible for any and all damage to the existing pavement and shoulder areas, and will be required to repair said damage or pay damages to Deschutes County for the necessary repairs. If during the course of moving, it is necessary to move bridge railings, the permittee shall be required to replace the railings to their original state. The sawing off of posts and railings will not be permitted. Dated this /tel day of 1979, Recommended 979- Recommended Approval: Department of Public Works E 1TTEE COMMISSIONER VOL 16 PAGE 25 2z Z fe�, 2 U