14-218-Order Recorded 10/14/1970VOL
IN THE BOARD OF COUNTY COMMISSIONERS
OF THE STATE OF OREGON
FOR THE COUNTY OF DESCHUTES
In the Matter )
of ) ORDER
Installing a pipeline)
14 pn-L 218
A permit is granted by Deschutes County to +Mike Sellard
to install a pipeline on or across Deschutes County
right-of-way. A detailed description and map of this operation must be provided
on the reverse side of this sheet. This permit is subject to the following gen-
eral specifications and is revocable at any time upon written notice by the
Deschutes County Board of Commissioners.
GENERAL SPECIFICATIONS FOR PARTICULAR INSTALLATIONS
paralle oad shat be in the existing ditch line, or no less than three
(3) feet from the _e7gxisting pavement edge. All pipe lines must be
installed to a depth to be no les (2) feet and properly backfilled to
the original grade line and with no obstruc i e drainage area. Permittee
shall be responsible for any or all damages to the exis i nt, and
Installing Pipe Line Transverse: 20' of pipe All pipe line installations
laid transversely to the road bed or right-of-way shall be installed in the
following manner: All pavement cuts prior to the excavation shall be made with
a breaking hammer so as to insure neat finish cut lines. All pipe lines shall
be installed to a depth of no less than two (2) feet below the existing road-
side ditch elevation. In all cases where a water line is installed in a trans-
verse direction the water pipe must be installed within a larger pipe which size
shall be no less than six (6) inches in diameter. Backfilling and Paving: The
permittee shall be required to properly backfill the trench in such a manner as
to guarantee a well compacted, stabliized sub -base prior to paving. The pave-
ment must be replaced to its original line, crown, and grade with an asphalt
mixture to conform with the surrounding road bed. The area of installation
must be kept smooth for the traveling public at all times. The permittee will
be required at all times to take every precaution to protect the traveling
public. All signs and traffic controls shall be furnished by the permittee.
In regard to other utility installations, such as gas lines, telephone lines and
electric conduits, all the general specifications shall apply if they are to be
run under ground, with one exception: It would not be necessary to have these
lines within a larger pipe when crossing the right-of-way.
Dated this � day of OC2�7� , 1 g�zU
Rec nded Approval
Approved Board of Commissioners:
Charles L. Plummer,
DESCHUTES COUNTY ROADMASTER
CHAIRM J
COMMISSIO
COMMISSIONER PE MITTEE
VOL 1 PAGE �_
SE% SEC. 20 T. {- S. RJ3 E.W.Ivi_ ae. numbers 4500 15 13 20c
DESCHUTES COUNTY
SCALE: I" • 200'
SEE MAP 15 13 20A
ROA6---------r_o2+--
--ry2p2�
3200.
}
r -------'___'_
3201
�
e
3204
y
---------------
____ _ _____ _3204
3203.
3300
\'�"Q'oe 20 21
e.._ 7 �h `V 5
6 \ 29 28
SEE MAP 15 1 3 29 Av
�I 15 13 20D
kA/ C circa -'
i
1