Loading...
13-368-Order Recorded 10/15/1969VOL 13 PAGE 368 IN THE COUNTY COURT OF THE STATE OF OREGON FOR THE COUNTY OF DESCHUTES Tu the Matter ) .inetatMg a pipeline ) O R D E R parallel Robert E. Thonapeon install a pipeline paraZlel A permit is granted by Deschutes County to to on or across Deschutes County right-of-way. A detailed description and map of this operation must be provided on the reverse side of this sheat. This permit is subject to the following gen- eral specifications and is revocable at any time upon written notice by the Deschutes County Court. GENERAL SPECIFICATIONS FOR PARTICULAR INSTALLATIONS Installin Pie Line Parallel: All pipe lines running Far—all t t e road shall b'3 in the existing ditch line, or no less than three (3) feet from the edge of the existing pavement edge. All pipe lines must be installed to a depth to be no less than two (2) feet and properly backfilledditoee the original grade line and with no obstructions to the drainage area. shall be responsible for any or all damages to the existing pavement, and shoulders or other objects or areas within the right-of-way. lata aid transversely to the road bed or right-of-way shall be installed in the follow annex: A11 pavement cuts prior to excavation shall be made with. a breaking h�:,mme as to insure neat finish cut lines. A11 pipe lines shah. be installed to a dep no less than two 42) feet below the exi -0,1 t1g r��arl- side ditch elevation. In a ' uses where a water line is inst��led in a tr�+n9 verse direction the water pipe mu e installed withina larger pipe which size shall be no less than six (6) inches i ameter. Backfilling and Paving: The permittee shall be required to properly bac the trench In such a manneras to guarantee a well compacted, stabilized sub -bas 'or to paving. The pave- ment must be replaced to its original line, crown, and e with an asphalt The area stallation mixture to conform with the surrounding road bed. The pe tee will must be kept smooth for the traveling public at all times. be required at all times to take every precaution to protect the traveli In regard to other utility installations, such as gas lines, l teleif phoneare lines bed electric conduits, l all -the general specifications sh PP y to have these. run under ground, with one exception: It would not be necessary lines within a larger pipe when crossing the right-of-way. Dated this�day of e _ Oil 196 Recommended Approval Appr ved Co rt: Charles L. Plummer, DESCHUTES COUNTY ROADMASTER COUT COTY OMr1ISSI ER I ...rm T T/1TTTQ 411MUTTEE