14-470-Order Recorded 2/9/1971In the Matter
of
Installing a pipeline
IN THE BOARD OF COUNTY COMMISSIONERS
OF THE STATE OF OREGON
FOR THE COUNTY OF DESCHUTES
O R D E R
VOL 1.4- ?AGF Ad
A permit is granted by Deschutes County to Joseph H. Berger
to install a pipeline parallel on or across Deschutes County
right-of-way. A detailed description and map of this operation must be provided
on the reverse side of this sheet. This permit is subject to the following gen-
eral specifications and is revocable at any time upon written notice by the
Deschutes County Board of Commissioners.
,;l GENERAL SPECIFICATIONS FOR PARTICULAR INSTALLATIONS
Installinq Pipe Line Parallel: See attached sketch All pipe lines running
parallel with the road shall be in the existing ditch line, or no less than three
(3) feel; from the edge of the existing pavement edge. All pipe lines must be
installed to a depth to be no less than two (2) feet and properly backfilled to
the original grade line and with no obstructions to the drainage area. Permittee
shall be responsible for any or all damages to the existing pavement, and
shoulders or other objects or areas within the right-of-way.
laid transversely to the road bed or right-of-way shall be installed in the
following manner: All pavement cuts prior to the excavation shall be e with
a breaking hammer so as to insure neat finish cut lines. All Ines shall
be installed to a depth of no less than two (2) feet belo existing road-
side ditch elevation. In all cases where a water 1' s installed in a trans-
verse direction the water pipe must be install — 1thin a larger pipe which size
shall be no less than six (6) inches in eter. Backfilling and Paving: The
permittee shall be required to pro backfill the trench in such a manner as
to guLmust
ntee a well compacte abliized sub -base prior to paving. The pave-
ment be replaced s original line, crown, and grade with an asphalt
mixtuto confo h the surrounding road bed. The area of installation
must ke both for the traveling public at all times. The permittee will
be reed at all times to take every precaution to protect the traveling
In regard to other utility installations, such as gas lines, telephone lines and
electric conduits, all the general specifications shall apply if they are to be
run under ground, with one exception: It would not be necessary to have these
lines within a larger pipe when crossing the right-of-way.
Dated thisT_ day of 192L.
Recomm nded Approval
Charles L. Plummer,
DESCHUTES COUNTY ROADMASTER
W
aPR PVT EE