Loading...
15-583-Order Recorded 5/3/1972.. IN THE BOARD OF COUNTY COMMISSIONERS OF THE STATE OF OREGON .FOR THE COUNTY OF DESCHUTES In the Matter ) of ) ORDER Constructing ) an Access ) va 15 ?AGE 583 A permit is granted by Deschutes County to R. L. Durr to construct an access on or across Deschutes Countv right-of-way. A detailed description and map of this operation must be provided on the reverse side of this sheet. This permit is subject to the following general specifications and is revocable at any time upon written notice by the Deschutes County Board of Commissioners. GENERAL SPECIFICATIOIS FOR PARTICULAR INSTALLATIONS in o ui in_gs: 'he p ittee shall be required to observe the following rules and regulations - aining to moving of buildings. The permittee shall be required to m he uildings on pn tic dollies evenly spaced so as to insure an eve fight dis- ribution, and proper honed so as to prevent collapse while . the process of oving. The permittee sha e responsible for all traf . warnings to the raveling public, as may be nece ry to insure saf ravel while in the process f oving the building. The permittee s 1 be . . ired to have at least two (2) ilot cars equipped with signs depictin ' Load", and all the necessary signs nd flagmen at all intersections s s to insure even flow of the traffic and revent congestion. The per . ee will be held direr responsible for any and 11 damage to the exis ' pavement and shoulder areas, an 'll be required to epair said lama r pay damages to Deschutes County for tl-ie ne sary repairs. f during t nurse of moving, it is necessary to move bridge railin the ermi shall be required to replace the railings to their original stat The Private Access to County Road_ The permittee will be required to construct the access at the safest and most practical point of entry. The size of the access must be noted on the description. If there is obvious need for a culvert, the proper size and length must be deter- mined, and also included on the description. The permittee will be responsible for the construction of the access and all the costs of the materials used in the access. If at any time this installation in any way impedes the progress and future maintenance or construction, the permittee will be required to move this installation at his own expense. Deschutes County will assume no responsibility for damage to said installation as & result of maintenance or construction. Failure of permittee to comply with performance of work will result in a charge for work performed by Deschutes County. Dated this day of Reco Iended Ap ov Charles L. Plummer __ Deschutes County Roadmaster Q Y : � PERMIT E IQ 72 ?rs: M, 'W - I