14-934-Order Recorded 7/22/1971In the Matter )
of )
installing a pipeline
IN THE BOARD OF COUNTY COMMISSIONERS
OF THE STATE OF OREGON
FOR THE COUNTY OF DESCHUTES
1 1W
A permit is granted by Deschutes County to Mr. E. Wilder
to install a pipeline on or across Deschutes County
right-of-way. A detailed description and map of this operation must be provided
on the reverse side of this sheet. This permit is subject to the following gen-
eral specifications and is revocable at any time upon written notice by the
Deschutes County Board of Commissioners.
GENERAL SPECIFICATIONS FOR PARTICULAR INSTALLATIONS
Installing Pipe Line Parallel: All pipe lines running
parallel with the road shall be in the existing ditch line, or no less than three
(3) feet from the edge of the existing pavement edge. All pipe lines must be
installed to a depth to be no less than two (2) feet and properly backfilled to
the original grade line and with no obstructions to the drainage area. Permittee
shall be responsible for any or all damages to the existing pavement, and
shoulders or other objects or areas within the right-of-way.
d transversely to the road bed or right-of-way shall be installed in the
follo manner: All pavement cuts prior to the excavation shall be made with
a breaking er so as to insure neat finish cut lines. All pipe lines shall
be installed to th of no less than two (2) feet below the existing road-
side ditch elevation. all cases where a water line is installed in a trans-
verse direction the water pi ust be installed within a larger pipe which size
shall be no less than six (6) inc in diameter. Backfilling and Paving: The
permittee shall be required to properl Vill the trench in such a manner as
to guarantee a well compacted, stabliized su e prior to paving. The pave-
ment must be replaced to its original line, crown, grade with an asphalt
mixture to conform with the surrounding road bed. The a of installation
must be kept smooth for the traveling public at all times. ermittee will
be required at all times to take every precaution to protect the tr ing
Pblkl14. All signs ani traffic controls sh 11 be furnished by the permit
In regard to other utility installations, such as gas lines, telephone lines and
electric conduits, all the general specifications shall apply if they are to be
run under ground, with one exception: It would not be necessary to have these
lines within a larger pipe when crossing the right-of-way.
Dated this 22nd day of July , 19 71.
Approved Board of Com s:
C I RMAi =-)
ftecom ended App al "
��/ate
Charles L. Plummer,
DESCHUTES COUNTY ROADMASTEP,
f
CrNEK
-
64
COf1MISS ONER PERMITTEE '
UNITED STATES DEPARTMENT OF AGRICULTURE.
SOIL. CONSERVATION SERVICE
U. S. Post. Office 1'. 0. Box 230, Bond, Orcgon 97701
Q I
r
Dcsc',1utc,,1 CcranCorr-,isr,.Ioncrs
Do,sc'nutcl'Cour Courthouse
Bend, Orcgon c;`7701
L
j
July 14, 1971
VOL 14 PAGE 936
Dear Sirs:
Yx. E. Wilder o-11' Brothers, Oregon has applied for assistance for F-
pl-T)cline for v,te-r under the Agriculture Conservation ',".rDgra—.j,.
a coun"-,-
The T"' t Brothers and vill go north do
ro"'-d !hick !in(-, 1,)otwCen sr�ct`ons and 20 .')r
.-,nd w` l7 be,E'," to 2"' deer.
Vic .5 '.:J*
F- "abcm
h c1 1, rot'�c.,. s and h -'s i rt 1 el Batt --e a• ay
ca C,
c n- t c or t I
r
A ar( n h(.
pipc).'ine
x