14-622-Order Recorded 3/30/1971In the Matter
of
Installing a pipeline
IN THE BOARD OF COUNTY COMMISSIONERS
OF THE STATE OF OREGON
FOR THE COUNTY OF DESCHUTES
O R D E R
VOL -1poli
A permit.is granted by Deschutes County to Cascade Natural Gas Corp.
to install a pipeline on or across Deschutes County
right-of-way. A detailed description and map of this operation must be provided
on the reverse side of this sheet. This permit is subject to the following gen-
eral specifications and is revocable at any time upon written notice by the
Deschutes County Board of Commissioners.
GENERAL SPECIFICATIONS FOR PARTICULAR INSTALLATIONS
Installing Pipe Line Parallel: See attached sketch All pipe lines running
parallel with the road shall be in the existing ditch line, or no less than three
(3) feet from the edge of the existing pavement edge. All pipe lines must be
installed to a depth to be no less than two (2) feet and properly backfilled to
the original grade line and with no obstructions to the drainage area. Permittee
shall be responsible for any or all damages to the existing pavement, and
shoulders or other objects or areas within the right-of-way.
Installing Pipe Line Transverse: See attached sketch All pipe line installations
laid transversely to the road bed or right-of-way shall be installed in the
following manner: All pavement cuts prior to the excavation shall be made with
a breaking hammer so as to insure neat finish cut lines. All pipe lines shall
be installed to a depth of no less than two (2) feet below the existinq road-
side ditch elevation. In all cases where a water line is installed in -a trans-
verse direction the water pipe must be installed within a larger pipe which size
shall be no less than six (6) inches in diameter. Backfilling and Paving: The
permittee shall be required to properly backfill the trench in such a manner as
to guarantee a well compacted, stabliized sub -base prior to paving. The pave-
ment must be replaced to its original line, crown, and grade with an asphalt
mixture to conform with the surrounding road bed. The area of installation
must be kept smooth for the traveling public at all times. The permittee will
be required at all times to take every precaution to protect the traveling
public. All signs and traffic controls shall be furnished by the permittee.
In regard to other utility installations, such as gas lines, telephone lines and
electric conduits, all the general specifications shall apply if they are to be
run under ground, with one exception: It would not be necessary to have these
lines within a larger pipe when crossing the right-of-way.
Dated this S6 day of _2�120CCIL 19-71.
Recommended App r val,,
Charles L. Plummer,
DESCHUTES COUNTY ROADMASTER
�r 1 ism - s
COMMISSIONERPERMITTEE
Form No 336 7/66
CASCADE NATURAL GAS CORPORATION cc��
r VOL 14 P.46r ��c)
DISTRIBUTION LINE REPORT
Item
No.
Quantity
Proposed "As Built"
Stock No.
Description
1.
1 _` ; i
PWX-350
2" X -T AT PIPE
2.
+:
EL -360
2" 9010 Weld ell.
3.
NP -213
1" Save -A -Valve nipple
4.
SP -352
2" Weld line stopper fitting
5.
SP -354
2" Extension stopper fitting
6.
TE -351
2" x 2" x 2" Weld tee
7.
NONE
2" End plate
8.r
9.
10.'
11.
12.
13.
14.
E. R. No �+ City ``.E /.
State 'l,,� % Grid No. 4 7'; �
Ft. Blacktop Ft. Concrete
Ft. Gravel, RockFt. Sod, Dirt`"
Initiated by 7y Date
,�-� ,�^SafeS;,Representative y
Prepared by 4 ey e# 14- Date
[Distribution Clerk
Approved by Date
Head Serviceman
Constructed by Date
Test pressure by
"As — Built" by Date
Distribution Clerk
Checked by Date
Head Serviceman
Const. problems
Diagram No.
Posted Grid ❑
DI AT
Date by
acing ❑ Overall ❑
CITY OR COUNTY PRELIMINARY
4
r
{ ""r Aix.:4
E i ser ny' ar
4
CITY OR COUNTY PRELIMINARY