Loading...
14-615-Order Recorded 3/18/1971IN THE BOARD OF COUNTY COMMISSIONERS VOL 14 FQrr 6.' 5 OF THE STATE OF OREGON FOR THE COUNTY OF DESCHUTES In the Matter of ) ORDER Inatalling'a pipeline A permit is granted by Deschutes County to I'1TY ()nIr* to construct a 12" water main on or across Deschutes County right-of-way. A detailed description and map of this operation must be provided on the reverse side of this sheet. This permit is subject to the following gen- eral specifications and is revocable at any time upon written notice by the Deschutes County Board of Commissioners. GENERAL SPECIFICATIONS FOR PARTICULAR INSTALLATIONS Installing Pipe Line Parallel: All pipe lines running parallel with the road shall be in the existing ditch line, or no less than three (3) feet from the edge of the existing pavement edge. All pipe lines must be installed to a depth to be no less than two (2) feet and properly backfilled to the original grade line and with no obstructions to the drainage area. Permittee shall be responsible for any or all damages to the existing pavement, and shoulders or other objects or areas within the right-of-way. aid transversely to the road bed or right-of-way shall be installed in the owing manner: All pavement cuts prior to the excavation shall be made with abre ng rammer so as to insure neat finish cut lines. All pipe lines shall be insta to a depth of no less than two (2) feet below the existing road- side ditcf1 ele on. In all cases where a water line is installed in a trans- verse direction tl7e er pipe must be installed within a larger pipe which size shall be no less than si inches in diameter. Backfilling and Paving: The permittee shall be required operly backfill the trench in such a manner as to guarantee a well compacted, sta '' zed sub -base prior to paving. The pave- ment must be replaced to its original li crown, and grade with an asphalt mixture to conform with the surrounding road The area of installation must be kept smooth for the traveling public at a nes. The permittee will be required at all times to take every precaution to pro �h,�raveling ermittee. In regard to other utility installations, such as gas lines, telephone lines and electric conduits, all the general specifications shall apply if they are to be run under ground, with one exception: It would not be necessary to have these lines within a larger pipe crossing the right-of-way. Dated this -_/F /I day of , 19-V RecPm ended Approval Approved Board of Commissioners: Ntz_� Charles L. Plummer, DESCHUTES COUNTY ROADMASTER PE MITTEEt f Public Works RF'CiMOND