15-588-Order Recorded 5/15/1972IN THE BOARD OF COUNTY COMMISSIONERS
0•F. THE +STATE OF OREGON
FOR THE COUNTY OF DESCHUTES
In the Matter )
of ) O R D E R
Constructing
an Access
VOL 15 FAcE 588
A permit is granted by Deschutes County to Wayne Roan
to construct an access on or across Deschutes County right-of-way. A
detailed description and map of this operation must be provided on the reverse
side of this sheet. This permit is subject to the following general specifications
and is revocable at any time upon written notice by the Deschutes County Board of
Commissioners.
GENERAL SPECIFICATIONS FOR PARTICULAR INSTALLATIONS
tains o the moving of buildings. The permittee shall be required to the
buildings o eumatic dollies evenly spaced so as to insure an eve fight dis-
tribution, and p rly shored so as to prevent collapse while the process of
moving. The permittee 11 be responsible for all traf ' warnings to the
traveling public, as may be ssary to insure satravel while in the process of
moving the building. The permitte all be uired to have at least two (2)
pilot cars equipped with signs depicti 'de Load", and all the necessary signs
and flagmen at all intersections , s to ins an even flow of the traffic and
prevent congestion. The pe ' tee will be held dir responsible for any and
all damage to the exi ' g pavement and shoulder areas, a ill be required to
repair said dam or pay damages to Deschutes County for the n sary repairs.
If durin course of moving, it is necessary to move bridge railin the
per ee shall be required to replace the railings to their original state. he
PRIVATE ACCESS TO COUNTY ROAD: ,
The permittee will be required to construct the access at the safest and most
practical point of entry. The size of the access must be noted on the description.
If there is obvious need for a culvert, the proper size and length must'be deter-
mined, and also included on the description. The permittee will be responsible
for the construction of the access and all the costs of the materials used in the
access. If at any time this installation in any way impedes the progress and
future maintenance or construction, the permittee will be required to move this
installation at his own expense. Deschutes County will assume no responsibility
for damage to said installation as a result of maintenance or construction.
Failure of permittee to comply with performance of work will result in a charge for
work performed Eby Deschutes County.
Dated this /05- of
Recommended Approv Approved B and of ounty o is 'oners:
Charles L. Plummer CHAIRMA
Deschutes Cou oadmaster
/
COMMISSIONER
(i PE TTEE
COMMISSIONER
�7�C-)�