Loading...
13-735-Order Recorded 3/23/1970IN THE COUNTY COURT OF THE STATE OF OREGON FOR THE COUNTY OF DESCHUTES In the Matter of Constructing an access A permit is granted to construct an access detailed description and map side of this sheet. This per and is revocable at any time VOL 13- PAGE 73 5 by Deschutes County to Eugene E. Gustafson on or across Deschutes County right-of-way. A of this operation must be provided on the reverse mit is subject to the following general specifications upon written notice by the Deschutes County Court. GENERAL SPECIFICATIONS FOR PARTICULAR INSTALLATIONS ttees hall be required to observe the following rules and regulations per - tai nin a moving of buildings,, The permittee shall be required to move the buildings on tic dollies evenly spaced so as to insure an even weight dis- tribution, and pr shored so aa to,prevent collapse while in the process of moving. The permittee a responsible for all traffic warnings to the traveling public, as may be n ry to.insure safe travel while in the process of moving the building. The permte be required to have at least two (2) pilot cars equipped with signs depictin Loadt', and all the necessary signs and flagmen at all intersections so as to ins even flow of the traffic and prevent congestion. The permittee will be held ' responsible for any ,and all damage to the existing pavement and shoulder areas, 11 be required to repair said damage or pay damages to Deschutes County for the sary repairs. If during the course of moving, it is necessary to move bridge raiz. ` the permittee shall be required to replace the railings to their oz-igizial s=e Private Access to County Road: See attached map. The permittee will be required to construct the access at the safest and most practical point of entry. The size of the access ust be noted on the description. If there is obvious need for a culvert, the propersize and length must be deter- mined, and also included on the description. The permittee will be responsible for the construction of the access and all the costs of the materials used in the access. If at any time this installation in any way impedes the progress and future maintenance or construction, the permittee will be required to move this installation at his own expense. Deschutes County will assume no responsibility for damage to said installation as a result of maintenance or construction. Failure of permittee to comply with performance of work will result in a charge for work performed by�Deschutes County. �� Dated this-f.�-�-- day of �1 19.-x• Rec mm ded Approval: G' Charles L. Plummer Deschutes County Roadmaster D3'' — -- F TEE SEC. 3 T.18S R.12E.W.M. DESCHUTES COUNTY - SCALE; 11 - 400' Sea Map 17 12 34 L r' SEC. 3 T.18S R.12E.W.M. DESCHUTES COUNTY - SCALE; 11 - 400' Sea Map 17 12 34 L PAGE] dead numbers 1102 1000 1103 1001 18 12 3 1105 1002 1113 1003 1120 1100 1123 1101 1125 1104 1126 1106 1124 1108 1128 1109 1129 1110 1130 1119 31 1121 IIII 1122 1115 1132 g N 900 Map 18 12 10 18 12 3