Loading...
14-716-Order Recorded 6/9/1971In the Matter of I istalliiif, a pipa13ne IN THE BOARD OF COUNTY COMMISSIONERS VOL OF THE STATE OF OREGON FOR THE COUNTY OF DESCHUTES O R D E R 14 PAGE 716- A 6 A permit.is granted by Deschutes County to United Teleplsono r`o. of the N. W. to install a pipeline on or across Deschutes County right-of-way. A detailed description and map of this operation must be provided on the reverse side of this sheet. This permit is subject to the following gen- eral specifications and is revocable at any time upon written notice by the Deschutes County Board of Commissioners. GENERAL SPECIFICATIONS FOR PARTICULAR INSTALLATIONS Installing Pipe Line Parallel: See+ attached sketch. All pipe lines running parallel with the road shall be in the existing ditch line, or no less than three (3) feet from the edge of the existing pavement edge. All pipe lines must be installed to a depth to be no less than two (2) feet and properly backfilled to the original grade line and with no obstructions to the drainage area. Permittee shall be responsible for any or all damages to the existing pavement, and shoulders or other objects or areas within the right-of-way. Installing Pipe Line Transverse: All pipe line installations laid transversely to the road bed or right-of-way shall be installed in the following manner: All pavement cuts prior to the excavation shall be made with a breaking hammer so as to insure neat finish cut lines. All pipe lines shall be installed to a depth of no less than two (2) feet below the existinq road- side ditch elevation. In all cases where a water line is installed in -a trans- verse direction the water pipe must be installed within a larger pipe which size shall be no less than six (6) inches in diameter. Backfilling and Paving: The permittee shall be required to properly backfill the trench in such a manner as to guarantee a well compacted, stabliized sub -base prior to paving. The pave- ment must be replaced to its original line, crown, and grade with an asphalt mixture to conform with the surrounding road bed. The area of installation must be kept smooth for the traveling public at all times. The permittee will be required at all times to take every precaution to protect the traveling public. All signs and traffic controls shall be furnished by the permittee. In regard to other utility installations, such as gas lines, telephone lines and electric conduits, all the general specifications shall apply if they are to be run under ground, with one exception: It would not be necessary to have these lines within a larger pipe wn crossing the right-of-way. Dated this 9 d day of 19 Re co m n/d`e/d Approv --y N/'/' Charles L. Plummer, DESCHUTES COUNTY ROADMASTER ERMITTEE ' O©© UNITED TELEPHONE COMPANY VOL 14 PAGE I1 1 MEN OF THE NORTHWEST 313 S Sixth Street Redmond Oregon 97756 May 19, 1971 Mr Charles L Plummer Deschutes County Roadmaster 1507 East First Bend Oregon 97701 Dear Sir: The United Telephone Company of the Northwest requests permission to bury a communication cable along the east side of 33rd street north from Sedgewick Ave to the north side of Wilcox Road, a distance of 2200 feet, located in Section 15, T14S, R13E. See attached sheet. '+ J V Hooper Sr Ass't District Engineer