14-615-Order Recorded 3/18/1971IN THE BOARD OF COUNTY COMMISSIONERS VOL 14 FQrr 6.' 5
OF THE STATE OF OREGON
FOR THE COUNTY OF DESCHUTES
In the Matter
of ) ORDER
Inatalling'a pipeline
A permit is granted by Deschutes County to I'1TY ()nIr*
to construct a 12" water main on or across Deschutes County
right-of-way. A detailed description and map of this operation must be provided
on the reverse side of this sheet. This permit is subject to the following gen-
eral specifications and is revocable at any time upon written notice by the
Deschutes County Board of Commissioners.
GENERAL SPECIFICATIONS FOR PARTICULAR INSTALLATIONS
Installing Pipe Line Parallel: All pipe lines running
parallel with the road shall be in the existing ditch line, or no less than three
(3) feet from the edge of the existing pavement edge. All pipe lines must be
installed to a depth to be no less than two (2) feet and properly backfilled to
the original grade line and with no obstructions to the drainage area. Permittee
shall be responsible for any or all damages to the existing pavement, and
shoulders or other objects or areas within the right-of-way.
aid transversely to the road bed or right-of-way shall be installed in the
owing manner: All pavement cuts prior to the excavation shall be made with
abre ng rammer so as to insure neat finish cut lines. All pipe lines shall
be insta to a depth of no less than two (2) feet below the existing road-
side ditcf1 ele on. In all cases where a water line is installed in a trans-
verse direction tl7e er pipe must be installed within a larger pipe which size
shall be no less than si inches in diameter. Backfilling and Paving: The
permittee shall be required operly backfill the trench in such a manner as
to guarantee a well compacted, sta '' zed sub -base prior to paving. The pave-
ment must be replaced to its original li crown, and grade with an asphalt
mixture to conform with the surrounding road The area of installation
must be kept smooth for the traveling public at a nes. The permittee will
be required at all times to take every precaution to pro �h,�raveling
ermittee.
In regard to other utility installations, such as gas lines, telephone lines and
electric conduits, all the general specifications shall apply if they are to be
run under ground, with one exception: It would not be necessary to have these
lines within a larger pipe crossing the right-of-way.
Dated this -_/F /I day of , 19-V
RecPm ended Approval
Approved Board of Commissioners: Ntz_�
Charles L. Plummer,
DESCHUTES COUNTY ROADMASTER
PE MITTEEt f Public Works
RF'CiMOND