15-575-Order Recorded 5/11/1972In the Matter
of
INSTALLING A
PIPELINE
IN THE BOARD OF COUNTY COMMISSIONERS
OF THE STATE OF OREGON
FOR THE COUNTY OF DESCHUTES
O R D E R
va 15 ?ACE 5 °75
A permit is granted by Deschutes County to Freda A. McDaniel
to install a pipeline on or across Deschutes County
right-of-way. A detailed description and map of this operation must be provided
on the reverse side of this sheet. This permit is subject to the following gen-
eral specifications and is revocable at any time upon written notice by the
Deschutes County Board of Commissioners.
GENERAL SPECIFICATIONS FOR PARTICULAR INSTALLATIONS
Installing Pipe Line Parallel: All pipe lines running
parallel with the road shall be in the existing ditch line, or no less than three
(3) feet from the edge of the existing pavement edge. All pipe lines must be
installed to a depth to be no less than two (2) feet and properly backfilled to
the original grade line and with no obstructions to the drainage area. Permittee
shall be responsible for any or all damages to the existing pavement, and
shoulders or other objects or areas within the right-of-way.
lai sversely to the road bed or right-of-way shall be installed in the
following_Ter: All pavement cuts prior to the excavationshall be e with
a breaking hamme as to insure neat finish cut lines. All Ines shall
be installed to a dep no less than two (2) �feet bolo e existing road-
side ditch elevation. In a ses where a watei is installed in a trans-
verse direction the water pipe mu e install thin a larger pipe which size
shall be no less than six (6) inches in eter. Backfilling and Paving: The
permittee shall be required to pro y back the trench in such a manner as
to guarantee a well compacte abliized sub -base 'or to paving. The pave-
ment must be replaced s original line, crovdn, and g w-th an asphalt
mixture to confor ith the surrounding road bed. The area o tallation
must �keoti� for the traveling public at all times. The per ee tivill
be rell times to take every precaution to protect the an
+— P e,=Ri t tep-
In regard to other utility installations, such as gas lines, telephone lines and
electric conduits, all the general specifications shall apply if they are to be
run under ground, with one exception: It would not be necessary to have these
lines within a larger pipe wlj,@."crossing the right-of-way.
Dated this _11_day of 1972
COMMISSIONER
Re oo men F ro
V__/
Charles L. Plummer,
DESCHUTES COUNTY ROADMMASTER
o�/ Wo_ a ,
PERMITTEE