14-687-Order Recorded 5/7/1971IN THE BOARD OF COUNTY COMMISSIONERS \� OF THE STATE OF OREGON FOR THE COUNTY OF DESCNUTES In the Matter ) of ) ORDER Installing a pipeline ) A permit is granted by Deschutes County to Frank Zon.)relli to install a pipeline on or across Deschutes County right-of-way. A detailed description and map of this operation must be provided on the reverse side of this sheet. This permit is subject to the following gen- eral specifications and is revocable at any time upon written notice by the Deschutes County Board of Commissioners. GENERAL SPECIFICATIONS FOR PARTICULAR INSTALLATIONS Installing Pipe Line Parallel: See attached sketch. All pipe lines running parallel with the road shall be in the existing ditch line, or no less than three (3) feet from the edge of the existing pavement edge. All pipe lines must be installed to a depth to be no less than two (2) feet and properly backfilled to the original grade line and with no obstructions to the drainage area. Permittee shall be responsible for any or all damages to the existing pavement, and shoulders or other objects or areas within the right-of-way. lai nsversely to the road bed or right-of-way shall be installed in the following ner: All pavement cuts prior to the excavation shall be made with a breaking hamm o as to insure neat finish cut lines. All pipe lines shall be installed to a dep of no less than two (2) feet below the existing road- side ditch elevation. In` cases where a water line is installed in a trans- verse direction the water pipe be installed within a larger pipe which size shall be no less than six (6) inches iameter. Backfilling and Paving: The permittee shall be required to properly ba ll the trench in such a manner as to guarantee a well compacted, stabliized sub -ba riot to paving. The pave- ment must be replaced to its original line, crown, an de with an asphalt mixture to conform with the surrounding road bed. The area installation must be kept smooth for the traveling public at all times. Th�av ill be required at all times to take every precaution to protect t In regard to other utility installations, such as gas lines, telephone lines and electric conduits, all the general specifications shall apply if they are to be run under ground, with one exception: It would not be necessary to have these lines within a larger pipe when crossing the right-of-way. Dated this day of 197Y. Recommended Approval Charles L. Plummer, DESCNUTES COUNTY ROADMASTER PE MITTEE '