14-75-Order Recorded 7/31/1970vol. 14 FACE '15
IN THE BOARD OF COUNTY COMMISSIONERS
OF THE STATE OF OREGON
FOR THE COUNTY OF DESCHUTES
In the Matter )
of ) ORDER
Installing a pipeline
A permit is granted by Deschutes County to Terrebonne Domestic Water District
to Install a water line on or across Deschutes County
right-of-way. A detailed description and map of this operation must be provided
on the reverse side of this sheet. This permit is subject to the following gen-
eral specifications and is revocable at any time upon written notice by the
Deschutes County Board of Commissioners.
GENERAL SPECIFICATIONS FOR PARTICULAR INSTALLATIONS
Installing Pipe Line Parallel: 400' of pipe total -All pipe lines running
parallel with the road shall -tie in the existing ditch line, or no less than three
(3) feet from the edge of the existing pavement edge. All pipe lines must be
installed to a depth to be no less than two (2) feet and properly backfilled to
the original grade line and with no obstructions to the drainage area. Permittee
shall be responsible for any or all damages to the existing pavement, and
shoulders or other objects or areas within the right-of-way.
lai sversely to the road bed or right-of-way shall be installed in the
following r: A11 pavement cuts prior to the excavation shall be made with
a breaking hamme as to insure neat finish cut lines. All pipe lines shall
be installed to a dep no less than two (2) feet below the existing road-
side ditch elevation. In a ses where a water line is installed in a trans-
verse direction the water pipe7Mh**kee._instaTled within a larger pipe which size
shall be no less than six (6) inches i meter. Backfilling and Paving: The
permittee shall be required to properly bac the trench in such a manner as
to guarantee a well compacted, stabliized sub -bas or to paving. The pave-
ment must be replaced to its original line, crown, and graqp, with an asphalt
mixture to conform with the surrounding road bed. The area 7"""1"tallation
must be kept smooth for the traveling°public at all times. The pdM4&4ee will
be required at all times to take every precaution to protect the Crave i
In regard to other utility installations, such as gas lines, telephone lines and
electric conduits, all the general specifications shall apply if they are to be
run under ground, with one exception: It would not be necessary to have these
lines within a larger pipe when crossing the right-of-way.
Dated this -::51 day of 19 '07d
Re o ended Appro a;14?
Charles L. Plummer,
DESCHUTES COUNTY ROADMASTER
Approved Board of Commissioners:
d"Z d
PER TT