Loading...
12-442-Order Recorded 2/2/1969IN THE COUNTY COURT OF THE STATE OF OREGON VOL 12m,442 FOR THE COUNTY OF DESCHUTES Tu the Matter ) of ) ORDER Installation of pipeline ) A permit is granted by Deschutes County to City of Redmond to Install a pipeline on or across Deschutes County right-of-way. A detailed description and map of this operation must be provided on the reverse side of this sheet. This permit is subject to the following gen- eral specifications and is revocable at any time upon written notice by the Deschutes County Court. GENERAL SPECIFICATIONS FOR PARTICULAR INSTALLATIONS Installing Pipe Line Parallel: (Dotal Is on reverse side) All pipe lines running para el with the road s all be in the existing ditch line, or no less than three (3) feet from the edge of the existing pavement edge. All pipe lines must be installed to a depth to be no less than two (2) feet and properly backfilled to the original grade line and with no obstructions to the drainage area. Permittee shall be responsible for any or all damages to the existing pavement, and shoulders or other objects or areas within the right-of-way. Installing Pipe Line Transverse: (Details on reverse sIdQ1 Pipe line instal- lations laid transversely to the road bed or right-of-way shall be installed in the following manner: All pavement cuts prior to excavation shall be made with a breaking hammer so as to insure neat finish cut lines. All pipe lines shall be installed to a depth of no less than two 42) feet below the existing roa�- side ditch elevation. In all cases where a water line. i6 installed in a trans- verse direction the water pipe must be installed within a larger pipe which size shall be no less than six (6) inches in diameter. Backfilling and Paving: The permittee shall be required to properly backfill the trench n such a manner as to guarantee a well compacted, stabilized sub -base prior to paving. The pave- ment must be replaced to its original line, crown, and grade with an asphalt mixture to conform with the surrounding road bed. The area of installation must be kept smooth for the traveling public at all times. The permittee will be required at all times to take every precaution to protect the traveling public. All signs and traffic controls shall be furnished by the permittee. In regard to other utility installations, such as gas lines, telephone lines and electric conduits, all the general specifications shall apply if they are to be run under ground, with one exception: It would not be necessary to have these lines within a larger pipe when ossing the right of way. Dated this --,2-day of 196 . /Recozended Approval uv i41 UL Z C UNTY CO SSIONER. ),4.4 r ccMTY COMMIssIONER t: Charles L, Plummer, DESCHUTES COUNTY ROADMASTER Details as per attached letter and sketch. ALL INSTALLATIONS MUST BE MADE PRIOR TO PLACEMENT OF PAVEMENT. I