Loading...
15-41-Order Recorded 9/30/1971IN THE BOARD OF COUNTY COMMISSIONERS OF THE STATE OF OREGON FOR THE COUNTY OF DESCHUTES In the Matter ) of ) ORDER Iaatalling a ) pipeline VOL 15 ?ACE 41. 6`4 A permit is granted by Deschutes County to A. L. Peden to install a(waterline on or across Deschutes County right-of-way. A detailed description and map of this operation must be provided on the reverse side of this sheet. This permit is subject to the following gen- eral specifications and is revocable at any time upon written notice by the Deschutes County Board of Commissioners. GENERAL SPECIFICATIONS FOR PARTICULAR INSTALLATIONS parallel with the road shall be in the existing ditch line, or no les ree (3) feet from the edge of the existing pavement edge. Ines must be installed to a depth to be no less than - eet and properly backfilled to the original grade line an o structions to the drainage area. Permittee shall be res or any or all damages'to the existing pavement, and C v c n N n i- 1, n v. n k i . , i-.- .. ,.. .,... a- L...-. 1 L. - . _ _ -L- L _ r .. _ . . Installing Pipe line Transverse: All pipe line installations laid transversely to the road bed or right-of-way shall be installed in the following manner: All pavement cuts prior to the excavation shall be made with a breaking hammer so as to insure neat finish cut lines. All pipe lines shall be installed to a depth of no less than two (2) feet below the existinq road- side ditch elevation. In all cases where a water line is installed in -a trans- verse direction the water pipe must be installed within a larger pipe which size shall be no less than six (6) inches in diameter. Backfilling and Paving: The permittee shall be required to -properly backfill the trench in such a manner as to guarantee a well compacted, sta�liized sub -base prior to paving. The pave- ment must be replaced to its original line, crown, and grade with an asphalt mixture to conform with the sur•round-ing road bed. The area of installation must be kept smooth for the traveling public at all times. The permittee will be required at all times to take every precaution to protect the traveling public. All signs and traffic controls shall be furnished by the permittee. In regard to other utility installations, such as gas lines, telephone lines and electric conduits, all the general specifications shall apply if they are to be. run under ground, with one exception: It would not be necessary to have these lines within a larger pipe when cr ssing the right-of-way. Dated this4347-day of , 19 7r Approved Board of Commissioners: CHAI RMAN Recommended Approv, 1 Charles L. Plummer, DESCHUTES COUNTY ROADMASTEP, ERMITTE rI : is N °ZEppte, i2'gio r y7 r a <y.RbS i ° eCS'e S PPP s� G. F 1 <<a sif b G v I� VOL -.5 w:E 4 i �vIM r ` P yi iF E � �L� YYa O ►�N,1 ,p t F =z 77 rI : is N °ZEppte, i2'gio r y7 r a <y.RbS i ° eCS'e S PPP s� G. F 1 <<a sif b G v I� VOL -.5 w:E 4