15-10-Order Recorded 9/1/1971In the Matter )
of )
Installing Culvert )
IN THE BOARD OF COUNTY COMMISSIONERS
OF THE STATE OF OREGON
FOR THE COUNTY OF DESCHUTES
O R D E R
von 15 PACE Jo
A permit is granted by Deschutes County to Bud Bowers
to install a culvert on or across Deschutes County
right-of-way. A detailed description and map of this operation muss, be provided
on the reverse side of this sheet. This permit is subject to the following gen-
eral specifications and is revocable at any time upon written notice by the
Deschutes County Board of Commissioners.
GENERAL SPECIFICATIONS FOR PARTICULAR INSTALLATIONS
parallel with the road shall be in the existing ditch line, or no le ree
(3) feet from the edge of the existing pavement edge. lines must be
installed to a depth to be no less than eet and properly backfilled to
the original grade line a o structions to the drainage area. Permittee
shall be res or any or all damages to the existing pavement, and
._il- r
Installing Pipe Line Transverse: Culvert pipe All pipe line installations
laid transversely to the road bed or right-of-way shall be installed in the
following manner: All pavement cuts prior to the excavation shall be made with
a breaking hammer so as to insure neat finish cut lines. )Nx1X)p�)cxlxiXXc1X1X
b;�X�GX>J�X�DC�X?�X?��C4CJ0?iI�X�O?C�X)btu(�CiX��E�dXX�'c��?�1�CR(II�C�XX
s t0�? ?IX C)III�iCJi�: 7�X?i C9C x�k4C JX X XX XX i Backfilling and Paving: T h e
permittee shall be required to properly backfill the trench in such a manner as
to guarantee a well compacted, stabliized sub -base prior to paving. The pave-
ment must be replaced to its original line, crown, and grade with an asphalt
mixture to conform with the surrounding road bed. The area of installation
must be kept smooth for the traveling public at all times. The permittee will
be required at all times to take every precaution to protect the traveling
public. All signs and traffic controls shall be furnished by the permittee.
In regard to other utility installations, such as gas lines, telephone lines and
electric conduits, all the general specifications shall apply if they are to be
run under ground, with one exception: It would not be necessary to have these
lines within a larger pipe when crossing the right-of-way.
Dated this I js r day of S15:-77p—T--- 19 .
COMMISSIONER '
Recommended Appr val,---- ^`
Charles L. Plummer,
DESCHUTES COUNTY ROADMASTER
PER TEE '
VOL 15 WE ƒƒ� {