Loading...
13-369-Order Recorded 10/15/1969VOL 1.3 FACE • X69 1N THE COUNTY COURT OF THE STATE OF OREGON FOR THE COUNTY OF DESCHUTES Tu the Matter ) .1notal;ing a pipe Zine ) O R D E R para ZI*Z ) Robert K. Thopson inotaZZ a pipeline puralteZ A permit is granted by Deschutes County to to on or across Deschutes County right-of-way. A detailed description and map of this operation must be provided on the reverse side.of this sheet. This permit is subject to the following gen- eral specifications and is revocable at any time upon written notice by the Deschutes County Court. GENERAL SPECIFICATIONS FOR PARTICULAR INSTALLATIONS Installing Me Line Parallel: All pipe lines running parallel with the road shall be in the existing ditch line, or no less than three (3) feet from the edge of the existing pavement edge. All pipe lines must be installed to a depth to be no less than two (2) feet and properly backfilled to the original grade line and with no obstructions to the drainage area. Permittee shall be responsible for any or all damages to the existing pavement, and shoulders or other objects or areas within the right-of-way. All Ops 14,U8 d -nota-_ lat laid transversely to the road bed or right-of-way shall be installed in the follo manner: All pavement cuts prior to excavation shall be made with a breaking ho as to insure neat finish cut lines. All pipe lines shall be installed to a de of no less than two 42) feet below the exiyb3ng roarl- side ditch elevation. In cases where a water line is installed in a trans- verse direction the water pipe be installed within a larger pipe which size shall be no less than six (6) inches ameter. Backfilling and Paving: The permittee shall be required to properly ba l the trench in such a manner as to guarantee a well compacted, stabilized sub -ba rior to paving. The pave- ment must be replaced to its original line, crown, an ade with an asphalt mixture to conform with the surrounding road bed. The area installation must be kept smooth for the traveling public at all times. Thettee will be required at all times to take every precaution to protect the trave In regard to other utility installations, such as gas lines, telephone lines and electric conduits, all the general specifications shall apply if they are to be run under ground, with one exception: It would not be necessary to have these lines within a larger pipe when crossing the right-of-way. Dated this qday of _19617. Recommended Approval Charles L. Plummer, DESCHUTES COUNTY ROADMASTER i rM4ITTEL