Loading...
15-271-Order Recorded 1/12/1972r✓��� In the Clatter of ICJ THE BOARD OF COUNTY COCIMISSIONERS OF Ti(E STATE OF OREGON FOR THE COUNTY OF DESCHUTES 11111919MIMM, VOL O -DE -6 3H 15 %AiT 27� A permit is granted by Deschutes County to Pacific Gas Transmission Co. to install a 36" steel pipeline on or across Deschutes County right-of-way. A detailed description and map of this operation must be provided on the reverse side of this sheet. This permit is subject to the following gen- eral specifications and is revocable at any time upon �,,ritten notice by the Deschutes County Board of Commissioners. GENERAL SPECIFICATIONS FOR P+ARTICULAR, INSTALLATIONS Installing Pipe Line Parallel: All pipelines running parallel with the road shall be in the existing ditch line, or no less than three (3) feet from the edge of the existing pavement edge. All pipe lines must be installed to a depth to be no less than two (2) feet and properly backfilled to the original grade line and with no obstructions to the drainage area. Permittee shall be responsible for any or all damages to the existing pavement, and shoulders or other objects or areas within the right-of-way. Installing Pipe Line Transverse: All pipe line installations laid transversely to -tile road bed or right-of-way shall be installed in the following manner: All pavement cuts prior to the excavation shall be made with a breaking hammer so as to insure neat finish cut lines. All pipe lines shall be installed to a depth of no less than two (2) feet below the existinq road- side ditch elevation. In all cases where a i•rater line is installed in -a trans-' verse direction the water pipe must be installed within a. larger pipe which size shall be no less than six (6) inches in diameter. Backfilling_ and Paving: The permittee shall'be required to properly backfill the trench in such a manner as to guarantee a well compacted, stabl•iized sub -base prior to paving. The pave- ment must be replaced to its original line, crown, and grade with an asphalt mixture to conform with the surrounding road bed. The area of installation must be kept smooth for the traveling public at all times. The permittee will be required at all times to take every precaution to protect the traveling public.. All signs and traffic controls shall be furnished by the permittee. In regard to other utility installations, such.as gas lines, telephone lines and electric conduits, all the general specifications shall apply if they are to be run under ground, with one exception: It would not be necessary to have these lines within a larger pipe when crossing the right-of-way. Dated this_ day of 197 "7 • Recomme ded Approval / Charles L. Plummer, DESCHUTES COUNTY P,OADMASTEP. i9aSIONM _ ice---- 9E,HEE _ Pacific Gas Transmission Company