14-452-Order Recorded 1/28/1971Aw. A
VOL 1 PACE 452
IN THE BOARD OF COUNTY COMMISSIONERS
OF THE STATE OF OREGON
FOR THE COUNTY OF DESCHUTES
In the Matter
of ) ORDER
Constructing an
access
A permit is granted by Deschutes County to Henry Lin
to construct an access on or across Deschutes County right-of-way. A
detailed description and map of this operation must be provided on the reverse
side of this sheet. This permit is subject to the following general specifications
and is revocable at any time upon written notice by the Deschutes County Board of
Commissioners.
GENERAL SPECIFICATIONS FOR PARTICULAR, INSTALLATIONS
Movin4 of Buildinqs:
to n tovthe moving of buildings. The permittee shall be required to move the
buildings neumatic dollies evenly spaced so as to insure an even weight dis-
tribution, and p rly shored so as to prevent collapse while in the process of
moving. The permitte 11 be responsible for all traffic warnings to the
traveling public, as may be essary to insure safe travel while in the process of
moving the building. The permit hall berequired to have at least two -(2)
pilot cars equipped with signs depicts " ide Load", and all the necessary signs
and flagmen at all intersections so as to in an even flow of the traffic and
prevent congestion.` The permittee will be held 1 ly responsible for any and
all damage to the existing pavement and shoulder areas,, will be required to
repair said damage or pay damages to Deschutes County for the ssary repairs.
If during the course of moving, it is necessary to move bridge rai the
permittee 'shall be required to replace the railings to their original sta The
Private Access to County Road: See attached sketch.
The permittee will be required to construct the access at the safest and most
practical point of entry. The size of the access must be noted on the description.
If there is obvious need for a culvert, the proper size and length must be deter-
mined, and also included on the description. The permittee will be responsible
for the construction of the access and all the costs of the materials used in the
access. If at any time this installation in any way impedes the progress and
future maintenance or construction, the permittee will be required to move this
installation at his own expense. Deschutes County will assume no responsibility
for damage to said installation as a result of maintenance or construction.
Failure of permittee to comply with performance of work will result in a charge for
work performed by Deschutes County.
Dated this day of L.. ` LuL 19 7%
Recommended Approval:
Charles L. Plummer
Deschutes Co my Roadmaster
V BY:
PEeRMITTEE
rel County G issioners:
MAT P• N