15-528-Order Recorded 4/5/1972In the Matter )
1
r
of )
Installing a )
i eline
IN THE BOARD OF COUNTY COMMISSIONERS
OF THE STATE OF OREGON
FOR THE COUNTY OF DESCHUTES
O R D E R
BOOK 15 PAGE 528
p p
A permit is granted by Des0 utes County to Jess Orr
to install a pipeline on or across Deschutes County
right -of -gray. A detailed description and map of this operation must be provided
on the reverse side of this street. This permit is subject to the following gen-
eral specifications and is revocable at any time upon written notice by the
Deschutes County Board of Commissioners.
GENERAL SPECIFICATIONS FOR PARTICULAR INSTALLATIONS
parallel with the road shall be in the existing ditch line, or no an three
(3) feet from the edge of the existing pavement ed ipe lines must be
installed to a depth to be no less th feet and properly backfilled to
the original grade lin no obstructions to the drainage area. Permittee
shall be e for any or all damages'to the existing pavement, and
- _
Installing P_ipe_Line, Transverse_ All pipe line installations_
laid transversely to the road bed or r-ight-of-way shall be installed in the
following manner: All pavement cuts prior to the excavation shall be made with
a breaking hammer so a,, to insure neat finish cut lines. All pipe lines shall
be installed to a depth of no less than two (2) feet below the existing road-
side ditch elevation. In all cases where a water line is installed in a trans-
verse direction the water pipe must be installedwithin a larger pipe which size
shall be no less than six (6) inches in diameter. Backfilling_ and Paving: The
permittee shall be required to -properly backfill the trench in such a manner as
to guarantee a well compacted, stakrliized sub -base prior to paving. The pave-
ment must be replaced to its original line, crown, and grade with an asphalt
mixture to conform with the surrounding road bed. The area of installation
must be kept smooth for the traveling public at all times. The perrnittee will
be required at all times to take every precaution to protect the traveling
public. All signs and traffic controls shall be furnished by the permittee.
In regard to other utility installations, such as gas lines, telephone lines and
electric conduits, all the general specifications shall apple if they are to be.
run under ground, with one exception: It would not be necessary to have these
lines within a larger pipe when crossing the right-of-way.
Dated this__ �) ____day of_ ____ 19z�
Re fen,d/ed /',pp val.
Charles L. Plummer,
DESCH!J T ES COUNTY ROADMASTEP.
j4f_� 4" V/-�
P_ER H1`1 T V Sec ' T elfr C /3,6 '/y fi .IZ-
1.15'
0`
11
0)
#_Z4 s
j- � sT
BOOK 15 PAGE 529 f
CAR,
'9
9-770
Boox 15 PACE 530
ME 7—,E
5 s T-
'03 la�e,v
M