16-216-Order Recorded 11/9/1972IN THE BOARD OF COUNTY COMMISSIONERS
OF THE STATE OF OREGON
FOR THE COUNTY OF DESCHUTES
In the Matter
of
Installing a pipeline
A permit is granted by Deschutes County to
to install a water pipeline on or
right-of-way. A detailed description and map of this
vided on the reverse side of this sheet. This permit
lowing general specifications and is revocable at any
by the Deschutes County Board of Commissioners.
VOL 16 PAGE 216
Emmett Sipe
across Deschutes County
operation must be pro -
is subject to the fol -
time upon written notice
GENERAL SPECIFICATIONS FOR PARTICULAR INSTALLATIONS
Installing,Pipe Line Parallel: All pipe lines run-
ning parallel with the road shall -be in the existing ditch line, or no less than
three (3) feet from the edge of the -existing pavement edge. All pipe lines must
be installed to a depth to be no less than two (2) feet and properly backfilled
to the original grade line and with no obstructions to the drainage area. Per-
mittee shall be responsible for any or all damages to the existing pavement, and
shoulders or other objects or areas within the right-of-way.
Installing Pipe Line Transverse: All pipe line installations
laid transversely to the road bed or right-of-way shall be installed in the fol-
lowing manner: All pavement cuts prior -to the excavation shall be made with a
breaking hammer so as to insure neat finish cut lines. All pipe lines shall be
installed to a depth of no less than two (2) feet below the existing roadside
ditch elevation. In all cases where a water line is installed in a transverse
direction the water pipe must be instal eT d witfin a larger pipe which size shall
be no less than six (6) inches in diameter. Backfilling and Paving: The per-
mittee shall be required to properly backfill the trench in such a manner as to
guarantee a well compacted, stabilized sub -base prior to paving. The pavement
must be replaced to its original line, crown, and grade with an asphalt mixture
to conform with the surrounding road bed. The area of installation must be
kept smooth for the traveling public at all times. The permittee will be re-
quired at all times to take every precaution to protect the traveling public.
All signs and traffic controls shall be furnished by the permittee.
In regard to other utility installations, such as gas lines, telephone lines and
electric conduits, all the general -specifications shall apply if they are to be
run under ground, with one -exception: It would not be necessary to have these
lines within a larger pipe when crossing the right-of-way.
Dated this gtom day of �%G7�r�.lr c� , 19 .
COMMISSIONER
Recommended Approval
DEPARTMENT OF PUBLIC WORKS
R
PERMITTEE
■ ,
NEI/4 SEC 29 T.15 S R.13E.W.M.
DESCHUTES COUNTY
SCALE 1"-200'
S s Map
15 1 3 200
I- /
Sq, Ma0 15 13
N �n
i
NEI/4 SEC 29 T.15 S R.13E.W.M.
DESCHUTES COUNTY
SCALE 1"-200'
S s Map
15 1 3 200
I- /
Sq, Ma0 15 13
VOL 16 ?AGE 217
15 13 29A
n
4�
Ov
VOL 16 ?AGE 217
15 13 29A
n