15-978-Order Recorded 8/17/1972I
IN THE BOARD OF COUNTY COMMISSIONERS VOL 15 FACE978
OF THE STATE OF OREGON
FOR THE COUNTY OF DESCHUTES
In the Matter )
of )
Installing a pipeline)
City o� .R�m�n d
A permit is grtely�pschutes County to C'��y`�� J/ SSE rvrc�
�s o ! `may y� on or across Deschutes County
right-of-way. A detailed description and map of this operation must be pro-
vided on the reverse side of this sheet. This permit is subject to the fol-
lowing general specifications and is revocable at any time upon written notice
by the Deschutes County Board of Commissioners.
GENERAL SPECIFICATIONS FOR PARTICULAR INSTALLATIONS
Installing�Pipe Line Parallel:
ning parallel with the road shall b
three (3) feet from the edge of the
be installed to a depth to be no le
to the original grade line and with
mittee shall be responsible for any
shoulders or other objects or areas
All pipe lines run -
2 --in the existing ditch line, or no less than
existing pavement edge. All pipe lines must
ss than two (2) feet and properly backfilled
.no obstructions to the drainage area. Per -
or all damages to the existing pavement, and
within the right-of-way.
Installing Pipe Line Transverse: All pipe line installations
laid transversely to the road bed or right-of-way shall be installed in the fol-
lowing"manner: All pavement cuts prior -to the excavation shall be made with a
breaking hammer so as to insure neat finish cut lines. All pipe lines shall be
installed to a depth of no less than two (2) feet below the existing roadside
ditch elevation. In all cases where a water line is installed in a transverse
direction the water pipe must be instal e'I d witTi`n a larger pipe which size shall
be no less than six (6) inches in diameter. Backfilling and Paving: The per-
mittee shall be required to properly backfill the trench in such a manner as to
guarantee a well compacted, stabilized sub -base prior to paving. The pavement
must be replaced to its original line, crown, and grade with an asphalt mixture
to conform with the surrounding road bed. 'The area of installation must be
kept smooth for the traveling public at all times. The permittee will be re-
quired at all times to take every precaution to protect the traveling public.
All signs and traffic controls shall be furnished by the permittee.
In regard to other utility installations, such as gas lines, telephone lines and
electric conduits, all the -general -specifications shall apply if they are to be
run under ground, with one -exception: It would not be necessary to have these
lines within a larger pipe when crossing the riqht-of-way.
Dated this C day of ` L 197-�
Recommended Approval
COMMISSIONER
DEPARTMENT OF PUBLIC WORKS
VOL 15 PACE 9'79