Loading...
15-828-Order Recorded 7/19/1972- VOL 15 PAGE 820 IN THE BOARD OF COUNTY COMMISSIONERS OF THE STATE OF OREGON FOR THE COUNTY OF DESCHUTES In the Platter of Installing a pipeline A permit is granted by Deschutes County to ward Construction Co. to install a pipeline on or across Deschutes County right-of-way. A detailed description and map of this operation must be pro- vided on the reverse side of this sheet. This permit is subject to the fol- lowing general specifications and is revocable at any time upon written notice by the Deschutes County Board of Commissioners. GENERAL SPECIFICATIONS FOR PARTICULAR INSTALLATIONS Installing -Pipe Line Parallel: All pipe lines run- ning parallel with the road shall be in the existing ditch line, or no less than three (3) feet from the edge of the existing pavement edge. All pipe lines must be installed to a depth to be no less than two (2) feet and properly backfilled to the original grade line and with no obstructions to the drainage area. Per- mittee shall be responsible for any or all damages to the existing pavement, and shoulders or other objects or areas within the right-of-way. Installing Pipe -Line Transverse: All pipe line installations laid transversely to the road bed or right-of-way shall be installed in the fol- lowing manner: All pavement cuts prior to the excavation shall be made with a breaking hammer so as to insure neat finish cut lines. All pipe lines shall be installed to a depth of no less than two (2) feet below the existing roadside ditch elevation. In all cases where a -water line is installed in a transverse direction the water pipe must be instal eT d with ni a larger pipe which size shall be no less than six (6) inches in diameter. Backfilling and Paving: The per- mittee shall be required to properly backfill the trench in such a manner as to guarantee a well compacted, stabilized sub -base prior to paving. The pavement must be replaced to its original line, crown, and grade with an asphalt mixture to conform with the surrounding road bed. The area of installation must be kept smooth for the traveling public at all times. The permittee will be re- quired at all times to take every precaution to protect the traveling public. All signs and traffic controls shall be furnished by the permittee. In regard to other utility installations, such a electric -conduits, all the general specification run under ground, with orl exception: It would s gas lines, telephone lines and s shall apply if they are to be not be necessary to have these COMMISSIONER All lines crossing a paved road shall be inside culvert pipe. <,E�vari i� Vhyoo.� 41 LaH VOL 15 PACE 829 � a,'41 4ztV 'ill vA Nl. 1 ryq` •S +11 k if, .- LILCsy���7 Ck iU 1,