O R D E R
Installing a Pipeline )
Transverse
A permit is granted by Deschutes County to R. C. Cooper
to instaZZ a pipeline transverse on or across Deschutes County
right-of-way. A detailed description and map of this operation must be provided
on the reverse side of this sheet. This permit is subject to the following gen-
eral specifications and is revocable at any time upon written notice by the
Deschutes County Court.
GENERAL SPECIFICATIONS FOR PARTICULAR INSTALLATIONS
para he roadshall be in the existing ditch line, or no less than three
(3) feet from the he existing pavement edge. All pipe lines must be
Installed to a depth to be no two (2) feet and properly backfilled to
the original grade line and with no obstru the drainage area. Permittee
shall be responsible for any or all damages to the ex s nt, and
I nsta I I i ng Pi ee Line Transverse: 4" steel pipeline. All pipe line Instai-
atrons laid transversely o he road bed or right-of-way shall be installed in
the following manner: All pavement cuts prior to excavation shall be made with
a breaking hammer so as to insure neat finish cut lines. All pipe lines shall
be installed to a depth of no less than two (2) feet below the existing road-
side ditch elevation. In all cases where a water line is installed in a trans-
verse direction the water pipe must be instaTfec-within a larger pipe which size
shall be no less than six (6) inches in diameter. Backfilling and Paving: The
permittee shall be required to properly backfill the trench IF such a manner as
to guarantee a well compacted, stabilized sub -base prior to paving. The pave-
ment must be replaced to its original line, crown, and grade with an asphalt
mixture to conform with the surrounding road bed. The area of installation
must be kept smooth for the traveling public at all times. The permittee will
be required at all times to take every precaution to protect the traveling
public. All signs and traffic controls shall be furnished by the permittee.
In regard to other utility installations, such as gas lines, telephone lines and
electric conduits, all the general specifications shall apply if they are to be
run under ground, with one exception: It would not be necessary to have these
lines within a larger plpe when crossing the right-of-way.
Dated th i s.�S�day ofJ&g4C�,& 1969.
�" Recommended Approval, ---1
Approved County Court: Charles L. Plummer,
DESCHUTES COUNTY ROADMASTER
• �i' 1'7E
/
M SS I ON
7 COUNTY COMMISSIONER —r
Nf'/J'/f^W.
. _>'-OSHONE >1tz1 CIRCLE '�SHCSHO NOR7H
4?JJ /�✓ - 7J1 d
29 oa 2$ `(ZI
N110
\ w'�� i N 6 g I
cF �s I
o° � w o
may" N -
N r p0 l
00 02
`f.
ieje2 /
022
tiT_ s _ Oft' ��.Q �� Qs � "•^,\. /
M,9/. sl. siN pb
Z V
Z e•x Sl:fz• N
J
i
0--ys tip°
IF 4�
i l I
o \ 4 ? 4v �
u
w ti
v� Biye �0/ v
44 �
UTE
LAN E
OI
13� o
U.
co
T
c
iso
LA,
B/6Z
S
�A
3
FI°II
N IO'/O'R7
10,
o
rn
n
b �i1
CID
U
to
"'
1�U NJ JOIB^W ,Po
N. /0%O'CXl•W
C
e
IW
V
°
o
I
I
I
Iti
� i
I
4
ti
o
U
I
�
w
W
O
_
i 1
I