Loading...
13-379-Order Recorded 3/24/1969VOL 13 PACE 373 IN THE COUNTY COURT OF THE STATE OF OREGON FOR THE COUNTY OF DESCHUTES In the Hatter ) of ) ORDER Installation of access ) A permit is granted by Deschutes County to Mrs. Otis Collin to install an access on or across Deschutes County right-of-way, A detailed description and map of this operation must be provided on the reverse side of this sheet. This permit is subject to the following general specifications and is revocable at any time upon written notice by the Deschutes County Court. GENERAL SPECIFICATIONS FOR PARTICULAR INSTALLATIONS hall be required to observe the following rules and regulations per - moving of buildings, The permittee shall be required to move the buildings on uratic dollies evenly tribution, and pro shored so as t moving. The permittee 1 be respon traveling public, as may be- sary moving the building, The permitte pilot cars equipped with signs depicti spaced so as to insure an even weight dis- o prevent collapse while in the process of sible for all traffic warnings to the to insure safe travel while in the process of all be required to have at least two (2) n de Load", and all the necessary signs and flagmen at all intersections so as to ins an even flow of the traffic and prevent congestion, The permittee will be held responsible for any and all damage to the existing pavement and shoulder areas, will be required to repair said damage or pay damages to Deschutes County for the essary repairs, If during the course of moving, it is necessary to move bridge rai the permittee shall be required to replace the railings to their ox-aginal s The Private Access to County Roads (Details on reverse side) The permittee will be required to construct the access at the safest and most practical point of entry. The size of the access must be noted on the description. If there is obvious need for a culvert, the proper size and length must be deter- mined, and also included on the description, The permittee will be responsible for the construction of the access and all the costs of the materials used in the access. If at any time this installation in any way impedes the progress and future maintenance or construction, the permittee will be required to move this installation at his own expense, Deschutes County will assume no responsibility for damage to said installation as a result of maintenance or construction. Failure of permittee to comply with performance of work will result in a charge for work performed by schutes Co ty. Dated this da of J/%%-7�/ y 1 9 -0 Recommended Approvals Charles L. Plummer Deschutes County Roachnaster BY: , PERMITTEE � �� Approved County Courts