Loading...
13-841-Order Recorded 5/18/1970In the Matter of Moving a building IN THE BOARD OF COUNTY COMMISSIONERS OF THE STATE OF OREGON FOR THE COUNTY OF DESCHUTES O R D E R ✓Or' 13 PAGE 84-t A permit is granted by Deschutes County to Carl -Spencer to move a building on or across Deschutes County right-of-way. A detailed description and map of this operation must be provided on the reverse side of this sheet. This permit is subject to the following general specifications and is revocable at any time upon written notice by the Deschutes County Board of Commissioners. GENERAL SPECIFICATIONS FOR PARTICULAR, INSTALLATIONS Moving of Buildings: Note: Route to be taken The permittee shall be required to observe the following rules and regulations per- taining to the moving of buildings. The permittee shall be required to move the buildings on pneumatic dollies.evehl-y spaced so as to insure an even weight dis- tribution, and properly shored so as to prevent collapse while in the process of moving. The permittee shall be responsible for all traffic warnings to the traveling public, as may be necessary to insure safe travel while in the process of moving the building. The permittee shall be required to have at least two (2) pilot cars equipped with signs depicting "Wide Load", and all the necessary signs and flagmen at all inte,rsections so as to insure an even flow of the traffic and prevent congestion. The permittee will be held directly responsible for any and all damage to the existing pavement and shoulder areas, and will be required to repair said damage or pay damages to Deschutes County for the necessary repairs. If during the course of moving, it is necessary to move bridge railings, the permittee 'shall be required to replace the railings to their original state. The sawing off of posts and railings will not be permitted. Private Access to County Road: The permittee will be required to construct the access at the safest and most practical point of entry. The size of the access must be noted on the description. If there is obvious need for a culvert, the proper size and length must be deter- mined, and also included on the description. The permittee will be responsible for the construction of the access and all the costs of the materials used in the access. If at any time this installation in any way impedes the progress and future maintenance or construction, the permittee will be required to move this installation at his own expense. Deschutes County will assume no responsibility for damage to said installation as a result of maintenance or construction. Failure of permittee to comply with performance of work will result in a charge for work performed by Deschutes un Dated this Z/day of 19zz�, Recommended Approval- �/ Approved Board of County Commissioners: Charles L. Plummer Deschutes County Roa master BY: PERMITTEE ROUTE TO BE TAKEN: Date: May 19, 1970 Size: 16' square Spring River Road to Harper Road, to Vandervert, to Big Tree.