14-687-Order Recorded 5/7/1971IN THE BOARD OF COUNTY COMMISSIONERS
\� OF THE STATE OF OREGON
FOR THE COUNTY OF DESCNUTES
In the Matter )
of ) ORDER
Installing a pipeline )
A permit is granted by Deschutes County to Frank Zon.)relli
to install a pipeline on or across Deschutes County
right-of-way. A detailed description and map of this operation must be provided
on the reverse side of this sheet. This permit is subject to the following gen-
eral specifications and is revocable at any time upon written notice by the
Deschutes County Board of Commissioners.
GENERAL SPECIFICATIONS FOR PARTICULAR INSTALLATIONS
Installing Pipe Line Parallel: See attached sketch. All pipe lines running
parallel with the road shall be in the existing ditch line, or no less than three
(3) feet from the edge of the existing pavement edge. All pipe lines must be
installed to a depth to be no less than two (2) feet and properly backfilled to
the original grade line and with no obstructions to the drainage area. Permittee
shall be responsible for any or all damages to the existing pavement, and
shoulders or other objects or areas within the right-of-way.
lai nsversely to the road bed or right-of-way shall be installed in the
following ner: All pavement cuts prior to the excavation shall be made with
a breaking hamm o as to insure neat finish cut lines. All pipe lines shall
be installed to a dep of no less than two (2) feet below the existing road-
side ditch elevation. In` cases where a water line is installed in a trans-
verse direction the water pipe be installed within a larger pipe which size
shall be no less than six (6) inches iameter. Backfilling and Paving: The
permittee shall be required to properly ba ll the trench in such a manner as
to guarantee a well compacted, stabliized sub -ba riot to paving. The pave-
ment must be replaced to its original line, crown, an de with an asphalt
mixture to conform with the surrounding road bed. The area installation
must be kept smooth for the traveling public at all times. Th�av ill
be required at all times to take every precaution to protect t
In regard to other utility installations, such as gas lines, telephone lines and
electric conduits, all the general specifications shall apply if they are to be
run under ground, with one exception: It would not be necessary to have these
lines within a larger pipe when crossing the right-of-way.
Dated this day of 197Y.
Recommended Approval
Charles L. Plummer,
DESCNUTES COUNTY ROADMASTER
PE MITTEE '