Loading...
16-151-Order Recorded 10/4/1972VOL 16 PALE 151 IN THE BOARD OF COUNTY COMMISSIONERS OF THE STATE OF OREGON FOR THE COUNTY OF DESCHUTES Jn the Matter ) of ) ORDER Moving a Building) A permit is granted by Deschutes County to John Hastings to move a building on or across Deschutes County right-of-way. A detailed description and map of this operation must be provided on the reverse side of this sheet. This permit is subject to the following general specifica- tions and is revocable at any time upon written notice by the Deschutes County Board of Commissioners. GENERAL SPECIFICATIONS FOR MOVING BUILDINGS: The permittee shall be required to observe the following rules and regulations pertaining to the moving of buildings. The permittee shall be required to move the buildings on pneumatic dollies evenly spaced, so as to insure an even weight distribution, and properly shored, so as to prevent collapse while in the process of moving. The permittee shall be responsible for all traffic warnings to the traveling public, as may be necessary to insure safety while in the process of moving the building. The permittee shall be required to have at least two (2) pilot cars equipped with signs depicting "Wide Load", and all the necessary signs and flagmen at all intersections, so as to insure an even flow of the traffic and prevent congestion. The permittee will be held directly responsible for any and all damage to the existing pavement and shoulder areas, and will be -required -to repair said damage or pay damages to Deschutes County for the necessary repairs. If during the course of moving, it is necessary to move bridge -railings, the permitt a shall be required to replace the railings to th it original state. The wing -off of posts and railings will not be permjkted . Dated this day of j2�j/� 197 Recommended Approval: z—'o Department of Public Works PERMITTEE VOL 16 FACE 152