15-220-Order Recorded 12/16/1971Ind THE BOARD OF COUNTY COMMISSIONERS
OF THE STATE OF OREGON
FOR THE COUNTY OF DESCHUTES
In the Matter )
of ) ORDER
Constructing an
access
VOL 1-5 W'F V0
A permit is granted by Deschutes County to Don Peterman
to construct an access on or across Deschutes County right-of-way. A
detailed description and map of this operation must be provided on the reverse
side of this sheet. This permit is subject to the following general specifications
and is revocable at any time upon written notice by the Deschutes County Board of
Commissioners.
GENERAL SPECIFICATIONS FOR PARTICULAR, INSTALLATIONS
The permittee shall be required to observe the following rules and regulations pe
taining to the moving of buildings. The permittee shall be required to mov e
buildings on pneumatic dollies evenly spaced so as to insure an even t dis-
tribution, and properly shored so as to prevent collapse while e process of
moving. The permittee shall be responsible for all traff' arnings to the
traveling public, as may be necessary to insure saf avel while in the process of
moving the building. The permittee shall be r red to have at least two (2)
pilot cars equipped with signs depictin de Load", and all the necessary signs
and flagmen at all intersections s to insure an even flow of the traffic and
prevent congestion. The per ee will be held directly responsible for any and
all damage to the exis pavement and shoulder areas, and will be required to
repair said dama r pay damages to Deschutes County for the necessary repairs.
If during course of moving, it -is necessary to move bridge railings, the
permi e shall be required to replace the railings to their original state. The
Private Access to County Road:
The permittee will be required to construct the access at the safest and most
practical point of entry. The size of the access must be noted on the description.
If there is obvious need for a culvert, the proper size and length must be deter-
mined, and also included on the description. The permittee will be responsible
for the construction of the access and all the costs of the materials used in the
access. If at any time this installation in any way impedes the progress and
future maintenance or construction, the permittee will be required to move this
installation at his oum expense. Deschutes County will assume no responsibility
for damage to said installation as a result of maintenance or construction.
Failure of permittee to comply with performance of work will result in a charge for
work performed by Deschutes County.
Dated t 1 s day of U/� C '. /', � c)-7/ -
Recommended App o�al�
Charles Plummer
Des chut Countyq R
i1M
r
Vol
sJ CP
0
iI
VOL 15 PAGE 221
J
4 O
LA
-4
>
17
r
Vol
sJ CP
0
iI
VOL 15 PAGE 221
iJ
J
4 O
LA
-4
>
iJ
4 O
LA
-4
>
Ill. UY461, it3 - W.
Fi
w
cu ZG 15- W.
T T
J)
'r,
Ir -P
CP
1jj
LA
-4
>
Fi
w
cu ZG 15- W.
T T
J)
'r,
Ir -P
CP
1jj