Loading...
16-212-Order Recorded 11/1/1972IN THE BOARD OF COUNTY COKMISSIONERS OF THE STATE OF OREGON FOR THE COUNTY OF DESCHUTES In the Matter 7io�6S90 of ) VOL 16 PAGE 212 A permit is granted by Deschutes County to,43"i��G .L'.► �►-- to Lr9J' e�it.i".�.e►rs.w,et� r5b.�' ei„i,�' on or across Deschutes County right-of-way. A detailed description and map of this operation must be pro- vided on the reverse side of this sheet. This permit is subject to the fol- lowing general specifications and is revocable at any time upon written notice by the Deschutes County Board of Commissioners. GENERAL SPECIFICATIONS FOR PARTICULAR INSTALLATIONS Installin aPi a Line Parallel: All pipe lines run- ning parallel with the road shall -be -in the existing ditch line, or no less than three (3) feet from the edge -of the -existing pavement edge. All pipe lines must be installed to a depth to be no less than two (2) feet and properly backfilled to the original grade line and with no obstructions to the drainage area. Per- mittee shall be responsible for any -or all damages to the existing pavement, and shoulders or other objects or -areas within the right-of-way. Installin Pipe -Line Transverse: All pipe line installations laid transverse y to t e road bed or right-of-way shall be installed in the fol- lowing manner: All pavement cuts -prior -to the excavation shall be made with a breaking hammer -so as to -insure neat finish cut lines. All pipe lines shall be installed to a depth of no less than two (2) feet below the existing roadside ditch elevation. In all cases where a -water line is installed in a transverse direction the water pipe must be instalTe witFin a larger pipe which size shall be no less than six (6) inches in diameter. Backfilling and Paving: The per- mittee shall be required to properly backfill the trench in such a manner as to guarantee a well compacted, stabilized sub -base prior to paving. The pavement must be replaced to its original line, crown, and grade with an asphalt mixture to conform with the surrounding road bed. The area of installation must be kept smooth for the traveling public at all times. The permittee will be re- quired at all times to take every precaution to protect the traveling public. All signs and traffic controls shall -be furnished by the permittee. In regard to other utility -installations, such as gas lines, telephone lines and electric conduits, all the -general -specifications shall apply if they are to be run under ground; with one -exception: It would not be necessary -to -have these lines within a larger pipe when -crossing the right-of-way. Dated this. 141 day ;of �4�ce'?��-� , 19M Recommended Approval DEPARTMENT OF PUBLIC WORKS COMMISSIONER vD 16 ?AGE 213 t q© f gti,�T PACIFIC POWER & LIGHT COMPANY E R SKETCH #1SCALE