14-179-Order Recorded 9/18/1970In the Matter
of
Installing a pipeline
IN THE BOARD OF COUNTY COMMISSIONERS
OF THE STATE OF OREGON
FOR THE COUNTY OF DESCHUTES
O R D E R
VOL 14 pAci-J 49
A permit is granted by Deschutes County to Rick C. Hinman
to install a pipeline on or across Deschutes County
right-of-way. A detailed description and map of this operation must be provided
on the reverse side of this sheet. This permit is subject to the following gen-
eral specifications and is revocable at any time upon written notice by the
Deschutes County Board of Commissioners.
GENERAL SPECIFICATIONS FOR PARTICULAR INSTALLATIONS
Installing Pipe Line Parallel: See attached sketch. I -All pipe lines running
parallel with the road shall Fe in the existing ditch line, or no less than three
(3) feet from the edge of the existing pavement edge. All pipe lines must be
installed to a depth to be no less than two (2) feet and properly backfilled to
the original grade line and with no obstructions to the drainage area. Permittee
shall be responsible for any or all damages to the existing pavement, and
shoulders or other objects or areas within the right-of-way.
Installing Pipe Line Transverse: See attached sketch All pipe line installations
laid transversely to the road bed or right-of-way shall be installed in the
following manner: All pavement cuts prior to the excavation shall be made with
a breaking hammer so as to insure neat finish cut lines. All pipe lines shall
be installed to a depth of no less than two (2) feet below the existing road-
side ditch elevation. In all cases where a water line is installed in a trans-
verse direction the water pipe must be installed within a larger pipe which size
shall be no less than six (6) inches in diameter. Backfilling and Paving: The
permittee shall be required to properly backfill the trench in such a manner as
to guarantee a well compacted, stabliized sub -base prior to paving. The pave-
ment must be replaced to its original line, crown, and grade with an asphalt
mixture to conform with the surrounding road bed. The area of installation
must be kept smooth for the traveling°public at all times. The permittee will
be required at all times to take every precaution to protect the traveling
public. All signs and traffic controls shall be furnished by the permittee.
In regard to other utility installations, such as gas lines, telephone lines and
electric conduits, all the general specifications shall apply if they are to be
run under ground, with one exception: It would not be necessary to have these
lines within a large pipe when ossing the right-of-way.
Dated thisday o
Approved Board of Commissioners:
COMMISSIONER
Recommended Approval
Charles L. Plummer,
DESCHUTES COUNTY ROADMASTER
r
/ERMXIITTEE
VOL 14 ?AGE 1 (�
I t„t32400
!}{ 1 2600
,{. 0 .220,0
-1800
LO
2700
# / y 2 1900
-'1 2x'1.12•.. "' \ / ' _
H r�� 2800 t fb� 2500 `� t I'
�. 2301 2300 2loa.a
2000 n
W Lo 16-
19
4200
` I h
\t J •wr: 77
! 1 a^!\ _ cam• 1 • 2 S—'-----_.�~ r: + a
,s ,' ��.o• \,�. S1 BEET
290 � 30x0 33017 � 34� 0� 7{ � - s�-�-,-F.-----
37300
. -
.. a�00 c 10a 4!01 / "5 4102
iR
D+/
<o ¢4'J 3 300 0 ., f � �, ✓ac � a� 1 ��..
Ci +
j t0
3201
_-- �
v
370', �a00 3900 -
20 d -
1 oy
EE
, o
n'
~�. • - .. ^tel. G�'a �-- �iW� C.t.. – _
E
t'AP 13 29B
1