15-583-Order Recorded 5/3/1972.. IN THE BOARD OF COUNTY COMMISSIONERS
OF THE STATE OF OREGON
.FOR THE COUNTY OF DESCHUTES
In the Matter )
of ) ORDER
Constructing )
an Access )
va 15 ?AGE 583
A permit is granted by Deschutes County to R. L. Durr
to construct an access on or across Deschutes Countv right-of-way. A
detailed description and map of this operation must be provided on the reverse
side of this sheet. This permit is subject to the following general specifications
and is revocable at any time upon written notice by the Deschutes County Board of
Commissioners.
GENERAL SPECIFICATIOIS FOR PARTICULAR INSTALLATIONS
in o ui in_gs:
'he p ittee shall be required to observe the following rules and regulations -
aining to moving of buildings. The permittee shall be required to m he
uildings on pn tic dollies evenly spaced so as to insure an eve fight dis-
ribution, and proper honed so as to prevent collapse while . the process of
oving. The permittee sha e responsible for all traf . warnings to the
raveling public, as may be nece ry to insure saf ravel while in the process f
oving the building. The permittee s 1 be . . ired to have at least two (2)
ilot cars equipped with signs depictin ' Load", and all the necessary signs
nd flagmen at all intersections s s to insure even flow of the traffic and
revent congestion. The per . ee will be held direr responsible for any and
11 damage to the exis ' pavement and shoulder areas, an 'll be required to
epair said lama r pay damages to Deschutes County for tl-ie ne sary repairs.
f during t nurse of moving, it is necessary to move bridge railin the
ermi shall be required to replace the railings to their original stat The
Private Access to County Road_
The permittee will be required to construct the access at the safest and most
practical point of entry. The size of the access must be noted on the description.
If there is obvious need for a culvert, the proper size and length must be deter-
mined, and also included on the description. The permittee will be responsible
for the construction of the access and all the costs of the materials used in the
access. If at any time this installation in any way impedes the progress and
future maintenance or construction, the permittee will be required to move this
installation at his own expense. Deschutes County will assume no responsibility
for damage to said installation as & result of maintenance or construction.
Failure of permittee to comply with performance of work will result in a charge for
work performed by Deschutes County.
Dated this day of
Reco Iended Ap ov
Charles L. Plummer __
Deschutes County Roadmaster
Q Y : �
PERMIT E
IQ 72
?rs:
M,
'W -
I