Loading...
15-258-Order Recorded 1/10/1972., . . VOL 15 PAcF ?58 Ind THE BOARD OF COUNTY COMMISSIONERS OF THE STATE OF OREGON FOR THE COUNTY OF DESCHUTES In tine Matter ) of ) ORDER Construct an access A permit is granted by Deschutes County to Arland C. Sanborn to construct an access on or across Deschutes County right-of-way. A detailed description and map of this operation must be provided on the reverse side of this sheet. This permit is subject to the following general specifications and is revocable at any time upon written notice by the Deschutes County Board of Commissioners. GENERAL SPECIFICATIONS FOR PARTICULAR, INSTALLATIONS The permittee shall be required to observe the following rules and regulations pe taining to the moving of buildings. The permittee shall be required to mov e buildings on pneumatic dollies evenly spaced so as to insure an even dis- tribution, and properly shored so as to prevent collapse while i e process of moving. The permittee shall be responsible for all traffi rnings to the traveling public, as may be necessary to insure safe vel while in the process of moving the building. The permittee shall be r red to have at least two (2) pilot cars equipped with signs depictin " e Load", and all the necessary signs and flagmen at all intersections s to insure an even flow of the traffic and prevent congestion. The per ' e will be held directly responsible for any and all damage to the exis ' pavement and shoulder areas, and will be required to repair said dama pay damages to Deschutes County for the necessary repairs. If during t ourse of moving, it 'is necessary to move bridge railings, the permi shall be required to replace the railings to their original state. The Private Access to County Road: The permittee will be required to construct the access at the safest and most practical point of entry. The size of the access must be noted on the description. If there is obvious need for a culvert, the proper size and length must be deter- mined, and also included on the description. The permittee will be responsible for the construction of the access and all the costs of the materials used in the access. If at any time this installation in any way impedes the progress and future maintenance or construction, the permittee will be required to move this installation at his own expense. Deschutes County will assume no responsibility for damage to said installation as a result of maintenance or construction. Failure of permittee to comply with performance of work will result in a charge for work performed by Deschutes County. Dated this. /Q day 1 g� Recommended ,Approval : Charles L. Plummer Deschutes County Roadmaster //._- PERMITTEE fz. '. VOL 15 PuE 259 N E % SEC. 20 T. 15 S. R.13 E.W.M. Dead Numbers 501 DESCHUTES COUNTY SCALE: I" - 200' SEE MAP 15 13 17 15 13 20A SEE MAP 15 13 20D 15 13 20A