Loading...
15-184-Order Recorded 12/8/1971VOL 15 PAcF t84 \d� IN THE BOARD OF COUNTY COMMISSIONERS L OF THE STATE OF OREGON FOR THE COUNTY OF DESCHUTES In the Matter ) of ) O R D E R Installing a pipeline A permit is granted by Deschutes County to Ben A. Bidwell to install a pipeline on or across Deschutes County right-of-u,ay. A detailed description and map of this operation must, be provided on the reverse side of this street. This permit is subject to the following gen- eral specifications and is revocable at any time upon ;,irltten notice by the Deschutes County Board of Commissioners. GENERAL SPECIFICATIOJS FOR PARTICULAR INSTALLATIO'1S parallel with the road scall tie in the existing ditch line, or no 1 ree (3) feet firom the edge of the existing pavement ed e. e Ines must be installed to a depth to be no less th cet and properly backfilled to the original grade line no obstructions to the drainaqe area. Permittee shall b > e for any or all damages to t:he existing pavement, and Installin Pipe Line Transverse: All pipe line installations laid transversely to the road bed or right-of-way shall be installed in the following manner: All pavement cuts prior to the excavation shall be made with a breaking hammer so as to insure neat finish cut lines. All pipe lines shall be installed to a depth of no less than two (2) feet below the existing road- side ditch elevation. In all cases where a i%,ater line is installed in"a trans- verse verse direction the r,.,at:er pipe mist be installed �.tiith— in a larger pipe which size shall be no less t'nnan six ((6) inches in diameter. Backfillinq and Paving: The permittee shall be required to -properly backfill the trench in such a manner as to guarantee a well compacted, star)liized suh-base prior to paving. The pave- ment must be replaced to ics original line, crov,,,n, and grade with an asphalt mixture to conform with the surrounding road bed. The.area of installation must be kept smooth for the traveling public at all times. The permittee will be required at all times to take every precaution to protect the traveling public. All signs and traffic controls shall he furnished by the permittee. In regard to other utility installations, such as gas lines, telephone lines and electric conduits, all the general specifications shall apple if they are to be run under ground, with one exception: It would not be necessary to have these lines within a larger pipe when crossings the right--of-Viay. Dated this F day of _C�cC� - 191L. COHIIISSIONER t;ec,mmended/; pr , 2_ Charles L. Plummer, DESCHU ES COUNTY no,, ASTEP, 4 � I& � PERMITTEE — VOL 15 pAcf 185 i It,