15-547-Order Recorded 4/20/1972IN THE BOARD OF COUNTY COMMISSIONERS
OF THE STATE OF OREGON
FOR THE COUNTY OF DESCHUTES
In the Matter )
of ) 0 R D E P.
Installing a )
pipeline )
VOL 15 MEW
A permit is granted by Deschutes County to Patrick Gisle
to install a pipeline on or across Deschutes &unty
right-of-way. A detailed description and map of this operation must be provided
on the reverse side of this sheet. This permit is subject to the following gen-
eral specifications and is revocable at any time upon written notice by the
Deschutes County Board of Commissioners.
GENERAL SPECIFICATIONS FOR PARTICULAR INSTALLATIONS
Installing Pipe Line Parallel: All pipe lines running
parallel with the road shall be in the existing ditch line, or no less than three
(3) feet from the edge of the existing pavement edge. All pipe lines must be
installed to a depth to be no less than two (2) feet and properly backfilled to
the original grade line and with no. obstructions to the drainage area. Permittee
shall be responsible for any or all damages o the existing pavement, and
shoulders or other objects or areas within t e right-of-way.
�_i "_ i '' ice '" ' U I I Ct L. J
laid transversely to the road bed or right -o 'way shall be installe:be
in th
following manner: All pavement cuts prior to the excavation shall e with
a breaking rammer so as to insure neat finish cut lines. All n' lines shall
be installed to a depth of no less than two ( ) feet bel e existing road-
side ditch elevation. In all cases where a w ter 1', is installed in -'a trans-
verse direction the water pipe must be instal within a larger pipe which size
shall be no less than six (6) inches in mer. Backfilling and Pavinq: The
permittee shall be required to pr y backfill the trench in such a manner as
to guarantee a well compact , stabliized sub- ase prior to paving. The pave-
ment must be replaced its original line, crown, and grade with an asphalt
mixture to conf_or-m—with the surrounding road bed. The area of installation
must be k smooth for the traveling public at all times. The permittee will
be regvr� ed at all times to take every precaution to protect the traveling
-p4bliG. All signs and traffj-� shall be :�urHished by the perfflittee.
In regard to other utility installations, such as gas lines, telephone lines and
electric conduits, all the general specifications shall apply if they are to be
run under ground, with one exception: It would not be necessary to have these
lines within a larger pipe when crossing the right-of-way.
Dated this 0(Z day of,A_,?w I L , 19� Z.
C011111MISSION R
Rec mended Appr�val��'`
01Z&101�
Charles L. Plummer,
DESCHUTES COUNTY ROADMASTER
PERMITTEE
2Lf 0 /
� 6 "X
/-/0"
7—/2 rN ( 0 L 6 1L -/Z)
&UR66s-s
reo�q-o )
A --ND
6 '
f /4f Tw L-
(0 N VLo4 ,
7-1
TT -7 &-yol-,oe W Z- L
/V -S L6)9
6 kAV4-,
000l
L7C>
CD